This document appears to be a log or table of structural shop drawings for a construction project. It lists 37 submittal items with details like submission date, contractor, drawing type, trade, serial number, and revision number. The submittals relate to drawings for structural steel, general steel, and precast concrete elements of the project and appear to have undergone multiple revisions over time as indicated by the revision numbers.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
297 views114 pages

Shop Drawings Submittal Log

This document appears to be a log or table of structural shop drawings for a construction project. It lists 37 submittal items with details like submission date, contractor, drawing type, trade, serial number, and revision number. The submittals relate to drawings for structural steel, general steel, and precast concrete elements of the project and appear to have undergone multiple revisions over time as indicated by the revision numbers.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 114

KING FAISAL SPECIALIST HOSPITAL & RESEARCH CENTER, JEDDAH

KFSH-STRUCTURAL SHOP DRAWI


ABREVIATIONS USED : A = APPROVED , B = APPROVED AS NOTED , C = REVISE & RESUBMIT , D = REJECTED , S = SUPERCEDED , V = VALID

SUB.CON.CODE
PROJECT NO

DWG TYPE
SEGMENT

S.TRADE

SERIAL
TRADE
DWG

LEVEL
ZONE
SUB Date of
Sl.No SUBMITTAL NO CONTRACTOR REV
REV NO submission
NO

1 DW/CN1169P01/00133 0 27-Oct-13 SBG-PBAD 1169 B01 E EGS L01 601814 0

2 DW/CN1169P01/00135 0 27-Oct-13 SBG-PBAD 1169 B01 E EGS L01 601816 0

3 DW/CN1169P01/00136 0 27-Oct-13 SBG-PBAD 1169 B01 E EGS L01 601857 0

4 DW/CN1169P01/00137 0 27-Oct-13 SBG-PBAD 1169 B01 E LPS L02 SD S SC 601858 0

5 DW/CN1169P01/00138 0 27-Oct-13 SBG-PBAD 1169 B01 E LPS L02 SD S SC 601859 0

6 DW/CN1169P01/00139 0 27-Oct-13 SBG-PBAD 1169 B01 E LPS L03 SD S SC 601863 0

7 DW/CN1169P01/00140 0 27-Oct-13 SBG-PBAD 1169 B01 E LPS L07 SD S SR 601875 0

8 DW/CN1169P01/00141 0 27-Oct-13 SBG-PBAD 1169 B01 E LPS L08 SD S SR 601878 0

9 DW/CN1169P01/00201 0 18-Nov-13 SBG-PBAD 1169 01 Z1 H0 LS1 SD E EP 601200 0

10 DW/CN1169P01/00201 1 7-Dec-13 SBG-PBAD 1169 01 Z1 H0 LS1 SD E EP 601200 1

11 DW/CN1169P01/00201 2 12-Apr-14 SBG-PBAD 1169 01 Z1 H0 LS1 SD E EP 601200 2

12 DW/CN1169P01/00201 3 30-Apr-14 SBG-PBAD 1169 01 Z1 H0 LS1 SD E EP 601200 3

13 DW/CN1169P01/00201 4 26-May-14 SBG-PBAD 1169 01 Z1 H0 LS1 SD E EP 601200 4

14 DW/CN1169P01/00201 5 24-Dec-14 SBG-PBAD 1169 01 Z1 H0 LS1 SD E EP 601200 5

15 DW/CN1169P01/00202 0 18-Nov-13 SBG-PBAD 1169 01 Z1 H1 LS1 SD E EP 601201 0

16 DW/CN1169P01/00202 1 7-Dec-13 SBG-PBAD 1169 01 Z1 H1 LS1 SD E EP 601201 1

17 DW/CN1169P01/00202 2 12-Apr-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD E EP 601201 2

18 DW/CN1169P01/00202 3 30-Apr-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD E EP 601201 3

19 DW/CN1169P01/00202 4 26-May-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD E EP 601201 4

20 DW/CN1169P01/00202 5 24-Dec-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD E EP 601201 5

21 DW/CN1169P01/00203 0 18-Nov-13 SBG-PBAD 1169 01 Z1 H2 LS1 SD E EP 601202 0

22 DW/CN1169P01/00203 1 7-Dec-13 SBG-PBAD 1169 01 Z1 H2 LS1 SD E EP 601202 1

23 DW/CN1169P01/00203 2 12-Apr-14 SBG-PBAD 1169 01 Z1 H2 LS1 SD E EP 601202 2

24 DW/CN1169P01/00203 3 30-Apr-14 SBG-PBAD 1169 01 Z1 H2 LS1 SD E EP 601202 3

25 DW/CN1169P01/00203 4 26-May-14 SBG-PBAD 1169 01 Z1 H2 LS1 SD E EP 601202 4

Page 1 of 114
KING FAISAL SPECIALIST HOSPITAL & RESEARCH CENTER, JEDDAH
KFSH-STRUCTURAL SHOP DRAWI
ABREVIATIONS USED : A = APPROVED , B = APPROVED AS NOTED , C = REVISE & RESUBMIT , D = REJECTED , S = SUPERCEDED , V = VALID

SUB.CON.CODE
PROJECT NO

DWG TYPE
SEGMENT

S.TRADE

SERIAL
TRADE
DWG

LEVEL
ZONE
SUB Date of
Sl.No SUBMITTAL NO CONTRACTOR REV
REV NO submission
NO

26 DW/CN1169P01/00204 1 19-Nov-13 SBG-PBAD 1169 01 Z1 H0 L01 SD E GS 601814 1

27 DW/CN1169P01/00204 2 25-Nov-13 SBG-PBAD 1169 01 Z1 H0 L01 SD E GS 601814 2

28 DW/CN1169P01/00204 3 10-Dec-13 SBG-PBAD 1169 01 Z1 H0 L01 SD E GS 601814 3

29 DW/CN1169P01/00204 4 13-Jan-14 SBG-PBAD 1169 01 Z1 H0 L01 SD E GS 601814 4

30 DW/CN1169P01/00204 5 9-Feb-14 SBG-PBAD 1169 01 Z1 H0 L01 SD E GS 601814 5

31 DW/CN1169P01/00204 6 29-Jun-14 SBG-PBAD 1169 01 Z1 H0 L01 SD E GS 601814 6

32 DW/CN1169P01/00204 7 20-Jul-14 SBG-PBAD 1169 01 Z1 H0 L01 SD E GS 601814 7

33 DW/CN1169P01/00205 1 19-Nov-13 SBG-PBAD 1169 01 Z1 H0 L01 SD E GS 601815 1

34 DW/CN1169P01/00205 2 18-Nov-13 SBG-PBAD 1169 01 Z1 H0 L01 SD E GS 601815 2

35 DW/CN1169P01/00205 3 13-Jan-14 SBG-PBAD 1169 01 Z1 H0 L01 SD E GS 601815 3

36 DW/CN1169P01/00205 4 9-Feb-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E GS 601815 4

37 DW/CN1169P01/00205 5 29-Jun-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E GS 601815 5

38 DW/CN1169P01/00205 6 20-Jul-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E GS 601815 6

39 DW/CN1169P01/00206 1 19-Nov-13 SBG-PBAD 1169 01 Z1 H1 L01 SD E GS 601816 1

40 DW/CN1169P01/00206 2 10-Dec-13 SBG-PBAD 1169 01 Z1 H1 L01 SD E GS 601816 2

41 DW/CN1169P01/00206 3 13-Jan-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E GS 601816 3

42 DW/CN1169P01/00206 4 9-Feb-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E GS 601816 4

43 DW/CN1169P01/00206 5 29-Jun-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E GS 601816 5

44 DW/CN1169P01/00206 6 20-Jul-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E GS 601816 6

45 DW/CN1169P01/00207 1 19-Nov-13 SBG-PBAD 1169 01 Z1 H0 L02 SD E EG 601857 1

46 DW/CN1169P01/00207 2 7-Aug-14 SBG-PBAD 1169 01 Z1 H0 L02 SD E EG 601857 2

47 DW/CN1169P01/00208 1 19-Nov-13 SBG-PBAD 1169 01 Z1 H1 L02 SD E EG 601859 1

48 DW/CN1169P01/00208 2 7-Aug-14 SBG-PBAD 1169 01 Z1 H1 L02 SD E EG 601859 2

49 DW/CN1169P01/00209 1 19-Nov-13 SBG-PBAD 1169 01 Z1 H0 L02 SD E EG 601858 1

50 DW/CN1169P01/00209 2 7-Aug-14 SBG-PBAD 1169 01 Z1 H0 L02 SD E EG 601858 2

Page 2 of 114
KING FAISAL SPECIALIST HOSPITAL & RESEARCH CENTER, JEDDAH
KFSH-STRUCTURAL SHOP DRAWI
ABREVIATIONS USED : A = APPROVED , B = APPROVED AS NOTED , C = REVISE & RESUBMIT , D = REJECTED , S = SUPERCEDED , V = VALID

SUB.CON.CODE
PROJECT NO

DWG TYPE
SEGMENT

S.TRADE

SERIAL
TRADE
DWG

LEVEL
ZONE
SUB Date of
Sl.No SUBMITTAL NO CONTRACTOR REV
REV NO submission
NO

51 DW/CN1169P01/00210 1 19-Nov-13 SBG-PBAD 1169 01 Z1 H1 L03 SD E EG 601863 1

52 DW/CN1169P01/00213 1 18-Nov-13 SBG-PBAD 1169 01 Z1 H0 L07 SD E EG 601875 1

53 DW/CN1169P01/00214 1 18-Nov-13 SBG-PBAD 1169 01 Z1 H0 L08 SD E EG 601878 1

54 DW/CN1169P01/00229 0 20-Nov-13 SBG-PBAD 1169 01 Z1 H0 L01 SD E EP 601124 0

55 DW/CN1169P01/00230 0 20-Nov-13 SBG-PBAD 1169 01 Z1 H0 L01 SD E EP 601125 0

56 DW/CN1169P01/00231 0 20-Nov-13 SBG-PBAD 1169 01 Z1 H0 L01 SD E EP 601126 0

57 DW/CN1169P01/00232 0 20-Nov-13 SBG-PBAD 1169 01 Z1 H0 L01 SD E EP 601127 0

58 DW/CN1169P01/00233 0 20-Nov-13 SBG-PBAD 1169 01 Z1 H0 L01 SD E EP 701124 0

59 DW/CN1169P01/00234 0 20-Nov-13 SBG-PBAD 1169 01 Z1 H0 LS1 SD E EP 601111 0

60 DW/CN1169P01/00234 1 31-May-14 SBG-PBAD 1169 01 Z1 H0 LS1 SD E EP 601111 1

61 DW/CN1169P01/00234 2 3-Aug-14 SBG-PBAD 1169 01 Z1 H0 LS1 SD E EP 601111 2

62 DW/CN1169P01/00234 3 24-Dec-14 SBG-PBAD 1169 01 Z1 H0 LS1 SD E EP 601111 3

63 DW/CN1169P01/00235 0 20-Nov-13 SBG-PBAD 1169 01 Z1 H0 LS1 SD E EP 601112 0

64 DW/CN1169P01/00235 1 31-May-14 SBG-PBAD 1169 01 Z1 H0 LS1 SD E EP 601112 1

65 DW/CN1169P01/00235 2 3-Aug-14 SBG-PBAD 1169 01 Z1 H0 LS1 SD E EP 601112 2

66 DW/CN1169P01/00235 3 24-Dec-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD E EP 601112 3

67 DW/CN1169P01/00236 0 20-Nov-13 SBG-PBAD 1169 01 Z1 H1 LS1 SD E EP 601113 0

68 DW/CN1169P01/00236 1 31-May-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD E EP 601113 1

69 DW/CN1169P01/00236 2 3-Aug-14 SBG-PBAD 1169 01 Z1 H0 LS1 SD E EP 601113 2

70 DW/CN1169P01/00237 0 20-Nov-13 SBG-PBAD 1169 01 Z1 H0 LS1 SD E EL 701111 0

71 DW/CN1169P01/00237 1 10-Mar-14 SBG-PBAD 1169 01 Z1 H0 LS1 SD E EL 701111 1

72 DW/CN1169P01/00237 2 16-Mar-14 SBG-PBAD 1169 01 Z1 H0 LS1 SD E EL 701111 2

73 DW/CN1169P01/00237 3 30-Apr-14 SBG-PBAD 1169 01 Z1 H0 LS1 SD E EL 701111 3

74 DW/CN1169P01/00237 4 24-Dec-14 SBG-PBAD 1169 01 Z1 H0 LS1 SD E EL 701111 4

75 DW/CN1169P01/00238 0 20-Nov-13 SBG-PBAD 1169 01 Z1 H0 LS1 SD E EL 701112 0

Page 3 of 114
KING FAISAL SPECIALIST HOSPITAL & RESEARCH CENTER, JEDDAH
KFSH-STRUCTURAL SHOP DRAWI
ABREVIATIONS USED : A = APPROVED , B = APPROVED AS NOTED , C = REVISE & RESUBMIT , D = REJECTED , S = SUPERCEDED , V = VALID

SUB.CON.CODE
PROJECT NO

DWG TYPE
SEGMENT

S.TRADE

SERIAL
TRADE
DWG

LEVEL
ZONE
SUB Date of
Sl.No SUBMITTAL NO CONTRACTOR REV
REV NO submission
NO

76 DW/CN1169P01/00238 1 10-Mar-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD E EL 701112 1

77 DW/CN1169P01/00238 2 16-Mar-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD E EL 701112 2

78 DW/CN1169P01/00238 3 30-Apr-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD E EL 701112 3

79 DW/CN1169P01/00238 4 24-Dec-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD E EL 701112 4

80 DW/CN1169P01/00239 0 20-Nov-13 SBG-PBAD 1169 01 Z1 H1 LS1 SD E EL 701113 0

81 DW/CN1169P01/00239 1 10-Mar-14 SBG-PBAD 1169 01 Z1 H2 LS1 SD E EL 701113 1

82 DW/CN1169P01/00239 2 16-Mar-14 SBG-PBAD 1169 01 Z1 H2 LS1 SD E EL 701113 2

83 DW/CN1169P01/00239 3 30-Apr-14 SBG-PBAD 1169 01 Z1 H2 LS1 SD E EL 701113 3

84 DW/CN1169P01/00273 0 21-Nov-13 SBG-PBAD 1169 01 Z1 H0 SCH SD E EG 601910 0

85 DW/CN1169P01/00273 1 3-Dec-13 SBG-PBAD 1169 01 Z1 H0 SCH SD E EG 601910 1

86 DW/CN1169P01/00273 2 9-Feb-14 SBG-PBAD 1169 01 Z1 H0 SCH SD E EG 601910 2

87 DW/CN1169P01/00295 0 2-Dec-13 SBG-PBAD 1169 01 Z1 H0 LS1 SD E FA 801011 0

88 DW/CN1169P01/00295 1 25-Feb-14 SBG-PBAD 1169 01 Z1 H0 LS1 SD E FA 801011 1

89 DW/CN1169P01/00296 0 2-Dec-13 SBG-PBAD 1169 01 Z1 H0 LS1 SD E FA 801012 0

90 DW/CN1169P01/00296 1 25-Feb-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD E FA 801012 1

91 DW/CN1169P01/00297 0 2-Dec-13 SBG-PBAD 1169 01 Z1 H0 LS1 SD E FA 801013 0

92 DW/CN1169P01/00297 1 25-Feb-14 SBG-PBAD 1169 01 Z1 H2 LS1 SD E FA 801013 1

93 DW/CN1169P01/00301 0 5-Dec-13 SBG-PBAD 1169 01 Z1 H0 LS1 SD E BM 801111 0

94 DW/CN1169P01/00301 1 17-Feb-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD E BM 801111 1

95 DW/CN1169P01/00301 2 10-Apr-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD E BM 801111 2

96 DW/CN1169P01/00301 3 24-Dec-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD E BM 801111 3

97 DW/CN1169P01/00302 0 5-Dec-13 SBG-PBAD 1169 01 Z1 H0 LS1 SD E BM 801112 0

98 DW/CN1169P01/00302 1 17-Feb-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD E BM 801112 1

99 DW/CN1169P01/00302 2 10-Apr-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD E BM 801112 2

100 DW/CN1169P01/00302 3 24-Dec-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD E BM 801112 3

Page 4 of 114
KING FAISAL SPECIALIST HOSPITAL & RESEARCH CENTER, JEDDAH
KFSH-STRUCTURAL SHOP DRAWI
ABREVIATIONS USED : A = APPROVED , B = APPROVED AS NOTED , C = REVISE & RESUBMIT , D = REJECTED , S = SUPERCEDED , V = VALID

SUB.CON.CODE
PROJECT NO

DWG TYPE
SEGMENT

S.TRADE

SERIAL
TRADE
DWG

LEVEL
ZONE
SUB Date of
Sl.No SUBMITTAL NO CONTRACTOR REV
REV NO submission
NO

101 DW/CN1169P01/00303 0 5-Dec-13 SBG-PBAD 1169 01 Z1 H0 LS1 SD E BM 801113 0

102 DW/CN1169P01/00303 1 17-Feb-14 SBG-PBAD 1169 01 Z1 H2 LS1 SD E BM 801113 1

103 DW/CN1169P01/00303 2 10-Apr-14 SBG-PBAD 1169 01 Z1 H2 LS1 SD E BM 801113 2

104 DW/CN1169P01/00303 3 24-Dec-14 SBG-PBAD 1169 01 Z1 H2 LS1 SD E BM 801113 3

105 DW/CN1169P01/00611 0 9-Feb-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E FA 801021 0

106 DW/CN1169P01/00611 1 17-Mar-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E FA 801021 1

107 DW/CN1169P01/00611 2 13-Aug-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E FA 801021 2

108 DW/CN1169P01/00611 3 28-Sep-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E FA 801021 3

109 DW/CN1169P01/00611 4 8-Nov-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E FA 801021 4

110 DW/CN1169P01/00612 0 9-Feb-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E FA 801022 0

111 DW/CN1169P01/00612 1 17-Mar-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E FA 801022 1

112 DW/CN1169P01/00612 2 13-Aug-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E FA 801022 2

113 DW/CN1169P01/00612 3 28-Sep-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E FA 801022 3

114 DW/CN1169P01/00612 4 8-Nov-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E FA 801022 4

115 DW/CN1169P01/00613 0 9-Feb-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E FA 801023 0

116 DW/CN1169P01/00613 1 14-Mar-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E FA 801023 1

117 DW/CN1169P01/00613 2 13-Aug-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E FA 801023 2

118 DW/CN1169P01/00613 3 28-Sep-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E FA 801023 3

119 DW/CN1169P01/00613 4 8-Nov-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E FA 801023 4

120 DW/CN1169P01/00614 0 9-Feb-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E FA 801024 0

121 DW/CN1169P01/00614 1 17-Mar-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E FA 801024 1

122 DW/CN1169P01/00614 2 13-Aug-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E FA 801024 2

123 DW/CN1169P01/00614 3 28-Sep-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E FA 801024 3

124 DW/CN1169P01/00614 4 8-Nov-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E FA 801024 4

125 DW/CN1169P01/00615 0 9-Feb-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E FA 801025 0

Page 5 of 114
KING FAISAL SPECIALIST HOSPITAL & RESEARCH CENTER, JEDDAH
KFSH-STRUCTURAL SHOP DRAWI
ABREVIATIONS USED : A = APPROVED , B = APPROVED AS NOTED , C = REVISE & RESUBMIT , D = REJECTED , S = SUPERCEDED , V = VALID

SUB.CON.CODE
PROJECT NO

DWG TYPE
SEGMENT

S.TRADE

SERIAL
TRADE
DWG

LEVEL
ZONE
SUB Date of
Sl.No SUBMITTAL NO CONTRACTOR REV
REV NO submission
NO

126 DW/CN1169P01/00615 1 30-Mar-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E FA 801025 1

127 DW/CN1169P01/00615 2 13-Aug-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E FA 801025 2

128 DW/CN1169P01/00615 3 28-Sep-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E FA 801025 3

129 DW/CN1169P01/00615 4 8-Nov-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E FA 801025 4

130 DW/CN1169P01/00616 0 9-Feb-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E FA 801026 0

131 DW/CN1169P01/00616 1 17-Mar-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E FA 801026 1

132 DW/CN1169P01/00616 2 13-Aug-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E FA 801026 2

133 DW/CN1169P01/00616 3 28-Sep-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E FA 801026 3

134 DW/CN1169P01/00616 4 8-Nov-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E FA 801026 4

135 DW/CN1169P01/00617 0 9-Feb-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E FA 801027 0

136 DW/CN1169P01/00617 1 17-Mar-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E FA 801027 1

137 DW/CN1169P01/00617 2 13-Aug-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E FA 801027 2

138 DW/CN1169P01/00617 3 28-Sep-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E FA 801027 3

139 DW/CN1169P01/00617 4 8-Nov-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E FA 801027 4

140 DW/CN1169P01/00618 0 9-Feb-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E FA 801028 0

141 DW/CN1169P01/00618 1 17-Mar-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E FA 801028 1

142 DW/CN1169P01/00618 2 13-Aug-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E FA 801028 2

143 DW/CN1169P01/00618 3 28-Sep-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E FA 801028 3

144 DW/CN1169P01/00618 4 8-Nov-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E FA 801028 4

145 DW/CN1169P01/00619 0 9-Feb-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E FA 801029 0

146 DW/CN1169P01/00619 1 17-Mar-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E FA 801029 1

147 DW/CN1169P01/00619 2 13-Aug-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E FA 801029 2

148 DW/CN1169P01/00619 3 28-Sep-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E FA 801029 3

149 DW/CN1169P01/00619 4 8-Nov-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E FA 801029 4

150 DW/CN1169P01/00620 0 9-Feb-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E FA 801030 0

Page 6 of 114
KING FAISAL SPECIALIST HOSPITAL & RESEARCH CENTER, JEDDAH
KFSH-STRUCTURAL SHOP DRAWI
ABREVIATIONS USED : A = APPROVED , B = APPROVED AS NOTED , C = REVISE & RESUBMIT , D = REJECTED , S = SUPERCEDED , V = VALID

SUB.CON.CODE
PROJECT NO

DWG TYPE
SEGMENT

S.TRADE

SERIAL
TRADE
DWG

LEVEL
ZONE
SUB Date of
Sl.No SUBMITTAL NO CONTRACTOR REV
REV NO submission
NO

151 DW/CN1169P01/00620 1 17-Mar-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E FA 801030 1

152 DW/CN1169P01/00620 2 13-Aug-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E FA 801030 2

153 DW/CN1169P01/00620 3 28-Sep-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E FA 801030 3

154 DW/CN1169P01/00620 4 8-Nov-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E FA 801030 4

155 DW/CN1169P01/00621 0 9-Feb-14 SBG-PBAD 1169 01 Z1 H3 L01 SD E FA 801031 0

156 DW/CN1169P01/00621 1 17-Mar-14 SBG-PBAD 1169 01 Z1 H3 L01 SD E FA 801031 1

157 DW/CN1169P01/00621 2 13-Aug-14 SBG-PBAD 1169 01 Z1 H3 L01 SD E FA 801031 2

158 DW/CN1169P01/00621 3 28-Sep-14 SBG-PBAD 1169 01 Z1 H3 L01 SD E FA 801031 3

159 DW/CN1169P01/00621 4 8-Nov-14 SBG-PBAD 1169 01 Z1 H3 L01 SD E FA 801031 4

160 DW/CN1169P01/00622 0 9-Feb-14 SBG-PBAD 1169 01 Z1 H3 L01 SD E FA 801032 0

161 DW/CN1169P01/00622 1 17-Mar-14 SBG-PBAD 1169 01 Z1 H3 L01 SD E FA 801032 1

162 DW/CN1169P01/00622 2 13-Aug-14 SBG-PBAD 1169 01 Z1 H3 L01 SD E FA 801032 2

163 DW/CN1169P01/00622 3 28-Sep-14 SBG-PBAD 1169 01 Z1 H3 L01 SD E FA 801032 3

164 DW/CN1169P01/00622 4 8-Nov-14 SBG-PBAD 1169 01 Z1 H3 L01 SD E FA 801032 4

165 DW/CN1169P01/00623 0 9-Feb-14 SBG-PBAD 1169 01 Z1 H3 L01 SD E FA 801033 0

166 DW/CN1169P01/00623 1 17-Mar-14 SBG-PBAD 1169 01 Z1 H3 L01 SD E FA 801033 1

167 DW/CN1169P01/00623 2 13-Aug-14 SBG-PBAD 1169 01 Z1 H3 L01 SD E FA 801033 2

168 DW/CN1169P01/00623 3 28-Sep-14 SBG-PBAD 1169 01 Z1 H3 L01 SD E FA 801033 3

169 DW/CN1169P01/00623 4 8-Nov-14 SBG-PBAD 1169 01 Z1 H3 L01 SD E FA 801033 4

170 DW/CN1169P01/00626 0 19-Feb-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E DT 801221 0

171 DW/CN1169P01/00627 0 19-Feb-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E DT 801222 0

172 DW/CN1169P01/00628 0 19-Feb-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E DT 801223 0

173 DW/CN1169P01/00629 0 19-Feb-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E DT 801224 0

174 DW/CN1169P01/00630 0 19-Feb-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E DT 801225 0

175 DW/CN1169P01/00631 0 19-Feb-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E DT 801226 0

Page 7 of 114
KING FAISAL SPECIALIST HOSPITAL & RESEARCH CENTER, JEDDAH
KFSH-STRUCTURAL SHOP DRAWI
ABREVIATIONS USED : A = APPROVED , B = APPROVED AS NOTED , C = REVISE & RESUBMIT , D = REJECTED , S = SUPERCEDED , V = VALID

