This document provides details of the drum schedule and conductor pulling layout for a 244 meter section of a 132KV overhead transmission line between power plants PP-2 and PP-1 at Sharurah. It outlines the phase arrangement, drum lengths, number of drums, and drum numbers for midspan joints and balance drums across the two pulling sections. Tower numbers, span lengths, conductor lengths and cumulative lengths are also specified.
Download as XLS, PDF, TXT or read online on Scribd
100%(1)100% found this document useful (1 vote)
354 views
Stringing Chart
This document provides details of the drum schedule and conductor pulling layout for a 244 meter section of a 132KV overhead transmission line between power plants PP-2 and PP-1 at Sharurah. It outlines the phase arrangement, drum lengths, number of drums, and drum numbers for midspan joints and balance drums across the two pulling sections. Tower numbers, span lengths, conductor lengths and cumulative lengths are also specified.