Chapter No. Titel Page No
Chapter No. Titel Page No
1. INTRODUCTION 1-4
1.1 KaTPP OVERVIEW.1
1.2 ENERGY GENERATED IN KaTPP....4
2. GENERAL LAYOUT AND BASIC IDEA 5
3. CONTROL ROOM 6-8
3.1 MAIN CONTROL ROOM6
3.2 CONTROL PANNEL-I.7
3.2.1 Fan Control Desk.......................................7
3.3 CONTROL PANNEL-II................7
3.3.1 Fuel Control Desk.....7
3.4 CONTROL PANNEL- III.................................7
3.4.1 Steam and Water Desk.....................7
3.5 CONTROL PANNEL-IV..................8
3.5.1 Turbine Control Desk.......8
3.6 CONTROL PANNEL-V...8
3.6.1 Generator Control Desk...................8
4. CONTROL AND INSTRUMENTAL SYSTEM 9-11
4.1 INTRODUCTION....9
4.2 OBJECTIVE OF C&I SYSTEM.......9
4.3 DDCMIS SYSTEM..10
4.3.1 System Description...10
5. POLLUTION CONTROL SYSTEM 12
5.1 ELECTROSTATIC PRECIPITATOR12
5.2 FUEL GAS STACKS..12
5.3 NEUTRILIZATION PITS...12
5.4 COOLING TOWERS..12
iii
5.5 ASH and WATER RECYCLING PLANT.12
6. GENERATOR 13-14
7. CONCLUSION 15
REFERENCE
iv