Asorc-Qcp 1652 Modified

This quality control plan outlines inspection requirements for revamping two water tube boilers for ASORC. It lists 27 dismantling processes to be completed including removing the casing, refractory, headers, superheater, tubes, and tube ends from the drums. Inspection types include visual, radiographic, ultrasonic, magnetic particle, dye penetrant, and hydrostatic tests. Four inspectors are assigned to sign off on acceptance criteria and note any non-conformances.

Uploaded by

alkhiat
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
163 views22 pages

Asorc-Qcp 1652 Modified

This quality control plan outlines inspection requirements for revamping two water tube boilers for ASORC. It lists 27 dismantling processes to be completed including removing the casing, refractory, headers, superheater, tubes, and tube ends from the drums. Inspection types include visual, radiographic, ultrasonic, magnetic particle, dye penetrant, and hydrostatic tests. Four inspectors are assigned to sign off on acceptance criteria and note any non-conformances.

Uploaded by

alkhiat
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 22

Date : 23/1/2010

QUALITY CONTROL PLAN


Sheet: 1 OF 16

DOC. NO : QCP 03/034-08


Client : ASORC
JOB NO : 065/09
Project No :441-A-00-06-330
TYPE OF UINT : WATER TUBE BOILER(D.TYPE)
TAG NO : 30 - X - 331 A
MANF. SERIAL NO. : 1652
INSPECTION AUTHORITY : ONEBEACON AMERICA INSURANCE CO.
Code : NBIC-PART 3 2007-ADDENDA 2008
DRAWING No :3239

INSPECTOR SYMBOL TYPE OF TEST OR WORK SYMBOL Q. C. PROC. REF.

SITE PRODUCTION ENG. 1 VISUAL EXAM. VT EMC-VT-01 REV 0

SITE QC INSPECTOR 2 RADIOGRAPHIC EXAM. RT EMC-RT-01 REV 0

AUTHORIZED INSPECTOR 3 ULTRASONIC EXAM. UT EMC-UT-01 REV 0

CLIENT REP. 4 MAGNETIC PARTICLE EXAM. MT EMC-MT-01 REV 0

HOLD POINT H DYE PENETRANT EXAM. PT EMC-PT-01 REV 0

WITNESS POINT W HYDROSTATIC TEST HT EMC-HYD-P-1 REV 0

REPORT REVIEW R POSTWELD HEATREATMENT PWHT EMC-HT-P-01 REV 0

SPOT WITNESS S/W WORK PLAN WP -------------------

Rev. Date Description Prepared Approved Client Rep. Reviewed by


0 5 -7- 09 Original Issue QC INSPECTOR QC MANAGER Authorized Inspector

ENG/ ABD ELWAHAB


1 25-8-2009 Revised Issue FARAG

2 23-1-2010 Revised Issue


Date : 23/1/ 2010
QUALITY CONTROL PLAN Sheet :
Revision :
2
OF 16
1

Client: ASORC Project: REVAMPING Of TWO BOILERS FOR ASORC Tag No : 30-X-331A Item: WATER TUBE BOILER(D.TYPE)
Acceptance Remarks Or Non
S. No. Process Description
Criteria Type 1 Sign Date 2 Sign Date 3 Sign Date 4 Sign Date Conformance
APPROVAL R
1
Review of original drawing &calculation. original drawings H R R
2
Review of quality control plan H R R
3
Review of WPSs & PQRs ASME IX H R R
4
Review of WPQs ASME IX H R R
5 Review of procedures for cutting, lifting & H H R R
handling
6
Review of Painting Procedure H R R
7
Review of Cuality Control Procedures H R R
8
Review of Work Plan H R R
9
Review of Sequence Plan for Dismantling H H R R
MATERIAL
10
Review of refractory material certificates Material certificate H H R R
11 ASORC
Review of Painting Data Sheet Secification
H H R R
12
Review of insulation material certificates Material certificate H H R R
13 Review of fabrication Material certificate H H R R
material(piping,tubes,etc) certificates.
DISMANTLING
14 Dismantling external attachment ( valves, WP W BY ASORC
instrumentation sets ,) .
15
Removing of out casing . WP H H W
16
Removing of refractory WP H H W
17
Fixing the drums by temporary support . WP H H W
Date : 23/1/ 2010
QUALITY CONTROL PLAN Sheet :
Revision :
3
OF 16
1

