INSTRUCTIONS AND
RECOMMENDED PARTS GEK-41902 C
FOR MAINTENANCE
‘Supersedes GEK-41902 B
MAGNE-BLAST CIRCUIT BREAKER
Type:
AM-4.16- 250-9
1200 & 2000 Amperes
With ML-13 Mechanism
CONTENTS
INTRODUCTION oo. ces eee ence eee 3
RECEIVING HANDLING And STORAGE
INSTALLATION . .
DESCRIPTION OF OF
ADJUSTMENTS .. 6. +
GENERAL MAINTENANCE
RENEWAL PARTS...
GENERAL @@ ELECTRICMAGNE-BLAST CIRCUIT BREAKER
AM-4.16-250-9 (A)
&X Letter Designation B, C, H, K, R and N, used immediately following
the model number indicates basic design features.
INTRODUCTION
‘The Magne-blast breaker is the removable and
interchangeable interrupting element used.in metal-
clad switchgear to provide reliable control andpro-
tection of electrical apparatus and power systems.
‘The AM-4.16-250 Magne-blast breaker is
available with continuous current ratings of 1200
amperes and 2000 amperes in accordance with
applicable industry standards. Refer tothe breaker
nameplate for complete rating information of any
particular breaker. The nameplate also describes
the control power requirements for that breaker.
The application of a breaker must be such that its
voltage, current,
voltage, current, and interrupting ratings arenever
exceeded, Since this book is written to include
all ratings of the breaker as well as several design
variations, the instructions will be of a general
character ‘and all illustrations will be typical unless
otherwise specified.
PROPER INSTALLATION AND MAINTENANCE,
ARE NECESSARY TO INSURE CONTINUED SAT-
ISFACTORY OPERATION OF THE BREAKER. The
following instructions will provide complete infor-
mation for placing magne-blast breakers in service
and for maintaining satisfactory operation.
RECEIVING, HANDLING AND STORAGE
Receiving and Handling
Each breaker is carefully inspected and packed
for shipment. Immediately upon receipt of the
circuit breaker, an examination should be made
for any damage’ sustained in transit. If injury or
rough handling is evident, a damage claim should
be filed immediately with’ the transportation com-
pany and the nearest General Electric Sales Office
should be notified,
It is expected that due care will be exercised
during the unpacking and installation of the breaker
so that no damage will occur from careless or
rough handling, or from exposure to moisture or
dirt. Check all parts against the packing list to
be ‘sure that no parts have been overlooked.
Storag
It is recommended that the breaker be put
into service immediately in its permanent location.
If this is not possible, the following precautions
must be taken to insure the proper storage of the
breaker:
1, The breaker should be carefully protected
against condensation, preferable by stor-
ing it in a warm dry room, since water
absorption has an adverse effect on the
insulation parts. Circuit breakers for
outdoor metal-clad switchgear should be
stored in the equipment only when power is.
available and the heaters are in operation
to prevent condensation,
2, The breaker should be stored in a clean
location, free from corrosive gases or
fumes; "particular care should be taken
to protect the equipment from moisture
and cement dust, as this combination has
a very corrosive effect on many parts,
3, Unfinished surfaces of rollers, latches
etc., of the operating mechanism should
be Coated with grease to prevent rusting.
If the breaker is stored for any lengthof time,
it should be inspected periodically to see that rust-
ing has not started and to insure good mechanical
condition, Should the breaker be stored under
unfavorable atmospheric conditions, it should be
cleaned and dried out before being placed in service.
(Cover Photo-8034472
These instructions do not purport to cover all details or variations in equipment nor to provide for
‘every possible contingency to be met in connection with installation, operation or mlintenance.
Should
further information be desired or should particular problens arise which are not covered sufficiently for
the purchaser's purposes, the matter should be referred to the General Electric Company.
To the extent requized the products described herein meet applicable ANSI, IEEE and NEMA standards;
but no such assurance is given with respect to local codes and ordinances because they vary greatlyGEK~41902 Magne-blast Circuit Breaker
INSTALLATION
Each breaker has been tested and inspected
before shipment from the factory; however, before
placing the breaker in service the following items
Should be checked to assure that no change has oc-
curred during shipment and storage.
1. Remove the box barriers and mechanism cover
and make a visual inspection to ascertain that the
breaker and mechanism isin satisfactory condition.
Check all bearing surfaces of the mechanism for
lubrication. Refer to section on LUBRICATION page
16 and Figure 17,
2. Charge the breaker closing springs manually
using a 5/8" ratchet wrench to turn the driving ec
centric (6) Figurel. Turning the eccentric counter =
clockwise will advance the ratchet wheel and com-
ress the springs.
When the springs have reached the fully charged
position the indicator (1) will read "CHARGED", and
the driving pawl will be raised from the ratchet
wheel teeth. Additional turning of the eccentric will
not advance the ratchet wheel.
Insert the spring blocking device(10)and manually
discharge the springs against the pins by pushing
the manual release button (4). The springs are now
blocked and slow closing of the breaker contacts can
beaccomplished by again turning the driving eccen-
tric with a 5/8" ratchet wrench.
During the slow closing operation check to insure
that the mechanism does not stick or bind during
the entire stroke, that it latches securely in the
closed position, and that it trips freely when the
manual trip lever is operated, At this time, also
check the following adjustments:
a, Arcing contact wipe (Refer to page 10)
b. Primary contact wipe (Refer to page 11)
¢. Primary contact gap (Refer to page 11)
DO NOT WORK ON EITHER THE BREAKER OR
‘MECHANISM UNLESS THE CLOSING SPRINGS ARE
BLOCKED AND THE OPENING SPRINGS HAVE
BEEN TRIPPED OPEN OR MECHANICALLY
BLOCKED. THIS PRECAUTION IS REQUIRED TO
PREVENT ACCIDENTAL CLOSING OR TRIPPING
The closing springs should now be unblocked. Ro-
tate the driving eccentric until the indicator reads
"CHARGED" and the ratchet wheel does not advance.
The spring blocking device can now be removed.
3. To assure that the electrical connections
have remained tight, they should be checked during
installation as well as during each maintenance in-
spection. This check of electrical connections is
particularly necessary on breakers used in nuclear
generating stations and other critical applications.
The bolted braid connections on the stationary arcing
contacts shouldbe checked for tightness by removing
the arc chutes as described on page 15.
4. Connect the test coupler to the circuit breaker
and operate it electrically several times. Check
the control voltage as described under "CONTROL
POWER CHECK" (Page 14).
5. Disconnect the test coupler and before replacing
the box barrier, the primary bushings and other
insulation should be wiped clean.
6. Ifthebreaker has been stored for a long period
of time, it is recommended that the insulation be
checked witha standard 60 hertz high potential test.
Refer to Insulation Test (Page 16).
NOTE: If the breaker secondary wiring is to
be given a hi-potential test at 1500 volts, remove
both the motor leads from the terminal connection.
Failure to disconnect the motor from the circuit
may cause damage to the winding insulation,
7. Lubticate the silver portion of the ball contact
at the top of the breaker bushing and the rear por-
tion of the ground shoe, by applying a thin jilm of
contact lubricant DS0H47.
8. Refer to metal-clad instruction book GEH-1802
for instructions on inserting the breaker into the
metal-clad unit.
DESCRIPTION OF OPERATION
‘The Magne-blast Breaker has twoprincipal com-
ponents; the breaker element and the operating
mechanism:
‘The breaker element is three similar pole units,
each of which includes the current carrying parts,
main and arcing contacts, interrupter, and an
enclosing barrier system that provides insulation
between poles, or phases and to ground. The pri-
mary connections to the associated metal-clad
4 * Indicates revision
switchgear are made through the ball contacts at
the top of the breaker bushings.
The operating mechanism type ML~13 is of the
stored energy type designed to give high speed
closing and opening. The mechanism will operate
on acc or d-c voltage as indicated on the breaker
nameplate, Closing and opening operations are
controlled’ either electrically from the metal-clad
unit and remote location, or mechanically by themanual close and trip levers on the breake
Magne-blast Circuit Breaker GEK-41902
All A spring release interlock, Fig 3, is provided
Secondary connectionsfrom the breaker tothe metal to discharge both the closing and opening springs
clad unit are made through the coupler (1) Fig; 2, when the breaker is withdrawn from or inserted
Figure 1, (8034475) spring Blocking Device
1
2.
3.
4
5.
6
7
8
9
10.
Figure 3, (8088805) Spring Discharge Linkage
into the Metal Clad unit.
Charge-Discharge Indicator
Support Bolts
Driving Pawl
Manual Close Lever
Motor
Eccentric
Closing Spring
Manual Charging Wrench
Fuse
Spring Blocking Device
Figure 2. (8034473) Left Side View ML~13
Operating Mechanism
Ankh ON
Secondary Coupler
Interlock Switches
Auxiliary Switch
Latch Checking Switch
‘Switch Cam
Charge-Discharge Indicator
Closing Latch Roller
Link
Power Switches
Adjusting Bolt
‘Trip Lateh Crank Closing Latch
Discharge Crank Closing Springs
Adjusting Clevis 11; Motor
Spring Release Crank 12, FusesGEK-41902 Magne-blast Circuit Breaker
A positive interlock (3) Figure 4 and interlock
switch (2) Figure 2, are provided between the
breaker and metal-clad unit to prevent raising
or lowering of the breaker in the unit while in a
closed position and to prevent a closing operation
when the breaker is not in either the fully raised
or lowered position, To insure that this interlock
will function during manual, as well as during
electrical operation of the equipment, both mechan-
ical and electrical blocking is provided. If for
any reason the closing springs should be dis-
charged against the positive interlock the mechan-
ism ‘will be jammed and be inoperable, The
mechanism can be released and returned to the
reset position by pushing in on the trip lever (8)
Figure 5. It may require more than normal
force to release the interlock,
A plunger interlock, Figure 14 can be provided
when required to operate a stationary auxiliary
‘switch and/or a rod interlock mounted in the metal-
clad unit.
