0% found this document useful (0 votes)
116 views

1-Demolation Risk Assessment Report

This document discusses health and safety risks associated with demolition work at the AFIA Jeddah Factory Project. It identifies several potential hazards like reduced visibility, falls from heights, dust exposure, welding hazards, and equipment movement. For each hazard, it evaluates the severity, probability, and risk rating. It then lists existing control measures and additional controls needed to reduce the risks. The document uses a risk matrix to determine if risks are acceptable, high, or important and possible.

Uploaded by

Syed Ali Hassan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
116 views

1-Demolation Risk Assessment Report

This document discusses health and safety risks associated with demolition work at the AFIA Jeddah Factory Project. It identifies several potential hazards like reduced visibility, falls from heights, dust exposure, welding hazards, and equipment movement. For each hazard, it evaluates the severity, probability, and risk rating. It then lists existing control measures and additional controls needed to reduce the risks. The document uses a risk matrix to determine if risks are acceptable, high, or important and possible.

Uploaded by

Syed Ali Hassan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 8

REF:

REVISION:
AFIA Jeddah Factory Project DATE: 27/01/2016

Location AFIA Jeddah Factory Project Task/Activity DEMOLITION


Completed by: Date:2\2\2016
Completed by: Date:

Severity

Probability

Severity

Page 1 of 8 Health, Safety, and Environmental


2 4 6 8 10
10 20 40 60 80 100 REF:
REVISION:
8 16 32 48 64 80
AFIA Jeddah Factory Project DATE: 27/01/2016
6 12 24 36 48 60
4 8 16 24 32 40
2
2 4 8 12 16 20
First aid

Unlikely

Probability

Page 2 of 8 Health, Safety, and Environmental


REF:
REVISION:
AFIA Jeddah Factory Project DATE: 27/01/2016

Minor injury or damage

Possible

Moderate injury or damage

Likely

Page 3 of 8 Health, Safety, and Environmental


REF:
REVISION:
AFIA Jeddah Factory Project DATE: 27/01/2016

Major injury or damage

Very Likely

10

Fatality or extensive damage

10

Imminent

Page 4 of 8 Health, Safety, and Environmental


REF:
REVISION:
AFIA Jeddah Factory Project DATE: 27/01/2016

RISK ACCEPTABILITY MATRIX

Risk Rating Acceptability level Action required &


priority

Unacceptable risk Shutdown the


installation immediate
R>80
correct action

(40:64) High risk Immediate corrective


action

(20:36) Important & possible Corrective action ASAP


risk

Page 5 of 8 Health, Safety, and Environmental


REF:
REVISION:
AFIA Jeddah Factory Project DATE: 27/01/2016

R<16 Acceptable risk Consider the necessary


of a corrective action

Potential P S Ris Existing control Risk After control Additional Control Final
Hazard k measure measure measure required risk
Rat P S
e R
Reduced Provided proper light at Workers should must be
visibility 8 10 80 workplace, High 4 4 16 trained when workers
For workers visibility vests will be are working at night.
worn by all workers.
Vehicle and Equipment Notify utility companies
Reduced lights have been checked before controlling their
6 10 60 4 6 24
visibility for properly, Revolving lights utility lines
attached with equipments
Equipments
and
and Vehicles

Falls from Use fall protection Personal fall arrest


heights or 4 8 32 systems: guardrails, 4 6 24 system including
through safety nets, or fall harnesses, lanyards,
openings arrest systems. lifelines, connectors,
anchorages, and anchor
points (as needed)

Page 6 of 8 Health, Safety, and Environmental


REF:
REVISION:
AFIA Jeddah Factory Project DATE: 27/01/2016

Power and Do not use equipment that Hand protection for cut-
hand tool use is defective, such as and abrasion-control
6 8 48 4 8 32
equipment with inoperable
and vibration
safety switches, missing
guards, frayed/cut cords,
dampening.
etc.
Dust Must using dust mask Workers are well aware
4 4 16 especially when we 2 2 4 and trained and knows
working with grinder, how to work in dusty
cutter or chipper and places
put fire extinguisher
and fire blanket.
Welding, Do not perform "hot work" Maintain good housekeeping
cutting, and such as welding, cutting, and fire watcher provide fire
6 8 48 2 8 16
or burning in areas where extinguishers, Provide
burning
flammable, combustible, natural, exhaust, or
corrosive or toxic mechanical ventilators and
substances are being apply PTW.
used, stored, or may
otherwise be present, put
fire extinguisher and
fire blanket and suitable
PPE related job.
Equipment 6 10 60 Movement of 4 8 32 Proper barrication
hazard equipments like surrounding equipments
excavators, dump movement area, make
trucks can cause by hit separate walk way for
objects or persons. workers
Equipment Operators
must have been TUV

Page 7 of 8 Health, Safety, and Environmental


REF:
REVISION:
AFIA Jeddah Factory Project DATE: 27/01/2016

and equipments
checked by HSE
department.

Page 8 of 8 Health, Safety, and Environmental