Process Audit Check Sheet Cum Report
Process Audit Check Sheet Cum Report
5. Awareness about special characteristics? Operator not aware about special characteristics.
Operator
Production supervisor
Quality inspector
B. Production Materials /
Equipment/Process
8. Process Capability SPC data availabled.
Page 1 of 4
Requirements SCORE Auditors Notes /
Objective Evidence
0 1 2 3
9. Process validation Record not availabled.
12. Monitoring of process parameters Process parameter data not availabled in desired
format.
SMP not freezed.SMP Head temp.ZONE 8-198 &
Actual temp.180
17. Availability of the relevant details in the Production documents availbled but SMP not
production documents? freezed.
18. Availability of the relevant details in the Quality documents availabed at desired locations
Quality Assurance documents? like FPA/LPA Sheet and In-process check sheet.
Page 2 of 4
Requirements SCORE Auditors Notes /
Objective Evidence
0 1 2 3
21. Are process adjustment details as well as Not applicable till audit.
deviations recorded?
Page 3 of 4
Requirements SCORE Auditors Notes /
Objective Evidence
0 1 2 3
34. Are the causes of product and process non- Data not available from Nov and Dec month.
conformances analyzed and the corrective
actions checked for their effectiveness?
Page 4 of 4