=BP2 Wauran
5
Figure 4. (8034463) Right Side View-ML-13
Operating Mechanism
Upper Spring Pin
; Latehing Pawis
Bositive lterlock Roller
ening Spring
Cam Shaft
Ratchet Wheel
Bearing Block
Driving Pawl
Lower Spring Pin
10. Driving Pawl Lever
11. Eecentrie
12. Closing Spring
Rogpone
6 + Indicates revision
When the breaker is used interchangeably with
type MS-13 solenoid operated breakers in M-26
lad units, fuses (12) Figure 2, are mounted
on the breaker for protection of the motor and
closing circuit. These breakers are identified by
a"C" or "K" suffix in the breaker nomenclature.
«In cases where breakers with type ML-13
mechanisms must match and line up with breakers
having type ML~11 mechanisms the spring chargi
circuit for both mechanisms should be fused wit
Buss Company Fusetrons as follows:
Cont. Volt. | Fuse Size | Cat. No.
48y dee 304 | FRN $0
110v dee FRN 4
125v dee FRN 4
115v a-e FRN 4
220v dee FRN 2.5
250v de FRN 2°5
230v ac FRN 2.5
spring Charging
‘The mechanism has a high speed gear motor
(10) Figure 5, that compresses a set of closing
springs through the action of an eccentric, ratchet,
and pawl assembly. ‘The rotary actionof the motor
1s converted to a Straight stroke through the eccen-
tric (11) Figure 4, and alever that carries a spring
loaded driving pawl (3) Figure 1.
Figure 5. (8034471) Front View ML~13
Operating Mechanism
}, Auniliary Switeh
2. Open = Close Indicator
3. Trip Coil
4. Prop Spring
5. Operation Counter
6. Trip Latch
1. Charge-Discharge Indicator
8. Manual Trip Lever
9. Manual Close Lever
10. Motor
~~
am‘The pawl advances the ratchet wheel (6) Figure 4
a few degrees each stroke where it is held in pos-
ition by the latching pawls (2). When the ratchet
wheel has been rotated approximately 180 degrees
the closing springs (12) will be fully compressed,
‘As the ratchet wheel continues to rotate, the spring
load will shift over center and attempt to discharge.
‘After a few degrees of rotation, the closing roller
(7) Figure 2, will engage the closing latch (9) and
the compressed springs will be held by the latch
until a closing operation is required. During the
last few degrees of the ratchet wheel rotation the
power switches (8) are opened ard the driving pawl
is raised from the ratchet wheel surface. This
allows the motor and driving mechanism to coast
to a natural stop expending all residual energy.
During the time the springs are being com-
pressed a relay (17) Figure 6, is energized to hold
the closing circuit open. 'The relay remains
energized until the springs are fully charged and
the control switch contacts are re-set.
‘The closing springs may be charged manually
if control voltage is lost. A 5/8" ratchet wrench
can be used to rotate the eccentric in a counter
clockwise direction until the indicator reads"Charg-
Magne-blast Circuit Breaker GEK~41902
ed and the driving pawl is raised from the
fatehet wheel. The use of the ratchet wrench
provides for maximum safety in the event that
Control power is suddenly restored without warning.
In this ‘event, the motor drive will override the
ratchet wrench and continues to charge the springs.
Closing Operation
‘The breaker can be closed electrically by
energizing the spring release solenoid (15) Figure
6, or manually by pushing the close button (9)
Figure 5. In either method the closing latch is
rotated from under the closing roller, to release
ihe closing springs (10) Figure 2. The enerey
fn the springs 1s used to rotate a cam (16) Figure
T and close the breaker through the operating
mechanism linkage. During the closing operation
the mechanism is trip-free at al times. The break-
fer is held closed by the closing prop (14) moving
fhto position under the prop pin 3}, During the
closing operation the opening springs (4) Figure 4,
fare compressed and held ready for an opening
operation with the trip latch (8) Figure 7 bearing
against the trip lateh roller (9).
When the closing operation of the breaker is
completed and the closing latch is fully reset,
Figure 6. (8034467) Control Mechanism
1. Latch Checking Switch 7. Power Switches 13. Latch Monitoring Switch
2) Switch Cam 8, Closing Latch 14, Switch Mounting Bracket
3, Switch Striker 9, Closing Latch Shaft 15, Spring Release Solenoid
4, Switch Support Bolts 10, Latch Adjusting Screw 16. Release Coil Support
5, Switch Support 11, Release Coil Bolts 17. Control Relay
6. Closing Latch Roller 12.
Closing Latch SpringGEK-41902 Magne-blast Circuit Breaker
the contacts of the latch monitoring switch closes
to permit the spring charging motor to be energiz~
ed and recharge the closing springs.
‘Qpening Operation
The breaker can be opened either electrically
by energizing the trip coil (3) Figure 5, or man=
ually by pushing the trip lever (8). In each method
the trip latch is rotated off the trip latch roller,
permitting the operating mechanism linkage {0
collapse. ‘The energy stored in the opening springs
is released to provide the required opening speed
for successful interruption of the circuit.
As the breaker opens to interrupt a current,
the are finst starts af the arcing contacts (6 27)
Figure 6, transfers to the are runner (4 & 10)
and energizes the blow-out coils (3'& 11). This
action introduces a magnetic field between the
pole pieces (5 & 9) of the interrupter that forces
the are deeper into the are chute (6). At the time
the arcing contacts part a discharge of alr is
expelled through the ‘booster tube (28), across
the arc. This air flow assists the are transfer
and interruption by blowing the arc away from the
contacts and into the "are chute. The magnetic
field forces the arc deeper into the interrupter
along the diverging arc runners.
Fig. 7 (0114C5320) Sectional Side View of Mechanism
1. Handle 10. Trip Latch Roller Support Stop Plate
2. Trip Coll Support 11. Crank Shaft Spring Rod
3. Trip Coil 12. Cranks Spring
4. Trip Armature 18. Prop Pin Spring
5. Prop Reset Spring 14. Prop Spring Guide
8. Cam Follower Roller 15. Drive Shaft Stop Bin
7. Trip Shaft 16. Cam Main Shaft Bearing
8. Trip Latch 17. Cheek Nut Cam Shaft Bearing
9° Trip Latch Roller‘Magne-blast Circuit Breaker GEK-41902
'
2 =
3——_+——
4 +
5
6
7
8
9 ——+f
10. A
u AG
12 [ez
13 =
Figure 8. (0152C5973) Cross Section of Breaker Pole Unit
Box Barrier Support Lower Blow-out Coil 21. Operating Rod
Upper Blow-out Core Lower Blow-out Core 22, Stationary Primary Contacts
Upper Blow-out Coll Box Barrier Guide 23. Movable Primary Contacts
ipper Are Runner Front Bushing 24. Cup Bearing
Upper Pole Piece Rear Bushing 25. Yoke
Stationary Arcing Contact Frame 26. Movable Contact Arm Assembly
Box Barrier Main Operating Crank 27. Movable Arcing Contact
Are Chute Side Primary Contact Springs 28. Booster Tube and Piston
Lower Pole Piece Spring Retainer 29. Connection Bar
Lower Arc Runner 20. Lower Horizontal Barrier 30. Booster CylinderGEK-41902 Magne-blast Circuit Breaker
The arc chute has a series of interleaving cer-
amic fins, Figure 19, As the arcis forced into the
interrupter it is lengthened in the gradually deep-
serpentine path between the fins so that the
ctrical resistance of the arc is rapidly increased
and its heat is absorbed by the ceramic material.
‘The increased resistance reduces the magnitude
and phase angle of the current and at an early
current zero the arc cannot re-establish itself
and interruption occurs.
‘Trip Free Operation
It the trip coil circuit is energized while the
breaker is closing, the trip armature will force
the trip latch (8) ’Figure 7 away from the trip
roller (0) causing the mechanism ligkags to collapas
and the breaker to re-open. The closing cam (16)
Will complete its closing stroke and the springs
will re-charge as in a normal closing operation,
ADJUSTMENTS
All adjustments should be checked during per-
jodie inspections and whenever it becomes nec-
essary to repair or replace parts that have become
worn or defective while in service. The following
adjustments are listed in the order in which they
are to be checked after removing the box barriers
and front cover from the breaker,
DO NOT WORK ON EITHER THE BREAKEROR
Nuon
Primary Contact Wipe
MECHANISM UNLESS THE CLOSING SPRINGS ARE
BLOCKED AND THE OPENING SPRINGS HAVE
BEEN TRIPPED OPEN OR MECHANICALLY
BLOCKED. THIS MEASURE IS REQUIRED TO
PREVENT ACCIDENTAL CLOSING OR TRIPPING,
Arcing Contact Wipe
Refer to Figure 9, Close the breaker until
Arcing Contact Wipe
Figure 9, "-9" Contact Structure (0132C2709)
Figure 9 Contact Adjustments
1, Stationary Primary Contacts 5.
2, Movable Primary Contacts
3. Buffer Block
4. Stationary Arcing Contacts
10
Movable Arcing Contacts
6, Contact Arm
7. Throat Baffle
~,the arcing contacts just touch. This can be
determined with the use of a circuit continuity
fester such as a light indicator or bell set. In
this position, the gap between the stationary prima
contgets ()’and ihe movable primary. contact ()
Should be 8/16" or greater. This setting bas been
made in the factory and no adjustment is provided.
