Comparison of ISO9001:2008 To AS91000 / AS9110 / AS9120
Comparison of ISO9001:2008 To AS91000 / AS9110 / AS9120
Same
5.2 Customer Focus 5.1 Management Commitment
Added h, I, j
5.7 Safety Policy - ADDED
6.0 Resource Management 6.0 Resource Management 6.0 Resource Management 6.0 Resource Management
added f,g,h
6.3 Infrastructure
Added d
7.0 Product Realization 7 Product Realization 7.0 Product Realization 7.0 Product Realization
Added e.
Added c.
Major revisions
7.4.3 Verification of Purchased Product
Major revisions
Major revisions
7.5.1.1 Product and Process Verification -
ADDED
7.5.1.2 Control of Production Process
Changes - ADDED
Comparison of ISO9001:2008 To AS91000 / AS9110 / AS9120
AS9100 Compared to AS9110 Compared to AS9120 Compared to
ISO9001:2008 ISO9001:2008 AS9100 AS9100
7.5.1.3 Control of Production Equipment,
Tools, and Software Programs -
ADDED
7.5.1.4 Post Delivery Support - ADDED
7.5.5 Preservation of Product
Major Changes
7.6 Control of Monitoring and
Measuring Equipment
Notes added
8.0 Measurement Analysis and 8.0 Measurement Analysis and 8.0 Measurement Analysis and 8.0 Measurement Analysis and
Improvement Improvement Improvement Improvement
8.1 General DELETED SECTION AFTER 8.1 c
Added notes
8.2.1 Customer Satisfaction
Added note
8.2.2 Internal Audit
Added note
8.2.3 Monitoring and Measurement of 8.2.5 Evidence of Conformity ADDED
Processes
added a.b.c.d
8.2.4 Monitoring and Measurement of
Product
Major additions
8.3 Control of Nonconforming Product 8.3 Control of Nonconforming Product
Note added
8.5.2 Corrective Action
Added g.h.i
Comparison of ISO9001:2008 To AS91000 / AS9110 / AS9120
AS9100 Compared to AS9110 Compared to AS9120 Compared to
ISO9001:2008 ISO9001:2008 AS9100 AS9100
8.5.3 Preventive Action
Added note