1) The document discusses the design of a wastewater treatment plant, including the design of a collection well, pumps, and conveyance pipelines. It determines sizes and dimensions based on estimated wastewater flow rates. 2) A collection well with dimensions of 2m x 2m x 4m is designed to accommodate the peak flow rate. Two submersible pumps with 300mm diameters are selected to handle the average flow rate. 3) Conveyance pipelines are designed with a 600mm diameter to carry the full flow at a velocity of 0.78m/s, with a depth of 0.6m and slope of 0.0013.

Uploaded by

Bella Nita
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
231 views20 pages

Bab IV Sampai Grit Chamber

1) The document discusses the design of a wastewater treatment plant, including the design of a collection well, pumps, and conveyance pipelines. It determines sizes and dimensions based on estimated wastewater flow rates. 2) A collection well with dimensions of 2m x 2m x 4m is designed to accommodate the peak flow rate. Two submersible pumps with 300mm diameters are selected to handle the average flow rate. 3) Conveyance pipelines are designed with a 600mm diameter to carry the full flow at a velocity of 0.78m/s, with a depth of 0.6m and slope of 0.0013.

Uploaded by

Bella Nita
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 20

Perencanaan Bangunan Pengolahan Air Limbah (PBPAL)

BAB IV
PENGOLAHAN FISIK

1.1 Bak Pengumpul


Direncanakan:
Td = 1 menit = 60 detik (Karia & Christian, 2006)
Bentuk Bak Pengumpul = Persegi.
Tebal dinding saluran = 20 cm
Q domestik = 132,5 L/dtk
Q Industri = 13,25 L/dtk
Q campuran = 145,75 L/dtk
Qrata-rata = 0,145 m3/dtk
Fmd = 1,2
Qmd = Fmd x Q camp
=0,1749 m3/dtk
Fph = 1,3
Qpeak = Qmd x Fph
= 0,1749 m3/dtk x 1,3
=0,227 m3/dtk
V asumsi = 1 m/dtk
Kedalaman galian = 5,2 m
D pipa (SPAB) = 900 mm
d muka air maks = 0,55 m
P:L =1:1
Tinggiefektif sumur = 3,5 m
Freeboard = 0,5 m
Perhitungan
- H total = H efektif sumur + Free board
= 3,5 m + 0,5 m
=4m

- H Statis = Kedalaman galian pipa + H total

BELLA NITA-082.12.012 1
Perencanaan Bangunan Pengolahan Air Limbah (PBPAL)

= 5,2 m + 4 m = 9,2 m
- Volume = Qpeak x Td
= 0,227 m3/detik x 60 detik
= 13,62 m3
Volume sumur
- A sumur = H total

13,62 m3
= 4m

= 3,4 m2

- A =PxL
=LxL
= L2

L = 1,85m =2 m
P =1,85m = 2 m

- Dimensi = P x L x H
=2mx2 mx4m
= 16 m3
Qratarata x td
d mukaair ratarata=
- PxL

m3
0,145 x 60 dtk
= dtk
2mx 2m
= 2,175 m

4.2 Pompa

Pemilihan Alternatif Pompa :


1. Pompa Celup Showfou, large volume KL-1032 dengan debit 6500 L/menit.
2. Pompa Celup Showfou, large volume KL-1532 dengan debit 8000 L/menit
3. Pompa Celup Showfou, large volume KL-2032 dengan debit 9000 L/menit
Pompa yang dapat dipakai adalah pompa yang dapat memenuhi debit air buangan kota, dan
disediakan satu pompa cadangan untuk mengantisipasi apabila terdapat gangguan pada pompa.
Adapun pompa yang memenuhi kriteria desain tertera pada Tabel 4.1.

