The document outlines the process for selecting, constructing, testing, and analyzing a compressor station over three sections totaling 3 man-hours. It first discusses calculating power needs, source availability, and selecting a prime mover. It next covers installing compressor components, balancing, controls, auxiliary equipment, and testing. Finally, it analyzes compressor failures, losses, vibration, and performs a systematic analysis using pressure-volume diagrams and ultrasonic traces.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
21 views
Pry Mover Selection 1m
The document outlines the process for selecting, constructing, testing, and analyzing a compressor station over three sections totaling 3 man-hours. It first discusses calculating power needs, source availability, and selecting a prime mover. It next covers installing compressor components, balancing, controls, auxiliary equipment, and testing. Finally, it analyzes compressor failures, losses, vibration, and performs a systematic analysis using pressure-volume diagrams and ultrasonic traces.