SUB.CON.CODE
PROJECT NO

DWG TYPE
SEGMENT

S.TRADE

SERIAL
TRADE
DWG

LEVEL
ZONE
SUB Date of
Sl.No SUBMITTAL NO CONTRACTOR REV
REV NO submission
NO

176 DW/CN1169P01/00632 0 19-Feb-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E DT 801227 0

177 DW/CN1169P01/00633 0 19-Feb-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E DT 801228 0

178 DW/CN1169P01/00634 0 19-Feb-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E DT 801229 0

179 DW/CN1169P01/00635 0 19-Feb-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E DT 801230 0

180 DW/CN1169P01/00636 0 19-Feb-14 SBG-PBAD 1169 01 Z1 H3 L01 SD E DT 801231 0

181 DW/CN1169P01/00637 0 19-Feb-14 SBG-PBAD 1169 01 Z1 H3 L01 SD E DT 801232 0

182 DW/CN1169P01/00638 00 19-Feb-14 SBG-PBAD 1169 01 Z1 H3 L01 SD E DT 801233 0

183 DW/CN1169P01/00646 0 27-Feb-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E BM 801131 0

184 DW/CN1169P01/00646 1 3-Aug-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E BM 801131 1

185 DW/CN1169P01/00646 2 2-Nov-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E BM 801131 2

186 DW/CN1169P01/00647 0 27-Feb-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E BM 801132 0

187 DW/CN1169P01/00647 1 3-Aug-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E BM 801132 1

188 DW/CN1169P01/00647 2 2-Nov-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E BM 801132 2

189 DW/CN1169P01/00648 0 27-Feb-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E BM 801133 0

190 DW/CN1169P01/00648 1 3-Aug-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E BM 801133 1

191 DW/CN1169P01/00648 2 2-Nov-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E BM 801133 2

192 DW/CN1169P01/00649 0 27-Feb-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E BM 801134 0

193 DW/CN1169P01/00649 1 3-Aug-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E BM 801134 1

194 DW/CN1169P01/00649 2 2-Nov-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E BM 801134 2

195 DW/CN1169P01/00650 0 27-Feb-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E BM 801135 0

196 DW/CN1169P01/00650 1 3-Aug-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E BM 801135 1

197 DW/CN1169P01/00650 2 2-Nov-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E BM 801135 2

198 DW/CN1169P01/00651 0 27-Feb-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E BM 801136 0

199 DW/CN1169P01/00651 1 3-Aug-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E BM 801136 1

200 DW/CN1169P01/00651 2 2-Nov-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E BM 801136 2

Page 8 of 114
KING FAISAL SPECIALIST HOSPITAL & RESEARCH CENTER, JEDDAH
KFSH-STRUCTURAL SHOP DRAWI
ABREVIATIONS USED : A = APPROVED , B = APPROVED AS NOTED , C = REVISE & RESUBMIT , D = REJECTED , S = SUPERCEDED , V = VALID

SUB.CON.CODE
PROJECT NO

DWG TYPE
SEGMENT

S.TRADE

SERIAL
TRADE
DWG

LEVEL
ZONE
SUB Date of
Sl.No SUBMITTAL NO CONTRACTOR REV
REV NO submission
NO

201 DW/CN1169P01/00652 0 27-Feb-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E BM 801137 0

202 DW/CN1169P01/00652 1 3-Aug-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E BM 801137 1

203 DW/CN1169P01/00652 2 2-Nov-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E BM 801137 2

204 DW/CN1169P01/00653 0 27-Feb-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E BM 801138 0

205 DW/CN1169P01/00653 1 3-Aug-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E BM 801138 1

206 DW/CN1169P01/00653 2 2-Nov-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E BM 801138 2

207 DW/CN1169P01/00654 0 27-Feb-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E BM 801139 0

208 DW/CN1169P01/00654 1 3-Aug-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E BM 801139 1

209 DW/CN1169P01/00654 2 2-Nov-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E BM 801139 2

210 DW/CN1169P01/00655 0 27-Feb-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E BM 801140 0

211 DW/CN1169P01/00655 1 3-Aug-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E BM 801140 1

212 DW/CN1169P01/00655 2 2-Nov-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E BM 801140 2

213 DW/CN1169P01/00656 0 27-Feb-14 SBG-PBAD 1169 01 Z1 H3 L01 SD E BM 801141 0

214 DW/CN1169P01/00656 1 3-Aug-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E BM 801141 1

215 DW/CN1169P01/00656 2 2-Nov-14 SBG-PBAD 1169 01 Z1 H3 L01 SD E BM 801141 2

216 DW/CN1169P01/00657 0 27-Feb-14 SBG-PBAD 1169 01 Z1 H3 L01 SD E BM 801142 0

217 DW/CN1169P01/00657 1 3-Aug-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E BM 801142 1

218 DW/CN1169P01/00657 2 2-Nov-14 SBG-PBAD 1169 01 Z1 H3 L01 SD E BM 801142 2

219 DW/CN1169P01/00658 0 27-Feb-14 SBG-PBAD 1169 01 Z1 H3 L01 SD E BM 801143 0

220 DW/CN1169P01/00658 1 3-Aug-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E BM 801143 1

221 DW/CN1169P01/00658 2 2-Nov-14 SBG-PBAD 1169 01 Z1 H3 L01 SD E BM 801143 2

222 DW/CN1169P01/00659 0 27-Feb-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E EL 701141 0

223 DW/CN1169P01/00659 1 13-Apr-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E EL 701141 1

224 DW/CN1169P01/00659 2 7-Aug-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E EL 701141 2

225 DW/CN1169P01/00660 0 27-Feb-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E EL 701142 0

Page 9 of 114
KING FAISAL SPECIALIST HOSPITAL & RESEARCH CENTER, JEDDAH
KFSH-STRUCTURAL SHOP DRAWI
ABREVIATIONS USED : A = APPROVED , B = APPROVED AS NOTED , C = REVISE & RESUBMIT , D = REJECTED , S = SUPERCEDED , V = VALID

SUB.CON.CODE
PROJECT NO

DWG TYPE
SEGMENT

S.TRADE

SERIAL
TRADE
DWG

LEVEL
ZONE
SUB Date of
Sl.No SUBMITTAL NO CONTRACTOR REV
REV NO submission
NO

226 DW/CN1169P01/00660 1 13-Apr-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E EL 701142 1

227 DW/CN1169P01/00660 2 7-Aug-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E EL 701142 2

228 DW/CN1169P01/00661 0 27-Feb-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E EL 701143 0

229 DW/CN1169P01/00661 1 13-Apr-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E EL 701143 1

230 DW/CN1169P01/00661 2 7-Aug-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E EL 701143 2

231 DW/CN1169P01/00662 0 27-Feb-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E EL 701144 0

232 DW/CN1169P01/00662 1 13-Apr-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E EL 701144 1

233 DW/CN1169P01/00662 2 7-Aug-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E EL 701144 2

234 DW/CN1169P01/00663 0 27-Feb-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E EL 701145 0

235 DW/CN1169P01/00663 1 13-Apr-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E EL 701145 1

236 DW/CN1169P01/00663 2 7-Aug-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E EL 701145 2

237 DW/CN1169P01/00664 0 27-Feb-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E EL 701146 0

238 DW/CN1169P01/00664 1 13-Apr-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E EL 701146 1

239 DW/CN1169P01/00664 2 7-Aug-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E EL 701146 2

240 DW/CN1169P01/00665 0 27-Feb-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E EL 701147 0

241 DW/CN1169P01/00665 1 13-Apr-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E EL 701147 1

242 DW/CN1169P01/00665 2 7-Aug-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E EL 701147 2

243 DW/CN1169P01/00666 0 27-Feb-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E EL 701148 0

244 DW/CN1169P01/00666 1 13-Apr-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E EL 701148 1

245 DW/CN1169P01/00666 2 7-Aug-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E EL 701148 2

246 DW/CN1169P01/00667 0 27-Feb-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E EL 701149 0

247 DW/CN1169P01/00667 1 13-Apr-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E EL 701149 1

248 DW/CN1169P01/00667 2 7-Aug-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E EL 701149 2

249 DW/CN1169P01/00668 0 27-Feb-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E EL 701150 0

250 DW/CN1169P01/00668 1 13-Apr-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E EL 701150 1

Page 10 of 114
KING FAISAL SPECIALIST HOSPITAL & RESEARCH CENTER, JEDDAH
KFSH-STRUCTURAL SHOP DRAWI
ABREVIATIONS USED : A = APPROVED , B = APPROVED AS NOTED , C = REVISE & RESUBMIT , D = REJECTED , S = SUPERCEDED , V = VALID

SUB.CON.CODE
PROJECT NO

DWG TYPE
SEGMENT

S.TRADE

SERIAL
TRADE
DWG

LEVEL
ZONE
SUB Date of
Sl.No SUBMITTAL NO CONTRACTOR REV
REV NO submission
NO

251 DW/CN1169P01/00668 2 7-Aug-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E EL 701150 2

252 DW/CN1169P01/00669 0 27-Feb-14 SBG-PBAD 1169 01 Z1 H3 L01 SD E EL 701151 0

253 DW/CN1169P01/00669 1 13-Apr-14 SBG-PBAD 1169 01 Z1 H3 L01 SD E EL 701151 1

254 DW/CN1169P01/00669 2 7-Aug-14 SBG-PBAD 1169 01 Z1 H3 L01 SD E EL 701151 2

255 DW/CN1169P01/00670 0 27-Feb-14 SBG-PBAD 1169 01 Z1 H3 L01 SD E EL 701152 0

256 DW/CN1169P01/00670 1 13-Apr-14 SBG-PBAD 1169 01 Z1 H3 L01 SD E EL 701152 1

257 DW/CN1169P01/00670 2 7-Aug-14 SBG-PBAD 1169 01 Z1 H3 L01 SD E EL 701152 2

258 DW/CN1169P01/00671 0 27-Feb-14 SBG-PBAD 1169 01 Z1 H3 L01 SD E EL 701153 0

259 DW/CN1169P01/00671 1 13-Apr-14 SBG-PBAD 1169 01 Z1 H3 L01 SD E EL 701153 1

260 DW/CN1169P01/00671 2 7-Aug-14 SBG-PBAD 1169 01 Z1 H3 L01 SD E EL 701153 2

261 DW/CN1169P01/00681 0 2-Mar-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E PA 801421 0

262 DW/CN1169P01/00681 1 16-Aug-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E VE 801421 1

263 DW/CN1169P01/00681 2 22-Sep-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E VE 801421 2

264 DW/CN1169P01/00681 3 8-Nov-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E VE 801421 3

265 DW/CN1169P01/00682 0 2-Mar-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E PA 801422 0

266 DW/CN1169P01/00682 1 16-Aug-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E VE 801422 1

267 DW/CN1169P01/00682 2 22-Sep-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E VE 801422 2

268 DW/CN1169P01/00682 3 8-Nov-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E VE 801422 3

269 DW/CN1169P01/00683 0 2-Mar-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E PA 801423 0

270 DW/CN1169P01/00683 1 16-Aug-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E VE 801423 1

271 DW/CN1169P01/00683 2 22-Sep-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E VE 801423 2

272 DW/CN1169P01/00683 3 8-Nov-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E VE 801423 3

273 DW/CN1169P01/00684 0 2-Mar-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E PA 801424 0

274 DW/CN1169P01/00684 1 16-Aug-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E VE 801424 1

275 DW/CN1169P01/00684 2 22-Sep-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E VE 801424 2

Page 11 of 114
KING FAISAL SPECIALIST HOSPITAL & RESEARCH CENTER, JEDDAH
KFSH-STRUCTURAL SHOP DRAWI
ABREVIATIONS USED : A = APPROVED , B = APPROVED AS NOTED , C = REVISE & RESUBMIT , D = REJECTED , S = SUPERCEDED , V = VALID

SUB.CON.CODE
PROJECT NO

DWG TYPE
SEGMENT

S.TRADE

SERIAL
TRADE
DWG

LEVEL
ZONE
SUB Date of
Sl.No SUBMITTAL NO CONTRACTOR REV
REV NO submission
NO

276 DW/CN1169P01/00684 3 8-Nov-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E VE 801424 3

277 DW/CN1169P01/00685 0 2-Mar-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E PA 801425 0

278 DW/CN1169P01/00685 1 16-Aug-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E VE 801425 1

279 DW/CN1169P01/00685 2 22-Sep-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E VE 801425 2

280 DW/CN1169P01/00685 3 8-Nov-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E VE 801425 3

281 DW/CN1169P01/00686 0 2-Mar-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E PA 801426 0

282 DW/CN1169P01/00686 1 16-Aug-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E VE 801426 1

283 DW/CN1169P01/00686 2 22-Sep-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E VE 801426 2

284 DW/CN1169P01/00686 3 8-Nov-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E VE 801426 3

285 DW/CN1169P01/00687 0 2-Mar-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E PA 801427 0

286 DW/CN1169P01/00687 1 16-Aug-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E VE 801427 1

287 DW/CN1169P01/00687 2 22-Sep-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E VE 801427 2

288 DW/CN1169P01/00687 3 8-Nov-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E VE 801427 3

289 DW/CN1169P01/00688 0 2-Mar-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E PA 801428 0

290 DW/CN1169P01/00688 1 16-Aug-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E VE 801428 1

291 DW/CN1169P01/00688 2 22-Sep-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E VE 801428 2

292 DW/CN1169P01/00688 3 8-Nov-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E VE 801428 3

293 DW/CN1169P01/00689 0 2-Mar-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E PA 801429 0

294 DW/CN1169P01/00689 1 16-Aug-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E VE 801429 1

295 DW/CN1169P01/00689 2 22-Sep-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E VE 801429 2

296 DW/CN1169P01/00689 3 8-Nov-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E VE 801429 3

297 DW/CN1169P01/00690 0 2-Mar-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E PA 801430 0

298 DW/CN1169P01/00690 1 16-Aug-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E VE 801430 1

299 DW/CN1169P01/00690 2 22-Sep-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E VE 801430 2

300 DW/CN1169P01/00690 3 8-Nov-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E VE 801430 3

Page 12 of 114
KING FAISAL SPECIALIST HOSPITAL & RESEARCH CENTER, JEDDAH
KFSH-STRUCTURAL SHOP DRAWI
ABREVIATIONS USED : A = APPROVED , B = APPROVED AS NOTED , C = REVISE & RESUBMIT , D = REJECTED , S = SUPERCEDED , V = VALID

SUB.CON.CODE
PROJECT NO

DWG TYPE
SEGMENT

S.TRADE

SERIAL
TRADE
DWG

LEVEL
ZONE
SUB Date of
Sl.No SUBMITTAL NO CONTRACTOR REV
REV NO submission
NO

301 DW/CN1169P01/00691 0 2-Mar-14 SBG-PBAD 1169 01 Z1 H3 L01 SD E PA 801431 0

302 DW/CN1169P01/00691 1 16-Aug-14 SBG-PBAD 1169 01 Z1 H3 L01 SD E VE 801431 1

303 DW/CN1169P01/00691 2 22-Sep-14 SBG-PBAD 1169 01 Z1 H3 L01 SD E VE 801431 2

304 DW/CN1169P01/00691 3 8-Nov-14 SBG-PBAD 1169 01 Z1 H3 L01 SD E VE 801431 3

305 DW/CN1169P01/00692 0 2-Mar-14 SBG-PBAD 1169 01 Z1 H3 L01 SD E PA 801432 0

306 DW/CN1169P01/00692 1 16-Aug-14 SBG-PBAD 1169 01 Z1 H3 L01 SD E VE 801432 1

307 DW/CN1169P01/00692 2 22-Sep-14 SBG-PBAD 1169 01 Z1 H3 L01 SD E VE 801432 2

308 DW/CN1169P01/00692 3 8-Nov-14 SBG-PBAD 1169 01 Z1 H3 L01 SD E VE 801432 3

309 DW/CN1169P01/00693 0 2-Mar-14 SBG-PBAD 1169 01 Z1 H3 L01 SD E PA 801433 0

310 DW/CN1169P01/00693 1 16-Aug-14 SBG-PBAD 1169 01 Z1 H3 L01 SD E VE 801433 1

311 DW/CN1169P01/00693 2 22-Sep-14 SBG-PBAD 1169 01 Z1 H3 L01 SD E VE 801433 2

312 DW/CN1169P01/00693 3 8-Nov-14 SBG-PBAD 1169 01 Z1 H3 L01 SD E VE 801433 3

313 DW/CN1169P01/00708 0 17-Mar-14 SBG-PBAD 1169 01 00 00 000 SD E FA 901101 0

314 DW/CN1169P01/00708 1 1-Oct-14 SBG-PBAD 1169 01 00 00 000 SD E FA 901101 1

315 DW/CN1169P01/00725 0 10-Apr-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD E CR 601300 0

316 DW/CN1169P01/00725 1 15-Jul-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD E CR 601300 1

317 DW/CN1169P01/00725 2 23-Aug-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD E CR 601300 2

318 DW/CN1169P01/00725 3 15-Oct-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD E CR 601300 3

319 DW/CN1169P01/00725 4 24-Dec-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD E CR 601300 4

320 DW/CN1169P01/00726 0 10-Apr-14 SBG-PBAD 1169 01 Z1 H0 LS1 SD E CT 801511 0

321 DW/CN1169P01/00726 1 17-Aug-14 SBG-PBAD 1169 01 Z1 H0 LS1 SD E CT 801511 1

322 DW/CN1169P01/00726 2 28-Sep-14 SBG-PBAD 1169 01 Z1 H0 LS1 SD E CT 801511 2

323 DW/CN1169P01/00726 3 10-Nov-14 SBG-PBAD 1169 01 Z1 H0 LS1 SD E CT 801511 3

324 DW/CN1169P01/00726 4 24-Dec-14 SBG-PBAD 1169 01 Z1 H0 LS1 SD E CT 801511 4

325 DW/CN1169P01/00727 0 10-Apr-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD E CT 801512 0

Page 13 of 114
KING FAISAL SPECIALIST HOSPITAL & RESEARCH CENTER, JEDDAH
KFSH-STRUCTURAL SHOP DRAWI
ABREVIATIONS USED : A = APPROVED , B = APPROVED AS NOTED , C = REVISE & RESUBMIT , D = REJECTED , S = SUPERCEDED , V = VALID

SUB.CON.CODE
PROJECT NO

DWG TYPE
SEGMENT

S.TRADE

SERIAL
TRADE
DWG

LEVEL
ZONE
SUB Date of
Sl.No SUBMITTAL NO CONTRACTOR REV
REV NO submission
NO

326 DW/CN1169P01/00727 1 17-Aug-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD E CT 801512 1

327 DW/CN1169P01/00727 2 28-Sep-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD E CT 801512 2

328 DW/CN1169P01/00727 3 10-Nov-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD E CT 801512 3

329 DW/CN1169P01/00727 4 24-Dec-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD E CT 801512 4

330 DW/CN1169P01/00728 0 10-Apr-14 SBG-PBAD 1169 01 Z1 H2 LS1 SD E CT 801513 0

331 DW/CN1169P01/00728 1 17-Aug-14 SBG-PBAD 1169 01 Z1 H2 LS1 SD E CT 801513 1

332 DW/CN1169P01/00728 2 28-Sep-14 SBG-PBAD 1169 01 Z1 H2 LS1 SD E CT 801513 2

333 DW/CN1169P01/00728 3 10-Nov-14 SBG-PBAD 1169 01 Z1 H2 LS1 SD E CT 801513 3

334 DW/CN1169P01/00777 0 3-Jun-14 SBG-PBAD 1169 01 Z1 H0 L01 SD E CR 601321 0

335 DW/CN1169P01/00777 1 17-Aug-14 SBG-PBAD 1169 01 Z1 H0 L01 SD E CR 601321 1

336 DW/CN1169P01/00778 0 3-Jun-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E CR 601322 0

337 DW/CN1169P01/00778 1 17-Aug-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E CR 601322 1

338 DW/CN1169P01/00779 0 3-Jun-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E CR 601323 0

339 DW/CN1169P01/00779 1 17-Aug-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E CR 601323 1

340 DW/CN1169P01/00780 0 3-Jun-14 SBG-PBAD 1169 01 Z1 H3 L01 SD E CR 601324 0

341 DW/CN1169P01/00780 1 17-Aug-14 SBG-PBAD 1169 01 Z1 H3 L01 SD E CR 601324 1

342 DW/CN1169P01/00816 0 6-Jul-14 SBG-PBAD 1169 01 Z1 H1 L02 SD E BM 801151 0

343 DW/CN1169P01/00816 1 9-Nov-14 SBG-PBAD 1169 01 Z1 H1 L02 SD E BM 801151 1

344 DW/CN1169P01/00817 0 6-Jul-14 SBG-PBAD 1169 01 Z1 H1 L02 SD E BM 801154 0

345 DW/CN1169P01/00817 1 9-Nov-14 SBG-PBAD 1169 01 Z1 H1 L02 SD E BM 801154 1

346 DW/CN1169P01/00818 0 6-Jul-14 SBG-PBAD 1169 01 Z1 H1 L02 SD E BM 801155 0

347 DW/CN1169P01/00818 1 9-Nov-14 SBG-PBAD 1169 01 Z1 H1 L02 SD E BM 801155 1

348 DW/CN1169P01/00819 0 6-Jul-14 SBG-PBAD 1169 01 Z1 H2 L02 SD E BM 801156 0

349 DW/CN1169P01/00819 1 9-Nov-14 SBG-PBAD 1169 01 Z1 H2 L02 SD E BM 801156 1

350 DW/CN1169P01/00820 0 6-Jul-14 SBG-PBAD 1169 01 Z1 H2 L02 SD E BM 801157 0

Page 14 of 114
KING FAISAL SPECIALIST HOSPITAL & RESEARCH CENTER, JEDDAH
KFSH-STRUCTURAL SHOP DRAWI
ABREVIATIONS USED : A = APPROVED , B = APPROVED AS NOTED , C = REVISE & RESUBMIT , D = REJECTED , S = SUPERCEDED , V = VALID