Client: ASORC Project: REVAMPING Of TWO BOILERS FOR ASORC Tag No : 30-X-331A Item: WATER TUBE BOILER(D.TYPE)
Acceptance Remarks Or Non
S. No. Process Description
Criteria Type 1 Sign Date 2 Sign Date 3 Sign Date 4 Sign Date Conformance
18
Cutting the risers tubes from the front wall WP H H W
19
Cutting the risers tubes from the rear wall WP H H W
20
Cutting the feeder tubes from the front wall WP H H W
21
Cutting the feeder tubes from the rear wall WP H H W
22
lifting two header from the front wall WP H H W
23
lifting two header from the rear wall WP H H W
24
Dismantling of the super heater WP H H W
25 Cutting D shape tubes from the lower WP H H W
drum .
26 Cutting D shape tubes from the upper WP H H W
drum
27
Cutting bank tubes from the lower drum WP H H W
28
Cutting bank tubes from the upper drum WP H H W
Removing the tube ends from the both
29 WP H H W
Drums
Check surface conditions for the drum ASME V
30 ARTICLE 6 VT & PT & MT H H H H
holes
FABRICATION
SUPER HEATER
31 QC Surveillance of Material Verification Matrial Certificate H H H
FIRST MAIN HYDRANT 8
Approved
32 Cutting pipe ,plate & surface preparation . drawings VT & DT H H W
Approved
33 Fit up tees to pipes. drawings& VT & DT H H H H
WPS
Date : 23/1/ 2010
QUALITY CONTROL PLAN Sheet :
Revision :
4
OF 16
1

Client: ASORC Project: REVAMPING Of TWO BOILERS FOR ASORC Tag No : 30-X-331A Item: WATER TUBE BOILER(D.TYPE)
Acceptance Remarks Or Non
S. No. Process Description
Criteria Type 1 Sign Date 2 Sign Date 3 Sign Date 4 Sign Date Conformance
34 Welding PW 51 VT H H W
35 Complete Weld ASME V VT & RT H H H H
36 Repair for Welding ( if any ) PW 51 VT H H W
37 Re RT for Repairing ASME V RT H H H H
Approved
38 Fit up both pipes to middle plate . drawings& VT & DT H H H H
WPS

39 Welding PW 51 VT H H W
40 Complete Weld ASME V VT & PT H H H H
41 Repair for Welding ( if any ) PW 51 VT H H W
Approved
42 Marking holes and orientation check. drawings& VT & DT H H H H
ASME V
43 Opening holes ARTICLE 6 VT & PT H H W
Approved
44 Fit up end plates to pipes . drawings& VT & DT H H H
WPS

45 Welding PW 51 VT H H W
46 Complete Weld ASME V VT & PT H H H H
47 Repair for Welding ( if any ) PW 51 VT H H W
48 SECOND MAIN HYDRANT 8
Approved
49 Cutting pipe ,plate & surface preparation . drawings VT & DT H H W
Approved
50 Fit up tees to pipes. drawings& VT & DT H H H H
WPS

51 Welding PW 51 VT H H W
52 Complete Weld ASME V VT & RT H H H H
53 Repair for Welding ( if any ) PW 51 VT H H W
Date : 23/1/ 2010
QUALITY CONTROL PLAN Sheet :
Revision :
5
OF 16
1

Client: ASORC Project: REVAMPING Of TWO BOILERS FOR ASORC Tag No : 30-X-331A Item: WATER TUBE BOILER(D.TYPE)
Acceptance Remarks Or Non
S. No. Process Description
Criteria Type 1 Sign Date 2 Sign Date 3 Sign Date 4 Sign Date Conformance
54 Re RT for Repairing ASME V RT H H H H
Approved
55 Marking holes and orientation check. drawings& VT & DT H H H H
ASME V
56 Opening holes ARTICLE 6 VT & PT H H W
Approved
57 Fit up end plates to pipes . drawings& VT & DT H H H H
WPS
ASME V
58 Welding ARTICLE 6 VT H H W
59 Complete Weld ASME V VT & PT H H H H
60 Repair for Welding ( if any ) PW 51 VT H H W

SUPER HEATER ASSEMBLY


Approved
61 Assembly both headers and fixation drawings& VT & DT H H H
Approved
62 Prepared sample &templates drawings VT & DT H H H W
VT & MT & DT & Ball Test
63 Bending Tests QC Procedure
& Thick. Measurements
H H H H
Approved
64 Bending the tubes drawings VT & DT H H W
VT & MT & DT & Ball Test
65 Bending Tests QC Procedure & Thick. Measurements & H H H H
Spong Check
Fit up the inside row of the tubes to both Approved
66 drawings& VT & DT H H H H
headers WPS

67 Welding PW 51 VT H H W
68 Complete Weld ASME V VT & PT H H H H
69 Repair for Welding ( if any ) PW 51 VT H H W

70
Fit up the middle row of the tubes to both Approved
drawings& VT & DT H H
headers WPS
ASME V
71 Welding ARTICLE 6 VT H H W
Date : 23/1/ 2010
QUALITY CONTROL PLAN Sheet :
Revision :
6
OF 16
1