A wipe of 1ess than 5/16” is an indication that the
acing contacts need fo be replaced. “When making
ihis check, see that the movable arcing contact (3)
passes between the probes on the upper are runner
Without touching, "On. the "'=9" ‘design, check
for clearance between the arcing contact’ (6) and
the ‘slot inthe throat baffle (i) during ‘entire
Stroke of the moving contact assembly.
Primary Contact Wipe
Refer to Figure 9, when the breaker is closed
the stationary primary contacts. (1) should rise
from 1/4" to 5/16". Before checking this dimen-
sion be sure the mechanism is re-set so that
the prop pin (13) Figure 7 is resting on the prop.
To ‘obtain the proper contact adjustment, open
the breaker and, referring to Figure 10, loosen the
check nut (4) and turn the adjusting nut (3). Screw-
ing up on the adjusting nut will decrease the primary
contact wipe, down will increase it. Tighten the
‘check nut, close the breaker and recheck the wipe.
With the primary contact wipe correctly adjusted,
the clearance between the contact arm (6) Fig-
ure 9 and the buffer block (3) should be 1/16” or
greater when the breaker is fully closed.
Figure 10. (8039619) Adjustable Coupling For
Making Primary Contact
Wipe Adjustments
1, Operating Rod
2. Operating Rod Pin
3. Adjusting Nut
4. Check Nut
5. Stationary Primary Contacts
i
7 Contact Arm
8. Movable Primary Contacts
* Indicates revision
Magne-blast Circuit Breaker GEK-41902
Primary Contact Gay
Refer to Figure 10, With the breaker closed,
press the manual trip'button allowing the breaker
fo trip open normally. Do not force the contacts
open wider by hand, ‘The gap between the stationary
primary contacts (5) and the movable primary con-
fact (8) measured between the closest points, should
be 3.5/8" to 315/16". To change this gap, loosen
the check nut (17) Figure 7, and turn the adjusting
nut (18) on stud (19). Screwing the adjusting nut
down will decrease the primary contact gap. Tighten
the check nut and re-measure the contact gap
(close and trip the breaker before checking the
measurement). Whenever the primary contact gap
is changed, the primary contact wipe should be
rechecked and, if necessary, readjusted.
WHEN WORKING ON THE MECHANISM INTHE
CLOSED POSITION, KEEP FINGERS CLEAR OF
THE LINKAGE, AS ACCIDENTAL TRIPPING CAN
CAUSE SEVERE INJURY.
Trip Latch Wipe
Refer to Figure 7. The wipe of the trip latch
(8) on the trip roller (9) should be from'3/16”
to 1/4", ‘This can be measured by putting a film
vf grease on the latch (8), closing the breaker
part way, and tripping. The mechanism has the
proper trip latch wipe when the latch rests against
the stop pin (23). No adjustment is provided and
a visual inspection is usually all that is required,
If this setting is not correct, look for insufficient
travel of the trip shaft (7).
Joly Armature Travel
Refer to Figure 7. The trip armature (4) shoul:
have 1/16" to 3/6" travel before the trip inten (O)
starts to move plus 1/32" minimum overtravel after
tripping.
‘This can be adjusted by moving the trip coil support
(2) and/or by adjusting the trip armature screw (12)
Figure 11, "A locking screw located behind the trip
armature screw must first be loosened, Retighten
locking screw after making adjustment.
Release Latch Wipe
Refer to Figure 6. ‘The wipe between the release
latch (8) and roller (6) should be 3/16” to 1/4".
If re-setting is required, loosen, set, and re-
tighten adjustment nut and screw (10).
Release Latch Monitoring Switch
Refer to Figure 6, The release latch must be
fully re-set and the latch monitoring switch (13)
operated before the motor will start, When the
latch is fully reset the clearance between the switch
striker arm and the switch mounting bracket (14)
is 1/32" or less, this can be adjusted by bending
the striker arm,
Motor and Relay Switches
Refer to Figure 6, With the closing springs
blocked rotate the switch cam (2) until the switch
uGEK-41902 Magne-blast Circuit Breaker
Figure 11, (8039585) Auxiliary Switch and
Trip Coil
1. Open - Close Indicator
2) Auxiliary Switch
3. Prop Spring
4. Trip Latch Spring
5. Spring Discharge Crank
6. Cotter Pin
1. Trip Coil Support
8. Trip Coil
9. Mounting Bolts
10. Latch Set Screw
11. Trip Latch
12) Trip Arm Screw
13. Manual Trip Lever
striker (3) has traveled the maximum amouct
(about 180 degrees rotation of cam). At this point
the clearance between the striker and the switch
support (5) should be 1/32" or less. This can be
adjusted by loosening the switch support mounting
bolts (4) and rotating the support.
Interlock Switch Wipe
Refer to Figure 12. With the positive interlock
in the reset, or normal position the clearance
between the interlock switch arm (2) andthe switch
mounting plate (3) should be 1/32" or less. This
can be adjusted by bending the switch arm,
Driving Pawl Adjustment
Refer to Figure 4. The driving pawl (8) must
advance the ratchet wheel (6) sufficiently on each
stroke to allow the latching pawls (2) to fall
into the ratchet teeth, This should be checked with
the closing spring load against the driving members.
With the ‘mechanism unblocked, hand charge the
closing springs with the manual charging wrench
until they are slightly more than half charged,
Slowly rotate the charging wrench until the driving
pawl has traveled through its return stroke and
check the maximum clearance between the pawl
and the ratchet tooth. Rotate the charging wrench
until the driving pawl has advanced the ratchet tooth
12 * Indicates revision
Figure 12. (8034474) Positive Interlock switch
1. Positive Interlock Shaft
2. Switch Arm
‘Switch Support
Interlock Switch
Auxiliary Switch
Switch Suppo
Latch Checking Switch
Switch Arm
Trip Shaft
to its maximum travel. Now check the clearance
between the ratchet tooth and the latching pawl, The
clearance should be approximately equal for both
the driving und latching pawls and not less than
015" in either case.
If adjustment is required for either pawl the
springs must first be fully charged and blocked,
Loosen seven motor support bolts (2) Figure 1
and move entire motor assembly to the rear if
the clearance is under the minimum at the latching
pawls, and to the front if the clearance is under
the minimum at the driving pawl, Move the motor
assembly approximately twice the dimensional in-
crease required at the pawl. Be certain the
motor assembly is moved straight forward or
rearward and tighten the one bolt on the right side
of the mounting frame first to assure proper
alignment, After tightening the remaining bolts
the springs should be released and the clearance
again checked as described above.
Crank Shaft End Play
‘The outboard cranks (12)Figure 7 on the crank
shaft shouldbe adjusted so the end play side to side——\,
is less than 0.015 inch. After this adjustment is
made, the clearance of the prop pin(13)Figure 7 to
the frame is a minimum of 0.025 inch.AUXILIARY DEVICES
Latch Checking Switch
Refer to Figure 13. Charge the closing springs
sufficiently to reset the mechanism linkage. Rotate
the trip latch (4) by pressing the manual trip lever
Figure 13, (0114C5320) Latch Checking Switch
1, Switch Support 5, Reset Pin Stop
2. Latch Checking Switch 6. Latch Roller
3. Switch Arm Latch Roller Link
4. Trip Latch ; Latch Roller Pin
to open the latch checking switch (2), Allow the
trip latch to reset slowly and determine the point
at which the contacts are made by using a circuit
Continuity tester Gught indicator, bell set, etc),
‘The contacts of the latch checking switch should
just make when the gap between the trip latch
{8)‘and the stop, pin (9) located on the latch roller
Tine (i) is 1/16") "There should be a minimum of
1/64" between the switch arm (3) and the switeh
Support (1). To obtain adjustment of the latch check-
fagvewiteh, bend the latch checking switch arm
Plunger Interlock
Refer to Figure 14, With the breaker in the
closed position, the vertical distance "A" from the
top of the plunger bolt (1) to the bottom of the
breaker lifting rail (3) should be 16-19/32" to
16-23/32", To change this adjustment, add or
remove washers (2).
Auxiliary Fuses
Refer to Figure 15. Onbreakers witha "C" or
“"K" suffix, a set of protecting fuses (10)are mounted
‘on the front of the breaker, These fuses are the
primary protective devices for the closing control
Gireuit on those breakers that are used in metal
lad units designed for solenoid operated breakers.
* Indicates revision
Magne-blast Circuit Breaker GEK-41902
Figure 14, (8034464) Plunger Interlock
1, Plunger Bolt
2. Washer
3. Breaker Lifting Rail
Figure 15. (8034471) Driving Elements
1, Mounting Bolts
2: Manual Close Button
Retaining
Rel Ring
5. Hex Charging Stud
6. Driving Link
7. Motor Support
8. Retaining Ring
9. Motor
10. Fuse
Inspection and Test
1
For ease in reviewing the adjustments, the
following are recapitulated:
a, Primary contact wipe: 1/4" to 6/16".
b. Arcing contact wipe: 5/16" or greater
gap at primary contact:
c. Primary contact gap: 3-5/8" to3-15/16".
4, Trip latch wipe: 3/16" to 1/4" with trip
lateh resting against stop pin.
e. Trip armature travel 1/16"t0 3/16" plus
1/32" minimum overtravel.
{, Release latch wipe: 3/16" to 1/4".
g. Release latch monitoring switch: Max-
imum clearance 1/32",
13GEK-41902 Magne-blast Circuit Breaker
h. Motor and relay switch:
clearance 1/32".
