0% found this document useful (0 votes)
37 views

To Do List: Project / Task Status Priority Pick Due Date Person Concerned Notes/Details

The document is a to-do list for a project containing 5 tasks of varying statuses, priorities, and due dates assigned to different people. Task 1 is in the planning stage and has a high priority and is due tomorrow. Task 2 is approved and is due on April 9th. Task 3 is pending review, has a low priority and is due on April 11th.

Uploaded by

Naimul Kader
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
37 views

To Do List: Project / Task Status Priority Pick Due Date Person Concerned Notes/Details

The document is a to-do list for a project containing 5 tasks of varying statuses, priorities, and due dates assigned to different people. Task 1 is in the planning stage and has a high priority and is due tomorrow. Task 2 is approved and is due on April 9th. Task 3 is pending review, has a low priority and is due on April 11th.

Uploaded by

Naimul Kader
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

To Do List

Project: [Project Name]

Project / Task Status Priority PICK Due Date Person Concerned Notes/Details
Easy / Low
Task Name 1 Planning 4/13/17 Swapan Install 20 veeva by tomorrow
high Value
Some notes about Task 2
Easy / High
Task Name 2 Approved normal Naimul thas are long enough to span
Value 4/9/17 two different lines
Pending Hard / Low
Task Name 3 4/11/17
Review low Value
Easy /
Task Name 4 Completed normal High Value 1/1/17
Easy / Low
Task Name 5 On Hold
low Value 2/28/17

If needed insert coulms above

http://www.vertex42.com/ExcelTemplates/to-do-list-template.html To Do List Template by Vertex42.com


Status Priority PICK
- - - Edit these lists to change what
shows up within the drop-down
Planning high Easy / Low Value lists in the To Do List table.
Pending Approval normal Easy / High Value
Approved low Hard / High Value
In Progress Hard / Low Value
Pending Review
On Hold
Completed
lists to change what
within the drop-down
To Do List table.

You might also like