PT Request28jan
PT Request28jan
SATIP NUMBER SATIP ACTIVITY NUMBER CONTRACTOR INSP LEVEL SUBCONTRACTOR INSP LEVEL ARAMCO INSP LEVEL
SATIP-W-011-01 3.12
6 BA-737289
7 BA-737289
8 BA-737289
9 BA-737289
10 BA-737289
11 BA-737289
12
13
14
15
Remarks
Reasons for Re-shoots or Re-weld
CONSTRUCTION REPRESENTATIVE
QC INSPECTOR or SUPERVISOR
PRIME CONTRACTOR NDT COORDINATOR
NDT TECHNICIAN
SAUDI ARAMCO PROJECT MANAGEMENT
PID REPRESENTATIVE
Rev 7 31-Mar-13
DATE APPROVED QR NUMBER REPORT DATE
30-Apr-13
CONTRACTOR/SUBCONTRACTOR LOCATION
ESTED
HARDNESS OTHER
WELDING
DIA Thk REMARKS
PROCESS
SMAW
SMAW
SMAW
SMAW
SMAW
Sign Date
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - March 2013) Rev 7 31-Mar-13
SAUDI ARAMCO TEST REPORT SATR NUMBER DATE APPROVED QR NUMBER REPORT DATE
SATIP NUMBER SATIP ACTIVITY NUMBER CONTRACTOR INSP LEVEL SUBCONTRACTOR INSP LEVEL ARAMCO INSP LEVEL QTY INSP MH's SPENT TRAVEL TIME
SATIP-W-011-01 3.12
1 BA-060622 6"-P-0131-15CS9P OPTF CONN & F/L TIE-IN 001 0 01 SW-02 W-6236 SMAW 6 0.5
2 BA-060622 6"-P-0131-15CS9P OPTF CONN & F/L TIE-IN 001 0 01 SW-04 W-6236 SMAW 6 0.5
3 BA-060622 6"-P-0131-15CS9P OPTF CONN & F/L TIE-IN 001 0 01 SW-05 W-6236 SMAW 6 0.5
4 BA-060622 6"-P-0104-15CS9P OPTF CONN & F/L TIE-IN 001 0 02 SW-02 W-4997 SMAW 6 0.5
5 BA-060622 6"-P-0104-15CS9P OPTF CONN & F/L TIE-IN 001 0 02 SW-04 W-4997 SMAW 6 0.5
6 BA-060622 6"-P-0104-15CS9P OPTF CONN & F/L TIE-IN 001 0 02 SW-05 W-6236 SMAW 6 0.5
10 BB-067455 6"-0104-15CS9P OPTF AREA 001 0 12 SW-39 W-7676 GTAW + SMAW 2" 0.5"
Remarks
Reasons for Re-shoots or Re-weld
CONSTRUCTION REPRESENTATIVE
QC INSPECTOR or SUPERVISOR
PRIME CONTRACTOR NDT COORDINATOR
NDT TECHNICIAN
SAUDI ARAMCO PROJECT MANAGEMENT
PID REPRESENTATIVE