1. Interlock switeh: maximum clearance
i, Driving and Latching Pawl: minimum
clearance to ratchet teeth .015",
Kk, Latch checking switch contacts make
when the gap between the trip latch
and the stop pin is 1/16".
1, Plunger interlock: ‘16-19/32" to 16-
23/32",
Check all nuts, washers, bolts, cotter pins,
and terminal’ connections for tightness.
maximum
3. Inspect all wiring to make sure that no
damage has resulted during installation,
and test for possible grounds or short
circuits.
4, See that all bearing surfaces of the mech-
anism have been lubricated. Refer to the
section on LUBRICATION. (Page 16 and
Figure 17).
5. Operate the breaker slowly with the manual
charging wrench and note that there is no
excessive binding or friction and that the
breaker can be movedto the fully opened and
fully closed positions,
See that any place where the surface of the
paint has been damaged is repainted immed-
iately.
7. Check, the trip coll plunger and the release
coil plunger to see that they move freely,
Opening and Closing Speeds
The closing speed of the arcing contact of the
breaker should be a minimum of 11feetper second,
This represents the average speed of the movable
arcing contact from a point 3” before the tip is
tangent to the lower surface of the probes on the
upper arc runner to the tangent position,
‘The opening speed of the arcing contact should
be a minimum of 12 feet per second, This repre-
sents the average speed over 3" from the point
when the tip on the movable arcing contact is
tangent to the lower surface of the probes on the
upper runner. Proper servicing and lubrication
of the breaker and its operating mechanism should
maintain these speeds and no adjustment is provided,
Control Power Check
After the breaker has been operated several
times with the manual charging wrench and the
mechanism adjustments are checked as described,
the operating voltages should be checked at the
release coil, trip coil, and motor terminals.
Control Power for electrical operation of the
breaker may be from either an alternating or
direct current source. The operating ranges for
the closing and tripping voltages as given on the
breaker nameplate, are as follows:
Nominal
Voltage
Closing
‘Tripping
Range
Range
- 4
Sovdee | 28
ll5vd-c | 60
13ov d-e | 70
230v d-e | 120
260v d-e | 140
125v a-c | 95
250va-c | 190
2avd-e | -
4avd-c | 34
Lov dee | 80
125v dec | 90
220v dec | 160
250v d-e | 180
115v a-c | 95
230v a-c | 190
30v de
Gov dec
125v dec
140v de
250v d-c
280v de
125v a-c
250v a-c
If the closed circuit voltage at the terminals
of the coil or motor does not fall in the specified
range, check the voltage at the source of power and
line drop between the power source and breaker.
When two or more breakers operating from the
same control power source are required to close
simultaneously, the closed circuit voltage at the
closing coil or motor of each breaker must fall
within the specified limits.
Electrical closing or opening is accomplished by
energizing the closing or trip coil circuit. Control
Switches are provided for this purpose on the
metal-clad unit. It is also possible to trip or close
the breaker manually by pressing the manual trip
lever (8) Figure 5 or the manual close button (9).
GENERAL MAINTENANCE
General
Safe and dependable service from electrical ap-
paratus and power systems is contingent upon re-
liable performance of power circuit breakers. To
obtain maximum reliability the breaker should be
inspected and maintained on a regular schedule,
The breakers are designed in accordance with ap-
plicable standards which require that they be
capable of performing up to 5000 operations for
1200 ampere breakers and 3000 operations for 2000
ampere breakers switching rated continuous cur-
rent before any replacement of parts should be
necessary. This requirement is based on the
breakers being serviced, or maintained, at least
14
every 2000 operations, or onceper year, whichever
comes first. If the breaker is also required to
interrupt fault currents during this period of time
additional maintenance and replacement of parts
may be necessary,
BEFORE ANY MAINTENANCE WORK IS PER-
FORMED, MAKE CERTAIN THAT ALL CONTROL
CIRCUITS ARE DE-ENERGIZED AND THAT THE
BREAKER 1S REMOVED FROMTHE METAL-CLAD ——\
UNIT. DO NOT WORK ON THE BREAKER OR
MECHANISM WHILE IN THE CLOSED POSITION
UNLESS THE PROP AND TRIP LATCH HAVE
BEEN SECURELY WIRED OR BLOCKED TO PRE-VENT ACCIDENTAL TRIPPING. DO NOT WORK
ON THE BREAKER OR MECHANISM WHILE THE
SPRINGS ARE CHARGED UNLESS THEY ARE
SECURED IN THAT POSITION BY THE MAIN-
‘TENANCE SPRING BLOCKING DEVICE.
Periodic Inspection
‘The frequency of the inspection and maintenance
operations required should be determined by each
‘operating company and will depend on the applica~
tion of the breakers and the operating conditions.
Factors which should be considered are: Import-
ance to overall plant or system operation; number
of operations and magnitude of currents switched by
Breaker; frequency of fault interruptions; and the
atmospheric conditions in which the breaker nor-
mally operates, Extreme conditions of dust,
moisture, corrosive gases etc., can indicate that
inapection and maintenance will be required more
frequently than every 2000 operations. Very clean
dry operating conditions with low current switching
duty can justify a longer period of time between
inspections, Any time a breaker is known to
have interrupted a fault at or near its rating it
is recommended that the breaker be inspected and
necessary maintenance be performed as soon after
the interruption as is practical. The following
instructions give the items that should be included
in an inspection and general recommendations on
the maintenance of breakers.
Interrupters
Since there are no moving parts, the interrupters
of a magne-blast breaker will normally require
a
TT
i
Magne-blast Circuit Breaker GEK-41902
little or no inspection unless there is evidence
of damage to the arc chutes sides or contamination
in the throat area. If either of these conditions
are present the interrupters should be removed
from the breaker and the following points noted:
1, The throat area of the interrupter should
be cleaned with sandpaper (Do Not use
emery cloth or other metallic abrasives).
All flat areas on either side of the movable
‘arcing contact travel should be sanded.
Do not sand or otherwise attempt to clean
the ceramic fins of the arc chute sides.
Heavily contaminated parts should be re-
placed,
Cracks which have formed in the fins of the
are chute are to be expected in ceramic
materials of this type when subjected to
the severe heat of an arc, These cracks
do not interfere with the operation of the
device in any way and shouldbe disregarded.
3, If the are chute has suffered any mechanical
injury due to dropping or accidental striking,
resulting in the actual breaking off of fins,
replacement will be necessary. Sm:
broken corners on the exhaust end of the
are chute sides will not interfere with its
performance and can be disregarded,
4, The plastisol flexible covering for the pole
pieces (3 & 6) Figure 18 shouldbe inspected
for breaks in the insulation. If there are
holes or breaks in the insulation they
should be repaired or the part replaced.
+ Electrical Connections
To assure that the electrical connections
have remained tight, they should be checked during
installation as well as during each maintenance in
spection. This check of electrical connections is
particularly necessary on breakers used in nuclear
generating stations and other critical applications.
‘The bolted braid connections on the stationary arcing
contacts should be checked for tightness by removing
the are chutes as described on page 15.
. Rear Bushing
Supporting Bolt
Upper Interrupter Support
Stationary Arcing Contacts
Movable Arcing Contact
Mounting Bolts’
‘Are Chute Brace
‘Support Bracket
Lower Supporting Bolt
Lower Interrupter Support
interrupter
Figure 16, (8917442A) Interrupter Removed Showing Accessibility of Arcing Contacts
* Indicates revision
15GEK-41902 Magne-blast Circuit Breaker
Interrupter Removal and Replacement
Refer to Figure 16. To remove the interrupter
loosen the two upper supporting bolts (2) and the one
lower support bolt (9)using a standard 3/4" wrench,
Raise the assembly approximately 3/8" and slide
it toward the rear of the breaker.
To reassemble the interrupter to the breaker,
rest the lower interrupter support (10) on thé
Support bracket (8). Slide the arc chute forward
Lifting it slightly to engage the supporting bolts (2)
in the slots of the upper interrupter support (3).
Check to assure that the upper insulation is prop
erly positioned within the barrier suspended from
the stationary contact support (9) Figure 23.
Tighten the supporting bolts (2 and 9) Figure
16, These bolts serve as both the electrical
and mechanical connections between the bushings
and the are runners within the interrupter. Check
that the movable arcing contact (5) passes between
the probes on the upper are runner (5) Figure 19
without touching,
Breaker Contacts
By removing the box barrier the movable and
stationary primary contacts andthe movable arcing
contacts ‘can be inspected, The stationary arcing
contacts can be inspected only after removing the
interrupter. If the contacts are burned or pitted,
they can be made smooth with a fine file,
After completing inspection of the contacts,
check the contact adjustments as specified under
ADJUSTMENTS.
‘Mechanism
A careful inspection should be made to check
for loose nuts or bolts and broken retaining rings:
All ‘cam, ‘roller, and latch surfaces should be
inspected for any evidence of damage or excessive
Wear. Lubricate the mechanism as outlined below,
then, using the manual charging wrench, open and
close the breaker several times to make certain
that the mechanism operates freely throughout its
entire stroke. Check the mechanism adjustments:
as Specified ‘under ADJUSTMENTS. Check the
control wiring for tightness of connections and
damaged insulation,
Bushings and Insulation
The surface of the bushings should be kept clean
and unmarred to prevent moisture absorption.