BELLA NITA-082.12.012 2
Perencanaan Bangunan Pengolahan Air Limbah (PBPAL)

Debit Pompa 1 Pompa 2 Pompa 3

Qrata-rata X V (2 unit pompa) X

Qpeak X V(2 unit pompa) X

Qmax X V(2 unit pompa) X

Direncanakan
Jumlah pompa = 2 Unit Pompa, 1 unit dalam keadaan standby
V pompa = 1 m/dtk
Qdomestik = 132,5 L / detik = 11448 m3/hari
Q industri = 13,25 /detik = 1145 m3/hari
Qrata-rata = 0,145 m3/detik = 8700 L/menit
Qmax = 0,1749 m3/detik=10494 L/menit
Qph = 0,227 m3/detik=13620 L/menit
d muka air rata-rata = 2,54 m
Qratarata
- Qpompa = jumlah pompa yang beroperasi

0,145m3 /dtk
= 2 = 0,0725 m3/dtk

Qpompa
- A = V
0,0725m /dtk
= 1 m/dtk = 0,0725 m2

- D = (A x 4 )

= (0.0725 x 4 )

=0,3 m=300 mm

- Pipa suction
H Pipa suction = (Htotal sumur d muka airrata-rata) + Kedalaman galian pipa
= (4 m 2,54m ) + 5,2 = 6,66 m
Q = 0,2785 x C x D2,63 x S0,54
BELLA NITA-082.12.012 3
Perencanaan Bangunan Pengolahan Air Limbah (PBPAL)

0,145 m3/dtk = 0,2785 x 120 x (0,3 m)2,63 x S0,54


S =0,0148
S = Hf/L
Hf /L = 0,0148
Hf = 0,0148 x 6,66 m
Hf = 0,098 m

- Pipa discharge
Pipa discharge = 10 m
Q = 0,2785 x C x D2,63 x S0,54
0,145 m3/dtk = 0,2785 x 120 x (0,3 m)2,63 x S0,54
S = 0,0148
S = Hf/L
Hf /L = 0,0148
Hf = 0,0148x 10 m
Hf = 0,148 m

Minor Loses
- Belokan
Terdapat 1 belokan, dimana K belokan = 0,5
V asumsi = 1 m/dtk.
v2
Hm = K x 2g
2
1
= 0,5 x 2 x 9,81
= 0,025 m
Jadi Hf belokan = 1 x 0,025 m = 0,025 m

- Valve
K valve = 0,8
V asumsi = 1 m/dtk
2
V
Hm = K x 2g
2
1
= 0,8 x 2 x 9,81
= 0,04 m

BELLA NITA-082.12.012 4
Perencanaan Bangunan Pengolahan Air Limbah (PBPAL)

- Direncanakan H statis = 9,2 m


HL Total = Hf suction + Hf discharge + Hf belokan + Hf valve + H statis
= (0,098 + 0,148 + 0,025 + 0,04 + 9,2)m
= 9,5 m

- Daya pompa (P)


Direncanakan efisiensi pompa () = 80%
xgxQx H
P =
1000 x 9,81 x 0,145 x 9,511
= 0,8 =16.911 Kg m2/dtk3 =16.911 Kwatt

a. Saluran Pembawa
Kriteria Desain Saluran Pembawa
Komponen Kriteria Desain Satuan

Kecepatan (v) 0,6 3,0 m/dtk

d/D 0,7 0,8 -

Sumber: Qasim, 1985

Diketahui :
v asumsi = 0,8 m/dtk
Q domestik = 132,5 L/dtk = 11448 m3/hari
Q Industri = 13,25 L/dtk = 1144,8 m3/hari
Q total = 145,75 L/dtk =12592,8 m3/hari
Fmd = 1,2
Fph = 1,3

Perhitungan Debit
Fmd = 1,2
- Qmd = Fmd x Q camp
=0,1749 m3/dtk

BELLA NITA-082.12.012 5
Perencanaan Bangunan Pengolahan Air Limbah (PBPAL)

Fph = 1,3
- Qpeak = Qmd x Fph
= 0,1749 m3/dtk x 1,3
=0,227 m3/dtk
- Fluktuasi Minimum
Fluktuasi Minimum diambil dari persentase terkecil dari fluktuasi air buangan yaitu 1,39 %

F min = % fluktuasi minimum / (100%/24jam)


= 1,39 % / (100%/24)
= 0,334
Q min = f min x Q total
= 0,334 x 0,145 m3/detik
= 0,048 m3/detik.