Client: ASORC Project: REVAMPING Of TWO BOILERS FOR ASORC Tag No : 30-X-331A Item: WATER TUBE BOILER(D.TYPE)
Acceptance Remarks Or Non
S. No. Process Description
Criteria Type 1 Sign Date 2 Sign Date 3 Sign Date 4 Sign Date Conformance
72 Complete Weld ASME V VT & PT H H H H
73 Repair for Welding ( if any ) PW 51 VT H H W

74
Fit up the out side row of the tubes to both Approved
drawings& VT & DT H H
headers WPS

75 Welding PW 51 VT H H W
76 Complete Weld ASME V VT & PT H H H H
77 Repair for Welding ( if any ) PW 51 VT H H W
Approved
78 Fit up vents to pipes . drawings& VT & DT H H H H
WPS s
ASME V
79 Welding ARTICLE 6 VT H H W
80 Complete Weld ASME V VT & PT H H H H
81 Repair for Welding ( if any ) PW 51 VT H H W
Approved
82 Fit up drains to pipes . drawings& VT & DT H H H H
WPS

83 Welding PW 51 VT H H W
84 Complete Weld ASME V VT & PT H H H H
85 Repair for Welding ( if any ) PW 51 VT H H W
Approved
86 Fit up nozzle neck to flanges. drawings& VT & DT H H H H
WP

87 Welding PW 51 VT H H W
88 Complete Weld ASME V VT & RT H H H H
89 Repair for Welding ( if any ) PW 51 VT H H W
90 Re RT for Repairing ASME V RT H H H H
Approved
91 Fit up nozzle to headers. drawings& VT & DT H H H H
WPS
Date : 23/1/ 2010
QUALITY CONTROL PLAN Sheet :
Revision :
7
OF 16
1

Client: ASORC Project: REVAMPING Of TWO BOILERS FOR ASORC Tag No : 30-X-331A Item: WATER TUBE BOILER(D.TYPE)
Acceptance Remarks Or Non
S. No. Process Description
Criteria Type 1 Sign Date 2 Sign Date 3 Sign Date 4 Sign Date Conformance
92 Welding PW 51 VT H H W
93 Complete Weld ASME V VT & PT H H H H
94 Repair for Welding ( if any ) PW 51 VT H H W
Approved
95 Final dimensional check drawings DT H H H H
Approved VT
96 Final visual check drawings H H H H
97 Heat treatment (annealing) Chart DATA SHEET VT& hardness test H H R H
98 Hydro test PG 99 VT H H H H
MANUFACTURER
99 Sandblasting and Painting SPECIFICATION VT & DFT Measurment H H H
100 Documentation review. H H R R
101 FRONT & REAR HEADERS
102 QC Surveillance of Material Verification Matrial Certificate H H H
103 FRONT SIDE HEADER
104 UPPER HEADER
Approved
105 Cutting pipe ,plate & surface preparation . drawings VT & DT H H W
Approved
106 Marking holes and orientation check. drawings VT & DT H H H H
Approved
107 Opening holes . drawings VT & DT H H W
Approved
108 Fit up end plates to header. drawings& VT & DT H H H H
WPS

109 Welding PW 51 VT H H W
110 Complete Weld ASME V VT & PT H H H H
111 Repair for Welding ( if any ) PW 51 VT H H W
Date : 23/1/ 2010
QUALITY CONTROL PLAN Sheet :
Revision :
8
OF 16
1

Client: ASORC Project: REVAMPING Of TWO BOILERS FOR ASORC Tag No : 30-X-331A Item: WATER TUBE BOILER(D.TYPE)
Acceptance Remarks Or Non
S. No. Process Description
Criteria Type 1 Sign Date 2 Sign Date 3 Sign Date 4 Sign Date Conformance
Approved
112 Fit up vents to header. drawings& VT & DT H H H W
WPS

113 Welding PW 51 VT H H W
114 Complete Weld ASME V VT & PT H H H H
115 Repair for Welding ( if any ) PW 51 VT H H W

LOWER HEADER
Approved
116 Cutting pipe ,plate & surface preparation . drawings VT & DT H H W
Approved
117 Marking holes and orientation check.` drawings VT & DT H H H H
Approved
118 Opening holes . drawings VT & DT H H W
Approved
119 Fit up end plates to header . drawings& VT & DT H H H
WPS

120 Welding PW 51 VT H H W
121 Complete Weld ASME V VT & PT H H H H
122 Repair for Welding ( if any ) PW 51 VT H H W
Approved
123 Fit up drain and nozzles to header . drawings& VT & DT H H H
WPS

124 Welding PW 51 VT H H W
125 Complete Weld ASME V VT & PT H H H H
126 Repair for Welding ( if any ) PW 51 VT H H W

FRONT WALL ASSEMBLY


Approved
127 Swaging tubes drawings VT & DT H H W
128 Heat treatment (annealing) Chart DATA SHEET VT & Hardness T H H R H
Adjuset both headers by temporary Approved
129 drawings VT & DT H H H
supports
Date : 23/1/ 2010
QUALITY CONTROL PLAN Sheet :
Revision :
9
OF 16
1

Client: ASORC Project: REVAMPING Of TWO BOILERS FOR ASORC Tag No : 30-X-331A Item: WATER TUBE BOILER(D.TYPE)
Acceptance Remarks Or Non
S. No. Process Description
Criteria Type 1 Sign Date 2 Sign Date 3 Sign Date 4 Sign Date Conformance
Approved
130 Fit up the tubes (21 tubes)to both headers . drawings& VT & DT H H H H
WPS

131 Welding PW 51 VT H H W
132 Complete Weld ASME V VT & PT H H H H
133 Repair for Welding ( if any ) PW 51 VT H H W
Approved
134 Fit up tube to tube drawings& VT &DT H H H
WPS

135 Welding PW 51 VT H H W
136 Complete Weld ASME V VT & PT H H H H
137 Repair for Welding ( if any ) PW 51 VT H H W

REAR SIDE HEADER

UPPER HEADER
Approved
138 Cutting pipe ,plate & surface preparation . drawings VT & DT H H W
Approved
139 Marking holes and orientation check. drawings VT & DT H H H H
Approved
140 Opening holes . drawings VT & DT H H W
Approved
141 Fit up end plates to header. drawings& VT & DT H H H H
WPS

142 Welding PW 51 VT H H W
143 Complete Weld ASME V VT & PT H H H H
144 Repair for Welding ( if any ) PW 51 VT H H W
Date : 23/1/ 2010
QUALITY CONTROL PLAN Sheet :
Revision :
10
OF 16
1

Client: ASORC Project: REVAMPING Of TWO BOILERS FOR ASORC Tag No : 30-X-331A Item: WATER TUBE BOILER(D.TYPE)
Acceptance Remarks Or Non
S. No. Process Description
Criteria Type 1 Sign Date 2 Sign Date 3 Sign Date 4 Sign Date Conformance
Approved
drawings&
145 Fit up vents to header. WPS VT & DT H H H W

146 Welding PW 51 VT H H W
147 Complete Weld ASME V VT & PT H H H H
148 Repair for Welding ( if any ) PW 51 VT H H W
LOWER HEADER
Approved
149 Cutting pipe ,plate & surface preparation . drawings VT & DT H H W
Approved
150 Marking holes and orientation check.` drawings VT & DT H H H H
Approved
151 Opening holes . drawings VT & DT H H W
Approved
152 Fit up end plates to header . drawings& VT & DT H H H
WPS

153 Welding PW 51 VT H H W
154 Complete Weld ASME V VT & PT H H H H
155 Repair for Welding ( if any ) PW 51 VT H H W
Approved
156 Fit up drain and nozzles to header . drawings& VT & DT H H H
WPS

157 Welding PW 51 VT H H W
158 Complete Weld ASME V VT & PT H H H H
159 Repair for Welding ( if any ) PW 51 VT H H W

REAR WALL ASSEMBLY


Approved
160 Swaging tubes drawings VT & DT H H W
161 Heat treatment (annealing) Chart DATA SHEET VT & Hardness T H H R H
Adjuset both headers by temporary Approved
162 drawings VT & DT H H H
supports
Date : 23/1/ 2010
QUALITY CONTROL PLAN Sheet :
Revision :
11
OF 16
1

Client: ASORC Project: REVAMPING Of TWO BOILERS FOR ASORC Tag No : 30-X-331A Item: WATER TUBE BOILER(D.TYPE)
Acceptance Remarks Or Non
S. No. Process Description
Criteria Type 1 Sign Date 2 Sign Date 3 Sign Date 4 Sign Date Conformance
Approved
163 Fit up the tubes (33 tube)to both headers drawings& VT &DT H H H H
WPS

164 Welding PW 51 VT H H W
165 Complete Weld ASME V VT & PT H H H H
167 Repair for Welding ( if any ) PW 51 VT H H W
Approved
168 Fit up tube to tube drawings& VT &DT H H H
WPS

169 Welding PW 51 VT H H W
170 Complete Weld ASME V VT & PT H H H H
171 Repair for Welding ( if any ) PW 51 VT H H W
Prepare Ligth opining Position in rear wall Approved
172 drawings VT H H H W
tube
Approved
173 Fit up spool pipe with rear wall tube drawings VT H H H H
174 Welding PW 51 VT H H W
175 Complete Weld ASME V VT & PT H H H H
176 Repair for Welding ( if any ) PW 51 VT H H W
177 D - SHAPE TUBES
178 QC Surveillance of Material Verification Matrial Certificate H H H
Approved
179 Cutting tube &surface preparation. drawings VT & DT H H H
Approved VT & DT & Ball Test &
180 Prepared Bending sample & template. drawings Thickness Measurements
H H H H
Approved
181 Bending tubes. drawings VT & DT H H W
VT & DT & Ball Test &
182 Bending Test QC Porcedure Spong Check & Thickness H H H
Measurements
Approved
183 Swaging. drawings VT & DT H H H H
Date : 23/1/ 2010
QUALITY CONTROL PLAN Sheet :
Revision :
12
OF 16
1

Client: ASORC Project: REVAMPING Of TWO BOILERS FOR ASORC Tag No : 30-X-331A Item: WATER TUBE BOILER(D.TYPE)
Acceptance Remarks Or Non
S. No. Process Description
Criteria Type 1 Sign Date 2 Sign Date 3 Sign Date 4 Sign Date Conformance
VT& hardness test
184 Heat treatment (annealing) Chart DATA SHEET H H R H
Approved
185 Fit up every eight tubes together. drawings& VT & DT H H
WPS

186 Welding PW 51 VT H H W
187 Complete Weld ASME V VT & PT H H H
188 Repair for Welding ( if any ) PW 51 VT H H W
Prepare Ligth opining Position in rear wall Approved
189 drawings VT H H W
tube
Approved
190 Fit up spool pipe with D shapl tube drawings VT H H H W
191 Welding PW 51 VT H H W
192 Complete Weld ASME V VT & PT H H H H
193 Repair for Welding ( if any ) PW 51 VT H H W
194 QC Surveillance of Material Verification Matrial Certificate H H H
Approved
195 Cutting tube &surface preparation. drawings VT & DT H H H
Prepared Bending sample & template for Approved VT & DT & Ball Test &
196 drawings Thickness Measurements
H H H H
every row.
Approved
197 Bending tubes. drawings VT & DT H H W
VT & DT & Ball Test &
198 Bending Test QC Porcedure Spong Check & Thickness H H H
Measurements
Approved
199 Swaging. drawings VT & DT H H H
VT& hardness test
200 Heat treatment (annealing) Chart DATA SHEET H H R H
Approved
201 Prepare Ligth Position in D tube drawings
Approved
202 Fit up spool pipe with D tube drawings

203 Welding PW 51 VT H H W
Date : 23/1/ 2010
QUALITY CONTROL PLAN Sheet :
Revision :
13
OF 16
1

Client: ASORC Project: REVAMPING Of TWO BOILERS FOR ASORC Tag No : 30-X-331A Item: WATER TUBE BOILER(D.TYPE)
Acceptance Remarks Or Non
S. No. Process Description
Criteria Type 1 Sign Date 2 Sign Date 3 Sign Date 4 Sign Date Conformance
204 Complete Weld ASME V VT & PT H H H H
205 Repair for Welding ( if any ) PW 51 VT H H W

RISER TUBES
206 QC Surveillance of Material Verification Matrial Certificate H H H
Approved
207 Cutting tube &surface preparation. drawings VT & DT H H H
Prepared Bending sample & template for Approved VT & DT & Ball Test &
208 drawings Thickness Measurements
H H H H
every row.
Approved
209 Bending tubes. drawings VT & DT H H W
VT & DT & Ball Test &
210 Bending Test QC Porcedure Spong Check & Thickness H H H
Measurements
Approved
211 Swaging for one side (the header inlet ). drawings VT & DT H H H
VT& hardness test
212 Heat treatment (annealing) Chart DATA SHEET H H R H

FEEDER TUBES
213 QC Surveillance of Material Verification Matrial Certificate H H H
Approved
214 Cutting tube &surface preparation. drawings VT & DT H H H
Prepared Bending sample & template for Approved VT & DT & Ball Test &
215 drawings Thickness Measurements
H H H H
every row.
Approved
216 Bending tubes. drawings VT & DT H H W
VT & DT & Ball Test &
217 Bending Test QC Porcedure Spong Check & Thickness H H H
Measurements
Approved
218 Swaging for both sides. drawings VT & DT H H H
VT& hardness test
219 Heat treatment (annealing) Chart DATA SHEET H H R H

ASSEMBLY
Date : 23/1/ 2010
QUALITY CONTROL PLAN Sheet :
Revision :
14
OF 16
1

Client: ASORC Project: REVAMPING Of TWO BOILERS FOR ASORC Tag No : 30-X-331A Item: WATER TUBE BOILER(D.TYPE)
Acceptance Remarks Or Non
S. No. Process Description
Criteria Type 1 Sign Date 2 Sign Date 3 Sign Date 4 Sign Date Conformance
BANK TUBES
Approved
220 Re-Adjust the Drums Temperary Supports drawings& VT & DT H H H
Approved
Assembly each bank tube to upper and drawings & and
222 Approved VT & DT H H W
lower drum . procedure
Approved
223 Adjusting the tubes on both drums. drawings& VT & DT H H H
Approved
224 Expanding and Flaring . drawings& VT & DT H H H
Approved
225 Fit up tube to tube from item no. 6 drawings& VT & DT H H W
WPS

226 Welding PW 51 VT H H W
227 Complete Weld ASME V VT & PT H H H
228 Repair for Welding ( if any ) PW 51 VT H H W
Approved
228 Fit up tube to tube from item no. 7 drawings& VT & DT H H W
WPS
ASME V
229 Welding ARTICLE 6 VT H H W
230 Complete Weld ASME V VT & PT H H H
231 Repair for Welding ( if any ) PW 51 VT H H W
Approved
232 Prepare Soot blower Position in bank tube drawings VT H H W
Approved
233 Fit up spool pipe with bank tube drawings VT H H H W
234 Welding PW 51 VT H H W
235 Complete Weld ASME V VT & PT H H H
236 Repair for Welding ( if any ) PW 51 VT H H W

D - SHAPE TUBES
Date : 23/1/ 2010
QUALITY CONTROL PLAN Sheet :
Revision :
15
OF 16
1

Client: ASORC Project: REVAMPING Of TWO BOILERS FOR ASORC Tag No : 30-X-331A Item: WATER TUBE BOILER(D.TYPE)
Acceptance Remarks Or Non
S. No. Process Description
Criteria Type 1 Sign Date 2 Sign Date 3 Sign Date 4 Sign Date Conformance
Approved
237 Assembly D shape tubes to upper drum . drawings& VT & DT H H W
Approved
238 Assembly D shape tubes to lower drum drawings& VT & DT H H W
Approved
239 Adjusting the tubes on both drums. drawings& VT & DT H H H
Approved
240 Expanding and Flaring . drawings& VT & DT H H W
Fit up every 8 tubes to 8 tubes in Approved
241 drawings& VT & DT H H W
sequence . WPS
ASME V
242 Welding ARTICLE 6 VT H H W
243 Complete Weld ASME V VT & PT H H H
244 Repair for Welding ( if any ) PW 51 VT H H W

FEEDER & RISER TUBES


Assembly and Adjust four tubes in four Approved
245 drawings VT & DT H H W
corners in the feeder and riser tubes
Assembly riser tubes to upper drum with Approved
246 drawings VT & DT H H W
front and rear headers one by one.
Approved
247 Expanding and Flaring in drum side . drawings VT & DT H H W
Welding for front and rear headers side ASME V
248 ARTICLE 6 VT H H W
one by one
249 Complete Weld ASME V VT & PT H H H
250 Repair for Welding ( if any ) PW 51 VT H H W
Assembly feeder tubes to lower drum with Approved
251 drawings VT & DT H H W
front and rear headers one by one.
Approved
252 Expanding and Flaring in lower drum side drawings VT & DT H H W
Welding for front and rear headers side ASME V
253 ARTICLE 6 VT H H W
one by one
Date : 23/1/ 2010
QUALITY CONTROL PLAN Sheet :
Revision :
16
OF 16
1

Client: ASORC Project: REVAMPING Of TWO BOILERS FOR ASORC Tag No : 30-X-331A Item: WATER TUBE BOILER(D.TYPE)
Acceptance Remarks Or Non
S. No. Process Description
Criteria Type 1 Sign Date 2 Sign Date 3 Sign Date 4 Sign Date Conformance
254 Complete Weld ASME V VT & PT H H H
255 Repair for Welding ( if any ) PW 51 VT H H W
256 D - TUBE & FRON REAR WALL TUBES
Welding for front and rear wall tubes with ASME V
257 ARTICLE 6 VT H H W
the D - tube
258 Complete Weld ASME V VT & PT H H H H
259 Repair for Welding ( if any ) PW 51 VT H H W
DESUPERHEATER

DESUPERHEATER FABRICATION

260 QC Surveillance of Material Verification Matrial Certificate H H H


FIRST HEADER FABRICATION
Approved
261 Cutting pipe & surface preparation. drawings VT & DT H H W
Approved
262 Cutting spool Pipes & surface preparation drawings VT & DT H H W
Approved
263 Marking holes and orientation check. drawings VT & DT H H H H
Approved
264 Opening holes . drawings VT & DT H H W
Approved
265 Swaging tubes from both sides. drawings VT & DT H H W
VT& hardness test
266 Heat treatment (annealing) Chart DATA SHEET H H R W
Approved
267 Fit up elbows to pipes . drawings& VT & DT H H H
WPS

268 Welding PW 51 VT H H W
269 Complete Weld ASME V VT & RT H H H H
270 Repair for Welding ( if any ) PW 51 VT H H W
Date : 23/1/ 2010
QUALITY CONTROL PLAN Sheet :
Revision :
17
OF 16
1

Client: ASORC Project: REVAMPING Of TWO BOILERS FOR ASORC Tag No : 30-X-331A Item: WATER TUBE BOILER(D.TYPE)
Acceptance Remarks Or Non
S. No. Process Description
Criteria Type 1 Sign Date 2 Sign Date 3 Sign Date 4 Sign Date Conformance
271 Re RT for Repairing ASME V RT H H H H
Approved
272 Fit up elbows to header . drawings& VT & DT H H H
WPS

273 Welding PW 51 VT H H W
274 Complete Weld ASME V VT & PT H H H H
275 Repair for Welding ( if any ) PW 51 VT H H W
276 SECOND HEADER FABRICATION W
Approved
277 Cutting pipe & surface preparation . drawings VT & DT H H W
Approved
278 Cutting spool pipes & surface preparation drawings VT & DT H H W
Approved
279 Marking holes and orientation check. drawings VT & DT H H H W
Approved
280 Open holes . drawings VT & DT H H H
Approved
281 Swaging tubes from both sides. drawings VT & DT H H W
VT& hardness test
282 Heat treatment (annealing) Chart DATA SHEET H H R W
Approved
283 Fit up elbows to pipes . drawings& VT & DT H H H
WPS

284 Welding PW 51 VT H H W
285 Complete Weld ASME V VT & RT H H H H
286 Repair for Welding ( if any ) PW 51 VT H H W
287 Re RT for Repairing ASME V RT H H H H
Approved
288 Fit up elbows to header . drawings& VT & DT H H H
WPS

289 Welding PW 51 VT H H W
290 Complete Weld ASME V VT & PT H H H H
Date : 23/1/ 2010
QUALITY CONTROL PLAN Sheet :
Revision :
18
OF 16
1

Client: ASORC Project: REVAMPING Of TWO BOILERS FOR ASORC Tag No : 30-X-331A Item: WATER TUBE BOILER(D.TYPE)
Acceptance Remarks Or Non
S. No. Process Description
Criteria Type 1 Sign Date 2 Sign Date 3 Sign Date 4 Sign Date Conformance
291 Repair for Welding ( if any ) PW 51 VT H H W

HEADERS FABRICATION FINAL


ASSEMBLY
Inter the first header and second header Approved
292 drawings VT & DT H H W
in the lower drum
Approved
293 Fit up pipe spools to elbows. drawings& VT & DT H H H
WPS

294 Welding PW 51 VT H H W
295 Complete Weld ASME V VT & RT H H H H
296 Repair for Welding ( if any ) PW 51 VT H H W
297 Re RT for Repairing ASME V RT H H H H
Approved
298 Final dimensional check drawings DT H H H H
Approved VT
299 Final visual check drawings H H H H
Fit-up Piping from S.H to De-super heater Approved
300 drawings VT & DT H H H
inlet.
Welding the both inlet and outlet De- ASME V
301 ARTICLE 6 VT & PT H H H
super heater
302 Welding PW 51 VT H H W
303 Complete Weld ASME V VT & RT H H H H
304 Repair for Welding ( if any ) PW 51 VT H H W
305 Re RT for Repairing ASME V RT H H H H
VT
306 Hydro test PG 99 H H H H
AIR DUCTS
Date : 23/1/ 2010
QUALITY CONTROL PLAN Sheet :
Revision :
19
OF 16
1

Client: ASORC Project: REVAMPING Of TWO BOILERS FOR ASORC Tag No : 30-X-331A Item: WATER TUBE BOILER(D.TYPE)
Acceptance Remarks Or Non
S. No. Process Description
Criteria Type 1 Sign Date 2 Sign Date 3 Sign Date 4 Sign Date Conformance
A-DUCT FABRICATION

307 QC Surveillance of Material Verification Matrial Certificate H H H


Cutting plates and steel member & surface Approved
308 drawings VT & DT H H W
preparation.
Approved
309 Opening connecting flange holes . drawings VT & DT H H W
Approved
310 Fit up steel member and flange. drawings & WPS VT & DT H H W
311 Complete weld WPS VT & DT H H W
312 Sand blasting and painting CLIENT SPECS. VT & DT H H H
GAS DUCTS

G-DUCT FABRICATION

313 QC Surveillance of Material Verification Matrial Certificate H H H


Cutting plates and steel member & surface Approved
314 drawings VT & DT H H W
preparation.
Approved
315 Opening connecting flange holes . drawings VT & DT H H W
Approved
316 Fit up steel member and flange. drawings & WPS VT & DT H H W
317 Complete weld WPS VT & DT H H W