If the insulation surface should become damaged,
it should be sanded and cleaned, and should be
refinished with either clear varnish or clear
resin, Allow to dry smooth and hard,
All other insulation parts on the breaker should
be kept clean and dry. Smoke or dust collected
16 * Indicates revision
between inspection periods should be wiped off,
and if dampness is apparent, heaters should
installed in the metal clad switchgear to insure
dryness,
Insulation Test
When insulation has been repaired or replaced,
or when breaker has been operating in adversé
moisture conditions, it is recommended that the
insulation be checked before the breaker is placed
back in service. A standard 60 hertz high poten-
tial test at 14,000 volts RMS for one minute will
normally indi¢ate whether the breaker is satis-
factory for service. With the breaker contacts in
the fully opened position, apply the test potential
to each terminal of the breaker individually with all
other terminals and the breaker frame grounded,
After high potential tests are made on organic ine
sulating materials, these materials should be
inspected for visible leakage current paths, and
necessary action must be takento repair or replace
insulation that may have been affected by moisture
absorption,
If the breaker secondary wiring is to be given
a high-potential test at 1500 volts, remove both of
the motor leads from the terminal board. Failure
to disconnect the motor from the circuit may cause
damage to the winding insulation.
Lubrication
In order to maintain reliable operation, it is
important that all circuit breakers be properly lu-
bricated at all times. Some of the bearings and
rolling surfaces utilize a new type of dry lubrica-
tion that will require no maintenance and will last
the life of the equipment. The remaining bearings
and surfaces require lubrication as listed in the
lubrication chart, Figure 17. These have been
Properly lubricated during assembly at the factory,
using the finest grades of lubricants available.
However, even the finest oils and greases have a
tendency to oxidize with age, as evidenced by hard-
ening and darkening in color. Elimination of the
hardened lubricant is essential for the proper op-
eration of circuit breakers. Also frequent opera-
tion of thebreaker causes the lubricant to be forced
out from between the bearing surfaces. A simple
lubrication will often clear up minor disturbances
which might be mistaken for more serious trouble.
A definite lubrication schedule should be set up
taking into consideration the frequency of operation
of the breaker and local conditions.
It is recommended that lubrication of the breaker
and its operating mechanism be a part of the per
iodic inspection and maintenance program, with not
more than a two year period between lubrications.
It is also recommended that all circuit breakers be
operated at regular intervals, at least once ayear,
to insure the lubrication is in good condition and
the breaker is operable,‘The lubrication chart, Figure 17, is divided into
‘two methods of lubricat{on. ‘The first method out
lines the maintenance fubrication which should be
performed at the time of periodic maintenance, and
requires no disassembly. The second method out-
lines a lubrication procedure similar to that per-
‘Magne-blast Circuit Breaker GEK-41902
formed on the breaker at the factory, and should be
used when a general overhaul of the breaker is
necessary,
General Electric Lubricants D50H15 and D50H47
are available in 1/4lb collapsible tubes. It is so
packaged to insure cleanliness and to prevent
oxidation,
PARTS
LUBRICATION AT
MAINTENANCE PERIOD
ALTERNATE LUBRICATION
(REQUIRES DISASSEMBLY)
Prop & Trip Shaft Bearings
(Teflon coated bearings)
No lubrication required
No lubrication required
Sleeve Bearings - main crank shaft,
mechanism pawls, spring charging
and operating linkages, etc. (Bronze)
Light application of machine
oil SAE 20 or SAE 30.
Remove bearings or links,
clean per instructions and
apply DS0H15 lubricant
liberally.
Contact Arm Hinge Assembly
Cup Bearing
Loose rings between bushing and
contact arm
No lubrication required
Wipe clean and apply D50H47.
Roller and Needle Bearings
Light application of machine
oil SAE 20 or SAE 30.
Clean per instructions and re-
pack with D50H15 lubricant.
Ground surfaces such as cams, ratchet
teeth, ete, (Surfaces coated with MoS)
No lubrication required.
No lubrication required.
Ground surfaces such as latches,
rollers, prop, etc.
Wipe clean and apply
DS0H15 lubricant
Wipe clean and apply
DS0H15 lubricant.
Silver plated contacts and primary
disconnect studs
Wipe cleanad apply
DS0H47 lubricant
Wipe clean and apply
DS50H47 lubricant.
Booster Cylinder
Do not lubricate
Do not lubricate
Arcing Contacts
Do not lubricate
Do not lubricate
Figure 17, Lubrication Chart
METHOD OF CLEANING
‘BEARINGS
Whenever cleaning of bearings is required, as
indicated in the lubrication chart, the following pro-
cedures are recommended.
* Indicates revision
Sleeve Bearings
The sleeve bearings used in the prop (14) Fig-
ure‘ and the bearings for the trip shaft (7) utilize
Teflon surfaces and do not require lubrication.
After a number of operations, the surface will ac-
17GEK-41902 Magne-blast Circuit Breaker
quire a thin black film. Do not remove this film
unless there is evidence of outside contaminants,
such as dry or hardened grease. If contaminants
are present they should be removed by immersing
thepropandbearing in clean petroleum solvent, or
similar cleaner, and using a stiff brush, Do not
remove the bearings from the prop or frame. DO
NOT USE CARBON TETRACHLORIDE,
The remaining sleeve bearings located in the
driving element and the mechanism linkage and
frame shouldbe cleaned and relubricated with G-E
DSOH15 lubricant at general overhaul periods. This
includes the bearings in the driving link (6) Figure
15, driving pawl lever (10) Figure 4, driving paw!
(6), latching pawls (2), trip lateh roller support
(10) Figure 7, cranks (3), and the bearings in the
mechanism frameand interconnecting links. Bear-
ings that are pressed into the frame or other mech-
anism members should not be removed.
The cup bearing (24) Figure 8 of the primary
contact arm should be disassembled, cleaned,
and lubricated with G-E D50H47 lubricant at gen-
eral overhaul periods.
‘The main shaft bearings (24) Figure 7 should
be removed, cleaned, and lubricated with G-E
D50HI6 lubricant at general overhaul periods.
Roller and Needle Bearings
Refer to Figure 7, The cam follower bearings
6), lateh roller bearing (9), and cam shaft bearings
(25) should be removed from the mechanism and
the inner race disassembled, They should then be
placed in a container of clean petroleum solvent
or similar cleaner. DO NOT USE CARBON
TETRACHLORIDE. ‘If the grease in the bearings
has become badly oxidized, it may be necessary to
use alcohol (type used for thinning shellac) to
remove it. Ordinarily, by agitating the bearings in
the cleaning solution, and using a stiff brush to
remove the solid particles, the bearings can be
satisfactorily cleaned. Do not handle the bearings
with bare hands as deposits from the skin onto the
bearings are inductive to corrosion, If the bear-
ings are touched, the contamination can be removed
by washing in alcohol, After the bearings have been
thoroughly cleaned, spin them in clean new light
machine oil until the cleaner or solvent is entirely
removed, Allow this oil to drainoff and then repack
them immediately with G-E lubricant D50H15 being
sure all metal parts are greased. Theinner races
should then be assembled,
NOTE: If it becomes necessary to clean the
bearings in alcohol (shellac thinner), be sure
the alcohol is perfectly clean, and do not allow the
bearings to remain in the alcohol more than a few
hours. If it is desirable to leave the bearings in
the alcohol for a longer time, an inhibited alcohol
such as is used for anti-freeze should be used.
Even then the bearings should be removedfrom the
alcohol within twenty-four hours. Precautions
against the toxic effects of the alcohol must be
exercised by wearing rubber gloves and by using
18. * Indicates revision
the alcohol in a well ventilated room; excessive
exposure to the fumes is sometimes’ unpleasant,
to” personnel,
oil, draining ‘and repacking with lubricant DS0H15
should follow immediately.
Bearings that are pressed into the frame or other
members ‘such as the motor support (7) Figure 15,
should not be removed. After removing the shaft
and inner race the bearing can be cleaned satis-
factorily with petroleum solvent or a similar
cleaner and a stiff brush. Follow the procedure
outlined above using a light machine oll and G-E
lubricant D50H15 before reassembling the inner
race and shaft,
Rolling Surfaces
A number of rolling and rubbing surfaces in the
mechanism have been lubricated with a baked-on
ary, molybdenum disulfide coating. This lubri-
cation, which can be recognized by its dark, almost
black ‘color (e.g. Face of switch cam (5) Figure 2)
requires no maintenance and should last the life
of the breaker.
Other rolling or rubbing surfaces that are not
lubricated with molybdenum disulfide should have
the dried, dirty grease removed and a thin film
of fresh lubricant D50H15 applied.
MAINTENANCE,
Magne-blast breakers used for switching arc
furnaces or capacitors will require more frequent
and more detailed inspection and maintenance
because of the repetitive nature of the applications,
The following schedule is recommended for such
breaker:
A. Every 500 Operations, or Every Six Months-
Whichever Comes First:
1, Remove the box barriers.
2, Wipe all insulating parts clean of smoke
deposit and dust with a clean dry cloth,
including the bushings, and the inside
of the box barriers,
3, All flat parts in the throat area of the
interrupters shouldbe thoroughly clean-
ed by using sandpaper. This cleaning
should be performed any time the inter-
rupter is removed. The fins onthe are
chute sides should not be cleaned.
Whenever the interrupter is removed,
loose dust and dirt should be blown
out before replacing arc chutes. Throat
insulation which is heavily contaminated
should be replaced.
B, Every 2000 Operations, or Every Six Months
Whichever Comes Firs
1, In addition to the servicing done each
500 operations, the following inspection
should be made and work done when
required,
‘Washing the bearings in the ligh™\
~1
Primary Contacts (3 and 10 Figure 23).
Inspect the condition of the stationary
contact fingers and movable contact
Blocks. Badly pittedor burned contacts
should’ be replaced. (Note: Burned
primary contacts indicate the probable
need for arcing contact replacements)
If the contact surfaces are only rough-
ened or galled, they shouldbe smoothed
with crocus cloth or draw filed. After
contact dressing the primary contacts
should be greased lightly with D50H47.