Perhitungan Saluran Pembawa


- Q full
d/D = 0,8
Qph/Qfull = 0,98 (Grafik Design of Main Sewers)
vpeak/vfull = 1,10 (1,07-1,14)
Q full = Qph x (Qpeak/Qfull)
= 0,227 m3/detik x 0,98
= 0,222 m3/detik

- Dimensi saluran
Qfull 0,222 m3 /dtk
Afull= = =0,278 m2
vfull 0,8 m/dtk
Afull = d2
0,278 = (3,14) d2
d = 0,59 m = 600 mm

Cek Afull = d2
= x 3,14 x (0,6)2
= 0,28 m2

BELLA NITA-082.12.012 6
Perencanaan Bangunan Pengolahan Air Limbah (PBPAL)

Qfull 0,222m 3 /dtk m


Cek v= = 2
=0,78 0,78 m/dtk OK
Afull 0,28 m dtk

- Kedalaman aliran di saluran pembawa


d/D = 0,8
d = 0,6 m
D = 0,8 x 0,6 = 0,48 m
- Keliling basah
d 0,6
R= = =0,15 m
4 4

- Kemiringan dasar saluran


v = 1/n x R 2/3 x S 1/2
0,78 m/dtk = 1/0,013 x 0,152/3 x S1/2
S = 1,29x 10-3

b. Bar Screen

Gambar 4.1 Skema Bar Screen

BELLA NITA-082.12.012 7
Perencanaan Bangunan Pengolahan Air Limbah (PBPAL)

Kriteria Manual Mekanis

Kecepatan (m/det) 0,3-0,6 0,6-1

Bar 4-8
25-50 8-10
- Lebar (mm) 50-75
- kedalaman (mm)

Jarak antar bar (mm) 25-75 10-50

Slope 45-60 75-85

Head loss minimal 150 150


saat clogging (mm)

Head loss maksimal 800 800


saat clogging (mm)

Desain Terpilih :
Bar screen tipe mekanik dengan:
Model Channel Frame Dimensions (mm) Capacity (m3/hr)
(mm)

Wid Dept Water Screen Screen Falling Screen Opening (mm)


ht h Level Width Heigh Distanc
t e

A B C D E F 3 6 10 15 20

BS-70-6 700 600 550 600 1700 450 257 321 401 443 486

BS-70-7 700 650 1800 303 379 474 524 574

BS-70-8 800 750 1900 350 437 547 605 663

BS-70-9 900 850 2000 397 496 620 685 751

BS-70-10 1000 950 2100 443 554 693 766 839

BELLA NITA-082.12.012 8
Perencanaan Bangunan Pengolahan Air Limbah (PBPAL)

BS-70-11 1100 1050 2200 490 612 765 846 928

Sumber: www.chishun.com.tw

Q domestik = 132,5 L/dtk = 11448 m3/hari


Q Industri = 13,25 L/dtk = 1144,8 m3/hari
Q total = 145,75 L/dtk =12592,8 m3/hari
- Qmd = 0,1749 m3/dtk
- Qpeak = 0,227 m3/dtk
- Bar screen yang dipilih adalah tipe BS-70-10 dengan debit 839 m3/jam atau 0,233 m/dt
- Jarak Bar Screen yang digunakan = 1 buah
- Jarak antar bar = 50 mm = 0,05 m
- V pada saluran = 0,8 m/dt
Lebar chamber = 600 mm = 0,6 m
Lebar bak = 700 mm = 0,7 m

Perhitungan Kedalaman Aliran dan Kecepatan di Chamber Pada Saat Aliran Puncak

Diketahui:
Kedalaman aliran pada aliran puncak (d1) = 0,48 m
Asumsi tinggi saluran masuk (z1) = 8 cm =0,08 m
Kecepatan aliran pada debit puncak (V1) = 0,78 m/detik
Dasar saluran saringan (Z2) = 0 meter
Q puncak = 0,227m3/detik.
Ke = 0,3
Dasar chamber = Horizontal
Dasar datum = Dasar chamber
Asumsi dasar saluran pembawa = 10 cm di atas datum