SUB.CON.CODE
PROJECT NO

DWG TYPE
SEGMENT

S.TRADE

SERIAL
TRADE
DWG

LEVEL
ZONE
SUB Date of
Sl.No SUBMITTAL NO CONTRACTOR REV
REV NO submission
NO

351 DW/CN1169P01/00820 1 9-Nov-14 SBG-PBAD 1169 01 Z1 H2 L02 SD E BM 801157 1

352 DW/CN1169P01/00821 0 6-Jul-14 SBG-PBAD 1169 01 Z1 H2 L02 SD E BM 801158 0

353 DW/CN1169P01/00821 1 9-Nov-14 SBG-PBAD 1169 01 Z1 H2 L02 SD E BM 801158 1

354 DW/CN1169P01/00822 0 6-Jul-14 SBG-PBAD 1169 01 Z1 H3 L02 SD E BM 801161 0

355 DW/CN1169P01/00822 1 9-Nov-14 SBG-PBAD 1169 01 Z1 H3 L02 SD E BM 801161 1

356 DW/CN1169P01/00823 0 6-Jul-14 SBG-PBAD 1169 01 Z1 H3 L02 SD E BM 801163 0

357 DW/CN1169P01/00823 1 9-Nov-14 SBG-PBAD 1169 01 Z1 H3 L02 SD E BM 801163 1

358 DW/CN1169P01/00859 0 3-Aug-14 SBG-PBAD 1169 01 Z1 H1 L04 SD E BM 801181 0

359 DW/CN1169P01/00859 1 9-Nov-14 SBG-PBAD 1169 01 Z1 H1 L04 SD E BM 801181 1

360 DW/CN1169P01/00859 2 6-Dec-14 SBG-PBAD 1169 01 Z1 H1 L04 SD E BM 801181 2

361 DW/CN1169P01/00860 0 3-Aug-14 SBG-PBAD 1169 01 Z1 H1 L03 SD E BM 801166 0

362 DW/CN1169P01/00860 1 9-Nov-14 SBG-PBAD 1169 01 Z1 H1 L03 SD E BM 801166 1

363 DW/CN1169P01/00860 2 29-Nov-14 SBG-PBAD 1169 01 Z1 H1 L03 SD E BM 801166 2

364 DW/CN1169P01/00861 0 3-Aug-14 SBG-PBAD 1169 01 Z1 H1 L03 SD E BM 801169 0

365 DW/CN1169P01/00861 1 9-Nov-14 SBG-PBAD 1169 01 Z1 H1 L03 SD E BM 801169 1

366 DW/CN1169P01/00861 2 29-Nov-14 SBG-PBAD 1169 01 Z1 H1 L03 SD E BM 801169 2

367 DW/CN1169P01/00862 0 3-Aug-14 SBG-PBAD 1169 01 Z1 H1 L03 SD E BM 801170 0

368 DW/CN1169P01/00862 1 9-Nov-14 SBG-PBAD 1169 01 Z1 H1 L03 SD E BM 801170 1

369 DW/CN1169P01/00862 2 29-Nov-14 SBG-PBAD 1169 01 Z1 H1 L03 SD E BM 801170 2

370 DW/CN1169P01/00863 0 3-Aug-14 SBG-PBAD 1169 01 Z1 H1 L03 SD E BM 801171 0

371 DW/CN1169P01/00863 1 9-Nov-14 SBG-PBAD 1169 01 Z1 H1 L03 SD E BM 801171 1

372 DW/CN1169P01/00863 2 29-Nov-14 SBG-PBAD 1169 01 Z1 H1 L03 SD E BM 801171 2

373 DW/CN1169P01/00864 0 3-Aug-14 SBG-PBAD 1169 01 Z1 H1 L03 SD E BM 801172 0

374 DW/CN1169P01/00864 1 9-Nov-14 SBG-PBAD 1169 01 Z1 H1 L03 SD E BM 801172 1

375 DW/CN1169P01/00864 2 29-Nov-14 SBG-PBAD 1169 01 Z1 H1 L03 SD E BM 801172 2

Page 15 of 114
KING FAISAL SPECIALIST HOSPITAL & RESEARCH CENTER, JEDDAH
KFSH-STRUCTURAL SHOP DRAWI
ABREVIATIONS USED : A = APPROVED , B = APPROVED AS NOTED , C = REVISE & RESUBMIT , D = REJECTED , S = SUPERCEDED , V = VALID

SUB.CON.CODE
PROJECT NO

DWG TYPE
SEGMENT

S.TRADE

SERIAL
TRADE
DWG

LEVEL
ZONE
SUB Date of
Sl.No SUBMITTAL NO CONTRACTOR REV
REV NO submission
NO

376 DW/CN1169P01/00865 0 3-Aug-14 SBG-PBAD 1169 01 Z1 H1 L03 SD E BM 801173 0

377 DW/CN1169P01/00865 1 9-Nov-14 SBG-PBAD 1169 01 Z1 H2 L03 SD E BM 801173 1

378 DW/CN1169P01/00865 2 29-Nov-14 SBG-PBAD 1169 01 Z1 H2 L03 SD E BM 801173 2

379 DW/CN1169P01/00866 0 3-Aug-14 SBG-PBAD 1169 01 Z1 H1 L03 SD E BM 801176 0

380 DW/CN1169P01/00866 1 9-Nov-14 SBG-PBAD 1169 01 Z1 H3 L03 SD E BM 801176 1

381 DW/CN1169P01/00866 2 29-Nov-14 SBG-PBAD 1169 01 Z1 H3 L03 SD E BM 801176 2

382 DW/CN1169P01/00867 0 3-Aug-14 SBG-PBAD 1169 01 Z1 H1 L03 SD E BM 801178 0

383 DW/CN1169P01/00867 1 9-Nov-14 SBG-PBAD 1169 01 Z1 H3 L03 SD E BM 801178 1

384 DW/CN1169P01/00867 2 29-Nov-14 SBG-PBAD 1169 01 Z1 H3 L03 SD E BM 801178 2

385 DW/CN1169P01/00906 0 7-Aug-14 SBG-PBAD 1169 01 Z1 H1 L04 SD E EL 701190 0

386 DW/CN1169P01/00906 1 10-Nov-14 SBG-PBAD 1169 01 Z1 H1 L04 SD E EL 701190 1

387 DW/CN1169P01/00906 2 9-Dec-14 SBG-PBAD 1169 01 Z1 H1 L04 SD E EL 701190 2

388 DW/CN1169P01/00907 0 7-Aug-14 SBG-PBAD 1169 01 Z1 H1 L04 SD E EL 701193 0

389 DW/CN1169P01/00907 1 9-Dec-14 SBG-PBAD 1169 01 Z1 H1 L04 SD E EL 701193 1

390 DW/CN1169P01/00908 0 7-Aug-14 SBG-PBAD 1169 01 Z1 H1 L04 SD E EL 701194 0

391 DW/CN1169P01/00908 1 10-Nov-14 SBG-PBAD 1169 01 Z1 H1 L04 SD E EL 701194 1

392 DW/CN1169P01/00908 2 9-Dec-14 SBG-PBAD 1169 01 Z1 H1 L04 SD E EL 701194 2

393 DW/CN1169P01/00909 0 7-Aug-14 SBG-PBAD 1169 01 Z1 H3 L04 SD E EL 701202 0

394 DW/CN1169P01/00909 1 9-Dec-14 SBG-PBAD 1169 01 Z1 H3 L04 SD E EL 701202 1

395 DW/CN1169P01/00910 0 7-Aug-14 SBG-PBAD 1169 01 Z1 H0 L02 SD E EP 601141 0

396 DW/CN1169P01/00910 1 27-Oct-14 SBG-PBAD 1169 01 Z1 H0 L02 SD E EP 601141 1

397 DW/CN1169P01/00910 2 25-Nov-14 SBG-PBAD 1169 01 Z1 H0 L02 SD E EP 601141 2

398 DW/CN1169P01/00911 0 7-Aug-14 SBG-PBAD 1169 01 Z1 H1 L02 SD E EP 601146 0

399 DW/CN1169P01/00911 1 27-Oct-14 SBG-PBAD 1169 01 Z1 H1 L02 SD E EP 601146 1

400 DW/CN1169P01/00911 2 25-Nov-14 SBG-PBAD 1169 01 Z1 H1 L02 SD E EP 601146 2

Page 16 of 114
KING FAISAL SPECIALIST HOSPITAL & RESEARCH CENTER, JEDDAH
KFSH-STRUCTURAL SHOP DRAWI
ABREVIATIONS USED : A = APPROVED , B = APPROVED AS NOTED , C = REVISE & RESUBMIT , D = REJECTED , S = SUPERCEDED , V = VALID

SUB.CON.CODE
PROJECT NO

DWG TYPE
SEGMENT

S.TRADE

SERIAL
TRADE
DWG

LEVEL
ZONE
SUB Date of
Sl.No SUBMITTAL NO CONTRACTOR REV
REV NO submission
NO

401 DW/CN1169P01/00912 0 7-Aug-14 SBG-PBAD 1169 01 Z1 H2 L02 SD E EP 601151 0

402 DW/CN1169P01/00912 1 27-Oct-14 SBG-PBAD 1169 01 Z1 H2 L02 SD E EP 601151 1

403 DW/CN1169P01/00912 2 25-Nov-14 SBG-PBAD 1169 01 Z1 H2 L02 SD E EP 601151 2

404 DW/CN1169P01/00913 0 7-Aug-14 SBG-PBAD 1169 01 Z1 H3 L02 SD E EP 601156 0

405 DW/CN1169P01/00913 1 27-Oct-14 SBG-PBAD 1169 01 Z1 H3 L02 SD E EP 601156 1

406 DW/CN1169P01/00913 2 25-Nov-14 SBG-PBAD 1169 01 Z1 H3 L02 SD E EP 601156 2

407 DW/CN1169P01/00914 0 7-Aug-14 SBG-PBAD 1169 01 Z1 H0 LS1 SD E PB 705001 0

408 DW/CN1169P01/00914 1 24-Dec-14 SBG-PBAD 1169 01 Z1 H0 LS1 SD E PB 705001 1

409 DW/CN1169P01/00915 0 7-Aug-14 SBG-PBAD 1169 01 Z1 H0 L02 SD E PB 705071 0

410 DW/CN1169P01/00916 0 7-Aug-14 SBG-PBAD 1169 01 Z1 H0 L02 SD E PB 705072 0

411 DW/CN1169P01/00927 0 10-Aug-14 SBG-PBAD 1169 01 Z1 H1 L05 SD E BM 801186 0

412 DW/CN1169P01/00927 1 9-Nov-14 SBG-PBAD 1169 01 Z1 H1 L05 SD E BM 801186 1

413 DW/CN1169P01/00927 2 14-Dec-14 SBG-PBAD 1169 01 Z1 H1 L05 SD E BM 801186 2

414 DW/CN1169P01/00964 0 11-Aug-14 SBG-PBAD 1169 01 Z1 H1 L05 SD E EL 701206 0

415 DW/CN1169P01/00964 1 10-Nov-14 SBG-PBAD 1169 01 Z1 H1 L05 SD E EL 701206 1

416 DW/CN1169P01/00964 2 9-Dec-14 SBG-PBAD 1169 01 Z1 H1 L05 SD E EL 701206 2

417 DW/CN1169P01/00965 0 11-Aug-14 SBG-PBAD 1169 01 Z1 H1 L05 SD E EL 701209 0

418 DW/CN1169P01/00965 1 10-Nov-14 SBG-PBAD 1169 01 Z1 H1 L05 SD E EL 701209 1

419 DW/CN1169P01/00965 2 9-Dec-14 SBG-PBAD 1169 01 Z1 H1 L05 SD E EL 701209 2

420 DW/CN1169P01/00966 0 11-Aug-14 SBG-PBAD 1169 01 Z1 H1 L05 SD E EL 701210 0

421 DW/CN1169P01/00966 1 10-Nov-14 SBG-PBAD 1169 01 Z1 H1 L05 SD E EL 701210 1

422 DW/CN1169P01/00967 0 11-Aug-14 SBG-PBAD 1169 01 Z1 H3 L05 SD E EL 701212 0

423 DW/CN1169P01/00967 1 9-Dec-14 SBG-PBAD 1169 01 Z1 H3 L05 SD E EL 701212 1

424 DW/CN1169P01/00968 0 11-Aug-14 SBG-PBAD 1169 01 Z1 H1 L06 SD E BM 801191 0

425 DW/CN1169P01/00968 1 9-Nov-14 SBG-PBAD 1169 01 Z1 H1 L06 SD E BM 801191 1

Page 17 of 114
KING FAISAL SPECIALIST HOSPITAL & RESEARCH CENTER, JEDDAH
KFSH-STRUCTURAL SHOP DRAWI
ABREVIATIONS USED : A = APPROVED , B = APPROVED AS NOTED , C = REVISE & RESUBMIT , D = REJECTED , S = SUPERCEDED , V = VALID

SUB.CON.CODE
PROJECT NO

DWG TYPE
SEGMENT

S.TRADE

SERIAL
TRADE
DWG

LEVEL
ZONE
SUB Date of
Sl.No SUBMITTAL NO CONTRACTOR REV
REV NO submission
NO

426 DW/CN1169P01/00968 2 14-Dec-14 SBG-PBAD 1169 01 Z1 H1 L06 SD E BM 801191 2

427 DW/CN1169P01/00969 0 11-Aug-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E EP 601131 0

428 DW/CN1169P01/00970 0 11-Aug-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E EP 601132 0

429 DW/CN1169P01/00971 0 11-Aug-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E EP 601133 0

430 DW/CN1169P01/00972 0 11-Aug-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E EP 601134 0

431 DW/CN1169P01/00973 0 11-Aug-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E EP 601135 0

432 DW/CN1169P01/00974 0 11-Aug-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E EP 601136 0

433 DW/CN1169P01/00974 1 21-Oct-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E EP 601136 1

434 DW/CN1169P01/00975 0 11-Aug-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E EP 601137 0

435 DW/CN1169P01/00975 1 21-Oct-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E EP 601137 1

436 DW/CN1169P01/00976 0 11-Aug-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E EP 601138 0

437 DW/CN1169P01/00977 0 11-Aug-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E EP 601139 0

438 DW/CN1169P01/00978 0 11-Aug-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E EP 601140 0

439 DW/CN1169P01/00979 0 11-Aug-14 SBG-PBAD 1169 01 Z1 H3 L01 SD E EP 601142 0

440 DW/CN1169P01/00979 1 21-Oct-14 SBG-PBAD 1169 01 Z1 H3 L01 SD E EP 601142 1

441 DW/CN1169P01/00980 0 11-Aug-14 SBG-PBAD 1169 01 Z1 H3 L01 SD E EP 601143 0

442 DW/CN1169P01/00981 0 11-Aug-14 SBG-PBAD 1169 01 Z1 H3 L01 SD E EP 601144 0

443 DW/CN1169P01/00981 1 21-Oct-14 SBG-PBAD 1169 01 Z1 H3 L01 SD E EP 601144 1

444 DW/CN1169P01/00988 0 13-Aug-14 SBG-PBAD 1169 01 Z1 H0 L03 SD E EP 601251 0

445 DW/CN1169P01/00988 1 8-Nov-14 SBG-PBAD 1169 01 Z1 H0 L03 SD E EP 601251 1

446 DW/CN1169P01/00989 0 13-Aug-14 SBG-PBAD 1169 01 Z1 H1 L03 SD E EP 601252 0

447 DW/CN1169P01/00989 1 8-Nov-14 SBG-PBAD 1169 01 Z1 H1 L03 SD E EP 601252 1

448 DW/CN1169P01/00990 0 13-Aug-14 SBG-PBAD 1169 01 Z1 H1 L03 SD E EP 601253 0

449 DW/CN1169P01/00990 1 8-Nov-14 SBG-PBAD 1169 01 Z1 H1 L03 SD E EP 601253 1

450 DW/CN1169P01/00991 0 13-Aug-14 SBG-PBAD 1169 01 Z1 H2 L03 SD E EP 601255 0

Page 18 of 114
KING FAISAL SPECIALIST HOSPITAL & RESEARCH CENTER, JEDDAH
KFSH-STRUCTURAL SHOP DRAWI
ABREVIATIONS USED : A = APPROVED , B = APPROVED AS NOTED , C = REVISE & RESUBMIT , D = REJECTED , S = SUPERCEDED , V = VALID

SUB.CON.CODE
PROJECT NO

DWG TYPE
SEGMENT

S.TRADE

SERIAL
TRADE
DWG

LEVEL
ZONE
SUB Date of
Sl.No SUBMITTAL NO CONTRACTOR REV
REV NO submission
NO

451 DW/CN1169P01/00991 1 8-Nov-14 SBG-PBAD 1169 01 Z1 H2 L03 SD E EP 601255 1

452 DW/CN1169P01/00992 0 13-Aug-14 SBG-PBAD 1169 01 Z1 H2 L03 SD E EP 601256 0

453 DW/CN1169P01/00992 1 8-Nov-14 SBG-PBAD 1169 01 Z1 H2 L03 SD E EP 601256 1

454 DW/CN1169P01/00993 0 13-Aug-14 SBG-PBAD 1169 01 Z1 H3 L03 SD E EP 601258 0

455 DW/CN1169P01/00993 1 8-Nov-14 SBG-PBAD 1169 01 Z1 H3 L03 SD E EP 601258 1

456 DW/CN1169P01/00994 0 13-Aug-14 SBG-PBAD 1169 01 Z1 H1 L02 SD E FA 801041 0

457 DW/CN1169P01/00994 1 8-Nov-14 SBG-PBAD 1169 01 Z1 H1 L02 SD E FA 801041 1

458 DW/CN1169P01/00995 0 13-Aug-14 SBG-PBAD 1169 01 Z1 H1 L02 SD E FA 801042 0

459 DW/CN1169P01/00995 1 8-Nov-14 SBG-PBAD 1169 01 Z1 H1 L02 SD E FA 801042 1

460 DW/CN1169P01/00996 0 13-Aug-14 SBG-PBAD 1169 01 Z1 H1 L02 SD E FA 801043 0

461 DW/CN1169P01/00996 1 8-Nov-14 SBG-PBAD 1169 01 Z1 H1 L02 SD E FA 801043 1

462 DW/CN1169P01/00997 0 13-Aug-14 SBG-PBAD 1169 01 Z1 H1 L02 SD E FA 801044 0

463 DW/CN1169P01/00997 1 8-Nov-14 SBG-PBAD 1169 01 Z1 H1 L02 SD E FA 801044 1

464 DW/CN1169P01/00998 0 13-Aug-14 SBG-PBAD 1169 01 Z1 H1 L02 SD E FA 801045 0

465 DW/CN1169P01/00998 1 8-Nov-14 SBG-PBAD 1169 01 Z1 H1 L02 SD E FA 801045 1

466 DW/CN1169P01/00999 0 13-Aug-14 SBG-PBAD 1169 01 Z1 H2 L02 SD E FA 801046 0

467 DW/CN1169P01/00999 1 8-Nov-14 SBG-PBAD 1169 01 Z1 H2 L02 SD E FA 801046 1

468 DW/CN1169P01/01000 0 13-Aug-14 SBG-PBAD 1169 01 Z1 H2 L02 SD E FA 801047 0

469 DW/CN1169P01/01000 1 8-Nov-14 SBG-PBAD 1169 01 Z1 H2 L02 SD E FA 801047 1

470 DW/CN1169P01/01001 0 13-Aug-14 SBG-PBAD 1169 01 Z1 H2 L02 SD E FA 801048 0

471 DW/CN1169P01/01001 1 8-Nov-14 SBG-PBAD 1169 01 Z1 H2 L02 SD E FA 801048 1

472 DW/CN1169P01/01002 0 13-Aug-14 SBG-PBAD 1169 01 Z1 H3 L02 SD E FA 801051 0

473 DW/CN1169P01/01002 1 8-Nov-14 SBG-PBAD 1169 01 Z1 H3 L02 SD E FA 801051 1

474 DW/CN1169P01/01003 0 13-Aug-14 SBG-PBAD 1169 01 Z1 H3 L02 SD E FA 801052 0

475 DW/CN1169P01/01003 1 8-Nov-14 SBG-PBAD 1169 01 Z1 H3 L02 SD E FA 801052 1

Page 19 of 114
KING FAISAL SPECIALIST HOSPITAL & RESEARCH CENTER, JEDDAH
KFSH-STRUCTURAL SHOP DRAWI
ABREVIATIONS USED : A = APPROVED , B = APPROVED AS NOTED , C = REVISE & RESUBMIT , D = REJECTED , S = SUPERCEDED , V = VALID

SUB.CON.CODE
PROJECT NO

DWG TYPE
SEGMENT

S.TRADE

SERIAL
TRADE
DWG

LEVEL
ZONE
SUB Date of
Sl.No SUBMITTAL NO CONTRACTOR REV
REV NO submission
NO

476 DW/CN1169P01/01004 0 13-Aug-14 SBG-PBAD 1169 01 Z1 H3 L02 SD E FA 801053 0

477 DW/CN1169P01/01004 1 8-Nov-14 SBG-PBAD 1169 01 Z1 H3 L02 SD E FA 801053 1

478 DW/CN1169P01/01020 0 17-Aug-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E CT 801515 0

479 DW/CN1169P01/01020 1 9-Nov-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E CT 801515 1

480 DW/CN1169P01/01021 0 17-Aug-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E CT 801516 0

481 DW/CN1169P01/01021 1 9-Nov-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E CT 801516 1

482 DW/CN1169P01/01022 0 17-Aug-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E CT 801517 0

483 DW/CN1169P01/01022 1 9-Nov-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E CT 801517 1

484 DW/CN1169P01/01023 0 17-Aug-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E CT 801518 0

485 DW/CN1169P01/01023 1 9-Nov-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E CT 801518 1

486 DW/CN1169P01/01024 0 17-Aug-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E CT 801519 0

487 DW/CN1169P01/01024 1 9-Nov-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E CT 801519 1

488 DW/CN1169P01/01025 0 17-Aug-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E CT 801520 0

489 DW/CN1169P01/01025 1 9-Nov-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E CT 801520 1

490 DW/CN1169P01/01026 0 17-Aug-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E CT 801521 0

491 DW/CN1169P01/01026 1 9-Nov-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E CT 801521 1

492 DW/CN1169P01/01027 0 17-Aug-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E CT 801522 0

493 DW/CN1169P01/01027 1 9-Nov-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E CT 801522 1

494 DW/CN1169P01/01028 0 17-Aug-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E CT 801523 0

495 DW/CN1169P01/01028 1 9-Nov-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E CT 801523 1

496 DW/CN1169P01/01029 0 17-Aug-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E CT 801524 0

497 DW/CN1169P01/01029 1 9-Nov-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E CT 801524 1

498 DW/CN1169P01/01030 0 17-Aug-14 SBG-PBAD 1169 01 Z1 H3 L01 SD E CT 801525 0

499 DW/CN1169P01/01030 1 9-Nov-14 SBG-PBAD 1169 01 Z1 H3 L01 SD E CT 801525 1

500 DW/CN1169P01/01031 0 17-Aug-14 SBG-PBAD 1169 01 Z1 H3 L01 SD E CT 801526 0

Page 20 of 114
KING FAISAL SPECIALIST HOSPITAL & RESEARCH CENTER, JEDDAH
KFSH-STRUCTURAL SHOP DRAWI
ABREVIATIONS USED : A = APPROVED , B = APPROVED AS NOTED , C = REVISE & RESUBMIT , D = REJECTED , S = SUPERCEDED , V = VALID