Arcing Contacts (6 and 27 Figure 8).
‘When the arcing contact wipe is less
than the minimum specified under AD-
JUSTMENTS, the contacts should be
replaced. "The contacts should be
inspected for uneven wear and/or dam-
age using a mirror to inspect the
Stationary confacts. Normally it will
not be necessary to remove the inter-
rupters for this 2000 operation ser-
vicing unless inadequate wipe or con-
tact condition indicate a need for re-
placement. If the interrupters are re~
moved, the contact braids, and other
parts subject to arcing shouldbe check-
ed for possible cleaning or replacement,
Do not grease the arcing contacts under
Par er aeestanes ecomactsn ‘circumstances.
Check the breaker and mechanism ad-
fustments as summarized under IN-
SPECTION AND TEST. Thenecessary
Teadjustments should be made as de~
scribed under ADJUSTMENTS.
‘The breaker and operating mechanism
should be carefully inspected for loose
nuts, bolts, retaining rings, etc., all
‘cam, latch’and roller surfaces should
be inspected for damage or excessive
wear. The buffer blocks and their
retainers on the bottom of the stationary
contact support should be inspectedfor
possible need of replacement.
‘The contacts of the control relay (17)
Figure 6, should be inspected for wear
and cleaned if necessary.
Lubricate the breaker operating mech-
anism in accordance with instructions
Under LUBRICATION, page 16 and the
lubrication chart Figure 17.
Inspect all wiring for tightness of con-
nections and possible damage of in-
sulation,
After the breaker has been serviced,
it should be operated manually to be
sure there is no binding or friction
and that the breaker contacts can move
to the fully opened and fully closed
‘Magne-blast Circuit Breaker GEK-41902
positions. Its electrical operation
should then be checked using either the
test cabinet or the test couplers.
C, After Every 10,000 Operations:
5.
6
In addition to the servicing done each
2000 operations, the interrupters should
be removed from the breaker and dis-
assembled to permit a detailed inspec-
tion of insulation, blow-out coils, arc
runners and assemblies which’ can
become contaminated by arc products.
The blow-out coils should be carefully
examined and if the insulation hasbeen
cracked, shrunk or eroded from are
action and heat so that the turns of the
coils are not fully insulated from each
other, the coils should be replaced, All
connections should be checked for
tightness.
The are runners should be inspected
and replaced when any part of their
area has been reduced to 25% of the
original metal thickness as a result
of are erosion.
Check the stationary are contacts to
assure that the arcing contacts are in
good condition and that their connections
are tight.
Insulating material that is carbonized
and cannot be satisfactorily cleaned
should be replaced.
Any parts damaged or severely burned
and/or eroded from are action should
be replaced.
NOTE: Fine cracks may develop in the
fins of the arc chute sides. This is to
be expected with ceramic materials
when subjected to the high heat of an
are and may be disregarded unless
they are long and present a possibility
of fin sections breaking completely off.
Small broken corners on the exhaust
fend of the are chute will not interfere
with its performance and can also
be disregarded.
‘The cup bearing and the contact ring
at the hinge point of the contact blade
Should be disassembled, inspected,
cleaned, and relubricated with G-E
contact lubricant D50H47. The contact
Ting should be inspected for wear and
replaced when reduced in thickness to
Jess than 1/32", When reassembling
the cup bearing, be sure the cotter
pin is properly assembled in the castle
hut on the hinge pin (7) Figure 23.
This assures proper contact pressure
at the hinge.
19GEK-41902 Magne-blast Circuit Breaker
D. Every 20,000 operations or Approximately
Every Five Years - Whichever comes first:
The breaker should be given a general
inspection and overhaul as required,
All excessively worn parts in both th
mechanism and breaker should be re-
placed. Such wear will usually be
indicated when the breaker cannot be
adjusted to indicated tolerances. This
overhaul and inspection is more detail~
ed and will require disassembly of mech-
anism and breaker operating parts,
2, All roller and needle bearings in the
operating mechanism should be dis-
assembled, cleaned, and repacked with
G. E. lubricant DS0H15 as described
under LUBRICATION,
3, The stationary primary contact fingers
(3) Figure 23, should be disassembled
and the silver-plated pivot area of the
contact and contact support cleaned
and lubricated with G-E lubricant
D5cHa7.
‘The breaker and operating mechaniem
should be serviced as described for
every 2,000 operations and properly
adjusted’ before being put back into
service,
REPAIR AND REPLACEMENT
This section covers the proper method of
removing and replacing those parts of the breaker
subject to damage and wear that may require repair
or replacement at the installation. IMPORTANT:
UPON COMPLETION OF ANY REPAIR WORK, ALL.
BREAKER AND MECHANISM ADJUSTMENTS MUST
BE CHECKED. Refer to the section on IN-
STALLATION, paying particular attention to AD-
SUSTMENTS and FINAL INSPECTION.
ARC CHUTE (To inspect or replace blow-out coils
and are runners):
With the breaker open and the closing springs
in the blocked position, remove the box barriers
(7) Figure 8. The interrupter can now be re-
moved as described under INTERRUPTER RE-
MOVAL AND REPLACEMENT page 16.
To disassemble the interrupter after ithas been
removed from the breaker, proceed as: follows:
NOTE: When disassembling the arc chute and
its components some small washers, spacers,
etc., will be found that cannot be identified in
these instructions. Care should be taken to
collect and identify these items so they can be
reassembled correctly.
1, Remove the assembly bolts (7, 9, 11, &13)
Figure 18,
20
2. Romare the side brace (5), and pole pieces —N
3, To remove the upper are runner assem-
bly (4) igure 20, remove assembly bolt
G3 Figure
4, Remove the assembly bolts (15) Figure
18 to remove the lower brace (8).
| Remove the lower interrupter support (13)
by removing the assembly bolts C4) ana
the connection nut (8) Figure 20,
6. At this point, the throat shields (5) Figure
20, ‘the lower arc runner assembly (6)
cah be‘removed.
7, Further disassembly of both the upper and
lower arc runner assemblies can be done
by removing the various screws andassem-
'y bolts (not illustrated) as shown in
Figure 19.
The are chute sides (6) Figure 19, can
also be separated for, ingpsction after
removing assembly bolts (2 & 4) Figure
18,
Reassemble the interrupter in the reverse order.
‘The following items should be noted during re-
assembly:
1, The fins of the are chute sides should be
equally spaced and aligned before bolt
together. ‘The front edge (along the runner}
of the two are chute sides shouldbe parallel
and in line,
2. The gap between the fina atthe rear of the
are chute sides measuredat east i" infrom
the back end of the arc chute (See Figure
21) should be 1/64" to 3/32",
3. Check to insure that electrical connections
to the blowout coils are tight.
4. When reassembling the arc runner as-
smblies, check that the spacers are cor-
ctly installed,
Before bolting the upper supports in place,
make certain that the upper are runner
assembly is tight against the arc chute
side so that the gap between the throat
insulation (7) Figure 19, and the arc
chute sides (6) is a minimum,
6. Make certain that the electrical connections
(2&8) Figure 20 are tight.
Reassemble the are chute on the breaker as
described under INTERRUPTER REMOVAL AND
REPLACEMENT, page 16,
on,‘Magne-blast Circuit Breaker GEK-41902
Assembly Bolts and Bushing
‘Assembly Bolts
Upper Pole Piece
Assembly Bolt
Side Brace
Lower Pole Piece
Assembly Bolt
Lower Brace
‘Assembly Bolt
Upper Interrupter Support
‘Throat Shield
Assembly Bolt
Lower Interrupter Support
Assembly Bolts
Assembly Bolts
Upper Arc Runner Spacer
Upper Arc Runner Assembly
Blowout Core
Blowout Coil
Upper Are Runner
‘Are Chute Side
Throat Insulation
Lower Shield
Lower Arc Runner
Blowout Coil
Blowout Core
Lower Insulation
Lower Are Runner Assembly
Lower Coil Connection
‘Lower Arc Runner Spacers
Figure 19, (8917442D) Interrupter Assembly with Side Removed
2GEK-41902 Magne-blast Circuit Breaker
22
Figure 20. (8917442C) interrupter Assembly
1. Upper Mounting Support
2. Connection Bolt
3. Insulation Plate
4. Upper Arc Runner Assembly
5. Throat Shield
8. Lower Arc Runner Assembly
7. Lower Coil Connection
8. Connection Nut
9. Lower Mounting Support
Figure 21. (8029373) Are Chute Fin Spacing
CONTACTS,
Open the breaker and remove the box barrier
and interrupters as previously described. To
remove the contacts, proceed as follows:
AL
Stationary Arcing Contacts (10) Figure 22.
1, Disconnect the contact braids (7) from
the contact fingers by removing two
bolts and locking plates (8).
2, Grasp the lower end of the contact
fingers with pliers and pull contact
assembly downward to remove from
stud assembly.
3. To disassemble braids from stud plate
remove one bolt (5).
4, To disassemble stud plate from contact
‘Support, remove two bolts (6).
5, Reassemble in the reverse order, make
sure locking plates are properly re-
assembled with bolts (8).
Movable Arcing Contact (14) Figure 23.
1, Remove the assembly bolts (12) making
note of quantity and location of shims
and spacers used between contacts and
contact arms,
2, Reassemble in reverse order, re-using
the shims and spacers.
3. Close the breaker slowly to check
that the movable arcing contact is
approximately centered on the station-
ary arcing contact and that it does
not rub on either side of the throat
barrier (9).
NOTE: Whenever it is found necessary
to replace arcing contacts on any pole
of a breaker it is recommended that
both the stationary and movable con-
tacts on that pole be replaced at the
same time,
Stationary Primary Contacts (9) Figure 24,
1, Compress the contact spring (6) by
use of the spring compressor.