Rumus:
v 12 v 22
z 1+ + d1 =z2 + +d 2 + HL
2g 2g

HL=Ke [ v 12 v 22

2 g 2g ]
Qph
v 2=
Lc x d 2

BELLA NITA-082.12.012 9
Perencanaan Bangunan Pengolahan Air Limbah (PBPAL)

Perhitungan:

[ ]
2 2

v 12
z 1+ + d1 =z2 +
[ Qp
Lc x d 2 ] + d2 + Ke
v 12

[ Qp
Lc x d 2 ]
2g 2g 2g 2g

0,78


2

0,08+

[ ]
0,143 0,0429

0,591=
( d 22 ) +d 2 + 0,0093
( d 22 )
19,62 19,62

0,0073 0,0021
0,591= 2
+ d 2
d d

0,0051
0,591=d + X
d22
d

0,591 d d - 0,0051 = 0
d- 0,591 d + 0,0051 = 0
Trial dan error maka ;d2 = 0,6(Karena mendekati 0)
ke persamaan diatas, maka didapat hasil 0,05.
Cek
(0,6)- 0,591(0,6) + 0,0051 = -0,0083 OK
Persamaan mendekati 0, maka d2 = 0,6m
- Cek V2

Qp 0,227 m 3/dtk m
v 2= = =0,63 OK
Lc x d 2 0,6 x 0,6 dtk

- Kecepatan saat melalui bar screen= 0,63 m/dtk OK


- Kehilangan Tekanan (HL)yang melewati bar screen

BELLA NITA-082.12.012 10
Perencanaan Bangunan Pengolahan Air Limbah (PBPAL)

V V 1 0,800,63 1
hL= x = x = 0,11 m
2g 0,7 2 x 9,81 0,7

-Kedalaman dan Kecepatan aliran di rak chamber

v 22 v2
+d 2= 3 +d 3 + HL
2g 2g

0,227 2
0,63
+0,6=
(
0,6 x d3 )
+d 3 + 0,11
2 x 9,81 2 x 9,81
0,143/d
0, 62= + d + 0,11 X
19,62
19,62
0,143
12,16= +19,62 d + 2,1582 X
d 2 d2

11,9682 d =0,143+ 19,62d +2 , 1582d

19,62 d33 10,0062d + 0,143= 0


Trial dan error maka ;d2 = 0,45 (Karena mendekati 0) ke persamaan diatas, maka didapat
hasil -0,055.

Cek
19,62 ( 0, 453 )10,0062(0, 452)+ 0,143 = -0,055

Persamaan mendekati 0, maka d3 = 0,45m


- Cek V3

Qp 0,227
v 3= = =0, 84 m/dtk OK
Lc x d 3 0,6 x 0, 45

Perhitungan Head Loss Saringan Saat 50% Clogging

Saat 50% clogging, luas bersih berkurang 50%

d2 + V2 = d3 + V3 + h50

dimana :

d2 dan V2= kedalaman dan kecepatan saat terjadi clogging

BELLA NITA-082.12.012 11
Perencanaan Bangunan Pengolahan Air Limbah (PBPAL)

h50 = head loss saat clogging

d3 + V3 = diasumsikan sama saat bersih (saat tidak terjadi clogging)

Q ph 0,227 m
v'= = =0,75 /d '
'
Lc x 0,5 x d 2 0,6 x 0,5 x d 2 '
dtk

- Kecepatan setelah melewati Bar Rack


m
0,37
Qph 0,227 dtk
v 2' = = =
Lc x d ' 0,6 x d ' d '

- Kedalaman dan kecepatan pada Bar saat clogging


d2 + v2 = d3 + v3 + h50
0,84


2

0,37 2
'
d2 +
( )d 2'
=0,45+
2(9,81)

