Basic Steps To Create Dynamic Modification Rule PP
Basic Steps To Create Dynamic Modification Rule PP
DMR contains the conditions for the inspection stage change. Inspection stage changes occur on the
basis of the inspection results that are recorded for inspection lots and inspection characteristics
(that is, on the basis of their acceptance or rejection).
With ref to DMR condition system update the quality level, which always reflects the current status.
Process:
Quality Management > Inspection Planning> Basic data> Sample > Dynamic modification Rule (QDR1)
E.g:
Normal inspect(5 lots(A*)) > skip(10lots(A*))> Reduced inspect(1 lot(A*))
> skip(10lots(A*))
skip(10lots(R*))> Tighten inspect(5 lot(A*))> Normal
inspect(5 lots(A*))
A Lot Accept
R Any one Lot Reject
Select option Dynamic modification rule is created for usage decision /At lot creation.
Assign stage, required inspection severity, enter short text and tick on Initial Inspection
Stage(ISt) )/Skip stage.
Normal inspection:
Skip Stage:
Max.skip duration is in days :
This field is used in the following ways:
To determine the current inspection stage at sample determination
The system first checks the number of skips and then the skip duration.
Inspection lot creation
At sample determination for a lot, if the number of allowed skips has not yet been
reached, but the maximum skip duration has been reached or exceeded, the next stage
in the sequence for accepted lots is taken as the current stage for the inspection lot. If
this stage is another skip, then the next stage in the sequence for a rejected lot is taken
as the current inspection stage. This means that the current inspection lot is due for
inspection as a result of the maximum skip duration, although the quality level contains
a skip as the next inspection stage.
Tighten inspection:
Reduced inspection:
We can assign DMR in
1. Task list at header level
2. Task list at characteristic level
3. Inspection setup of the material master at
inspection type level
We can review/change Quality level for DMR by using T.code QDL1/QDL2/QDL2
other guidance:
Now Lets consider material 123000 there are 2 vendors ABC and XYZ
For Vendor ABC you can create a task list where in Material Assignment you can mension ABC
vendor agaist material and Maintain a DMR(at lot level in Header of inspection Plan) which is Alwaz
skip.
For Vendor XYZ you can create a task list where in Material Assignment you can mension XYZ
vendor agaist material and do not maintain DMR.
1.Go to QDR1
5.Next line say 20,Enter seviarity say 4 ,click on seviearity ,Enter short text as say reject
No. of Inspection : 1
Rejections 1
SAVE
DMR: simple words means when you dynamicall want to change the stages of the inspection.that
means you want to reduce the inspection or skip the lots or tighten the inspection.
There are many links which are available with example for the same.
DM rule
DMR
Dynamic modification