2, Remove spring and spring guide (1).
3, Raise the contact finger to clear the
primary contact stop plate (8) and lift
the finger out of contact support (7).
Remove one contact finger at a time.
To replace the Stationary Primary Contacts:
1, Apply a thin coating of D50H47 grease
on the hinged edge of the finger (9) then
place it on the contact support (7) so
—~.4
‘Magne -blast Circuit Breaker GEK-41902
1, Rear Bushing
2. Guide and Support for Interrupter
3. Bolts for Contact Support
4. Contact Support
5. Bolt for Flexible Braid
6. Mounting Bolt
7. Flexible Braid
8. Connection Bolt
9. Stud for Mounting Arcing Fingers
10. Stationary Arcing Contact Assembly
11. Throat Baffle
Figure 22, (89174428) Rear Bushing Assembly
that it is retained by stop plate (8).
Open spring compressor (3) and as~
semble spr: ide, spring and spring
compressor (Figure 24A),
‘Turn nut (2) in clockwise direction to
compress contact spring (Figure 245).
Hold spring firmly in yoke on spring
‘compressor to prevent spring from
‘slipping out of the compressor,
st spring, place top of ple into
top of spring, place
hile in apring Tetainer (4) and the
found end of spring guide in cutout in
primary finger (Figure 24C).
Hold spring assembly firmly in place
and remove spring compressor.
D. Movable Primary Contacts (10) Figure 23.
tacts on a 12
To replace the movable primary con-
ampere breaker proceed a5
follows:
1
Disassemble nuts from assembly bolts
(11) and remove the movable primary
contacts (10).
Reassemble in reverse order.
To replace the movable primary con-
tacts on a 2000 ampere breaker it is first
necessary to disassemble the movable arc-
ing contacts,
1,
then proceed as follows:
Disassemble operating rod pin (4),first
noting quantity and location of washers
in the assemble.
23GEK-41902 Magne-blast Circuit breaker
Figure 23. (8039588) Contact Assembly
24
Front Bushing
Contact Springs
Stationary Primary Contacts
Operating Rod Pin
Buffer
Cup Bearing
Hinge Pin
Contact Arm
‘Throat Barrier
Movable Primary Contacts
Assembly Bolts,
Assembly Bolts
Piston Assembly
Movable Arcing Contact
Connection Bar
Pry contact arms (8) apart enough to
disengage pivot pins of piston assembly
(13) allowing piston to drop down into
its booster cylinder.
Rotate the two parts of the contact arm
assembly away from each other so as~
sembly bolts (11) are accessible and
movable primary contacts (10) can be
removed,
Reassemble in reverse order.
E, Contact Arm Assembly (8, 10, 12, 14,
Figure 23).
1, Remove connection bar (15).
2, Disassemble hinge pin(7), cup bearing
(6), and operating ‘rod pin (4) noting
quantity and location of any washers
and spacers used in assemblies.
3. The contact arm assembly including the
piston assembly (13) can now be re-
moved,
4. When reassembling, first insert piston
tube agsembly (13) into the booster
cylinder and reassemble the cup bear~
ing, making sure the silvered contact
washers between the bushing and con-
tact arms (both sides) are in place,
Reassemble operating rod pin (4) and
connection bar (15).
F, After disassembly and reassembly of any
contacts, check all contact adjustments as
described under ADJUSTMENTS.
BUSHINGS
IMPORTANT: DO NOT REMOVE ALL Six
BUSHINGS AT ONCE. The bushings have been
carefully aligned with’ the breaker frame, during
assembly at the factory, and it is important that
this alignment be maintainedto insure interchange-
ability of the breakers in the metal-clad units, It
is, therefore, recommended that the bushings be
removed and reassembled one at a time. Also,
before removing any one bushing, measure the dis-
tance from that particular bushing to adjacent
bushings in both directions, so that It may be
reinstalled in the same location,
However, it is possible to remove and re-
assemble three bushings at one time. If this is
preferred, alignment of the bushings may be
accomplished by placing the breaker in a de-
energized spare metal~clad unit before tightening
the bushing mounting bolts. This must be done
before the interrupters are reinstalled,
To replace the bushing, proceed as follows:
Rear Bushing
1, Open the breaker and remove the box
barrier and interrupters as already de-
scribed,
2, Remove the upper and lower horizontal
barriers (18 and 20) Figure 8,
3, Remove the four bolts at the mounting
flange of the rear bushing being removed
and lower the bushing assembly,
NOTE: Shims may be found between the
breaker mounting plate and the bushing‘Magne-blast Circuit Breaker GEK-41902
th
pn
=,
#
Figure 24A (8034466) Figure 248 (6034465)
Figure 24C (8034469) ‘Figure 24D (8034468)
Figure 24. Method of Installing Primary Contact
Springs Using a Spring Compressor
1, Spring Guide 6. Spring
2. Compressor Nut ‘ontact Support
3. Spring Compressor 8. Stop Plate
4. Spring Retainer . Stationary Primary
5. Assembly Bolts Finger
25GEK-41902 Magne-blast Circuit Breaker
mounting flange on some, or all bolts,
These shims are for squaring up the bushing
and may be required when new bushings are
assembled,
Referring to Figure 24, disassemble the
primary contact springs’ (6) as previously
described,
Disassemble the spring retainer (4) by
removing mounting bolts (5).
Referring to Figure 22, disassemble the
contact support (4) and interrupter mounting
bracket (2) removing two bolts (3).
Reassemble in the reverse order. The
interrupter mounting bracket (2) ‘is not
symmetrical and must be assembled cor-
rectly to orient the interrupter properly
on the breaker. The longest projection of
the bracket should be toward the lower end
of the bushing.
Front Bushing
1
4
5
Open the breaker and remove the box
barrier and interrupters as already de-
seribed.
Remove the upper and lower horizontal
barriers (18 and 20) Figure 8,
Remove the connection bar (15) Figure
23, cup bearing (6) and hinge pin (7).
Remove the four bolts at the mounting
flange of the front bushing being removed,
and lower the bushing, (See note under
rear bushings concerning use of shims.)
When reassembling, first mount the bushing
and assemble the cup bearing(6), contact arm
(8), and replace pin (7) being sure the
silvered contact washers between the bush-
ing and contact arms are in place. The
contact surfaces at the hinge point of the
contact blade and bushing should have a'thin
coating of D50H47 grease,
Check all contact adjustments as outlined
under ADJUSTMENTS,
INTERLOCK SWITCH
To remove the interlock switch (4) Figure 12,
remove the two mounting screws and disconnect
the lead wires, Reassemble in the reverse order
and check the’ switch adjustments as explained
under ADJUSTMENTS.
LATCH CHECKING SWITCH
To remove the latch checking switch (7) Figure
12, (when furnished), remove the two mounting
screws and disconnect the lead wires. Reassemble
in the reverse order and check the switch adjust=
ments as explained under ADJUSTMENTS.
26
in tandem as required
MOTOR, RELAY AND LIGHT SWITCHES
Two or three switches (7) Figure 6, are mounted
the application,
1, Remove the opening spring per instructions
below.
2, Remove (2) mounting bolts (4) from switch
bracket (5).
3, Remove the (2) mounting screws of the lower
switch,
4. Remove the (2) mounting screws of the center
switch,
5. Remove the (2) mounting screws of the upper
switch,
6. Disconnect the lead wires of switch to be
replaced,
7, Reassemble in the reverse order and check
switch adjustment as explained under AD-
JUSTMENTS.
TRIP SHAFT AND LATCH (See Figure 11)
1. Remove spring discharge crank (5), manual
trip lever (13) and if furnished, the latch
checking switch operating arm (6) Figure
12 from the trip shaft.
2, Disengage trip latch spring (4) Figure 11.
3, Remove three (3) cotter pins from trip shaft.
4, Remove trip arm screw (12) and trip latch
set screw (10).
5. Place a block between the trip latch (11)
and the left side of the mechanism frame,
Drive the trip shaft to the left until the
latch is free of the key, then remove the key.
Check for and remove any burrs raised
around the keyway on the shaft to avoid
damaging the trip shaft bearings,
7, Shaft, latch, etc, may now be removed by
driving it to the left. Note quantity and
location of washers used as spacers in the
assembly,
8 Reassemble parts in reverse order. Be sure
trip latch is aligned in center of trip latch
roller and that the latch spring is properly
installed. Check latch adjustment as de-
scribed under ADJUSTMENTS.
TRIP LATCH ROLLER BEARING
1, Remove (2) cotter pins at ends of trip latch
roller shaft (8) Figure 13,
Partially remove shaft out right side of
frame until latch roller (6) is free.3
Reassemble in reverse order with proper
Spacing of washers, Be sure latch roller
rotates freely.
CLOSING LATCH
1
5.
Remove cotter pins at both ends of closing
latch shaft (9) Figure 6,
Remove spring and paddle (12).
Remove set screws from latch (8).
Move shaft (9) to left (away from frame) by
tapping lightly on the inside end of shaft.
Rotate shaft and continue tapping until shaft
is free. Shaft will push outside needle bear-
ing from housing.
Reassemble in reverse order putting bearing
into frame last. Use asmall piece of tubing
or pipe when inserting bearing to assure
proper alignment.
Check closing latch adjustments as de-
scribed under ADJUSTMENTS,
MOTOR SUPPORT
a
To remove motor support (7) Figure 15,
first remove the closing latch spring (12!
Figure 6.
Remove the retaining ring (4) Figure 15,
and driving link (6).
Remove motor leads from the terminal
board.