0,56 0,137
' 0,0069
d2 + =0,486+
'
d2 ( )( )

d 2'
d2' 13,734

__________________ X d 2' '


'
d - 0,486 d 2 0,0 24 1 = 0
Dengan metode pendekatan dimasukkan d = 0,6 m ke persamaan diatas, maka didapat
hasil 0,017.
Cek
( 0, 63 ) 0 , 486 ( 0, 62 ) 0,0241 = 0,007
Persamaan mendekati 0, maka d = 0,6 m

BELLA NITA-082.12.012 12
Perencanaan Bangunan Pengolahan Air Limbah (PBPAL)

Qph 0,227
v 2' = = =0, 63m/dtk
Lc x d ' 0,6 x 0,6

- Headloss saat 50% clogging


2
( velocity through rock opening )2( v 2' ) 1
h50= x
2g 0,7

0,6 3
0,6


0,37
0,6


2

h50=

Kecepatan melewati bar rack


v = v2/d2= 0,63 / 0,6 = 1 m/dtk OK

1 2

d1 d 1 d2

Z1 Z2

Gambar 4.4 Sketsa saluran penerima dan bar screen.

Keterangan : 1 titik saat sebelum bar screen


2 titik saat setelah bar screen
Z1 = Z2 = datum = 0

BELLA NITA-082.12.012 13
Perencanaan Bangunan Pengolahan Air Limbah (PBPAL)

4.3 Communitor

Kapasitas (MGD) Kapasitas (MGD)


No. Ukuran Motor
Controlled dischange Free Dischange
76 0 0.38 0 0.3
10A 0.17 1.1 0.17 0.82
15A 0.4 2.3 0.4 1.4
25A 1 1.0 11.0 1.0 6.5
36A 2 1.5 25.0 1.6 9.6
54A Ditentukan oleh jenis pekerjanya
(Sumber: Elwyn. E, Seclye, Design 3rd edition, Jhon Wiley)

Diketahui :
Qmax = 0,1749 m3/detik
1 m3 = 22,82 MGD

Perhitungan :
Qmax = 0,1749 m3/detik x 22,82 MGD
= 3,99 MGD

4.4 Grit Chamber Dan Proporsional ware


Grit Chamber adalah unit operasi kedua dalam pengolahan primerair limbah dan
digunakan menangkap partikel supaya tidak ikut terbawa proses, sebab pasir tak dapat
dihancurkan secara proses biologis.
Untuk mempertahankan kecepatan baik pada saat Q minimum maupun Q maksimum
ada velocity control dan flow control yang secara teknik dilakukan oleh alat Parshall Flume
dan Proportional Weirs. Pada pengelolaan kali ini menggunakan Proportional
Weirs.Mekanisme proportional weir, naik turun muka air dikendalikan oleh weir sehingga
kecepatan hampir tepat, ditetapkan pada bagian belakang.Kriteria desain untuk grit chamber

BELLA NITA-082.12.012 14
Perencanaan Bangunan Pengolahan Air Limbah (PBPAL)

adalah sebagai berikut :

Gambar 4.4 Skema Grit Chamber Proportional Weir

Sumber: Reynolds dan Richards, 1996.

Tabel 4.6 Kriteria Desain Grit Chamber

Sumber:Crites dan Tchobanoglous, 1998.

BELLA NITA-082.12.012 15
Perencanaan Bangunan Pengolahan Air Limbah (PBPAL)

Tabel 4.7 Screening Removal Quantities

Sumber: Reynolds dan Richards, 1996.

Disain Terpilih:

Menggunakan 2 (dua) unit grit chamber yang dioperasikan secara bergantian

Waktu detensi (Td) = 60 detik = 1 menit

Kecepatan Horizontal (vh) = 1 ft/s = 0,3 m/ detik

Diameter partikel yang diendapkan = 50 mesh

Kecepatan Pengendapan (vs) = 2,8 m/menit = 0,0467 m/ detik

Q puncak = 0,227m3/ detik

Perhitungan:

- Luas penampang melintang:


Q 0,227 m3 /detik
A cross = Vh = 0,3 m/detik = 0,75 m2

- Luas permukaan:
Q 0,227 m3 /detik
A surface = Vs = 0,0467 m/detik =4,86 m2

- Kedalaman air:
h = vs x Td = 2.8 m/menit x 1 menit = 2,8 m
free board = 0,5 m

- Lebar Grit Chamber:

BELLA NITA-082.12.012 16
Perencanaan Bangunan Pengolahan Air Limbah (PBPAL)

2
A cross 0,75m
b= h = 2,8 m = 0,3 m= 0,5 m

- Panjang Grit Chamber:


m3
Volume Q x Td 0,227 x 60 detik
L= = b xh = detik = 8,7 m 9 m
b xh
0,5 m x 2,8 m

- Cek NRe:

bx h 0,5 m x 2,8 m
R= b+(2 x h) = 0,5 m+(2 x 2,8 m) = 0,2295

Vh x R 0,3 m/detik x 0,2295


NRe = = 0,8774 x 104 = 784,7 (memenuhi, 2000)

Perhitungan Grit Storage

Direncanakan:

Debit air buangan = 0, 227 m3/ detik = 19612,8 m3/ hari

Kadar (kandungan pasir) = 30 m3/106 m3 air buangan

Pengurasan direncanakan tiap 3 hari sekali

Bentuk grit storage = trapezium

- Volume pasir dalam 1 hari:


30 19612,8 m 3
V pasir = 10 6 x hari = 0,5884 m3

- Volume pengurasan:
V kuras = 0,5884 m3 x 3 = 1,765 m3

- Dimensi Grit Storage:

BELLA NITA-082.12.012 17
Perencanaan Bangunan Pengolahan Air Limbah (PBPAL)

Gambar 4.6 Storage Grit Chamber

Keterangan:

a = panjang grit chamber = 9 m

b = lebar grit chamber = 0,5 m

c = 7 m (asumsi)

d = 0,3 m (asumsi)

t = kedalaman grit storage (m)

- Luas permukaan:
A1 = a x b = (9 x 0,5) m2 = 4,5 m2
- Luas dasar:
A2 = c x d = (7 x 0,3) m2 = 2,1 m2
- Volume grit storage:

1
Vg = 3 x t x (A1 + A2 + ( A 1 x A 2)

1
2,6 = 3 x t x (4,5 m2 + 2,1m2 + (4,5 x 2,1)

t = 0,806 0,8 meter

Perhitungan proportional weir


Direncanakan:
- Debit = 0, 227 m3/ detik = 8,0154 ft3/det
a = 0,1 m = 0,33 ft
BELLA NITA-082.12.012 18
Perencanaan Bangunan Pengolahan Air Limbah (PBPAL)

y = 0,2 m = 0,66 ft
h = tinggi muka air di grit chamber = 2,8 m = 8,48 ft

- Debit propotional weir


a
1/2 (h )
Q = 4,97 x a x b x 3

0,33
(8,48 )
8,0154 = 4,97 x 0,331/2 x b x 3

b = 0,335 ft = 0,1 m

- Perbandingan
y 0,66
a = 0,33 =2

y x
Tabel 4.8 Nilai a dan b untuk Proportional Weir

y x y x y x
a b a b a b
0,1 0,805 1 0,500 10 0,195
0,2 0,732 2 0,392 12 0,179
0,3 0,681 3 0,333 14 0,166
0,4 0,641 4 0,295 15 0,156
0,5 0,608 5 0,268 18 0,147
0,6 0,580 6 0,247 20 0,140
0,7 0,556 7 0,230 25 0,126
0,8 0,536 8 0,216 30 0,115
0,9 0,517 9 0,205

x
Dari tabel, diperoleh nilai b = 0,392

x = 0,392 x b
x = 0,392 x 0,335 = 0,13 ft = 0,04 m
Dimensi proportional weir : a = 0,33 ft = 0,1 m

BELLA NITA-082.12.012 19
Perencanaan Bangunan Pengolahan Air Limbah (PBPAL)

b = 0,335 ft = 0,1 m
x = 0,13 ft = 0,04 m
y = 0,66 ft = 0,2 m

Gambar 4.7 Grit Chamber Proportional Weir


Sumber:Reynolds and Richards, 1996.

BELLA NITA-082.12.012 20