SUB.CON.CODE
PROJECT NO

DWG TYPE
SEGMENT

S.TRADE

SERIAL
TRADE
DWG

LEVEL
ZONE
SUB Date of
Sl.No SUBMITTAL NO CONTRACTOR REV
REV NO submission
NO

501 DW/CN1169P01/01031 1 9-Nov-14 SBG-PBAD 1169 01 Z1 H3 L01 SD E CT 801526 1

502 DW/CN1169P01/01032 0 17-Aug-14 SBG-PBAD 1169 01 Z1 H3 L01 SD E CT 801527 0

503 DW/CN1169P01/01032 1 9-Nov-14 SBG-PBAD 1169 01 Z1 H3 L01 SD E CT 801527 1

504 DW/CN1169P01/01033 0 17-Aug-14 SBG-PBAD 1169 01 Z1 H1 L02 SD E CT 801531 0

505 DW/CN1169P01/01033 1 2-Oct-14 SBG-PBAD 1169 01 Z1 H1 L02 SD E CT 801531 1

506 DW/CN1169P01/01034 0 17-Aug-14 SBG-PBAD 1169 01 Z1 H1 L02 SD E CT 801532 0

507 DW/CN1169P01/01034 1 2-Oct-14 SBG-PBAD 1169 01 Z1 H1 L02 SD E CT 801532 1

508 DW/CN1169P01/01035 0 17-Aug-14 SBG-PBAD 1169 01 Z1 H1 L02 SD E CT 801533 0

509 DW/CN1169P01/01035 1 2-Oct-14 SBG-PBAD 1169 01 Z1 H1 L02 SD E CT 801533 1

510 DW/CN1169P01/01036 0 17-Aug-14 SBG-PBAD 1169 01 Z1 H2 L02 SD E CT 801534 0

511 DW/CN1169P01/01036 1 2-Oct-14 SBG-PBAD 1169 01 Z1 H2 L02 SD E CT 801534 1

512 DW/CN1169P01/01037 0 17-Aug-14 SBG-PBAD 1169 01 Z1 H2 L02 SD E CT 801535 0

513 DW/CN1169P01/01037 1 2-Oct-14 SBG-PBAD 1169 01 Z1 H2 L02 SD E CT 801535 1

514 DW/CN1169P01/01038 0 17-Aug-14 SBG-PBAD 1169 01 Z1 H2 L02 SD E CT 801536 0

515 DW/CN1169P01/01038 1 2-Oct-14 SBG-PBAD 1169 01 Z1 H2 L02 SD E CT 801536 1

516 DW/CN1169P01/01039 0 17-Aug-14 SBG-PBAD 1169 01 Z1 H3 L02 SD E CT 801537 0

517 DW/CN1169P01/01039 1 2-Oct-14 SBG-PBAD 1169 01 Z1 H3 L02 SD E CT 801537 1

518 DW/CN1169P01/01040 0 17-Aug-14 SBG-PBAD 1169 01 Z1 H0 L02 SD E EL 701161 0

519 DW/CN1169P01/01040 1 8-Nov-14 SBG-PBAD 1169 01 Z1 H0 L02 SD E EL 701161 1

520 DW/CN1169P01/01041 0 17-Aug-14 SBG-PBAD 1169 01 Z1 H1 L02 SD E EL 701162 0

521 DW/CN1169P01/01042 0 17-Aug-14 SBG-PBAD 1169 01 Z1 H1 L02 SD E EL 701163 0

522 DW/CN1169P01/01042 1 8-Nov-14 SBG-PBAD 1169 01 Z1 H1 L02 SD E EL 701163 1

523 DW/CN1169P01/01043 0 17-Aug-14 SBG-PBAD 1169 01 Z1 H2 L02 SD E EL 701164 0

524 DW/CN1169P01/01044 0 17-Aug-14 SBG-PBAD 1169 01 Z1 H2 L02 SD E EL 701165 0

525 DW/CN1169P01/01045 0 17-Aug-14 SBG-PBAD 1169 01 Z1 H3 L02 SD E EL 701167 0

Page 21 of 114
KING FAISAL SPECIALIST HOSPITAL & RESEARCH CENTER, JEDDAH
KFSH-STRUCTURAL SHOP DRAWI
ABREVIATIONS USED : A = APPROVED , B = APPROVED AS NOTED , C = REVISE & RESUBMIT , D = REJECTED , S = SUPERCEDED , V = VALID

SUB.CON.CODE
PROJECT NO

DWG TYPE
SEGMENT

S.TRADE

SERIAL
TRADE
DWG

LEVEL
ZONE
SUB Date of
Sl.No SUBMITTAL NO CONTRACTOR REV
REV NO submission
NO

526 DW/CN1169P01/01045 1 8-Nov-14 SBG-PBAD 1169 01 Z1 H3 L02 SD E EL 701167 1

527 DW/CN1169P01/01046 0 17-Aug-14 SBG-PBAD 1169 01 Z1 H0 L2M SD E EL 701170 0

528 DW/CN1169P01/01046 1 8-Nov-14 SBG-PBAD 1169 01 Z1 H0 L2M SD E EL 701170 1

529 DW/CN1169P01/01047 0 17-Aug-14 SBG-PBAD 1169 01 Z1 H1 L03 SD E EP 601161 0

530 DW/CN1169P01/01048 0 17-Aug-14 SBG-PBAD 1169 01 Z1 H1 L03 SD E EP 601164 0

531 DW/CN1169P01/01049 0 17-Aug-14 SBG-PBAD 1169 01 Z1 H1 L03 SD E EP 601165 0

532 DW/CN1169P01/01050 0 17-Aug-14 SBG-PBAD 1169 01 Z1 H3 L03 SD E EP 601168 0

533 DW/CN1169P01/01051 0 17-Aug-14 SBG-PBAD 1169 01 Z1 H0 L03 SD E FA 801061 0

534 DW/CN1169P01/01051 1 27-Oct-14 SBG-PBAD 1169 01 Z1 H0 L03 SD E FA 801061 1

535 DW/CN1169P01/01051 2 19-Nov-14 SBG-PBAD 1169 01 Z1 H0 L03 SD E FA 801061 2

536 DW/CN1169P01/01052 0 17-Aug-14 SBG-PBAD 1169 01 Z1 H1 L03 SD E FA 801064 0

537 DW/CN1169P01/01052 1 27-Oct-14 SBG-PBAD 1169 01 Z1 H1 L03 SD E FA 801064 1

538 DW/CN1169P01/01052 2 19-Nov-14 SBG-PBAD 1169 01 Z1 H1 L03 SD E FA 801064 2

539 DW/CN1169P01/01053 0 17-Aug-14 SBG-PBAD 1169 01 Z1 H1 L03 SD E FA 801065 0

540 DW/CN1169P01/01053 1 27-Oct-14 SBG-PBAD 1169 01 Z1 H1 L03 SD E FA 801065 1

541 DW/CN1169P01/01053 2 19-Nov-14 SBG-PBAD 1169 01 Z1 H1 L03 SD E FA 801065 2

542 DW/CN1169P01/01054 0 17-Aug-14 SBG-PBAD 1169 01 Z1 H2 L03 SD E FA 801067 0

543 DW/CN1169P01/01054 1 27-Oct-14 SBG-PBAD 1169 01 Z1 H2 L03 SD E FA 801067 1

544 DW/CN1169P01/01054 2 19-Nov-14 SBG-PBAD 1169 01 Z1 H2 L03 SD E FA 801067 2

545 DW/CN1169P01/01055 0 17-Aug-14 SBG-PBAD 1169 01 Z1 H2 L03 SD E FA 801068 0

546 DW/CN1169P01/01055 1 27-Oct-14 SBG-PBAD 1169 01 Z1 H2 L03 SD E FA 801068 1

547 DW/CN1169P01/01055 2 19-Nov-14 SBG-PBAD 1169 01 Z1 H2 L03 SD E FA 801068 2

548 DW/CN1169P01/01056 0 17-Aug-14 SBG-PBAD 1169 01 Z1 H3 L03 SD E FA 801073 0

549 DW/CN1169P01/01056 1 27-Oct-14 SBG-PBAD 1169 01 Z1 H3 L03 SD E FA 801073 1

550 DW/CN1169P01/01056 2 19-Nov-14 SBG-PBAD 1169 01 Z1 H3 L03 SD E FA 801073 2

Page 22 of 114
KING FAISAL SPECIALIST HOSPITAL & RESEARCH CENTER, JEDDAH
KFSH-STRUCTURAL SHOP DRAWI
ABREVIATIONS USED : A = APPROVED , B = APPROVED AS NOTED , C = REVISE & RESUBMIT , D = REJECTED , S = SUPERCEDED , V = VALID

SUB.CON.CODE
PROJECT NO

DWG TYPE
SEGMENT

S.TRADE

SERIAL
TRADE
DWG

LEVEL
ZONE
SUB Date of
Sl.No SUBMITTAL NO CONTRACTOR REV
REV NO submission
NO

551 DW/CN1169P01/01057 0 17-Aug-14 SBG-PBAD 1169 01 Z1 H0 L03 SD E EL 701175 0

552 DW/CN1169P01/01057 1 8-Nov-14 SBG-PBAD 1169 01 Z1 H0 L03 SD E EL 701175 1

553 DW/CN1169P01/01058 0 17-Aug-14 SBG-PBAD 1169 01 Z1 H1 L03 SD E EL 701176 0

554 DW/CN1169P01/01058 1 8-Nov-14 SBG-PBAD 1169 01 Z1 H1 L03 SD E EL 701176 1

555 DW/CN1169P01/01059 0 17-Aug-14 SBG-PBAD 1169 01 Z1 H1 L03 SD E EL 701177 0

556 DW/CN1169P01/01059 1 8-Nov-14 SBG-PBAD 1169 01 Z1 H1 L03 SD E EL 701177 1

557 DW/CN1169P01/01060 0 17-Aug-14 SBG-PBAD 1169 01 Z1 H3 L03 SD E EL 701178 0

558 DW/CN1169P01/01060 1 8-Nov-14 SBG-PBAD 1169 01 Z1 H3 L03 SD E EL 701178 1

559 DW/CN1169P01/01061 0 17-Aug-14 SBG-PBAD 1169 01 Z1 H0 LS1 SD E PB 705002 0

560 DW/CN1169P01/01061 1 24-Dec-14 SBG-PBAD 1169 01 Z1 H0 LS1 SD E PB 705002 1

561 DW/CN1169P01/01062 0 17-Aug-14 SBG-PBAD 1169 01 Z1 H0 LS1 SD E PB 705003 0

562 DW/CN1169P01/01062 1 24-Dec-14 SBG-PBAD 1169 01 Z1 H0 LS1 SD E PB 705003 1

563 DW/CN1169P01/01063 0 20-Aug-14 SBG-PBAD 1169 01 Z1 H1 L07 SD E BM 801196 0

564 DW/CN1169P01/01063 1 10-Nov-14 SBG-PBAD 1169 01 Z1 H1 L07 SD E BM 801196 1

565 DW/CN1169P01/01064 0 20-Aug-14 SBG-PBAD 1169 01 Z1 H1 L08 SD E BM 801198 0

566 DW/CN1169P01/01064 1 10-Nov-14 SBG-PBAD 1169 01 Z1 H1 L08 SD E BM 801198 1

567 DW/CN1169P01/01094 0 24-Aug-14 SBG-PBAD 1169 01 Z1 H0 L07 SD E EP 601191 0

568 DW/CN1169P01/01094 1 10-Nov-14 SBG-PBAD 1169 01 Z1 H0 L07 SD E EP 601191 1

569 DW/CN1169P01/01095 0 24-Aug-14 SBG-PBAD 1169 01 Z1 H0 L07 SD E PB 705161 0

570 DW/CN1169P01/01096 0 24-Aug-14 SBG-PBAD 1169 01 Z1 H1 L07 SD E EL 701241 0

571 DW/CN1169P01/01096 1 10-Nov-14 SBG-PBAD 1169 01 Z1 H1 L07 SD E EL 701241 1

572 DW/CN1169P01/01097 0 24-Aug-14 SBG-PBAD 1169 01 Z1 H1 L08 SD E EL 701261 0

573 DW/CN1169P01/01097 1 10-Nov-14 SBG-PBAD 1169 01 Z1 H1 L08 SD E EL 701261 1

574 DW/CN1169P01/01098 0 24-Aug-14 SBG-PBAD 1169 01 Z1 H0 L04 SD E EP 601261 0

575 DW/CN1169P01/01098 1 10-Nov-14 SBG-PBAD 1169 01 Z1 H0 L04 SD E EP 601261 1

Page 23 of 114
KING FAISAL SPECIALIST HOSPITAL & RESEARCH CENTER, JEDDAH
KFSH-STRUCTURAL SHOP DRAWI
ABREVIATIONS USED : A = APPROVED , B = APPROVED AS NOTED , C = REVISE & RESUBMIT , D = REJECTED , S = SUPERCEDED , V = VALID

SUB.CON.CODE
PROJECT NO

DWG TYPE
SEGMENT

S.TRADE

SERIAL
TRADE
DWG

LEVEL
ZONE
SUB Date of
Sl.No SUBMITTAL NO CONTRACTOR REV
REV NO submission
NO

576 DW/CN1169P01/01099 0 24-Aug-14 SBG-PBAD 1169 01 Z1 H1 L04 SD E EP 601262 0

577 DW/CN1169P01/01099 1 10-Nov-14 SBG-PBAD 1169 01 Z1 H1 L04 SD E EP 601262 1

578 DW/CN1169P01/01100 0 24-Aug-14 SBG-PBAD 1169 01 Z1 H1 L04 SD E EP 601263 0

579 DW/CN1169P01/01100 1 10-Nov-14 SBG-PBAD 1169 01 Z1 H1 L04 SD E EP 601263 1

580 DW/CN1169P01/01101 0 24-Aug-14 SBG-PBAD 1169 01 Z1 H3 L04 SD E EP 601264 0

581 DW/CN1169P01/01101 1 10-Nov-14 SBG-PBAD 1169 01 Z1 H3 L04 SD E EP 601264 1

582 DW/CN1169P01/01102 0 26-Aug-14 SBG-PBAD 1169 01 Z1 H0 L04 SD E FA 801076 0

583 DW/CN1169P01/01102 1 8-Nov-14 SBG-PBAD 1169 01 Z1 H0 L04 SD E FA 801076 1

584 DW/CN1169P01/01103 0 26-Aug-14 SBG-PBAD 1169 01 Z1 H1 L04 SD E FA 801079 0

585 DW/CN1169P01/01103 1 8-Nov-14 SBG-PBAD 1169 01 Z1 H1 L04 SD E FA 801079 1

586 DW/CN1169P01/01104 0 26-Aug-14 SBG-PBAD 1169 01 Z1 H1 L04 SD E FA 801080 0

587 DW/CN1169P01/01104 0 8-Nov-14 SBG-PBAD 1169 01 Z1 H1 L04 SD E FA 801080 1

588 DW/CN1169P01/01105 0 26-Aug-14 SBG-PBAD 1169 01 Z1 H2 L04 SD E FA 801081 0

589 DW/CN1169P01/01105 1 8-Nov-14 SBG-PBAD 1169 01 Z1 H2 L04 SD E FA 801081 1

590 DW/CN1169P01/01106 0 26-Aug-14 SBG-PBAD 1169 01 Z1 H2 L04 SD E FA 801082 0

591 DW/CN1169P01/01106 1 8-Nov-14 SBG-PBAD 1169 01 Z1 H2 L04 SD E FA 801082 1

592 DW/CN1169P01/01107 0 26-Aug-14 SBG-PBAD 1169 01 Z1 H3 L04 SD E FA 801083 0

593 DW/CN1169P01/01107 1 8-Nov-14 SBG-PBAD 1169 01 Z1 H3 L04 SD E FA 801083 1

594 DW/CN1169P01/01108 0 26-Aug-14 SBG-PBAD 1169 01 Z1 H0 L02 SD E VE 801441 0

595 DW/CN1169P01/01108 1 2-Oct-14 SBG-PBAD 1169 01 Z1 H0 L02 SD E VE 801441 1

596 DW/CN1169P01/01108 2 11-Nov-14 SBG-PBAD 1169 01 Z1 H0 L02 SD E VE 801441 2

597 DW/CN1169P01/01109 0 26-Aug-14 SBG-PBAD 1169 01 Z1 H1 L02 SD E VE 801445 0

598 DW/CN1169P01/01109 1 2-Oct-14 SBG-PBAD 1169 01 Z1 H1 L02 SD E VE 801445 1

599 DW/CN1169P01/01109 2 11-Nov-14 SBG-PBAD 1169 01 Z1 H1 L02 SD E VE 801445 2

600 DW/CN1169P01/01110 0 26-Aug-14 SBG-PBAD 1169 01 Z1 H2 L02 SD E VE 801446 0

Page 24 of 114
KING FAISAL SPECIALIST HOSPITAL & RESEARCH CENTER, JEDDAH
KFSH-STRUCTURAL SHOP DRAWI
ABREVIATIONS USED : A = APPROVED , B = APPROVED AS NOTED , C = REVISE & RESUBMIT , D = REJECTED , S = SUPERCEDED , V = VALID

SUB.CON.CODE
PROJECT NO

DWG TYPE
SEGMENT

S.TRADE

SERIAL
TRADE
DWG

LEVEL
ZONE
SUB Date of
Sl.No SUBMITTAL NO CONTRACTOR REV
REV NO submission
NO

601 DW/CN1169P01/01110 1 2-Oct-14 SBG-PBAD 1169 01 Z1 H2 L02 SD E VE 801446 1

602 DW/CN1169P01/01110 2 11-Nov-14 SBG-PBAD 1169 01 Z1 H2 L02 SD E VE 801446 2

603 DW/CN1169P01/01111 0 26-Aug-14 SBG-PBAD 1169 01 Z1 H2 L02 SD E VE 801447 0

604 DW/CN1169P01/01111 1 2-Oct-14 SBG-PBAD 1169 01 Z1 H2 L02 SD E VE 801447 1

605 DW/CN1169P01/01111 2 11-Nov-14 SBG-PBAD 1169 01 Z1 H2 L02 SD E VE 801447 2

606 DW/CN1169P01/01112 0 26-Aug-14 SBG-PBAD 1169 01 Z1 H2 L02 SD E VE 801449 0

607 DW/CN1169P01/01112 1 2-Oct-14 SBG-PBAD 1169 01 Z1 H2 L02 SD E VE 801449 1

608 DW/CN1169P01/01112 2 11-Nov-14 SBG-PBAD 1169 01 Z1 H2 L02 SD E VE 801449 2

609 DW/CN1169P01/01113 0 26-Aug-14 SBG-PBAD 1169 01 Z1 H3 L02 SD E VE 801451 0

610 DW/CN1169P01/01113 1 2-Oct-14 SBG-PBAD 1169 01 Z1 H3 L02 SD E VE 801451 1

611 DW/CN1169P01/01113 2 11-Nov-14 SBG-PBAD 1169 01 Z1 H3 L02 SD E VE 801451 2

612 DW/CN1169P01/01114 0 26-Aug-14 SBG-PBAD 1169 01 Z1 H0 L03 SD E VE 801460 0

613 DW/CN1169P01/01114 1 10-Nov-14 SBG-PBAD 1169 01 Z1 H0 L03 SD E VE 801460 1

614 DW/CN1169P01/01115 0 26-Aug-14 SBG-PBAD 1169 01 Z1 H1 L03 SD E VE 801463 0

615 DW/CN1169P01/01115 1 10-Nov-14 SBG-PBAD 1169 01 Z1 H1 L03 SD E VE 801463 1

616 DW/CN1169P01/01116 0 26-Aug-14 SBG-PBAD 1169 01 Z1 H1 L03 SD E VE 801464 0

617 DW/CN1169P01/01116 1 10-Nov-14 SBG-PBAD 1169 01 Z1 H1 L03 SD E VE 801464 1

618 DW/CN1169P01/01117 0 26-Aug-14 SBG-PBAD 1169 01 Z1 H2 L03 SD E VE 801466 0

619 DW/CN1169P01/01117 1 10-Nov-14 SBG-PBAD 1169 01 Z1 H2 L03 SD E VE 801466 1

620 DW/CN1169P01/01118 0 26-Aug-14 SBG-PBAD 1169 01 Z1 H2 L03 SD E VE 801467 0

621 DW/CN1169P01/01118 1 10-Nov-14 SBG-PBAD 1169 01 Z1 H2 L03 SD E VE 801467 1

622 DW/CN1169P01/01119 0 26-Aug-14 SBG-PBAD 1169 01 Z1 H3 L03 SD E VE 801472 0

623 DW/CN1169P01/01119 1 10-Nov-14 SBG-PBAD 1169 01 Z1 H3 L03 SD E VE 801472 1

624 DW/CN1169P01/01120 0 26-Aug-14 SBG-PBAD 1169 01 Z1 H1 L06 SD E EL 701215 0

625 DW/CN1169P01/01120 1 10-Nov-14 SBG-PBAD 1169 01 Z1 H1 L06 SD E EL 701215 1

Page 25 of 114
KING FAISAL SPECIALIST HOSPITAL & RESEARCH CENTER, JEDDAH
KFSH-STRUCTURAL SHOP DRAWI
ABREVIATIONS USED : A = APPROVED , B = APPROVED AS NOTED , C = REVISE & RESUBMIT , D = REJECTED , S = SUPERCEDED , V = VALID

SUB.CON.CODE
PROJECT NO

DWG TYPE
SEGMENT

S.TRADE

SERIAL
TRADE
DWG

LEVEL
ZONE
SUB Date of
Sl.No SUBMITTAL NO CONTRACTOR REV
REV NO submission
NO

626 DW/CN1169P01/01121 0 26-Aug-14 SBG-PBAD 1169 01 Z1 H1 L06 SD E EL 701218 0

627 DW/CN1169P01/01121 1 10-Nov-14 SBG-PBAD 1169 01 Z1 H1 L06 SD E EL 701218 1

628 DW/CN1169P01/01122 0 26-Aug-14 SBG-PBAD 1169 01 Z1 H1 L06 SD E EL 701219 0

629 DW/CN1169P01/01122 1 10-Nov-14 SBG-PBAD 1169 01 Z1 H1 L06 SD E EL 701219 1

630 DW/CN1169P01/01123 0 26-Aug-14 SBG-PBAD 1169 01 Z1 H1 L06 SD E EL 701221 0

631 DW/CN1169P01/01123 1 10-Nov-14 SBG-PBAD 1169 01 Z1 H1 L06 SD E EL 701221 1

632 DW/CN1169P01/01128 0 31-Aug-14 SBG-PBAD 1169 01 Z1 H0 L03 SD E CR 601330 0

633 DW/CN1169P01/01128 1 10-Nov-14 SBG-PBAD 1169 01 Z1 H0 L03 SD E CR 601330 1

634 DW/CN1169P01/01142 0 1-Sep-14 SBG-PBAD 1169 01 Z1 H0 L2M SD E FA 801054 0

635 DW/CN1169P01/01142 1 8-Nov-14 SBG-PBAD 1169 01 Z1 H0 L2M SD E FA 801054 1

636 DW/CN1169P01/01143 0 1-Sep-14 SBG-PBAD 1169 01 Z1 H3 L2M SD E FA 801055 0

637 DW/CN1169P01/01143 1 8-Nov-14 SBG-PBAD 1169 01 Z1 H3 L2M SD E FA 801055 1

638 DW/CN1169P01/01144 0 1-Sep-14 SBG-PBAD 1169 01 Z1 H2 L2M SD E FA 801056 0

639 DW/CN1169P01/01144 1 8-Nov-14 SBG-PBAD 1169 01 Z1 H2 L2M SD E FA 801056 1

640 DW/CN1169P01/01145 0 1-Sep-14 SBG-PBAD 1169 01 Z1 H0 L04 SD E VE 801474 0

641 DW/CN1169P01/01145 1 9-Nov-14 SBG-PBAD 1169 01 Z1 H0 L04 SD E VE 801474 1

642 DW/CN1169P01/01146 0 1-Sep-14 SBG-PBAD 1169 01 Z1 H1 L04 SD E VE 801475 0

643 DW/CN1169P01/01146 1 9-Nov-14 SBG-PBAD 1169 01 Z1 H1 L04 SD E VE 801475 1

644 DW/CN1169P01/01147 0 1-Sep-14 SBG-PBAD 1169 01 Z1 H1 L04 SD E VE 801476 0

645 DW/CN1169P01/01147 1 9-Nov-14 SBG-PBAD 1169 01 Z1 H1 L04 SD E VE 801476 1

646 DW/CN1169P01/01148 0 1-Sep-14 SBG-PBAD 1169 01 Z1 H2 L04 SD E VE 801477 0

647 DW/CN1169P01/01148 1 9-Nov-14 SBG-PBAD 1169 01 Z1 H2 L04 SD E VE 801477 1

648 DW/CN1169P01/01149 0 1-Sep-14 SBG-PBAD 1169 01 Z1 H2 L04 SD E VE 801478 0

649 DW/CN1169P01/01149 1 9-Nov-14 SBG-PBAD 1169 01 Z1 H2 L04 SD E VE 801478 1

650 DW/CN1169P01/01150 0 1-Sep-14 SBG-PBAD 1169 01 Z1 H3 L04 SD E VE 801480 0

Page 26 of 114
KING FAISAL SPECIALIST HOSPITAL & RESEARCH CENTER, JEDDAH
KFSH-STRUCTURAL SHOP DRAWI
ABREVIATIONS USED : A = APPROVED , B = APPROVED AS NOTED , C = REVISE & RESUBMIT , D = REJECTED , S = SUPERCEDED , V = VALID

SUB.CON.CODE
PROJECT NO

DWG TYPE
SEGMENT

S.TRADE

SERIAL
TRADE
DWG

LEVEL
ZONE
SUB Date of
Sl.No SUBMITTAL NO CONTRACTOR REV
REV NO submission
NO

651 DW/CN1169P01/01150 1 9-Nov-14 SBG-PBAD 1169 01 Z1 H3 L04 SD E VE 801480 1

652 DW/CN1169P01/01151 0 1-Sep-14 SBG-PBAD 1169 01 Z1 H0 L06 SD E VE 801491 0

653 DW/CN1169P01/01151 1 9-Nov-14 SBG-PBAD 1169 01 Z1 H0 L06 SD E VE 801491 1

654 DW/CN1169P01/01152 0 1-Sep-14 SBG-PBAD 1169 01 Z1 H1 L06 SD E VE 801494 0

655 DW/CN1169P01/01152 1 9-Nov-14 SBG-PBAD 1169 01 Z1 H1 L06 SD E VE 801494 1

656 DW/CN1169P01/01153 0 1-Sep-14 SBG-PBAD 1169 01 Z1 H1 L06 SD E VE 801495 0

657 DW/CN1169P01/01153 1 9-Nov-14 SBG-PBAD 1169 01 Z1 H1 L06 SD E VE 801495 1

658 DW/CN1169P01/01154 0 1-Sep-14 SBG-PBAD 1169 01 Z1 H2 L06 SD E VE 801496 0

659 DW/CN1169P01/01154 1 9-Nov-14 SBG-PBAD 1169 01 Z1 H2 L06 SD E VE 801496 1

660 DW/CN1169P01/01155 0 1-Sep-14 SBG-PBAD 1169 01 Z1 H2 L06 SD E VE 801497 0

661 DW/CN1169P01/01155 1 9-Nov-14 SBG-PBAD 1169 01 Z1 H2 L06 SD E VE 801497 1

662 DW/CN1169P01/01156 0 1-Sep-14 SBG-PBAD 1169 01 Z1 H3 L06 SD E VE 801499 0

663 DW/CN1169P01/01156 1 9-Nov-14 SBG-PBAD 1169 01 Z1 H3 L06 SD E VE 801499 1

664 DW/CN1169P01/01157 0 1-Sep-14 SBG-PBAD 1169 01 Z1 H0 L05 SD E VE 801481 0

665 DW/CN1169P01/01157 1 9-Nov-14 SBG-PBAD 1169 01 Z1 H0 L05 SD E VE 801481 1

666 DW/CN1169P01/01158 0 1-Sep-14 SBG-PBAD 1169 01 Z1 H1 L05 SD E VE 801484 0

667 DW/CN1169P01/01158 1 9-Nov-14 SBG-PBAD 1169 01 Z1 H1 L05 SD E VE 801484 1

668 DW/CN1169P01/01159 0 1-Sep-14 SBG-PBAD 1169 01 Z1 H1 L05 SD E VE 801485 0

669 DW/CN1169P01/01159 1 9-Nov-14 SBG-PBAD 1169 01 Z1 H1 L05 SD E VE 801485 1

670 DW/CN1169P01/01160 0 1-Sep-14 SBG-PBAD 1169 01 Z1 H2 L05 SD E VE 801486 0

671 DW/CN1169P01/01160 1 9-Nov-14 SBG-PBAD 1169 01 Z1 H2 L05 SD E VE 801486 1

672 DW/CN1169P01/01161 0 1-Sep-14 SBG-PBAD 1169 01 Z1 H2 L05 SD E VE 801487 0

673 DW/CN1169P01/01161 1 9-Nov-14 SBG-PBAD 1169 01 Z1 H2 L05 SD E VE 801487 1

674 DW/CN1169P01/01162 0 1-Sep-14 SBG-PBAD 1169 01 Z1 H3 L05 SD E VE 801489 0

675 DW/CN1169P01/01162 1 9-Nov-14 SBG-PBAD 1169 01 Z1 H3 L05 SD E VE 801489 1

Page 27 of 114
KING FAISAL SPECIALIST HOSPITAL & RESEARCH CENTER, JEDDAH
KFSH-STRUCTURAL SHOP DRAWI
ABREVIATIONS USED : A = APPROVED , B = APPROVED AS NOTED , C = REVISE & RESUBMIT , D = REJECTED , S = SUPERCEDED , V = VALID

SUB.CON.CODE
PROJECT NO

DWG TYPE
SEGMENT

S.TRADE

SERIAL
TRADE
DWG

LEVEL
ZONE
SUB Date of
Sl.No SUBMITTAL NO CONTRACTOR REV
REV NO submission
NO

676 DW/CN1169P01/01163 0 2-Sep-14 SBG-PBAD 1169 01 Z1 H0 L04 SD E EP 601170 0

677 DW/CN1169P01/01163 1 10-Nov-14 SBG-PBAD 1169 01 Z1 H0 L04 SD E EP 601170 1

678 DW/CN1169P01/01164 0 2-Sep-14 SBG-PBAD 1169 01 Z1 H1 L04 SD E EP 601173 0

679 DW/CN1169P01/01164 1 10-Nov-14 SBG-PBAD 1169 01 Z1 H1 L04 SD E EP 601173 1

680 DW/CN1169P01/01165 0 2-Sep-14 SBG-PBAD 1169 01 Z1 H1 L04 SD E EP 601174 0

681 DW/CN1169P01/01165 1 10-Nov-14 SBG-PBAD 1169 01 Z1 H1 L04 SD E EP 601174 1

682 DW/CN1169P01/01166 0 2-Sep-14 SBG-PBAD 1169 01 Z1 H3 L04 SD E EP 601176 0

683 DW/CN1169P01/01166 1 10-Nov-14 SBG-PBAD 1169 01 Z1 H3 L04 SD E EP 601176 1

684 DW/CN1169P01/01174 0 6-Sep-14 SBG-PBAD 1169 01 Z1 H0 L05 SD E FA 801086 0

685 DW/CN1169P01/01174 1 8-Nov-14 SBG-PBAD 1169 01 Z1 H0 L05 SD E FA 801086 1

686 DW/CN1169P01/01175 0 6-Sep-14 SBG-PBAD 1169 01 Z1 H1 L05 SD E FA 801089 0

687 DW/CN1169P01/01175 1 8-Nov-14 SBG-PBAD 1169 01 Z1 H1 L05 SD E FA 801089 1

688 DW/CN1169P01/01176 0 6-Sep-14 SBG-PBAD 1169 01 Z1 H1 L05 SD E FA 801090 0

689 DW/CN1169P01/01176 1 8-Nov-14 SBG-PBAD 1169 01 Z1 H1 L05 SD E FA 801090 1

690 DW/CN1169P01/01177 0 6-Sep-14 SBG-PBAD 1169 01 Z1 H2 L05 SD E FA 801091 0

691 DW/CN1169P01/01177 1 8-Nov-14 SBG-PBAD 1169 01 Z1 H2 L05 SD E FA 801091 1

692 DW/CN1169P01/01178 0 6-Sep-14 SBG-PBAD 1169 01 Z1 H2 L05 SD E FA 801092 0

693 DW/CN1169P01/01178 1 8-Nov-14 SBG-PBAD 1169 01 Z1 H2 L05 SD E FA 801092 1

694 DW/CN1169P01/01179 0 6-Sep-14 SBG-PBAD 1169 01 Z1 H3 L05 SD E FA 801093 0

695 DW/CN1169P01/01179 1 8-Nov-14 SBG-PBAD 1169 01 Z1 H3 L05 SD E FA 801093 1

696 DW/CN1169P01/01180 0 9-Sep-14 SBG-PBAD 1169 01 Z1 H0 L05 SD E EP 601178 0

697 DW/CN1169P01/01180 1 10-Nov-14 SBG-PBAD 1169 01 Z1 H0 L05 SD E EP 601178 1

698 DW/CN1169P01/01181 0 9-Sep-14 SBG-PBAD 1169 01 Z1 H1 L05 SD E EP 601181 0

699 DW/CN1169P01/01182 0 9-Sep-14 SBG-PBAD 1169 01 Z1 H1 L05 SD E EP 601182 0

700 DW/CN1169P01/01183 0 9-Sep-14 SBG-PBAD 1169 01 Z1 H3 L05 SD E EP 601184 0

Page 28 of 114
KING FAISAL SPECIALIST HOSPITAL & RESEARCH CENTER, JEDDAH
KFSH-STRUCTURAL SHOP DRAWI
ABREVIATIONS USED : A = APPROVED , B = APPROVED AS NOTED , C = REVISE & RESUBMIT , D = REJECTED , S = SUPERCEDED , V = VALID

SUB.CON.CODE
PROJECT NO

DWG TYPE
SEGMENT

S.TRADE

SERIAL
TRADE
DWG

LEVEL
ZONE
SUB Date of
Sl.No SUBMITTAL NO CONTRACTOR REV
REV NO submission
NO

701 DW/CN1169P01/01183 1 10-Nov-14 SBG-PBAD 1169 01 Z1 H3 L05 SD E EP 601184 1

702 DW/CN1169P01/01184 0 9-Sep-14 SBG-PBAD 1169 01 Z1 H0 L06 SD E FA 801095 0

703 DW/CN1169P01/01184 1 8-Nov-14 SBG-PBAD 1169 01 Z1 H0 L06 SD E FA 801095 1

704 DW/CN1169P01/01185 0 9-Sep-14 SBG-PBAD 1169 01 Z1 H1 L06 SD E FA 801098 0

705 DW/CN1169P01/01185 1 8-Nov-14 SBG-PBAD 1169 01 Z1 H1 L06 SD E FA 801098 1

706 DW/CN1169P01/01186 0 9-Sep-14 SBG-PBAD 1169 01 Z1 H1 L06 SD E FA 801099 0

707 DW/CN1169P01/01186 1 8-Nov-14 SBG-PBAD 1169 01 Z1 H1 L06 SD E FA 801099 1

708 DW/CN1169P01/01187 0 9-Sep-14 SBG-PBAD 1169 01 Z1 H2 L06 SD E FA 801100 0

709 DW/CN1169P01/01187 1 8-Nov-14 SBG-PBAD 1169 01 Z1 H2 L06 SD E FA 801100 1

710 DW/CN1169P01/01188 0 9-Sep-14 SBG-PBAD 1169 01 Z1 H2 L06 SD E FA 801101 0

711 DW/CN1169P01/01188 1 8-Nov-14 SBG-PBAD 1169 01 Z1 H2 L06 SD E FA 801101 1

712 DW/CN1169P01/01189 0 9-Sep-14 SBG-PBAD 1169 01 Z1 H3 L06 SD E FA 801102 0

713 DW/CN1169P01/01189 1 8-Nov-14 SBG-PBAD 1169 01 Z1 H3 L06 SD E FA 801102 1

714 DW/CN1169P01/01190 0 9-Sep-14 SBG-PBAD 1169 01 Z1 H1 L07 SD E EP 601281 0

715 DW/CN1169P01/01190 1 10-Nov-14 SBG-PBAD 1169 01 Z1 H1 L07 SD E EP 601281 1

716 DW/CN1169P01/01191 0 9-Sep-14 SBG-PBAD 1169 01 Z1 H1 L08 SD E EP 601291 0

717 DW/CN1169P01/01191 1 10-Nov-14 SBG-PBAD 1169 01 Z1 H1 L08 SD E EP 601291 1

718 DW/CN1169P01/01207 0 20-Sep-14 SBG-PBAD 1169 01 Z1 H0 L05 SD E EP 601266 0

719 DW/CN1169P01/01208 0 20-Sep-14 SBG-PBAD 1169 01 Z1 H1 L05 SD E EP 601267 0

720 DW/CN1169P01/01209 0 20-Sep-14 SBG-PBAD 1169 01 Z1 H1 L05 SD E EP 601268 0

721 DW/CN1169P01/01210 0 20-Sep-14 SBG-PBAD 1169 01 Z1 H3 L05 SD E EP 601269 0

722 DW/CN1169P01/01211 0 20-Sep-14 SBG-PBAD 1169 01 Z1 H0 L06 SD E EP 601271 0

723 DW/CN1169P01/01212 0 20-Sep-14 SBG-PBAD 1169 01 Z1 H1 L06 SD E EP 601272 0

724 DW/CN1169P01/01213 0 20-Sep-14 SBG-PBAD 1169 01 Z1 H1 L06 SD E EP 601273 0

725 DW/CN1169P01/01214 0 20-Sep-14 SBG-PBAD 1169 01 Z1 H3 L06 SD E EP 601274 0

Page 29 of 114
KING FAISAL SPECIALIST HOSPITAL & RESEARCH CENTER, JEDDAH
KFSH-STRUCTURAL SHOP DRAWI
ABREVIATIONS USED : A = APPROVED , B = APPROVED AS NOTED , C = REVISE & RESUBMIT , D = REJECTED , S = SUPERCEDED , V = VALID

SUB.CON.CODE
PROJECT NO

DWG TYPE
SEGMENT

S.TRADE

SERIAL
TRADE
DWG

LEVEL
ZONE
SUB Date of
Sl.No SUBMITTAL NO CONTRACTOR REV
REV NO submission
NO

726 DW/CN1169P01/01227 0 28-Sep-14 SBG-PBAD 1169 01 Z1 H0 L01 SD E VE 801612 0

727 DW/CN1169P01/01241 0 1-Oct-14 SBG-PBAD 1169 01 Z1 H0 LS1 SD E VE 801411 0

728 DW/CN1169P01/01241 1 12-Nov-14 SBG-PBAD 1169 01 Z1 H0 LS1 SD E VE 801411 1

729 DW/CN1169P01/01241 2 24-Dec-14 SBG-PBAD 1169 01 Z1 H0 LS1 SD E VE 801411 2

730 DW/CN1169P01/01242 0 1-Oct-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD E VE 801412 0

731 DW/CN1169P01/01242 1 12-Nov-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD E VE 801412 1

732 DW/CN1169P01/01242 2 24-Dec-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD E VE 801412 2

733 DW/CN1169P01/01243 0 1-Oct-14 SBG-PBAD 1169 01 Z1 H2 LS1 SD E VE 801416 0

734 DW/CN1169P01/01243 1 12-Nov-14 SBG-PBAD 1169 01 Z1 H2 LS1 SD E VE 801416 1

735 DW/CN1169P01/01250 0 2-Oct-14 SBG-PBAD 1169 01 Z1 H3 L02 SD E CT 801538 0

736 DW/CN1169P01/01251 0 2-Oct-14 SBG-PBAD 1169 01 Z1 H3 L02 SD E CT 801539 0

737 DW/CN1169P01/01252 0 2-Oct-14 SBG-PBAD 1169 01 Z1 H2 L02 SD E CT 801540 0

738 DW/CN1169P01/01253 0 2-Oct-14 SBG-PBAD 1169 01 Z1 H0 L2M SD E CT 801544 0

739 DW/CN1169P01/01254 0 2-Oct-14 SBG-PBAD 1169 01 Z1 H2 L2M SD E CT 801545 0

740 DW/CN1169P01/01255 0 2-Oct-14 SBG-PBAD 1169 01 Z1 H3 L2M SD E CT 801548 0

741 DW/CN1169P01/01355 0 15-Oct-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E EP 601221 0

742 DW/CN1169P01/01355 1 15-Nov-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E EP 601221 1

743 DW/CN1169P01/01356 0 15-Oct-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E EP 601222 0

744 DW/CN1169P01/01356 1 15-Nov-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E EP 601222 1

745 DW/CN1169P01/01357 0 15-Oct-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E EP 601223 0

746 DW/CN1169P01/01357 1 15-Nov-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E EP 601223 1

747 DW/CN1169P01/01358 0 15-Oct-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E EP 601224 0

748 DW/CN1169P01/01358 1 15-Nov-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E EP 601224 1

749 DW/CN1169P01/01359 0 15-Oct-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E EP 601225 0

750 DW/CN1169P01/01359 1 15-Nov-14 SBG-PBAD 1169 01 Z1 H1 L01 SD E EP 601225 1

Page 30 of 114
KING FAISAL SPECIALIST HOSPITAL & RESEARCH CENTER, JEDDAH
KFSH-STRUCTURAL SHOP DRAWI
ABREVIATIONS USED : A = APPROVED , B = APPROVED AS NOTED , C = REVISE & RESUBMIT , D = REJECTED , S = SUPERCEDED , V = VALID

SUB.CON.CODE
PROJECT NO

DWG TYPE
SEGMENT

S.TRADE

SERIAL
TRADE
DWG

LEVEL
ZONE
SUB Date of
Sl.No SUBMITTAL NO CONTRACTOR REV
REV NO submission
NO

751 DW/CN1169P01/01360 0 15-Oct-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E EP 601226 0

752 DW/CN1169P01/01360 1 15-Nov-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E EP 601226 1

753 DW/CN1169P01/01361 0 15-Oct-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E EP 601227 0

754 DW/CN1169P01/01361 1 15-Nov-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E EP 601227 1

755 DW/CN1169P01/01362 0 15-Oct-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E EP 601228 0

756 DW/CN1169P01/01362 1 15-Nov-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E EP 601228 1

757 DW/CN1169P01/01363 0 15-Oct-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E EP 601229 0

758 DW/CN1169P01/01363 1 15-Nov-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E EP 601229 1

759 DW/CN1169P01/01364 0 15-Oct-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E EP 601230 0

760 DW/CN1169P01/01364 1 15-Nov-14 SBG-PBAD 1169 01 Z1 H2 L01 SD E EP 601230 1

761 DW/CN1169P01/01365 0 15-Oct-14 SBG-PBAD 1169 01 Z1 H3 L01 SD E EP 601231 0

762 DW/CN1169P01/01365 1 15-Nov-14 SBG-PBAD 1169 01 Z1 H3 L01 SD E EP 601231 1

763 DW/CN1169P01/01366 0 15-Oct-14 SBG-PBAD 1169 01 Z1 H3 L01 SD E EP 601232 0

764 DW/CN1169P01/01366 1 15-Nov-14 SBG-PBAD 1169 01 Z1 H3 L01 SD E EP 601232 1

765 DW/CN1169P01/01367 0 15-Oct-14 SBG-PBAD 1169 01 Z1 H3 L01 SD E EP 601233 0

766 DW/CN1169P01/01367 1 15-Nov-14 SBG-PBAD 1169 01 Z1 H3 L01 SD E EP 601233 1

767 DW/CN1169P01/01368 0 15-Oct-14 SBG-PBAD 1169 01 00 00 L01 SD E DT 801291 0

768 DW/CN1169P01/01369 0 15-Oct-14 SBG-PBAD 1169 01 00 00 L01 SD E DT 801292 0

769 DW/CN1169P01/01370 0 15-Oct-14 SBG-PBAD 1169 01 00 00 L01 SD E DT 801293 0

770 DW/CN1169P01/01371 0 15-Oct-14 SBG-PBAD 1169 01 00 00 L02 SD E DT 801294 0

771 DW/CN1169P01/01372 0 15-Oct-14 SBG-PBAD 1169 01 00 00 L03 SD E DT 801295 0

772 DW/CN1169P01/01373 0 15-Oct-14 SBG-PBAD 1169 01 Z1 H0 L06 SD E EP 601185 0

773 DW/CN1169P01/01373 1 22-Nov-14 SBG-PBAD 1169 01 Z1 H0 L06 SD E EP 601185 1

774 DW/CN1169P01/01374 0 15-Oct-14 SBG-PBAD 1169 01 Z1 H1 L06 SD E EP 601188 0

775 DW/CN1169P01/01374 1 22-Nov-14 SBG-PBAD 1169 01 Z1 H1 L06 SD E EP 601188 1

Page 31 of 114
KING FAISAL SPECIALIST HOSPITAL & RESEARCH CENTER, JEDDAH
KFSH-STRUCTURAL SHOP DRAWI
ABREVIATIONS USED : A = APPROVED , B = APPROVED AS NOTED , C = REVISE & RESUBMIT , D = REJECTED , S = SUPERCEDED , V = VALID

SUB.CON.CODE
PROJECT NO

DWG TYPE
SEGMENT

S.TRADE

SERIAL
TRADE
DWG

LEVEL
ZONE
SUB Date of
Sl.No SUBMITTAL NO CONTRACTOR REV
REV NO submission
NO

776 DW/CN1169P01/01375 0 15-Oct-14 SBG-PBAD 1169 01 Z1 H1 L06 SD E EP 601189 0

777 DW/CN1169P01/01375 1 22-Nov-14 SBG-PBAD 1169 01 Z1 H1 L06 SD E EP 601189 1

778 DW/CN1169P01/01376 0 15-Oct-14 SBG-PBAD 1169 01 Z1 H3 L06 SD E EP 601190 0

779 DW/CN1169P01/01376 1 22-Nov-14 SBG-PBAD 1169 01 Z1 H3 L06 SD E EP 601190 1

780 DW/CN1169P01/01463 0 21-Oct-14 SBG-PBAD 1169 01 Z1 H0 L01 SD E PB 705011 0

781 DW/CN1169P01/01463 02 3-Jan-15 SBG-PBAD 1169 01 Z1 H0 L01 SD E PB 705011 02

782 DW/CN1169P01/01464 0 21-Oct-14 SBG-PBAD 1169 01 Z1 H0 L01 SD E PB 705012 0

783 DW/CN1169P01/01464 02 3-Jan-15 SBG-PBAD 1169 01 Z1 H0 L01 SD E PB 705012 02

784 DW/CN1169P01/01465 0 21-Oct-14 SBG-PBAD 1169 01 Z1 H0 L01 SD E PB 705013 0

785 DW/CN1169P01/01465 02 3-Jan-15 SBG-PBAD 1169 01 Z1 H0 L01 SD E PB 705013 02

786 DW/CN1169P01/01466 0 21-Oct-14 SBG-PBAD 1169 01 Z1 H0 L01 SD E PB 705014 0

787 DW/CN1169P01/01466 02 3-Jan-15 SBG-PBAD 1169 01 Z1 H0 L01 SD E PB 705014 02

788 DW/CN1169P01/01467 0 21-Oct-14 SBG-PBAD 1169 01 Z1 H0 L01 SD E PB 705015 0

789 DW/CN1169P01/01467 02 3-Jan-15 SBG-PBAD 1169 01 Z1 H0 L01 SD E PB 705015 02

790 DW/CN1169P01/01468 0 21-Oct-14 SBG-PBAD 1169 01 Z1 H0 L01 SD E PB 705016 0

791 DW/CN1169P01/01468 02 3-Jan-15 SBG-PBAD 1169 01 Z1 H0 L01 SD E PB 705016 02

792 DW/CN1169P01/01469 0 21-Oct-14 SBG-PBAD 1169 01 Z1 H0 L01 SD E PB 705017 0

793 DW/CN1169P01/01469 02 3-Jan-15 SBG-PBAD 1169 01 Z1 H0 L01 SD E PB 705017 02

794 DW/CN1169P01/01470 0 21-Oct-14 SBG-PBAD 1169 01 Z1 H0 L01 SD E PB 705018 0

795 DW/CN1169P01/01470 02 3-Jan-15 SBG-PBAD 1169 01 Z1 H0 L01 SD E PB 705018 02

796 DW/CN1169P01/01471 0 21-Oct-14 SBG-PBAD 1169 01 Z1 H0 L01 SD E PB 705019 0

797 DW/CN1169P01/01472 0 21-Oct-14 SBG-PBAD 1169 01 Z1 H0 L01 SD E PB 705020 0

798 DW/CN1169P01/01495 0 26-Oct-14 SBG-PBAD 1169 01 Z1 H0 L01 SD E PB 705023 0

799 DW/CN1169P01/01496 0 26-Oct-14 SBG-PBAD 1169 01 Z1 H0 L02 SD E PB 705073 0

800 DW/CN1169P01/01497 0 26-Oct-14 SBG-PBAD 1169 01 Z1 H0 L03 SD E PB 705090 0

Page 32 of 114
KING FAISAL SPECIALIST HOSPITAL & RESEARCH CENTER, JEDDAH
KFSH-STRUCTURAL SHOP DRAWI
ABREVIATIONS USED : A = APPROVED , B = APPROVED AS NOTED , C = REVISE & RESUBMIT , D = REJECTED , S = SUPERCEDED , V = VALID

SUB.CON.CODE
PROJECT NO

DWG TYPE
SEGMENT

S.TRADE

SERIAL
TRADE
DWG

LEVEL
ZONE
SUB Date of
Sl.No SUBMITTAL NO CONTRACTOR REV
REV NO submission
NO

801 DW/CN1169P01/01498 0 26-Oct-14 SBG-PBAD 1169 01 Z1 H0 L04 SD E PB 705101 0

802 DW/CN1169P01/01499 0 26-Oct-14 SBG-PBAD 1169 01 Z1 H0 L05 SD E PB 705121 0

803 DW/CN1169P01/01500 0 26-Oct-14 SBG-PBAD 1169 01 Z1 H0 L06 SD E PB 705141 0

804 DW/CN1169P01/01501 0 26-Oct-14 SBG-PBAD 1169 01 Z1 H0 L01 SD E PB 705024 0

805 DW/CN1169P01/01502 0 26-Oct-14 SBG-PBAD 1169 01 Z1 H0 L01 SD E PB 705025 0

806 DW/CN1169P01/01503 0 26-Oct-14 SBG-PBAD 1169 01 Z1 H0 L01 SD E PB 705026 0

807 DW/CN1169P01/01504 0 26-Oct-14 SBG-PBAD 1169 01 Z1 H0 L01 SD E PB 705027 0

808 DW/CN1169P01/01505 0 27-Oct-14 SBG-PBAD 1169 01 Z1 H0 GNL SD E FA 801403 0

809 DW/CN1169P01/01677 0 8-Nov-14 SBG-PBAD 1169 01 Z1 H0 L02 SD E CR 601326 0

810 DW/CN1169P01/01678 0 8-Nov-14 SBG-PBAD 1169 01 Z1 H1 L02 SD E CR 601327 0

811 DW/CN1169P01/01679 0 8-Nov-14 SBG-PBAD 1169 01 Z1 H2 L02 SD E CR 601328 0

812 DW/CN1169P01/01680 0 8-Nov-14 SBG-PBAD 1169 01 Z1 H3 L02 SD E CR 601329 0

813 DW/CN1169P01/01681 0 8-Nov-14 SBG-PBAD 1169 01 Z1 H2 L02 SD E EQ 601391 0

814 DW/CN1169P01/01682 0 8-Nov-14 SBG-PBAD 1169 01 Z1 H2 L02 SD E EQ 601392 0

815 DW/CN1169P01/01683 0 8-Nov-14 SBG-PBAD 1169 01 Z1 H2 L2M SD E EQ 601393 0

816 DW/CN1169P01/01685 0 8-Nov-14 SBG-PBAD 1169 01 Z1 H0 GNL SD E FA 801402 0

817 DW/CN1169P01/01686 0 9-Nov-14 SBG-PBAD 1169 01 Z1 H0 L06 SD E CT 801581 0

818 DW/CN1169P01/01687 0 9-Nov-14 SBG-PBAD 1169 01 Z1 H1 L06 SD E CT 801582 0

819 DW/CN1169P01/01688 0 9-Nov-14 SBG-PBAD 1169 01 Z1 H1 L06 SD E CT 801583 0

820 DW/CN1169P01/01689 0 9-Nov-14 SBG-PBAD 1169 01 Z1 H2 L06 SD E CT 801584 0

821 DW/CN1169P01/01690 0 9-Nov-14 SBG-PBAD 1169 01 Z1 H2 L06 SD E CT 801585 0

822 DW/CN1169P01/01691 0 9-Nov-14 SBG-PBAD 1169 01 Z1 H3 L06 SD E CT 801587 0

823 DW/CN1169P01/01692 0 9-Nov-14 SBG-PBAD 1169 01 Z1 H0 L05 SD E CT 801571 0

824 DW/CN1169P01/01693 0 9-Nov-14 SBG-PBAD 1169 01 Z1 H1 L05 SD E CT 801572 0

825 DW/CN1169P01/01694 0 9-Nov-14 SBG-PBAD 1169 01 Z1 H1 L05 SD E CT 801573 0

Page 33 of 114
KING FAISAL SPECIALIST HOSPITAL & RESEARCH CENTER, JEDDAH
KFSH-STRUCTURAL SHOP DRAWI
ABREVIATIONS USED : A = APPROVED , B = APPROVED AS NOTED , C = REVISE & RESUBMIT , D = REJECTED , S = SUPERCEDED , V = VALID

SUB.CON.CODE
PROJECT NO

DWG TYPE
SEGMENT

S.TRADE

SERIAL
TRADE
DWG

LEVEL
ZONE
SUB Date of
Sl.No SUBMITTAL NO CONTRACTOR REV
REV NO submission
NO

826 DW/CN1169P01/01695 0 9-Nov-14 SBG-PBAD 1169 01 Z1 H2 L05 SD E CT 801574 0

827 DW/CN1169P01/01696 0 9-Nov-14 SBG-PBAD 1169 01 Z1 H2 L05 SD E CT 801575 0

828 DW/CN1169P01/01697 0 9-Nov-14 SBG-PBAD 1169 01 Z1 H3 L05 SD E CT 801577 0

829 DW/CN1169P01/01698 0 9-Nov-14 SBG-PBAD 1169 01 Z1 H0 L03 SD E CT 801551 0

830 DW/CN1169P01/01699 0 9-Nov-14 SBG-PBAD 1169 01 Z1 H1 L03 SD E CT 801552 0

831 DW/CN1169P01/01700 0 9-Nov-14 SBG-PBAD 1169 01 Z1 H1 L03 SD E CT 801553 0

832 DW/CN1169P01/01701 0 9-Nov-14 SBG-PBAD 1169 01 Z1 H2 L03 SD E CT 801554 0

833 DW/CN1169P01/01702 0 9-Nov-14 SBG-PBAD 1169 01 Z1 H2 L03 SD E CT 801555 0

834 DW/CN1169P01/01703 0 9-Nov-14 SBG-PBAD 1169 01 Z1 H3 L03 SD E CT 801556 0

835 DW/CN1169P01/01704 0 9-Nov-14 SBG-PBAD 1169 01 Z1 H0 L04 SD E CT 801561 0

836 DW/CN1169P01/01705 0 9-Nov-14 SBG-PBAD 1169 01 Z1 H1 L04 SD E CT 801562 0

837 DW/CN1169P01/01706 0 9-Nov-14 SBG-PBAD 1169 01 Z1 H1 L04 SD E CT 801563 0

838 DW/CN1169P01/01707 0 9-Nov-14 SBG-PBAD 1169 01 Z1 H2 L04 SD E CT 801564 0

839 DW/CN1169P01/01708 0 9-Nov-14 SBG-PBAD 1169 01 Z1 H2 L04 SD E CT 801565 0

840 DW/CN1169P01/01709 0 9-Nov-14 SBG-PBAD 1169 01 Z1 H3 L04 SD E CT 801567 0

841 DW/CN1169P01/01710 0 9-Nov-14 SBG-PBAD 1169 01 Z1 H0 L07 SD E CT 801591 0

842 DW/CN1169P01/01711 0 9-Nov-14 SBG-PBAD 1169 01 Z1 H1 L07 SD E CT 801201 0

843 DW/CN1169P01/01712 0 10-Nov-14 SBG-PBAD 1169 01 Z1 H1 L07 SD E VE 801501 0

844 DW/CN1169P01/01713 0 10-Nov-14 SBG-PBAD 1169 01 Z1 H1 L04 SD E CR 601351 0

845 DW/CN1169P01/01714 0 10-Nov-14 SBG-PBAD 1169 01 Z1 H1 L05 SD E CR 601361 0

846 DW/CN1169P01/01715 0 10-Nov-14 SBG-PBAD 1169 01 Z1 H1 L06 SD E CR 601371 0

847 DW/CN1169P01/02052 0 2-Dec-14 SBG-PBAD 1169 01 Z1 BC L01 SD E GS 601800 0

848 DW/CN1169P01/02052 1 21-Dec-14 SBG-PBAD 1169 01 Z1 BC L01 SD E GS 601800 1

849 DW/CN1169P01/02053 0 2-Dec-14 SBG-PBAD 1169 01 Z1 B1 L01 SD E GS 601801 0

850 DW/CN1169P01/02053 1 21-Dec-14 SBG-PBAD 1169 01 Z1 B1 L01 SD E GS 601801 1

Page 34 of 114
KING FAISAL SPECIALIST HOSPITAL & RESEARCH CENTER, JEDDAH
KFSH-STRUCTURAL SHOP DRAWI
ABREVIATIONS USED : A = APPROVED , B = APPROVED AS NOTED , C = REVISE & RESUBMIT , D = REJECTED , S = SUPERCEDED , V = VALID

SUB.CON.CODE
PROJECT NO

DWG TYPE
SEGMENT

S.TRADE

SERIAL
TRADE
DWG

LEVEL
ZONE
SUB Date of
Sl.No SUBMITTAL NO CONTRACTOR REV
REV NO submission
NO

851 DW/CN1169P01/02054 0 2-Dec-14 SBG-PBAD 1169 01 Z1 B2 L01 SD E GS 601802 0

852 DW/CN1169P01/02055 0 2-Dec-14 SBG-PBAD 1169 01 Z1 B3 L01 SD E GS 601803 0

853 DW/CN1169P01/02056 0 2-Dec-14 SBG-PBAD 1169 01 Z1 C1 L01 SD E GS 601804 0

854 DW/CN1169P01/02057 0 2-Dec-14 SBG-PBAD 1169 01 Z1 C2 L01 SD E GS 601805 0

855 DW/CN1169P01/02058 0 2-Dec-14 SBG-PBAD 1169 01 Z1 C3 L01 SD E GS 601806 0

856 DW/CN1169P01/02168 0 10-Dec-14 SBG-PBAD 1169 01 Z1 BC L02 SD E EG 601810 0

857 DW/CN1169P01/02169 0 10-Dec-14 SBG-PBAD 1169 01 Z1 B1 L02 SD E EG 601811 0

858 DW/CN1169P01/02170 0 10-Dec-14 SBG-PBAD 1169 01 Z1 B2 L02 SD E EG 601812 0

859 DW/CN1169P01/02171 0 10-Dec-14 SBG-PBAD 1169 01 Z1 B3 L02 SD E EG 601813 0

860 DW/CN1169P01/02172 0 10-Dec-14 SBG-PBAD 1169 01 Z1 C1 L02 SD E EG 601814 0

861 DW/CN1169P01/02173 0 10-Dec-14 SBG-PBAD 1169 01 Z1 C2 L02 SD E EG 601815 0

862 DW/CN1169P01/02174 0 10-Dec-14 SBG-PBAD 1169 01 Z1 C3 L02 SD E EG 601816 0

863 DW/CN1169P01/02175 0 10-Dec-14 SBG-PBAD 1169 01 Z1 BC L03 SD E EG 601820 0

864 DW/CN1169P01/02176 0 10-Dec-14 SBG-PBAD 1169 01 Z1 B1 L03 SD E EG 601821 0

865 DW/CN1169P01/02177 0 10-Dec-14 SBG-PBAD 1169 01 Z1 B2 L03 SD E EG 601822 0

866 DW/CN1169P01/02178 0 10-Dec-14 SBG-PBAD 1169 01 Z1 C1 L03 SD E EG 601823 0

867 DW/CN1169P01/02179 0 10-Dec-14 SBG-PBAD 1169 01 Z1 C2 L03 SD E EG 601824 0

868 DW/CN1169P01/02180 0 10-Dec-14 SBG-PBAD 1169 01 Z1 BC L04 SD E EG 601830 0

869 DW/CN1169P01/02181 0 10-Dec-14 SBG-PBAD 1169 01 Z1 B1 L04 SD E EG 601831 0

870 DW/CN1169P01/02182 0 10-Dec-14 SBG-PBAD 1169 01 Z1 B2 L04 SD E EG 601832 0

871 DW/CN1169P01/02183 0 10-Dec-14 SBG-PBAD 1169 01 Z1 C1 L04 SD E EG 601834 0

872 DW/CN1169P01/02184 0 10-Dec-14 SBG-PBAD 1169 01 Z1 C2 L04 SD E EG 601835 0

873 DW/CN1169P01/02185 0 10-Dec-14 SBG-PBAD 1169 01 Z1 BC L06 SD E EG 601840 0

874 DW/CN1169P01/02186 0 10-Dec-14 SBG-PBAD 1169 01 Z1 B1 L06 SD E EG 601841 0

875 DW/CN1169P01/02187 0 10-Dec-14 SBG-PBAD 1169 01 Z1 B2 L06 SD E EG 601842 0

876 DW/CN1169P01/02188 0 10-Dec-14 SBG-PBAD 1169 01 Z1 C1 L06 SD E EG 601844 0

Page 35 of 114
KING FAISAL SPECIALIST HOSPITAL & RESEARCH CENTER, JEDDAH
KFSH-STRUCTURAL SHOP DRAWI
ABREVIATIONS USED : A = APPROVED , B = APPROVED AS NOTED , C = REVISE & RESUBMIT , D = REJECTED , S = SUPERCEDED , V = VALID

SUB.CON.CODE
PROJECT NO

DWG TYPE
SEGMENT

S.TRADE

SERIAL
TRADE
DWG

LEVEL
ZONE
SUB Date of
Sl.No SUBMITTAL NO CONTRACTOR REV
REV NO submission
NO

877 DW/CN1169P01/02189 0 10-Dec-14 SBG-PBAD 1169 01 Z1 C2 L06 SD E EG 601845 0

878 DW/CN1169P01/02190 0 10-Dec-14 SBG-PBAD 1169 01 Z1 BC L07 SD E EG 601850 0

879 DW/CN1169P01/02191 0 10-Dec-14 SBG-PBAD 1169 01 Z1 B1 L07 SD E EG 601851 0

880 DW/CN1169P01/02192 0 10-Dec-14 SBG-PBAD 1169 01 Z1 B2 L07 SD E EG 601852 0

881 DW/CN1169P01/02291 0 16-Dec-14 SBG-PBAD 1169 01 Z1 A L01 SD E GS 601800 0

882 DW/CN1169P01/02292 0 16-Dec-14 SBG-PBAD 1169 01 Z1 A1 L01 SD E GS 601801 0

883 DW/CN1169P01/02293 0 16-Dec-14 SBG-PBAD 1169 01 Z1 A2 L01 SD E GS 601802 0

884 DW/CN1169P01/02294 0 16-Dec-14 SBG-PBAD 1169 01 Z1 A3 L01 SD E GS 601803 0

885 DW/CN1169P01/02295 0 16-Dec-14 SBG-PBAD 1169 01 Z1 A0 S01 SD E GS 604002 0

886 DW/CN1169P01/02296 0 16-Dec-14 SBG-PBAD 1169 01 Z1 A0 L02 SD E GS 604003 0

887 DW/CN1169P01/02364 0 22-Dec-14 SBG-PBAD 1169 01 Z6 A0 SCH SD E ES 504001 0

888 DW/CN1169P01/02463 00 3-Jan-15 SBG-PBAD 1169 01 Z1 A0 L03 SD E GS 604005 00

889 DW/CN1169P01/02464 00 3-Jan-15 SBG-PBAD 1169 01 Z1 A1 L03 SD E GS 604006 00

890 DW/CN1169P01/02465 00 3-Jan-15 SBG-PBAD 1169 01 Z1 A2 L03 SD E GS 604007 00

891 DW/CN1169P01/02466 00 3-Jan-15 SBG-PBAD 1169 01 Z1 A0 L02 SD E EG 604008 00

892 DW/CN1169P01/02467 00 3-Jan-15 SBG-PBAD 1169 01 Z1 A2 L02 SD E EG 604009 00

893 DW/CN1169P01/02468 00 3-Jan-15 SBG-PBAD 1169 01 Z1 A3 L02 SD E EG 604010 00

894 DW/CN1169P01/02469 00 3-Jan-15 SBG-PBAD 1169 01 Z1 A0 L08 SD E EG 604011 00

895 DW/CN1169P01/02470 00 3-Jan-15 SBG-PBAD 1169 01 Z1 A1 L08 SD E EG 604012 00

896 DW/CN1169P01/02471 00 3-Jan-15 SBG-PBAD 1169 01 Z1 A2 L08 SD E EG 604013 00

897 DW/CN1169P01/02472 00 3-Jan-15 SBG-PBAD 1169 01 Z1 A1 SCH SD E GS 604014 00

898 DW/CN1169P01/02473 00 3-Jan-15 SBG-PBAD 1169 01 Z1 A2 SCH SD E GS 604015 00

899 DW/CN1169P01/02474 00 3-Jan-15 SBG-PBAD 1169 01 Z6 B7 L01 SD E GS 607801 00

900 DW/CN1169P01/02475 00 3-Jan-15 SBG-PBAD 1169 01 Z6 B7 L01 SD E GS 607802 00

901 DW/CN1169P01/02476 00 3-Jan-15 SBG-PBAD 1169 01 Z1 H0 L01 SD E PB 705021 00

902 DW/CN1169P01/02477 00 3-Jan-15 SBG-PBAD 1169 01 Z1 H0 L01 SD E PB 705022 00

Page 36 of 114
KING FAISAL SPECIALIST HOSPITAL & RESEARCH CENTER, JEDDAH
KFSH-STRUCTURAL SHOP DRAWI
ABREVIATIONS USED : A = APPROVED , B = APPROVED AS NOTED , C = REVISE & RESUBMIT , D = REJECTED , S = SUPERCEDED , V = VALID

SUB.CON.CODE
PROJECT NO

DWG TYPE
SEGMENT

S.TRADE

SERIAL
TRADE
DWG

LEVEL
ZONE
SUB Date of
Sl.No SUBMITTAL NO CONTRACTOR REV
REV NO submission
NO

903 DW/CN1169P01/02478 00 3-Jan-15 SBG-PBAD 1169 01 Z1 H0 L01 SD E PB 705031 00

904 DW/CN1169P01/02479 00 3-Jan-15 SBG-PBAD 1169 01 Z1 H0 L01 SD E PB 705032 00

905 DW/CN1169P01/02480 00 3-Jan-15 SBG-PBAD 1169 01 Z1 H0 L01 SD E PB 705033 00

906 DW/CN1169P01/02481 00 3-Jan-15 SBG-PBAD 1169 01 Z1 H0 L01 SD E PB 705034 00

907 DW/CN1169P01/02482 00 3-Jan-15 SBG-PBAD 1169 01 Z1 H0 L01 SD E PB 705035 00

908 DW/CN1169P01/02483 00 3-Jan-15 SBG-PBAD 1169 01 Z1 H0 L01 SD E PB 705036 00

Page 37 of 114
H-STRUCTURAL SHOP DRAWINGS SUBMITTAL LOG
TED , S = SUPERCEDED , V = VALID 7-May-17

SEGMENT
RESPONSE DRAWING
DRAWING TITLE TYPE DISCIPLINE REPLY APPROVA REPLY DATE
REQUIRED BY STATUS
L STATUS

B01 ONCOLOGY BUILDING GROUNDING SYSTEM LAYOUT MASTER FOUNDATION AND LEVEL-01 FLOOR
SD EGS ELECTRICAL 10-Nov-13 Yes C 9-Nov-13 S
PLAN (MASTER PLAN)
B01 ONCOLOGY BUILDING GROUNDING SYSTEM LAYOUT MASTER FOUNDATION AND LEVEL-01 FLOOR
SD EGS ELECTRICAL 10-Nov-13 Yes C 10-Nov-13 S
PLAN (SEGMENT-H1)
B01 ONCOLOGY BUILDING LIGHTNING PROTECTION SYSTEM LAYOUT FOR LEVEL -2 (MASTER PLAN) SD EGS ELECTRICAL 10-Nov-13 Yes C 10-Nov-13 S
B01 ONCOLOGY BUILDING LIGHTNING PROTECTION SYSTEM LAYOUT FOR LEVEL -2 (SEGMENT-H)
SD LPS ELECTRICAL 10-Nov-13 Yes C 10-Nov-13 S
(PART-1)
B01 ONCOLOGY BUILDING LIGHTNING PROTECTION SYSTEM LAYOUT FOR LEVEL-2 (SEGMENT h1)
SD LPS ELECTRICAL 10-Nov-13 Yes C 10-Nov-13 S
(PART-2)
B01 ONCOLOGY BUILDING LIGHTNING PROTECTION SYSTEM LAYOUT FOR LEVEL-3 (SEGMENT-H1)
SD LPS ELECTRICAL 10-Nov-13 Yes C 10-Nov-13 S
(PART-2)
B01 ONCOLOGY BUILDING LIGHTNING PROTECTION SYSTEM LAYOUT FOR LEVEL-7 (SEGMENT-H)
SD LPS ELECTRICAL 10-Nov-13 Yes C 10-Nov-13 S
(LOWER ROOF)
B01 ONCOLOGY BUILDING LIGHTNING PROTECTION SYSTEM LAYOUT FOR LEVEL-8 (SEGMENT-H)
SD LPS ELECTRICAL 10-Nov-13 Yes C 10-Nov-13 S
(UPPER ROOF)
POWER FOR HVAC SYSTEM LAYOUT FOR LEVELS1- MASTER PLAN (SEGMENT H1&H2) SD H0 ELECTRICAL 1-Dec-13 Yes C 1-Dec-13 S

POWER FOR HVAC SYSTEM LAYOUT FOR LEVELS1- MASTER PLAN (SEGMENT H1&H2) SD H0 ELECTRICAL 19-Dec-13 Yes C 18-Dec-13 S

POWER FOR HVAC SYSTEM LAYOUT FOR LEVELS1- MASTER PLAN (SEGMENT H1&H2) SD H0 ELECTRICAL 26-Apr-14 Yes C 21-Apr-14 S

POWER FOR HVAC SYSTEM LAYOUT FOR LEVELS1- MASTER PLAN (SEGMENT H1&H2) SD H0 ELECTRICAL 14-May-14 Yes B 7-May-14 S

POWER FOR HVAC SYSTEM LAYOUT FOR LEVELS1- MASTER PLAN (SEGMENT H1&H2) SD H0 ELECTRICAL 9-Jun-14 Yes B 3-Jun-14 S

POWER FOR HVAC SYSTEM LAYOUT FOR LEVELS1- MASTER PLAN (SEGMENT H1&H2) SD H0 ELECTRICAL 7-Jan-15 Yes A 1-Jan-15 V

POWER FOR HVAC SYSTEM LAYOUT FOR LEVELS1- (SEGMENT H1) SD H1 ELECTRICAL 1-Dec-13 Yes C 27-Nov-13 S

POWER FOR HVAC SYSTEM LAYOUT FOR LEVELS1- (SEGMENT H1) SD H1 ELECTRICAL 7-Dec-13 Yes C 19-Dec-13 S

POWER FOR HVAC SYSTEM LAYOUT FOR LEVELS1- (SEGMENT H1) SD H1 ELECTRICAL 26-Apr-14 Yes C 21-Apr-14 S

POWER FOR HVAC SYSTEM LAYOUT FOR LEVELS1- (SEGMENT H1) SD H1 ELECTRICAL 14-May-14 Yes B 7-May-14 S

POWER FOR HVAC SYSTEM LAYOUT FOR LEVELS1- (SEGMENT H1) SD H1 ELECTRICAL 9-Jun-14 Yes B 3-Jun-14 S

POWER FOR HVAC SYSTEM LAYOUT FOR LEVELS1- (SEGMENT H1) SD H1 ELECTRICAL 7-Jan-15 Yes A 1-Jan-15 V

POWER FOR HVAC SYSTEM LAYOUT FOR LEVELS1 - (SEGMENT H2) SD H2 ELECTRICAL 1-Dec-13 Yes C 27-Nov-13 S

POWER FOR HVAC SYSTEM LAYOUT FOR LEVELS1 - (SEGMENT H2) SD H2 ELECTRICAL 7-Dec-13 Yes C 19-Dec-13 S

POWER FOR HVAC SYSTEM LAYOUT FOR LEVELS1 - (SEGMENT H2) SD H2 ELECTRICAL 26-Apr-14 Yes C 21-Apr-14 S

POWER FOR HVAC SYSTEM LAYOUT FOR LEVELS1 - (SEGMENT H2) SD H2 ELECTRICAL 14-May-14 Yes B 7-May-14 S

POWER FOR HVAC SYSTEM LAYOUT FOR LEVELS1 - (SEGMENT H2) SD H2 ELECTRICAL 9-Jun-14 Yes B 3-Jun-14 V

Page 38 of 114
H-STRUCTURAL SHOP DRAWINGS SUBMITTAL LOG
TED , S = SUPERCEDED , V = VALID 7-May-17

SEGMENT
RESPONSE DRAWING
DRAWING TITLE TYPE DISCIPLINE REPLY APPROVA REPLY DATE
REQUIRED BY STATUS
L STATUS

GROUNDING SYSTEM LAYOUT MASTER FOUNDATION AND LEVEL 01 MASTER PLAN (SEGMENT- H&H1) SD H0 ELECTRICAL 1-Dec-13 Yes C 26-Nov-13 S

GROUNDING SYSTEM LAYOUT MASTER FOUNDATION AND LEVEL 01 MASTER PLAN (SEGMENT- H&H1) SD H0 ELECTRICAL 8-Dec-13 Yes C 26-Nov-13 S

GROUNDING SYSTEM LAYOUT MASTER FOUNDATION AND LEVEL 01 MASTER PLAN (SEGMENT- H&H1) SD H0 ELECTRICAL 24-Dec-13 Yes C 12-Dec-13 S

GROUNDING SYSTEM LAYOUT MASTER FOUNDATION AND LEVEL 01 MASTER PLAN (SEGMENT- H&H1) SD H0 ELECTRICAL 24-Jan-14 Yes B 23-Jan-14 S

GROUNDING SYSTEM LAYOUT MASTER FOUNDATION AND LEVEL 01 MASTER PLAN (SEGMENT- H&H1) SD H0 ELECTRICAL 22-Feb-14 Yes B 18-Feb-14 S

GROUNDING SYSTEM LAYOUT MASTER FOUNDATION AND LEVEL 01 MASTER PLAN (SEGMENT- H&H1) SD H0 ELECTRICAL 14-Jul-14 Yes C 12-Jul-14 S
GROUNDING SYSTEM LAYOUT MASTER FOUNDATION AND LEVEL 01 MASTER PLAN (SEGMENT-
SD H0 ELECTRICAL 2-Aug-14 Yes A 2-Aug-14 V
H&H2 ,H3)
GROUNDING SYSTEM LAYOUT MASTER FOUNDATION AND LEVEL 01 FLOOR PLAN (SEGMENT- H) SD H0 ELECTRICAL 1-Dec-13 Yes C 26-Nov-13 S

GROUNDING SYSTEM LAYOUT MASTER FOUNDATION AND LEVEL 01 FLOOR PLAN (SEGMENT- H) SD H0 ELECTRICAL 24-Dec-13 Yes C 12-Jul-14 S

GROUNDING SYSTEM LAYOUT MASTER FOUNDATION AND LEVEL 01 FLOOR PLAN (SEGMENT- H) SD H0 ELECTRICAL 23-Jan-14 Yes B 23-Jan-14 S

GROUNDING SYSTEM LAYOUT MASTER FOUNDATION AND LEVEL 01 FLOOR PLAN (SEGMENT- H) SD H1 ELECTRICAL 22-Feb-14 Yes B 18-Feb-14 S

GROUNDING SYSTEM LAYOUT MASTER FOUNDATION AND LEVEL 01 FLOOR PLAN (SEGMENT- H) SD H1 ELECTRICAL 14-Jul-14 Yes C 12-Jul-14 S

GROUNDING SYSTEM LAYOUT MASTER FOUNDATION AND LEVEL 01 FLOOR PLAN (SEGMENT- H1 & H3 ) SD H1 ELECTRICAL 2-Aug-14 Yes A 2-Aug-14 V

GROUNDING SYSTEM LAYOUT MASTER FOUNDATION AND LEVEL 01FLOOR PLAN (SEGMENT- H1) SD H1 ELECTRICAL 1-Dec-13 Yes C 26-Nov-13 S

GROUNDING SYSTEM LAYOUT MASTER FOUNDATION AND LEVEL 01FLOOR PLAN (SEGMENT- H1) SD H1 ELECTRICAL 24-Dec-13 Yes C 12-Dec-13 S

GROUNDING SYSTEM LAYOUT MASTER FOUNDATION AND LEVEL 01FLOOR PLAN (SEGMENT- H1) SD H1 ELECTRICAL 23-Jan-14 Yes B 23-Jan-14 S

GROUNDING SYSTEM LAYOUT MASTER FOUNDATION AND LEVEL 01FLOOR PLAN (SEGMENT- H1) SD H2 ELECTRICAL 22-Feb-14 Yes B 18-Feb-14 S

GROUNDING SYSTEM LAYOUT MASTER FOUNDATION AND LEVEL 01FLOOR PLAN (SEGMENT- H1) SD H2 ELECTRICAL 14-Jul-14 Yes C 12-Jul-14 S

GROUNDING SYSTEM LAYOUT MASTER FOUNDATION AND LEVEL 01FLOOR PLAN (SEGMENT- H2&H3) SD H2 ELECTRICAL 2-Aug-14 Yes A 2-Aug-14 V

LIGHTING PROTECTION SYSTEM LAYOUT FOR LEVEL-2 MASTER PLAN SD H0 ELECTRICAL 1-Dec-13 Yes B 26-Nov-13 S

LIGHTING PROTECTION SYSTEM LAYOUT FOR LEVEL-2 MASTER PLAN SD H0 ELECTRICAL 23-Aug-14 Yes B 21-Aug-14 V

LIGHTING PROTECTION SYSTEM LAYOUT FOR LEVEL-2 (SEGMENT-H1) SD H1 ELECTRICAL 1-Dec-13 Yes B 26-Nov-13 S

LIGHTING PROTECTION SYSTEM LAYOUT FOR LEVEL-2 (SEGMENT-H1) SD H1 ELECTRICAL 23-Aug-14 Yes B 21-Aug-14 V

LIGHTING PROTECTION SYSTEM LAYOUT FOR LEVEL-2 (SEGMENT-H) SD H0 ELECTRICAL 1-Dec-13 Yes B 26-Nov-13 S

LIGHTING PROTECTION SYSTEM LAYOUT FOR LEVEL-2 (SEGMENT-H) SD H0 ELECTRICAL 23-Aug-14 Yes B 21-Aug-14 V

Page 39 of 114
H-STRUCTURAL SHOP DRAWINGS SUBMITTAL LOG
TED , S = SUPERCEDED , V = VALID 7-May-17

SEGMENT
RESPONSE DRAWING
DRAWING TITLE TYPE DISCIPLINE REPLY APPROVA REPLY DATE
REQUIRED BY STATUS
L STATUS

LIGHTING PROTECTION SYSTEM LAYOUT FOR LEVEL-3 (SEGMENT-H1) SD H1 ELECTRICAL 1-Dec-13 Yes A 26-Nov-13 V

LIGHTING PROTECTION SYSTEM LAYOUT FOR LEVEL-7 (SEGMENT-H)- LOWER ROOF SD H0 ELECTRICAL 1-Dec-13 Yes A 26-Nov-13 V

LIGHTING PROTECTION SYSTEM LAYOUT FOR LEVEL-8 (SEGMENT-H)- UPPER ROOF SD H0 ELECTRICAL 1-Dec-13 Yes A 26-Nov-13 V

POWER SYSTEM LAYOUT FOR LEVEL-1 (LOW LEVEL) VERSA HD-10,18MV LINAC ROOM SD H0 ELECTRICAL 3-Dec-13 Yes D 3-Dec-13 V

POWER SYSTEM LAYOUT FOR LEVEL-1 (HIGH LEVEL ABOVE CEILING) VERSA HD-10,18MV LINAC ROOM SD H0 ELECTRICAL 3-Dec-13 Yes D 3-Dec-13 V

POWER SYSTEM LAYOUT FOR LEVEL-1 (HIGH LEVEL ABOVE CEILING) VERSA HD-10,18MV LINAC ROOM SD H0 ELECTRICAL 3-Dec-13 Yes D 3-Dec-13 V

GENERAL EQUIPMENT LAYOUT PLAN- VERSA HD-10,18 MV SD H0 ELECTRICAL 3-Dec-13 Yes D 3-Dec-13 V

LIGHTING SYSTEM LAYOUT FOR LEVEL 01 VERSA HD-10,18MV- LINAC ROOM SD H0 ELECTRICAL 3-Dec-13 Yes D 3-Dec-13 V

POWER SYSTEM LAYOUT FOR LEVEL-S1- MASTER PLAN (SEGMENT- H&H1) SD H0 ELECTRICAL 3-Dec-13 Yes C 4-Dec-13 S

POWER SYSTEM LAYOUT FOR LEVEL-S1- MASTER PLAN (SEGMENT- H&H1) SD H0 ELECTRICAL 14-Jun-14 Yes C 17-Jun-14 S

POWER SYSTEM LAYOUT FOR LEVEL-S1- MASTER PLAN (SEGMENT- H1&H2) SD H0 ELECTRICAL 16-Aug-14 Yes A 11-Aug-14 S

POWER SYSTEM LAYOUT FOR LEVEL-S1- MASTER PLAN (SEGMENT- H1&H2) SD H0 ELECTRICAL 7-Jan-15 Yes D 1-Jan-15 V

POWER SYSTEM LAYOUT FOR LEVEL-S1- (SEGMENT- H1) SD H0 ELECTRICAL 3-Dec-13 Yes B 4-Dec-13 S

POWER SYSTEM LAYOUT FOR LEVEL-S1- (SEGMENT- H1) SD H0 ELECTRICAL 14-Jun-14 Yes C 17-Jun-14 S

POWER SYSTEM LAYOUT FOR LEVEL-S1- (SEGMENT- H1) SD H0 ELECTRICAL 16-Aug-14 Yes A 11-Aug-14 S

POWER SYSTEM LAYOUT FOR LEVEL-S1- (SEGMENT- H1) SD H1 ELECTRICAL 7-Jan-15 Yes D 1-Jan-15 V

POWER SYSTEM LAYOUT FOR LEVEL-S1- (SEGMENT-H2) SD H1 ELECTRICAL 3-Dec-13 Yes B 4-Dec-13 S

POWER SYSTEM LAYOUT FOR LEVEL-S1- (SEGMENT-H2) SD H1 ELECTRICAL 14-Jun-14 Yes C 17-Jun-14 S

POWER SYSTEM LAYOUT FOR LEVEL-S1- (SEGMENT-H2) SD H0 ELECTRICAL 16-Aug-14 Yes A 11-Aug-14 V

LIGHTING SYSTEM LAYOUT FOR LEVEL S1- MASTER PLAN (SEGMENT-H&H1) SD H0 ELECTRICAL 3-Dec-13 Yes B 4-Dec-13 S

LIGHTING SYSTEM LAYOUT FOR LEVEL S1- MASTER PLAN (SEGMENT-H1&H2) SD H0 ELECTRICAL 23-Mar-14 Yes C 24-Mar-14 S

LIGHTING SYSTEM LAYOUT FOR LEVEL S1- MASTER PLAN (SEGMENT-H1&H2) SD H0 ELECTRICAL 30-Apr-14 Yes C 24-Apr-14 S

LIGHTING SYSTEM LAYOUT FOR LEVEL S1- MASTER PLAN (SEGMENT-H1&H2) SD H0 ELECTRICAL 14-May-14 Yes B 17-May-14 S

LIGHTING SYSTEM LAYOUT FOR LEVEL S1- MASTER PLAN (SEGMENT-H1&H2) SD H0 ELECTRICAL 7-Jan-15 Yes B 1-Jan-15 V

LIGHTING SYSTEM LAYOUT FOR LEVEL S1- (SEGMENT-H) SD H0 ELECTRICAL 3-Dec-13 Yes B 4-Dec-13 S

Page 40 of 114
H-STRUCTURAL SHOP DRAWINGS SUBMITTAL LOG
TED , S = SUPERCEDED , V = VALID 7-May-17

SEGMENT
RESPONSE DRAWING
DRAWING TITLE TYPE DISCIPLINE REPLY APPROVA REPLY DATE
REQUIRED BY STATUS
L STATUS

LIGHTING SYSTEM LAYOUT FOR LEVEL S1- (SEGMENT-H1) SD H1 ELECTRICAL 23-Mar-14 Yes C 24-Mar-14 S

LIGHTING SYSTEM LAYOUT FOR LEVEL S1- (SEGMENT-H1) SD H1 ELECTRICAL 30-Apr-14 Yes C 24-Apr-14 S

LIGHTING SYSTEM LAYOUT FOR LEVEL S1- (SEGMENT-H1) SD H1 ELECTRICAL 14-May-14 Yes B 17-May-14 S

LIGHTING SYSTEM LAYOUT FOR LEVEL S1- (SEGMENT-H1) SD H1 ELECTRICAL 7-Jan-15 Yes B 1-Jan-15 V

LIGHTING SYSTEM LAYOUT FOR LEVEL S1- (SEGMENT-H1) SD H1 ELECTRICAL 3-Dec-13 Yes C 4-Dec-13 S

LIGHTING SYSTEM LAYOUT FOR LEVEL S1- (SEGMENT-H2) SD H2 ELECTRICAL 23-Mar-14 Yes C 24-Mar-14 S

LIGHTING SYSTEM LAYOUT FOR LEVEL S1- (SEGMENT-H2) SD H2 ELECTRICAL 30-Apr-14 Yes C 24-Apr-14 S

LIGHTING SYSTEM LAYOUT FOR LEVEL S1- (SEGMENT-H2) SD H2 ELECTRICAL 14-May-14 Yes B 17-May-14 V

EARTHING SYSTEM SCHEMATICS SD H0 ELECTRICAL 5-Dec-13 Yes C 26-Nov-13 S

EARTHING SYSTEM SCHEMATICS SD H0 ELECTRICAL 19-Dec-13 Yes C 9-Dec-13 S

EARTHING SYSTEM SCHEMATICS SD H0 ELECTRICAL 22-Feb-14 Yes A 18-Feb-14 V

FIRE ALARM& VOICE EVACUATION SYSTEM LEVELS1- MASTER PLAN (SEGMENT-H&H1) SD H0 ELECTRICAL 18-Dec-13 Yes C 12-Dec-13 S

FIRE ALARM& VOICE EVACUATION SYSTEM LEVELS1- MASTER PLAN (SEGMENT-H1&H2) SD H0 ELECTRICAL 10-Mar-14 Yes B 11-Mar-14 v

FIRE ALARM& VOICE EVACUATION SYSTEM LEVELS1- (SEGMENT-H) SD H0 ELECTRICAL 18-Dec-13 Yes C 12-Dec-13 S

FIRE ALARM& VOICE EVACUATION SYSTEM LEVELS1- (SEGMENT-H1) SD H1 ELECTRICAL 10-Mar-14 Yes B 11-Mar-14 v

FIRE ALARM& VOICE EVACUATION SYSTEM LEVELS1- (SEGMENT- H1) SD H0 ELECTRICAL 18-Dec-13 Yes C 12-Dec-13 S

FIRE ALARM& VOICE EVACUATION SYSTEM LEVELS1- (SEGMENT- H2) SD H2 ELECTRICAL 10-Mar-14 Yes B 11-Mar-14 v

BUILDING MANAGEMENT SYSTEM FOR LEVEL-S1- MASTER PLAN (SEGMENT- H1&H2) SD H0 ELECTRICAL 22-Dec-13 Yes C 19-Dec-13 S

BUILDING MANAGEMENT SYSTEM FOR LEVEL-S1- MASTER PLAN (SEGMENT- H1&H2) SD H1 ELECTRICAL 2-Mar-14 Yes C 2-Mar-14 S

BUILDING MANAGEMENT SYSTEM FOR LEVEL-S1- MASTER PLAN (SEGMENT- H1&H2) SD H1 ELECTRICAL 25-Apr-14 Yes A 18-May-14 S

BUILDING MANAGEMENT SYSTEM FOR LEVEL-S1- MASTER PLAN (SEGMENT- H1&H2) SD H1 ELECTRICAL 7-Jan-15 OverDue P V

BUILDING MANAGEMENT SYSTEM FOR LEVEL-S1- (SEGMENT- H1) SD H0 ELECTRICAL 22-Dec-13 Yes C 19-Dec-13 S

BUILDING MANAGEMENT SYSTEM FOR LEVEL-S1- (SEGMENT- H1) SD H1 ELECTRICAL 2-Mar-14 Yes C 2-Mar-14 S

BUILDING MANAGEMENT SYSTEM FOR LEVEL-S1- (SEGMENT- H1) SD H1 ELECTRICAL 25-Apr-14 Yes A 18-May-14 S

BUILDING MANAGEMENT SYSTEM FOR LEVEL-S1- (SEGMENT- H1) SD H1 ELECTRICAL 7-Jan-15 OverDue P V

Page 41 of 114
H-STRUCTURAL SHOP DRAWINGS SUBMITTAL LOG
TED , S = SUPERCEDED , V = VALID 7-May-17

SEGMENT
RESPONSE DRAWING
DRAWING TITLE TYPE DISCIPLINE REPLY APPROVA REPLY DATE
REQUIRED BY STATUS
L STATUS

BUILDING MANAGEMENT SYSTEM FOR LEVEL-S1 (SEGMENT- H2) SD H0 ELECTRICAL 22-Dec-13 Yes C 19-Dec-13 S

BUILDING MANAGEMENT SYSTEM FOR LEVEL-S1 (SEGMENT- H2) SD H2 ELECTRICAL 2-Mar-14 Yes C 2-Mar-14 S

BUILDING MANAGEMENT SYSTEM FOR LEVEL-S1 (SEGMENT- H2) SD H2 ELECTRICAL 25-Apr-14 Yes A 18-May-14 S

BUILDING MANAGEMENT SYSTEM FOR LEVEL-S1 (SEGMENT- H2) SD H2 ELECTRICAL 7-Jan-15 OverDue P V

FIRE ALARM SYSTEM LAYOUT LEVEL -01 MASTER PLAN SEGMENT-H1 SD H1 ELECTRICAL 22-Feb-14 Yes C 24-Feb-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL -01 MASTER PLAN SEGMENT-H1 SD H1 ELECTRICAL 30-Mar-14 Yes B 6-May-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL -01 MASTER PLAN SEGMENT-H1 SD H1 ELECTRICAL 27-Aug-14 Yes C 30-Aug-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL -01 MASTER PLAN SEGMENT-H1 SD H1 ELECTRICAL 12-Oct-14 Yes C 16-Oct-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL -01 MASTER PLAN SEGMENT-H1 SD H1 ELECTRICAL 22-Nov-14 Yes C 25-Nov-14 V

FIRE ALARM SYSTEM LAYOUT LEVEL -01 SEGMENT-H1 (PART-1) SD H1 ELECTRICAL 22-Feb-14 Yes C 24-Feb-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL -01 SEGMENT-H1 (PART-1) SD H1 ELECTRICAL 30-Mar-14 Yes B 6-May-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL -01 SEGMENT-H1 (PART-1) SD H1 ELECTRICAL 27-Aug-14 Yes C 30-Aug-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL -01 SEGMENT-H1 (PART-1) SD H1 ELECTRICAL 12-Oct-14 Yes C 16-Oct-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL -01 SEGMENT-H1 (PART-1) SD H1 ELECTRICAL 22-Nov-14 Yes C 25-Nov-14 V

FIRE ALARM SYSTEM LAYOUT LEVEL -01 SEGMENT-H1 (PART-2) SD H1 ELECTRICAL 22-Feb-14 Yes C 24-Feb-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL -01 SEGMENT-H1 (PART-2) SD H1 ELECTRICAL 30-Mar-14 Yes B 6-May-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL -01 SEGMENT-H1 (PART-2) SD H1 ELECTRICAL 27-Aug-14 Yes C 30-Aug-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL -01 SEGMENT-H1 (PART-2) SD H1 ELECTRICAL 12-Oct-14 Yes C 16-Oct-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL -01 SEGMENT-H1 (PART-2) SD H1 ELECTRICAL 22-Nov-14 Yes C 25-Nov-14 V

FIRE ALARM SYSTEM LAYOUT LEVEL -01 SEGMENT-H1 (PART-3) SD H1 ELECTRICAL 22-Feb-14 Yes C 24-Feb-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL -01 SEGMENT-H1 (PART-3) SD H1 ELECTRICAL 30-Mar-14 Yes B 6-May-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL -01 SEGMENT-H1 (PART-3) SD H1 ELECTRICAL 27-Aug-14 Yes C 30-Aug-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL -01 SEGMENT-H1 (PART-3) SD H1 ELECTRICAL 12-Oct-14 Yes C 16-Oct-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL -01 SEGMENT-H1 (PART-3) SD H1 ELECTRICAL 22-Nov-14 Yes C 25-Nov-14 V

FIRE ALARM SYSTEM LAYOUT LEVEL -01 SEGMENT-H1 (PART-4) SD H1 ELECTRICAL 22-Feb-14 Yes C 24-Feb-14 S

Page 42 of 114
H-STRUCTURAL SHOP DRAWINGS SUBMITTAL LOG
TED , S = SUPERCEDED , V = VALID 7-May-17

SEGMENT
RESPONSE DRAWING
DRAWING TITLE TYPE DISCIPLINE REPLY APPROVA REPLY DATE
REQUIRED BY STATUS
L STATUS

FIRE ALARM SYSTEM LAYOUT LEVEL -01 SEGMENT-H1 (PART-4) SD H1 ELECTRICAL 30-Mar-14 Yes B 6-May-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL -01 SEGMENT-H1 (PART-4) SD H1 ELECTRICAL 27-Aug-14 Yes C 30-Aug-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL -01 SEGMENT-H1 (PART-4) SD H1 ELECTRICAL 12-Oct-14 Yes C 16-Oct-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL -01 SEGMENT-H1 (PART-4) SD H1 ELECTRICAL 22-Nov-14 Yes C 25-Nov-14 V