Remove six 3/8" bolts (1) Figure 15, on
bottom and one 3/8” bolt on the right side
(not shown).
Remove four mounting bolts from motor
(not shown).
Remove the retaining ring (8) from the
eccentric (3). ve)
Reassemble all parts of the motor support
in the reverse order and re-align itproperly
as described under DRIVING PAWL AD-
SJUSTMENTS,
Remove 2 set screws from ratchet wheel
(O, Figure 4 and remove wheel trom main
st .
Remove 2 set screws from switch cam (5)
Figure 2 and remove cam from the main
shaft.
Remove prop reset spring (4) Fig. 5.
Remove 2 set screws from cam (16) Figure
7, and move cam to the right on the shaft
5.
6
‘Magne-blast Circuit Breaker GEK-41902
as far as it will go. Slide the shaft to the
left until key is fully ‘exposed. Remove key
and check shaft for burrs.
Remove shaft out left side of frame,
Reassemble in reverse order using the
correct number of washers and spacers to
properly locate the parts.
Rotate the mechanism through a closing
eration using the manual charging wrench.
jeck the location of the cam follower (6)
Figure 7, on the cam (16). if necessary,
move thé cam to correct the alignment.
Complete the closing operation and check the
location of the prop pin (13) on the prop (14).
It should be approximately centered.
‘TRIP COIL
‘To replace the potential trip coil (8) Figure 11,
proceed as follows :
1
2
3
5.
With the breaker in the open position, remove
the two mounting bolts Qe”
Remove trip coil support (7) and spacers.
Cut wires at the butt connectors and remove
coil,
When replacing the coil be sure to assemble
the correct fiber spacers at the ends before
bolting support (7).
Adjust coil location to allow approximately
ae " of armature travel before latch starts
move.
Butt connect wires and check operation of
solenoid electrically and mechanically.
SPRING RELEASE COIL
To remove the spring release coil (15) Figure
6, proceed as follows:
1
3
4,
Block the closing springs as described in
INSTALLATION,
Remove the left hand closing spring as
described in CLOSING SPRINGS below.
Remove two mounting bolts (11), coil support
(16), and spacers,
Cut wires at the butt connectors and remove
Replace the coil and the correct number of
fiber spacers before bolting support.
Butt connect wires and check that the arm-
ature is not binding. Check coil for
electrical operation.
27GEK-41902 Magne-blast Circuit Breaker
CLOSING SPRINGS
The closing springs (12) Figure 4, can be
removed as follows:
L
2,
5.
It is recommended that sufficient renewal
Charge the springs with the manual charg-
ing wrench and apply the spring blocking
device as described in INSTALLATION,
Discharge springs by pushing manual close
button (8) Figure 5.
Rotate cam shaft (5) Figure 4, by using the
manual charging wrench until the gap be-
‘tween the spring (12) and the bearing block
(1) is 2 inches or more,
Lift both springs until they clear the lower
supports, then pull forward and down until
the top supports are free,
Either discharge the opening springs by
—,
pushing the manual trip lever or block
the opening springs with a suitable blocking”
device.
OPENING SPRINGS
To remove the
opening springs (4) Figure 4,
proceed as follows:
1,
Charge and block the closing springs as
described under INSTALLATION,
Push manual trip lever (8) Figure 5, to be
sure the opening springs are fully dis-
charged.
Remove upper pin (1) Figure 4, and lower
pin (9).
After reassembling springs check the open
Bap at the primary contacts as described
under PRIMARY CONTACT GAP.
RENEWAL PARTS
ORDERING INSTRUCTIONS
arts
be carried in stock to enable the prompt replace-
ment of any worn, broken, or damaged parts. A
stock of such parts minimize service interruptions
caused by breakdowns, and saves time and expense.
When continuous operation is a primary consider-
ation, more renewal parts should be carried, the
amount depending upon the severity of the service
and the time required to secure replacements.
Renewal parts which are furnished may not be
identical to the original parts since improvements
are made from time to time. The parts which are
furnished, however, will be interchangeable.
NOTE:
The listed terms "Right" and "Left"
apply when facing the mechanism endof the breaker,
28
1
Always specify the complete nameplate data
of both the breaker and the mechanism,
Specify the quantity, catalog number (it
listed), reference number (if listed), and
description of each part ordered, and this
bulletin number.
Standard hardware, such as screws, bolts,
nuts, washers, etc., are not listed and
should be purchased locally.
For prices, refer to the nearest office of
the General Electric Company.
PARTS RECOMMENDED FOR NORMAL MAINTENANCE
In the following tabulations are listed those parts of the breaker
and operating mechanism which are usually recommendedfor stock
for normal maintenance, Other}
‘parts canbe obtained by contacting
the nearest office of the General Electric Company.‘Magne-blast Circuit Breaker GEK-41902
RECOMMENDED RENEWAL PARTS FOR
TYPE ML-13 STORED ENERGY MECHANISM
USED FOR AM-4.16-250-9 (*) 1200 & 2000 AMPERE
(*) SUFFIX LETTERS - H, C, K, N, R
Description Catalog No.
Spring Charging Motor ~ **
48 V-Di 0105C9393P001
110 & 126 V-DC & 115 V-AC, 60 Hz | 0105C9393P002
220 & 250 V-DC & 230 V-AC, 60Hz | 0105C9393P003
Relay - **, #
48 V-DC 0137A7575P004
110 & 125 V-DC 0137A7575P001
220 & 250 V-DC 0108B5565G004
115V-AC, 60 Hz 0137A7575P005
230V-AC, 60 Hz 0137A7575P002
Potential Trip Coil ~
110 & 125 V-DC 006174582G001
220 V-DC 006174582G015,
250 V-DC 006174582G002
115 V-AG, 60 Hz 006174582G013
230 V-AC, 60 Hz 006174582G032
24 V-DC 006275070G001
48 V-DC 006174582G034
Closing Coil - **
110 & 125 V-DC 006174582G001
220 V-DC 006174582G015
250 V-DC 006174582G002,
115 V-AC, 60 Hz 006174582G010
230 V-AC, 60 Hz 006174582G014
48 V-AC (006174582G034
Switch, Normally Open 045640866005
Switch, Normally Closed 0456A0866P006
Auxiliary Switch 0137A9192G011
Closing Latch Spring 0161A4231P001
Prop Spring 0137A9252P001
Driving Pawl Spring 0161A4241P001
Latching Pawl Spring - 9 0161A5909P001
** Refer to breaker nameplate or summary for proper voltage rating.
# Quantity two (2) relays required on special control circuits. Check
breaker and connection diagram.
§ Furnish 0161A4241P001 for breakers without closing spring
discharge mechanism.
29GEK-41902 Magne-blast Circuit Breaker
RECOMMENDED RENEWAL PARTS FOR _,
MAGNE-BLAST BREAKERS
TYPE AM-4.16-250-9\ 1200 & 2000 AMPERES
(A\SUFFIX LETTERS 4, C, N, K, B, & R)
frig. No] Reto. [AmRete] Type | catalog No. [pS Deseription
8 a1 all * + |o281B0708G002 | 3 Operating Rod Assembly
au B_ | 0281B0708G008| 3
++ |_|
22 7 Au Aut | o286co7s1Go01| 3 Flexible Conn. Right
22 7 au An | o286co7s1G004| 3 Flexible Conn. Left
22 rte an Atl | 0195A7388Go02| 3 ‘Throat Barrier Assembly
22 10 an An | 0236Co790G009] 3 Areing Contact Assembly
23 2 Au ++ | o1z1aseesPoo1 | 18 Primary Contact Finger Spring
Al B_ | o1z1asg64poo1 | 24
23 3 Al ++ | o11acsse2Po02 | 18 Primary Contact Finger
al B_ | 0114¢5382P002 | 24 ~
23 10 All ++ | o14csse2poos| 6 Movable Primary Contact
aul B_ | o137asi64P003
au B | o137asi64Po04| 6
23 14 Au Aut | o1osBss4aGoo1] 3 Movable Arcing Contact
23 13 2000 | an | o21sxosaaco01| 3 ‘Tube & Piston Assembly
1200 ++ | o213x0s43co00| 3
1200 B | 0213x0343G091| 3
19 7 ALL All | 0152C5960G001] 3 ‘Throat Insulation (Right)
All All | 0152c5960G002| 3 ‘Throat Insulation (Left)
+
19 8 All Au | o227as367Po01] 6 ‘Lower Runner Shield
19 2 All ant | o1s2css61P003| 6 Lower Insulation Barrier
** Al Except Breakers with "B" in Suffix
30Magne-blast Circuit Breaker GEK-41902
TYPICAL ELEMENTARY WIRING FOR MAGNE-BLAST BREAKERS
ttttt
‘SPARE CONTACTS
on SZ
Ox. sw
YeREQUIRED FoR 2208 250V-
OPERATION ONLY.
Q.coNTACTS FURNISHED
as"neauineD.
(016557908)
a DESCRIPTION
a
zee 2 3 [AUXILIARY SWITCH
Erreee 18 CLOSING COM, (SPRG. REL. sOL’D)
ay ° "7 CONTROL RELAY
|
2
& 5 3 ‘TRIP con.
leer T
= 2 2 INTERLOCK SWITCHES
a
was ‘ 8 CLOSING LATCH MONITORING
Swen
2
waits ‘ 1 POWER SWITCHES
2
& * 1 LATCH CHECKING SWITCH
no
wits 2 Hn SPRING CHARGING MOTOR
311-81
3-74
GENERAL ELECTRIC COMPANY
SWITCHGEAR BUSINESS DEPARTMENT
PHILADELPHIA, PA 19142
GENERAL @® ELECTRIC