0% found this document useful (0 votes)
161 views

Weekly Lookhead and Weekly Progress Report

The document is an invitation to attend a management meeting on December 12th from 9-11:30am at MWAUWASA in Mwanza City. The meeting will discuss issues related to a water and sanitation project in Geita Town, including 1) contract determination based on non-compliance of sectional works handing over, 2) contractor work performance issues, 3) employer obligations, 4) contractual variations and compensations, and 5) project completion period. It is signed by Mhando Jambia, Resident Engineer, and CC's MWAUWASA and the National Project Coordinator for LVWATSAN-II.
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
161 views

Weekly Lookhead and Weekly Progress Report

The document is an invitation to attend a management meeting on December 12th from 9-11:30am at MWAUWASA in Mwanza City. The meeting will discuss issues related to a water and sanitation project in Geita Town, including 1) contract determination based on non-compliance of sectional works handing over, 2) contractor work performance issues, 3) employer obligations, 4) contractual variations and compensations, and 5) project completion period. It is signed by Mhando Jambia, Resident Engineer, and CC's MWAUWASA and the National Project Coordinator for LVWATSAN-II.
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

JASSIE & COMPANY LIMITED,

Address COWI Tanzania Ltd.

P.O.Box 1810, 398, Kawawa Road

Mwanza, Tanzania
P.O.Box 1007
Dar es Salaam
Tel.: +255-28-2560800
Tanzania
Fax: +255-28-2560800
Tel +255 22 266 6161

Attn: Karanveer Bachu


+255 22 266 6094
Fax

www cowi.co.tz

Date 22 /11/ 2016


Page 1/2
Ref LUDO/mhjm/434j
Project No 613001

Re: LVWATSAN II Construction of Water and Sanitation Works Geita town:

Sub: Management Meeting

The above topic refers.

You are cordially invited to attend the Management Meeting that will be held at
MWAUWASA, LVWATSAN Coordination office in Mwanza City on 12th December
2016 starting at 9.00 am to 11.30am.The purpose of the meeting is to discuss among
other issues the following:
1. Determination of contract based on non-compliance to
sectional works handing over
2. Non-diligence of work performance by the contractor
3. Employer obligations
4. Contractual variations and compensations
5. Works completion period

Yours Faithfully

Mhando Jambia

For Resident Engineer

CC
Mwanza Urban Water Supply and Sanitation Authority (MWAUWASA)
P.O.Box 317, Mwanza.

Attn. National Project Coordinator, LVWATSAN- II; Eng. Gogadi Mgwatu

CONSTRUCTION WEEKLY PROGRESS


REPORT Directors (all Danish):
Project: Lake Victoria Water Supply and Helle Vang Andersen (Chairman)
Klaus Winther Ringgaard
(Managing)

VRN: 10-000298-P
TIN: 100-101-297
Page 2/2

Sanitation Program Phase-II


Contract MWAUWASA/LVWATSAN-
No: II/EAC/W/2014/004
14th November 2016 -20th November
Week from 2016
Week No. 60
Overall
46%
Progress
Previous
ITEM NO DESCRIPTION This week Progress Commulative
Comulative
E01 SCHOOL TOILET MAIN BUILDINGS 97% 0% 97%
E01.1 EARTHWORK 100% 0% 100%
Excavation works will include cart away, loading of
surplus excavated materials and remove from site to 100% 0% 100%
dispose at the area approved by engineer.
Excavate oversite average 150mm deep to remove
E01.1.1 vegetated soil, convey average 100 linear metres and 100% 0% 100%
deposit in spoil heaps
Excavate foundation trench commencing at stripped
E01.1.2 100% 0% 100%
level and not exceeding 1.50metres deep.
Extra over for the excavation in rock formations
E01.1.4 100% 0% 100%
(PROVISIONAL SUM)
Earth backfilling well rammed and consolidated around
E01.1.3 100% 0% 100%
foundations
Allow for planking and strutting to uphold the sides of
E01.1.4 100% 0% 100%
excavations.
E01.1.5 Allow for keeping excavations free from water 100% 0% 100%

E01.1.6 Apply 200mm blinded hardcore bed 100% 0% 100%

E01.2 CONCRETE WORK 100% 0% 100%

E01.3 BLOCK WORK 100% 0% 100%

E01.5 JOINEY WORK 100% 0% 100%

E01.6 FINISHING 100% 0% 100%

E01.7 PAINTING AND DECORATION 100% 0% 100%

E01.9 WASTEWATER INSTALLATIONS 100% 0% 100%

E01.10 WATER SUPPLY INSTALLATIONS 100% 0% 100%


PROTECTION OF BUILDING AGAINST
E01.11 100% 0% 100%
TERMITES
E02 EXTERNAL DRAINAGE 97% 0% 97%