0% found this document useful (0 votes)
280 views

PT Request28jan

This document is a non-destructive testing (NDT) request form for the ANDR-0618 project. It requests NDT including radiographic testing, ultrasonic testing, magnetic particle inspection, and liquid penetrant inspection for 10 items, including pipe supports and welds, with information like drawing numbers, weld IDs, and welder IDs provided. The form provides spaces for sign off by construction representatives, inspectors, NDT technicians, and Saudi Aramco management to approve the NDT work.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
280 views

PT Request28jan

This document is a non-destructive testing (NDT) request form for the ANDR-0618 project. It requests NDT including radiographic testing, ultrasonic testing, magnetic particle inspection, and liquid penetrant inspection for 10 items, including pipe supports and welds, with information like drawing numbers, weld IDs, and welder IDs provided. The form provides spaces for sign off by construction representatives, inspectors, NDT technicians, and Saudi Aramco management to approve the NDT work.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - March 2013)

SAUDI ARAMCO TEST REPORT SATR NUMBER DATE APPROVED

NON-DESTRUCTIVE TESTING (NDT) REQUEST FORM SATR-NDE-2011 30-Apr-13


PROJECT TITLE WBS/BI/JO NUMBER CONTRACTOR/SUBCONTRACTOR

ANDR-0618 10-01032-5534 ABIS

SATIP NUMBER SATIP ACTIVITY NUMBER CONTRACTOR INSP LEVEL SUBCONTRACTOR INSP LEVEL ARAMCO INSP LEVEL

SATIP-W-011-01 3.12

NON-DESTRUCTIVE TESTING (NDT) REQUESTED


RT UT MPI X LPI

DRAWING LINE SKETCH SHT REV SPOOL WELD WELDER


ITEM
NUMBER NUMBER NUMBER NO. NO. NUMBER ID ID

1 BA-060621 PIPE SUPPORT 001 0 TYPE-1 S-01 W-4997

2 BA-060621 PIPE SUPPORT 001 0 TYPE-1 S-02 W-4997

3 BA-060621 PIPE SUPPORT 001 0 TYPE-1 S-04 W-4997

4 BA-060621 8"-P-0101-95CS1T PIPE SUPPORT 001 0 TYPE-1 S-05 W-4997

5 BA-060621 8"-P-0103-15CS9P PIPE SUPPORT 001 0 TYPE-1 S-09 W-4997

6 BA-737289

7 BA-737289

8 BA-737289

9 BA-737289

10 BA-737289

11 BA-737289

12
13
14
15
Remarks
Reasons for Re-shoots or Re-weld

NDT Request flow Name Sign

CONSTRUCTION REPRESENTATIVE
QC INSPECTOR or SUPERVISOR
PRIME CONTRACTOR NDT COORDINATOR
NDT TECHNICIAN
SAUDI ARAMCO PROJECT MANAGEMENT
PID REPRESENTATIVE
Rev 7 31-Mar-13
DATE APPROVED QR NUMBER REPORT DATE

30-Apr-13
CONTRACTOR/SUBCONTRACTOR LOCATION

ABIS ABIS FABRICATION SHOP,ABUHADRYAH

SAUDI ARAMCO USE ONLY

ARAMCO INSP LEVEL QTY INSP MH's SPENT TRAVEL TIME

ESTED
HARDNESS OTHER

WELDING
DIA Thk REMARKS
PROCESS

SMAW

SMAW

SMAW

SMAW

SMAW

Sign Date
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - March 2013) Rev 7 31-Mar-13
SAUDI ARAMCO TEST REPORT SATR NUMBER DATE APPROVED QR NUMBER REPORT DATE

NON-DESTRUCTIVE TESTING (NDT) REQUEST FORM SATR-NDE-2011 30-Apr-13


PROJECT TITLE WBS/BI/JO NUMBER CONTRACTOR/SUBCONTRACTOR LOCATION

ANDR-0618 10-01032-5534 ABIS ABIS FABRICATION SHOP,ABUHADRYAH

SAUDI ARAMCO USE ONLY

SATIP NUMBER SATIP ACTIVITY NUMBER CONTRACTOR INSP LEVEL SUBCONTRACTOR INSP LEVEL ARAMCO INSP LEVEL QTY INSP MH's SPENT TRAVEL TIME

SATIP-W-011-01 3.12

NON-DESTRUCTIVE TESTING (NDT) REQUESTED


RT UT MPI X LPI HARDNESS OTHER

DRAWING LINE SKETCH SHT REV SPOOL WELD WELDER WELDING


ITEM DIA Thk REMARKS
NUMBER NUMBER NUMBER NO. NO. NUMBER ID ID PROCESS

1 BA-060622 6"-P-0131-15CS9P OPTF CONN & F/L TIE-IN 001 0 01 SW-02 W-6236 SMAW 6 0.5

2 BA-060622 6"-P-0131-15CS9P OPTF CONN & F/L TIE-IN 001 0 01 SW-04 W-6236 SMAW 6 0.5

3 BA-060622 6"-P-0131-15CS9P OPTF CONN & F/L TIE-IN 001 0 01 SW-05 W-6236 SMAW 6 0.5

4 BA-060622 6"-P-0104-15CS9P OPTF CONN & F/L TIE-IN 001 0 02 SW-02 W-4997 SMAW 6 0.5

5 BA-060622 6"-P-0104-15CS9P OPTF CONN & F/L TIE-IN 001 0 02 SW-04 W-4997 SMAW 6 0.5

6 BA-060622 6"-P-0104-15CS9P OPTF CONN & F/L TIE-IN 001 0 02 SW-05 W-6236 SMAW 6 0.5

7 BA-060622 6"-P-0131-15CS9P TIE-IN 001 0 03 SW-02 W-6236 SMAW 6 0.5

8 BA-060622 6"-P-0131-15CS9P TIE-IN 001 0 03 SW-04 W-6236 SMAW 6 0.5

9 BA-060622 6"-P-0131-15CS9P TIE-IN 001 0 03 SW-05 W-6236 SMAW 6 0.5

10 BB-067455 6"-0104-15CS9P OPTF AREA 001 0 12 SW-39 W-7676 GTAW + SMAW 2" 0.5"

Remarks
Reasons for Re-shoots or Re-weld

NDT Request flow Name Sign Date

CONSTRUCTION REPRESENTATIVE
QC INSPECTOR or SUPERVISOR
PRIME CONTRACTOR NDT COORDINATOR
NDT TECHNICIAN
SAUDI ARAMCO PROJECT MANAGEMENT
PID REPRESENTATIVE

You might also like