Bill of Quantities 16FI0009
Bill of Quantities 16FI0009
BILL OF QUANTITIES
ITEM AMOUNT IN
DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT
NO. WORDS
I. Earthworks
803 Structure Excavation :(Ftg., Stair Footing, FTB, Wall 64.88 cu.m.
Footing & Septic Tank)
804(a) Backfilling of Excavated Materials 41.50 cu.m
804(b) Filling Materials (Selected) 12.69 cu.m
804(c) Gravel Bedding at Ftg., Stair Ftg., FTB, Wtg., Slab on 7.91 cu.m.
Fill & Septic Tank
1000(a) Soil Poisoning 42.30 sq.m
II. Concrete Works
900(a) R.C. Column Footing 5.86 cu.m.
404(a) Reinforcing Steel for Col. Ftg. 529.36 kgs.
900(b) R.C. Wall Footing 0.97 cu.m.
404(b) Reinforcing Steel for Wall Footing 61.50 kgs.
900(c) R.C. Column 7.62 cu.m
404(c) Reinforcing Steel for Column 3,621.07 kgs.
900(d) R.C. Beams 10.63 cu.m
404(d) Reinforcing Steel for Beams 3,269.84 kgs.
900(e) R.C. Suspended Slab & Main. Stair 10.85 cu.m
404(e) Reinforcing Steel for Suspended Slab & Main Stair 3,229.29 kgs.
900(f) R.C. Slab on Fill & Septic Tank 5.11 cu.m
404(f) Reinforcing Steel for Slab on Fill & Septic Tank 266.11 kgs.
III. Masonry Works
506(1)a Masonry Units (CHB) 184.79 sq.m
IV. Fabricated Materials & Hardware
1010(b) Doors (Solid Panel & PVC Flush Door) 9.61 sq.m
1008(1)a Aluminum Glass Sliding Type Window 11.28 sq.m
1008(1)c Aluminum Glass Awning Type Window 1.44 sq.m
1008(1)d Aluminum Glass Fixed Type Window 3.42 sq.m
1010(a) Door Frames and Accessories 3.00 sets
V. Finishing Works
1027 Cement Plaster Finish 365.70 sq.m
VI. Railing Works
1208(2) Railing Works (2nd Floor & Main Stair Railings) 18.90 li.m
VII. Electrical Works
1100 Conduits, Boxes & Fittings 199.00 li.m
1101 Wires & Wiring Devices 770.00 li.m
1102(a) Lighting Fixtures 16.00 sets
1102 Panel Board and Cabinet 1.00 set
VIII. Carpentry Works
1003 Carpentry for Ceiling 72.98 sq.m
IX. Painting Works
1032(a-1) Masonry Painting (2 Coatings: Interior & Exterior) 324.14 sq.m
1032(a-2) Wood Surface Painting (2 Coatings) 86.32 sq.m
X. Plumbing and Tile Works
1001(a) Drainage & Sanitary Pipe (Orange PVC) 87.00 li.m
1002 Water Supply Pipes (PVC Blue) 51.00 li.m
1001(b) Fixtures and Accessories 6.00 sets
1018 Tile Works 34.64 sq.m
XI. Mobolization/Demobilization
B.9 Mobilization/Demobilization 1.00 L.S
XII. Safety and Health
B.7 Signages and Barricades 4.00 months
XIII. Billboard
B.5 Project Billboard 1.00 pc.
TOTAL AMOUNT: