The document outlines a preventive maintenance checklist for various facilities and equipment for the year 2017. It includes daily, weekly, monthly, quarterly, bi-annually, and annual maintenance tasks for areas like in-plant facilities, utilities, electrical systems, pre-cooker vessels, retort vessels, cold storage, printers, and labeling machines. Specific equipment listed include packshaper lines, seamer lines, boilers, generators, air compressors, freezers, printers, and labeling machines.

Uploaded by

Gede EriK Aktama
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1K views

Preventive Maintenance Checklist Fix

The document outlines a preventive maintenance checklist for various facilities and equipment for the year 2017. It includes daily, weekly, monthly, quarterly, bi-annually, and annual maintenance tasks for areas like in-plant facilities, utilities, electrical systems, pre-cooker vessels, retort vessels, cold storage, printers, and labeling machines. Specific equipment listed include packshaper lines, seamer lines, boilers, generators, air compressors, freezers, printers, and labeling machines.

Uploaded by

Gede EriK Aktama
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

PREVENTIVE MAINTENANCE CHECKLI

For the Year: 2017


AREA Daily Weekly Monthly
1. In- Plant Facilities
a In-Plant Equipment Daily Monitoring Report
a.1 307 Packshaper line 1
a.2 307 Packshaper Line 2
a.3 603 Packshaper line 3
b. Daily Equipment Downtime Monitoring Report
b.1 Varin 41 Seamer Line #1
b.2 Varin 41 Seamer Line # 2
b.3 Angelus A-59P Seamer Line # 3

2. Utilities Facilities
a. Daily Utilities Operational Logsheet
a.1 Lin Charng Boiler
a.2 Cleever Brooks Boiler
a.3 Man Leroy Gen-set

3. Electricals & Instrument


a. In-Plant Routinary Schedules - For motor, gears,
Contactors, sprocket, Inverter, breaker,etc.
a.1 Ingersoll Rand Air Compressor

4. Pre-Cooker Vessel
a. Pre-Cooker Checklist
a.1 . Pre-Cooker Vessel 1
a.2. Pre-cooker Vessel 2
a.3. Pre-Cooker Vessel 3
a.4 Pre-Cooker Vessel 4

5. Retort Vessel
a. Retort Vessel Checklist
a.1 Retort Vessel #1
a.2 Retort Vessel # 2
a.3 Retort Vessel # 3
a.4 Retort Vessel # 4
a.5 Retort Vessel # 5

6. Cold Storage
a. Cold Storage Daily Checklist
a.1 Air Blast Freezer 1
a.2 Air Blast Freezer 2
a.3 Cold Storage 1
a.4 Cold Storage 2

7. Hitachi Ink-jet Printer Machine


a. Daily Checklist
a.Ink-Jet Printer ( Can Coding)
a.2 Ink-jet Printer ( Warehouse)

8. Labelling Machine
a. Daily Checklist
a. 1 603 Labelling Machine
a.2 307 Labelling Machine
TENANCE CHECKLIST

Quarterly Bi-Annually Annually Remarks

For Renewal of Contract from Luthi


For Overhauling 10 yrs. Or more
Newly Overhauled last July-2016

Sevicing of lifter assy.


-do-
-do-

De-Scaling last dec. 2016


-d0-
Change-Oil Last Dec. 2016 & for 3rd
party evaluation/check-up Mar.2017

Change Oil & Filters every once a year

For Replacement of Silicone Door


Gasket every 6 months
-do-
-do-
For Replacement of Silicone Door
Gasket every 6 months
For Replacement of dilapidated vessel
-do-
-do-

change-oil every month


-do-
-do-
For replacement of Bitzer Compressor
& its. Accessories

change filters every 3 months


-do-

check-up electrical parts including


heater element