M5 = 1:4:8
M10 = 1:3:6
M15= 1:2:4
M20= 1:1.5:3
M25= 1:1:2
6mm = 0.222Kg
8mm = 0.395 Kg
10mm = 0.616 Kg
12mm = 0.888 Kg
16mm = 1.578 Kg
20mm = 2.466 Kg
25mm = 3.853 Kg
32mm = 6.313 Kg
40mm = 9.865 Kg
1bag cement-50kg
1feet-0.3048m
1m-3.28ft
1sq.m-10.76sq.feet
1cu.m-35.28cu.feet
1acre-43560sq.feet
1cent-435.6sq.feet
1hectare-2.47acre
1acre-100cent-4 046.724sq.m
1ground-2400sq. ft
1unit-100cu.ft- 2.83cu.m 1square-100sq.feet
DESIGN MIX
M30 ( 1 : 2 : 2.87)
Cement : 380 Kg/ M 3
20 mm Jelly : 654 Kg/ M 3
12.5 mm Jelly : 436 Kg/ M 3
River sand : 760 Kg/ M 3
Total water : 187 Kg/ M 3
Admixture : 0.7%
Fresh concrete density: 2420 Kg/ M 3
Note: Sand = 760 Kg with 2% moisture (170.80+15.20)
M35 ( 1 : 1.79 : 2.57)
Cement : 410 Kg/ M 3
20 mm Jelly : 632 Kg/ M 3
12.5 mm Jelly : 421 Kg/ M 3
River sand : 735 Kg/ M 3
Total water : 200 Kg/ M 3
Admixture : 0.7%
Fresh concrete density: 2400 Kg/ M 3
Note: sand = 735 + 2%, Water = 200- 14.7 = 185.30,
Admixture = 0.7%
BRICKS
1 cubic meter contains 500 bricks
The Standard size of 1st class brick is 190mm x 90mm x 90mm & motor joint should be 10mm thick
So brick with motor=200 x 100 x 100.
Volume of 1st class brick = 0.19 x 0.09 X 0.09 = 0.001539 cu.m
Volume of 1st class brick with motor =0.2 x 0.1 x 0.1 = 0.002 cu.m
No. of bricks per 1cu.m= 1/volume of1st class brick with motor = 1 / 0.002 = 500 nos of bricks
1 Newton = 0.101971 kg
1 mm2 = 0.01 cm2
1 cm2 = 100 mm2
1 mm2 = 20 N
100 mm2 = 2000N
1 cm2 = 2000N
2000 N = 203.942 kg
So 20 N/ mm2 = 203.942 kg / cm2
RATIO IS 1:1.5:3 then volume is 1+1.5+3=5.5 and the total volume for using mix=1.57 m3 then
cement required=1/ 5.5*1.57=0.285m3*1440=411 kg. (8+bag)
sandrequried=1.5/5.5*1.57=0.471m3
aggregaterequired=3/5.5*1.57=0.853m3
the standard volume of dry mix mortar=1.57.. U can check it in IS code also.
MATERIAL CALCULATION
CEMENT IN BAGS
METAL CALCULATION:
UNIT WEIGHT:
01. Concrete 25 kN/m3
02. Brick 19 kN/m3
03. Steel 7850 Kg/m3
04. Water 1000 Lt/m3
05. Cement 1440 Kg/m3
06. 1Gallon 4.81 Litres
07. Link 8" = 200mm
08. 1 Hectare 2.471 acr(10000m2)
09. 1 Acr 4046.82m2 = 100 cent
DEVELOPMENT LENGTH:
01. Compression 38d
02. Tension 47 & 60d
03. 1 Cent 435.60 Sft
04. 1 Meter 3.2808 ft
05. 1 M2 10.76 ft2
06. 1 Feet 0.3048m
07. 1 KN 100Kg
08. 1kN 1000N
09. 1 Ton 1000Kg = 10,000 N = 10 kN
10. 1 kG 9.81N