318 Sand blasting and painting CLIENT SPECS. VT & DT H H H

DRUM internal
Approved
319 Check drum internal drawings VT H H H H
320 Repair defect if any WPS VT H H H H
EXTERNAL SOOT BLOWERS PIPES
Approved
321 Cutting pipes & surface preparation. drawings VT & DT H H
Date : 23/1/ 2010
QUALITY CONTROL PLAN Sheet :
Revision :
20
OF 16
1

Client: ASORC Project: REVAMPING Of TWO BOILERS FOR ASORC Tag No : 30-X-331A Item: WATER TUBE BOILER(D.TYPE)
Acceptance Remarks Or Non
S. No. Process Description
Criteria Type 1 Sign Date 2 Sign Date 3 Sign Date 4 Sign Date Conformance
322
Assembly base plates for soot blowers on Approved
drawings& VT & DT H H
bank tube WPS

323 Welding PW 51 VT H H W
324 Complete Weld ASME V VT & PT H H H H
325 Repair for Welding ( if any ) PW 51 VT H H W
Approved
326 Fit up pipe to base plate drawings& VT & DT H H
WPS

327 Welding PW 51 VT H H W
328 Complete Weld ASME V VT & PT H H H H
329 Repair for Welding ( if any ) PW 51 VT H H W
Approved
330 Fit up pipes to flanges drawings& VT & DT H H
WPS

331 Welding PW 51 VT H H W
332 Complete Weld ASME V VT & PT H H H H
333 Repair for Welding ( if any ) PW 51 VT H H W
WIND BOX SUPPORT BOX Approved
drawings&
FABRICATION WPS

334 Welding PW 51 VT H H W
335 Complete Weld ASME V VT & PT H H H
336 Repair for Welding ( if any ) PW 51 VT H H W
Approved
337 Refractory casting drawings&

338 CASING & REFRACTORY WORKS


339 QC Surveillance of Material Verification Matrial Certificate H H H
Cutting plates and steel member & surface Approved
340 drawings VT & DT H H W
preparation.
Date : 23/1/ 2010
QUALITY CONTROL PLAN Sheet :
Revision :
21
OF 16
1

Client: ASORC Project: REVAMPING Of TWO BOILERS FOR ASORC Tag No : 30-X-331A Item: WATER TUBE BOILER(D.TYPE)
Acceptance Remarks Or Non
S. No. Process Description
Criteria Type 1 Sign Date 2 Sign Date 3 Sign Date 4 Sign Date Conformance
341 Complete weld WPS VT & DT H H W

PIPING FABRICATION
From upper drum to Superheater
From superheater to desuperheater
From desuperheater to Main header
342 QC Surveillance of Material Verification Matrial Certificate H H H
Approved
343 Cutting pipes & surface preparation. drawings VT & DT H H W
Approved
344 Fit up pipe to pipe & flanges and elbows drawings & WPS

345 Welding PW 51 VT H H W
346 Complete Weld ASME V VT & RT H H H H
347 Repair for Welding ( if any ) PW 51 VT H H W
348 Re RT for Repairing ASME V RT H H H H

ISULATION WORKS
Prepare Insulation Clips and Steel Approved
349 drawings VT & DT H H W
member for fram.
350 Complete weld WPS VT & DT H H W
FINAL INSPECTION
Approved
351 Final dimensional check drawings DT H H H H
Approved VT
352 Final visual check drawings H H H H
VT
353 Hydro test . PG 99 H H H H

354 Sand blasting & painting CLIENT SPEC. VT & DFT H H H


QC Surveillance of Material Verification for
354 Matrial Certificate H H H
Insulation and Refractory works
Date : 23/1/ 2010
QUALITY CONTROL PLAN Sheet :
Revision :
22
OF 16
1

Client: ASORC Project: REVAMPING Of TWO BOILERS FOR ASORC Tag No : 30-X-331A Item: WATER TUBE BOILER(D.TYPE)
Acceptance Remarks Or Non
S. No. Process Description
Criteria Type 1 Sign Date 2 Sign Date 3 Sign Date 4 Sign Date Conformance
Approved
355 Boiler refractory casting . drawings VT H H H

356 Complete weld WPS VT & DT H H W


Refractory and casing work for burner, VT
357 W.P H H H
man holes and sight glass
VT
358 Smoke test W.P H H H
359 Boiler insulation work W.P VT H H H
360 Boiler icon plates. W.P VT H H H
361 Boiler dry out . W.P VT H H H
362 Boiler commissioning & start up . W.P VT H H H
VT
363 Review name plate with NB NB H H H H
VT
364 Fix name plate H H H H
ASME VT
365 Stamping R Symbol Stamp CODE
H H H H
366 Documentation review. H H R R