The document outlines a design program for a WTP Reckit Benckiser project. It lists 4 main areas that need to be designed: 1) WTP tank, 2) Blower & Control room, 3) Belt press, filtrate & sludge cake room, and 4) Chemical tank area. For each area, it provides the drafting time, engineering time, and "my time" required to design different aspects such as the foundation, plans, sections, and details. The total time estimated for the project is 198 hours of drafting, 132 hours of engineering, and 51 hours of "my time".
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
23 views
WTP Reckit Program
The document outlines a design program for a WTP Reckit Benckiser project. It lists 4 main areas that need to be designed: 1) WTP tank, 2) Blower & Control room, 3) Belt press, filtrate & sludge cake room, and 4) Chemical tank area. For each area, it provides the drafting time, engineering time, and "my time" required to design different aspects such as the foundation, plans, sections, and details. The total time estimated for the project is 198 hours of drafting, 132 hours of engineering, and 51 hours of "my time".
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1
WTP Reckit Benckiser Design program
Drafting Time Engineering Time My time
No (hrs) (hrs) (hrs) 1 WTP tank (CIP Collection, balance, CSAS, Effluent, Biosludge & Chemical sludge) A Foundation 15 10 4 B WTP Tank Floor Plan 15 10 4 C WTP tank Roof Plan 15 10 4 D WTP Tank section & details 15 10 4 2 Blower & Control room A Foundation 12 8 3 B Slab on Ground Plan, Section & Details 12 8 3 C Concrete Roof Plan & Sections 12 8 3 D Beam schedule 12 8 3 3 Belt press, filtrate & sludge cake room A Foundation 12 8 3 B Slab on Ground Plan, Section & Details 12 8 3 C Roof Steelworks Plan & Elevations 12 8 3 D Roof Steelworks Section & Details 12 8 3 4 Chemical tank area A Chemical Tank area fondation 15 10 4 B Chemical Tanbk Area Slab Plan & Sections 15 10 4 C Chemical Tank Area Roof Steelwork Plan, Elevation & Details 12 8 3