FIRE ALARM SYSTEM LAYOUT LEVEL -01 MASTER PLAN SEGMENT-H2 SD H2 ELECTRICAL 22-Feb-14 Yes C 24-Feb-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL -01 MASTER PLAN SEGMENT-H2 SD H2 ELECTRICAL 30-Mar-14 Yes B 6-May-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL -01 MASTER PLAN SEGMENT-H2 SD H2 ELECTRICAL 27-Aug-14 Yes C 30-Aug-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL -01 MASTER PLAN SEGMENT-H2 SD H2 ELECTRICAL 12-Oct-14 Yes C 16-Oct-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL -01 MASTER PLAN SEGMENT-H2 SD H2 ELECTRICAL 22-Nov-14 Yes C 25-Nov-14 V

FIRE ALARM SYSTEM LAYOUT LEVEL -01 SEGMENT-H2 (PART-1) SD H2 ELECTRICAL 22-Feb-14 Yes C 24-Feb-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL -01 SEGMENT-H2 (PART-1) SD H2 ELECTRICAL 30-Mar-14 Yes B 6-May-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL -01 SEGMENT-H2 (PART-1) SD H2 ELECTRICAL 27-Aug-14 Yes C 30-Aug-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL -01 SEGMENT-H2 (PART-1) SD H2 ELECTRICAL 12-Oct-14 Yes C 16-Oct-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL -01 SEGMENT-H2 (PART-1) SD H2 ELECTRICAL 22-Nov-14 Yes C 25-Nov-14 V

FIRE ALARM SYSTEM LAYOUT LEVEL -01 SEGMENT-H2 (PART-2) SD H2 ELECTRICAL 22-Feb-14 Yes C 24-Feb-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL -01 SEGMENT-H2 (PART-2) SD H2 ELECTRICAL 30-Mar-14 Yes B 6-May-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL -01 SEGMENT-H2 (PART-2) SD H2 ELECTRICAL 27-Aug-14 Yes C 30-Aug-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL -01 SEGMENT-H2 (PART-2) SD H2 ELECTRICAL 12-Oct-14 Yes C 16-Oct-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL -01 SEGMENT-H2 (PART-2) SD H2 ELECTRICAL 22-Nov-14 Yes C 25-Nov-14 V

FIRE ALARM SYSTEM LAYOUT LEVEL -01 SEGMENT-H2 (PART-3) SD H2 ELECTRICAL 22-Feb-14 Yes C 24-Feb-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL -01 SEGMENT-H2 (PART-3) SD H2 ELECTRICAL 30-Mar-14 Yes B 6-May-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL -01 SEGMENT-H2 (PART-3) SD H2 ELECTRICAL 27-Aug-14 Yes C 30-Aug-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL -01 SEGMENT-H2 (PART-3) SD H2 ELECTRICAL 12-Oct-14 Yes C 16-Oct-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL -01 SEGMENT-H2 (PART-3) SD H2 ELECTRICAL 22-Nov-14 Yes C 25-Nov-14 V

FIRE ALARM SYSTEM LAYOUT LEVEL -01 SEGMENT-H2 (PART-4) SD H2 ELECTRICAL 22-Feb-14 Yes C 24-Feb-14 S

Page 43 of 114
H-STRUCTURAL SHOP DRAWINGS SUBMITTAL LOG
TED , S = SUPERCEDED , V = VALID 7-May-17

SEGMENT
RESPONSE DRAWING
DRAWING TITLE TYPE DISCIPLINE REPLY APPROVA REPLY DATE
REQUIRED BY STATUS
L STATUS

FIRE ALARM SYSTEM LAYOUT LEVEL -01 SEGMENT-H2 (PART-4) SD H2 ELECTRICAL 30-Mar-14 Yes B 6-May-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL -01 SEGMENT-H2 (PART-4) SD H2 ELECTRICAL 27-Aug-14 Yes C 30-Aug-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL -01 SEGMENT-H2 (PART-4) SD H2 ELECTRICAL 12-Oct-14 Yes C 16-Oct-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL -01 SEGMENT-H2 (PART-4) SD H2 ELECTRICAL 22-Nov-14 Yes C 25-Nov-14 V

FIRE ALARM SYSTEM LAYOUT LEVEL -01 MASTER PLAN SEGMENT-H3 SD H3 ELECTRICAL 22-Feb-14 Yes C 24-Feb-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL -01 MASTER PLAN SEGMENT-H3 SD H3 ELECTRICAL 30-Mar-14 Yes B 6-May-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL -01 MASTER PLAN SEGMENT-H3 SD H3 ELECTRICAL 27-Aug-14 Yes C 30-Aug-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL -01 MASTER PLAN SEGMENT-H3 SD H3 ELECTRICAL 12-Oct-14 Yes C 16-Oct-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL -01 MASTER PLAN SEGMENT-H3 SD H3 ELECTRICAL 22-Nov-14 Yes C 25-Nov-14 V

FIRE ALARM SYSTEM LAYOUT LEVEL -01 MASTER PLAN SEGMENT-H3 (PART-1) SD H3 ELECTRICAL 22-Feb-14 Yes C 24-Feb-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL -01 MASTER PLAN SEGMENT-H3 (PART-1) SD H3 ELECTRICAL 30-Mar-14 Yes B 6-May-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL -01 MASTER PLAN SEGMENT-H3 (PART-1) SD H3 ELECTRICAL 27-Aug-14 Yes C 30-Aug-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL -01 MASTER PLAN SEGMENT-H3 (PART-1) SD H3 ELECTRICAL 12-Oct-14 Yes C 16-Oct-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL -01 MASTER PLAN SEGMENT-H3 (PART-1) SD H3 ELECTRICAL 22-Nov-14 Yes C 25-Nov-14 V

FIRE ALARM SYSTEM LAYOUT LEVEL -01 MASTER PLAN SEGMENT-H3 (PART-2) SD H3 ELECTRICAL 22-Feb-14 Yes C 24-Feb-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL -01 MASTER PLAN SEGMENT-H3 (PART-2) SD H3 ELECTRICAL 30-Mar-14 Yes B 6-May-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL -01 MASTER PLAN SEGMENT-H3 (PART-2) SD H3 ELECTRICAL 27-Aug-14 Yes C 30-Aug-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL -01 MASTER PLAN SEGMENT-H3 (PART-2) SD H3 ELECTRICAL 12-Oct-14 Yes C 16-Oct-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL -01 MASTER PLAN SEGMENT-H3 (PART-2) SD H3 ELECTRICAL 22-Nov-14 Yes C 25-Nov-14 V

STRUCTURED CABLING LAYOUT LEVEL-1 PLAN (SEGMENT-H1) (MASTER PLAN) SD H1 ELECTRICAL 4-Mar-14 Yes C 9-Mar-14 v

STRUCTURED CABLING LAYOUT LEVEL-1 PLAN (SEGMENT-H1) (PART-1) SD H1 ELECTRICAL 4-Mar-14 Yes C 9-Mar-14 v

STRUCTURED CABLING LAYOUT LEVEL-1 PLAN (SEGMENT-H1) (PART-2) SD H1 ELECTRICAL 4-Mar-14 Yes C 9-Mar-14 v

STRUCTURED CABLING LAYOUT LEVEL-1 PLAN (SEGMENT-H1) (PART-3) SD H1 ELECTRICAL 4-Mar-14 Yes C 9-Mar-14 v

STRUCTURED CABLING LAYOUT LEVEL-1 PLAN (SEGMENT-H1) (PART-4) SD H1 ELECTRICAL 4-Mar-14 Yes C 9-Mar-14 v

STRUCTURED CABLING LAYOUT LEVEL-1 PLAN (SEGMENT-H2) (MASTER PLAN) SD H2 ELECTRICAL 4-Mar-14 Yes C 9-Mar-14 v

Page 44 of 114
H-STRUCTURAL SHOP DRAWINGS SUBMITTAL LOG
TED , S = SUPERCEDED , V = VALID 7-May-17

SEGMENT
RESPONSE DRAWING
DRAWING TITLE TYPE DISCIPLINE REPLY APPROVA REPLY DATE
REQUIRED BY STATUS
L STATUS

STRUCTURED CABLING LAYOUT LEVEL-1 PLAN (SEGMENT-H2) (PART-1) SD H2 ELECTRICAL 4-Mar-14 Yes C 9-Mar-14 v

STRUCTURED CABLING LAYOUT LEVEL-1 PLAN (SEGMENT-H2) (PART-2) SD H2 ELECTRICAL 4-Mar-14 Yes C 9-Mar-14 v

STRUCTURED CABLING LAYOUT LEVEL-1 PLAN (SEGMENT-H2) (PART-3) SD H2 ELECTRICAL 4-Mar-14 Yes C 9-Mar-14 v

STRUCTURED CABLING LAYOUT LEVEL-1 PLAN (SEGMENT-H2) (PART-4) SD H2 ELECTRICAL 4-Mar-14 Yes C 9-Mar-14 v

STRUCTURED CABLING LAYOUT LEVEL-1 PLAN (SEGMENT-H3) (MASTER PLAN) SD H3 ELECTRICAL 4-Mar-14 Yes C 9-Mar-14 v

STRUCTURED CABLING LAYOUT LEVEL-1 PLAN (SEGMENT-H3) (PART-1) SD H3 ELECTRICAL 4-Mar-14 Yes C 9-Mar-14 v

STRUCTURED CABLING LAYOUT LEVEL-1 PLAN (SEGMENT-H3) (PART-2) SD H3 ELECTRICAL 4-Mar-14 Yes C 9-Mar-14 v

BUILDING MANAGEMENT SYSTEM FOR LEVEL-1 MASTER PLAN (SEGMENT-H1) SD H1 ELECTRICAL 12-Mar-14 Yes B 12-Mar-14 S

BUILDING MANAGEMENT SYSTEM FOR LEVEL-1 MASTER PLAN (SEGMENT-H1) SD H1 ELECTRICAL 16-Aug-14 Yes C 21-Aug-14 S

BUILDING MANAGEMENT SYSTEM FOR LEVEL-1 MASTER PLAN (SEGMENT-H1) SD H1 ELECTRICAL 16-Nov-14 Yes C 19-Nov-14 V

BUILDING MANAGEMENT SYSTEM FOR LEVEL-1 (SEGEMENT-H1) PART-1 OF 4 SD H1 ELECTRICAL 12-Mar-14 Yes B 12-Mar-14 S

BUILDING MANAGEMENT SYSTEM FOR LEVEL-1 (SEGEMENT-H1) PART-1 OF 4 SD H1 ELECTRICAL 16-Aug-14 Yes C 21-Aug-14 S

BUILDING MANAGEMENT SYSTEM FOR LEVEL-1 (SEGEMENT-H1) PART-1 OF 4 SD H1 ELECTRICAL 16-Nov-14 Yes C 19-Nov-14 V

BUILDING MANAGEMENT SYSTEM FOR LEVEL-1 (SEGEMENT-H1) PART-2 OF 4 SD H1 ELECTRICAL 12-Mar-14 Yes B 12-Mar-14 S

BUILDING MANAGEMENT SYSTEM FOR LEVEL-1 (SEGEMENT-H1) PART-2 OF 4 SD H1 ELECTRICAL 16-Aug-14 Yes C 21-Aug-14 S

BUILDING MANAGEMENT SYSTEM FOR LEVEL-1 (SEGEMENT-H1) PART-2 OF 4 SD H1 ELECTRICAL 16-Nov-14 Yes C 19-Nov-14 V

BUILDING MANAGEMENT SYSTEM FOR LEVEL-1 (SEGEMENT-H1) PART-3 OF 4 SD H1 ELECTRICAL 12-Mar-14 Yes B 12-Mar-14 S

BUILDING MANAGEMENT SYSTEM FOR LEVEL-1 (SEGEMENT-H1) PART-3 OF 4 SD H1 ELECTRICAL 16-Aug-14 Yes C 21-Aug-14 S

BUILDING MANAGEMENT SYSTEM FOR LEVEL-1 (SEGEMENT-H1) PART-3 OF 4 SD H1 ELECTRICAL 16-Nov-14 Yes C 19-Nov-14 V

BUILDING MANAGEMENT SYSTEM FOR LEVEL-1 (SEGEMENT-H1) PART-4 OF 4 SD H1 ELECTRICAL 12-Mar-14 Yes B 12-Mar-14 S

BUILDING MANAGEMENT SYSTEM FOR LEVEL-1 (SEGEMENT-H1) PART-4 OF 4 SD H1 ELECTRICAL 16-Aug-14 Yes C 21-Aug-14 S

BUILDING MANAGEMENT SYSTEM FOR LEVEL-1 (SEGEMENT-H1) PART-4 OF 4 SD H1 ELECTRICAL 16-Nov-14 Yes C 19-Nov-14 V

BUILDING MANAGEMENT SYSTEM FOR LEVEL-1 MASTER PLAN (SEGMENT-H2) SD H2 ELECTRICAL 12-Mar-14 Yes B 12-Mar-14 S

BUILDING MANAGEMENT SYSTEM FOR LEVEL-1 MASTER PLAN (SEGMENT-H2) SD H1 ELECTRICAL 16-Aug-14 Yes C 21-Aug-14 S

BUILDING MANAGEMENT SYSTEM FOR LEVEL-1 MASTER PLAN (SEGMENT-H2) SD H2 ELECTRICAL 16-Nov-14 Yes C 19-Nov-14 V

Page 45 of 114
H-STRUCTURAL SHOP DRAWINGS SUBMITTAL LOG
TED , S = SUPERCEDED , V = VALID 7-May-17

SEGMENT
RESPONSE DRAWING
DRAWING TITLE TYPE DISCIPLINE REPLY APPROVA REPLY DATE
REQUIRED BY STATUS
L STATUS

BUILDING MANAGEMENT SYSTEM FOR LEVEL-1 (SEGEMENT-H2) PART-1 OF 4 SD H2 ELECTRICAL 12-Mar-14 Yes B 12-Mar-14 S

BUILDING MANAGEMENT SYSTEM FOR LEVEL-1 (SEGEMENT-H2) PART-1 OF 4 SD H1 ELECTRICAL 16-Aug-14 Yes C 21-Aug-14 S

BUILDING MANAGEMENT SYSTEM FOR LEVEL-1 (SEGEMENT-H2) PART-1 OF 4 SD H2 ELECTRICAL 16-Nov-14 Yes C 19-Nov-14 V

BUILDING MANAGEMENT SYSTEM FOR LEVEL-1 (SEGEMENT-H2) PART-2 OF 4 SD H2 ELECTRICAL 12-Mar-14 Yes B 12-Mar-14 S

BUILDING MANAGEMENT SYSTEM FOR LEVEL-1 (SEGEMENT-H2) PART-2 OF 4 SD H1 ELECTRICAL 16-Aug-14 Yes C 21-Aug-14 S

BUILDING MANAGEMENT SYSTEM FOR LEVEL-1 (SEGEMENT-H2) PART-2 OF 4 SD H2 ELECTRICAL 16-Nov-14 Yes C 19-Nov-14 V

BUILDING MANAGEMENT SYSTEM FOR LEVEL-1 (SEGEMENT-H2) PART-3 OF 4 SD H2 ELECTRICAL 12-Mar-14 Yes B 12-Mar-14 S

BUILDING MANAGEMENT SYSTEM FOR LEVEL-1 (SEGEMENT-H2) PART-3 OF 4 SD H1 ELECTRICAL 16-Aug-14 Yes C 21-Aug-14 S

BUILDING MANAGEMENT SYSTEM FOR LEVEL-1 (SEGEMENT-H2) PART-3 OF 4 SD H2 ELECTRICAL 16-Nov-14 Yes C 19-Nov-14 V

BUILDING MANAGEMENT SYSTEM FOR LEVEL-1 (SEGEMENT-H2) PART-4 OF 4 SD H2 ELECTRICAL 12-Mar-14 Yes B 12-Mar-14 S

BUILDING MANAGEMENT SYSTEM FOR LEVEL-1 (SEGEMENT-H2) PART-4 OF 4 SD H1 ELECTRICAL 16-Aug-14 Yes C 21-Aug-14 S

BUILDING MANAGEMENT SYSTEM FOR LEVEL-1 (SEGEMENT-H2) PART-4 OF 4 SD H2 ELECTRICAL 16-Nov-14 Yes C 19-Nov-14 V

BUILDING MANAGEMENT SYSTEM FOR LEVEL-1 MASTER PLAN (SEGMENT-H3) SD H3 ELECTRICAL 12-Mar-14 Yes B 12-Mar-14 S

BUILDING MANAGEMENT SYSTEM FOR LEVEL-1 MASTER PLAN (SEGMENT-H3) SD H1 ELECTRICAL 16-Aug-14 Yes C 21-Aug-14 S

BUILDING MANAGEMENT SYSTEM FOR LEVEL-1 MASTER PLAN (SEGMENT-H3) SD H3 ELECTRICAL 16-Nov-14 Yes C 19-Nov-14 V

BUILDING MANAGEMENT SYSTEM FOR LEVEL-1 (SEGEMENT-H3) PART- 1 OF 2 SD H3 ELECTRICAL 12-Mar-14 Yes B 12-Mar-14 S

BUILDING MANAGEMENT SYSTEM FOR LEVEL-1 (SEGEMENT-H3) PART- 1 OF 2 SD H1 ELECTRICAL 16-Aug-14 Yes C 21-Aug-14 S

BUILDING MANAGEMENT SYSTEM FOR LEVEL-1 (SEGEMENT-H3) PART- 1 OF 2 SD H3 ELECTRICAL 16-Nov-14 Yes C 19-Nov-14 V

BUILDING MANAGEMENT SYSTEM FOR LEVEL-1 (SEGEMENT-H3) PART- 2 OF 2 SD H3 ELECTRICAL 12-Mar-14 Yes B 12-Mar-14 S

BUILDING MANAGEMENT SYSTEM FOR LEVEL-1 (SEGEMENT-H3) PART- 2 OF 2 SD H1 ELECTRICAL 16-Aug-14 Yes C 21-Aug-14 S

BUILDING MANAGEMENT SYSTEM FOR LEVEL-1 (SEGEMENT-H3) PART- 2 OF 2 SD H3 ELECTRICAL 16-Nov-14 Yes C 19-Nov-14 V

LIGHTING SYSTEM LAYOUT FOR LEVEL -1 MASTER PLAN (SEGMENT-H1) SD H1 ELECTRICAL 12-Mar-14 Yes C 12-Mar-14 S

LIGHTING SYSTEM LAYOUT FOR LEVEL -1 MASTER PLAN (SEGMENT-H1) SD H1 ELECTRICAL 27-Apr-14 Yes B 27-May-14 S

LIGHTING SYSTEM LAYOUT FOR LEVEL -1 MASTER PLAN (SEGMENT-H1) SD H1 ELECTRICAL 23-Aug-14 Yes B 4-Sep-14 V

LIGHTING SYSTEM LAYOUT FOR LEVEL -1 PLAN SEGEMENT-H1 (PART-1 OF 4) SD H1 ELECTRICAL 12-Mar-14 Yes C 12-Mar-14 S

Page 46 of 114
H-STRUCTURAL SHOP DRAWINGS SUBMITTAL LOG
TED , S = SUPERCEDED , V = VALID 7-May-17

SEGMENT
RESPONSE DRAWING
DRAWING TITLE TYPE DISCIPLINE REPLY APPROVA REPLY DATE
REQUIRED BY STATUS
L STATUS

LIGHTING SYSTEM LAYOUT FOR LEVEL -1 PLAN SEGEMENT-H1 (PART-1 OF 4) SD H1 ELECTRICAL 27-Apr-14 Yes B 27-May-14 S

LIGHTING SYSTEM LAYOUT FOR LEVEL -1 PLAN SEGEMENT-H1 (PART-1 OF 4) SD H1 ELECTRICAL 23-Aug-14 Yes B 4-Sep-14 V

LIGHTING SYSTEM LAYOUT FOR LEVEL -1 PLAN SEGEMENT-H1 (PART-2 OF 4) SD H1 ELECTRICAL 12-Mar-14 Yes C 12-Mar-14 S

LIGHTING SYSTEM LAYOUT FOR LEVEL -1 PLAN SEGEMENT-H1 (PART-2 OF 4) SD H1 ELECTRICAL 27-Apr-14 Yes B 27-May-14 S

LIGHTING SYSTEM LAYOUT FOR LEVEL -1 PLAN SEGEMENT-H1 (PART-2 OF 4) SD H1 ELECTRICAL 23-Aug-14 Yes B 4-Sep-14 V

LIGHTING SYSTEM LAYOUT FOR LEVEL -1 PLAN SEGEMENT-H1 (PART-3 OF 4) SD H1 ELECTRICAL 12-Mar-14 Yes C 12-Mar-14 S

LIGHTING SYSTEM LAYOUT FOR LEVEL -1 PLAN SEGEMENT-H1 (PART-3 OF 4) SD H1 ELECTRICAL 27-Apr-14 Yes B 27-May-14 S

LIGHTING SYSTEM LAYOUT FOR LEVEL -1 PLAN SEGEMENT-H1 (PART-3 OF 4) SD H1 ELECTRICAL 23-Aug-14 Yes B 4-Sep-14 V

LIGHTING SYSTEM LAYOUT FOR LEVEL -1 PLAN SEGEMENT-H1 (PART-4 OF 4) SD H1 ELECTRICAL 12-Mar-14 Yes C 12-Mar-14 S

LIGHTING SYSTEM LAYOUT FOR LEVEL -1 PLAN SEGEMENT-H1 (PART-4 OF 4) SD H1 ELECTRICAL 27-Apr-14 Yes B 27-May-14 S

LIGHTING SYSTEM LAYOUT FOR LEVEL -1 PLAN SEGEMENT-H1 (PART-4 OF 4) SD H1 ELECTRICAL 23-Aug-14 Yes A 4-Sep-14 V

LIGHTING SYSTEM LAYOUT FOR LEVEL -1 MASTER PLAN (SEGMENT-H2) SD H2 ELECTRICAL 12-Mar-14 Yes C 12-Mar-14 S

LIGHTING SYSTEM LAYOUT FOR LEVEL -1 MASTER PLAN (SEGMENT-H2) SD H2 ELECTRICAL 27-Apr-14 Yes B 27-May-14 S

LIGHTING SYSTEM LAYOUT FOR LEVEL -1 MASTER PLAN (SEGMENT-H2) SD H2 ELECTRICAL 23-Aug-14 Yes B 25-Aug-14 V

LIGHTING SYSTEM LAYOUT FOR LEVEL -1 PLAN SEGEMENT-H2 (PART-1 OF 4) SD H2 ELECTRICAL 12-Mar-14 Yes C 12-Mar-14 S

LIGHTING SYSTEM LAYOUT FOR LEVEL -1 PLAN SEGEMENT-H2 (PART-1 OF 4) SD H2 ELECTRICAL 27-Apr-14 Yes B 27-May-14 S

LIGHTING SYSTEM LAYOUT FOR LEVEL -1 PLAN SEGEMENT-H2 (PART-1 OF 4) SD H2 ELECTRICAL 23-Aug-14 Yes B 25-Aug-14 V

LIGHTING SYSTEM LAYOUT FOR LEVEL -1 PLAN SEGEMENT-H2 (PART-2 OF 4) SD H2 ELECTRICAL 12-Mar-14 Yes C 12-Mar-14 S

LIGHTING SYSTEM LAYOUT FOR LEVEL -1 PLAN SEGEMENT-H2 (PART-2 OF 4) SD H2 ELECTRICAL 27-Apr-14 Yes B 27-May-14 S

LIGHTING SYSTEM LAYOUT FOR LEVEL -1 PLAN SEGEMENT-H2 (PART-2 OF 4) SD H2 ELECTRICAL 23-Aug-14 Yes B 25-Aug-14 V

LIGHTING SYSTEM LAYOUT FOR LEVEL -1 PLAN SEGEMENT-H2 (PART-3 OF 4) SD H2 ELECTRICAL 12-Mar-14 Yes C 12-Mar-14 S

LIGHTING SYSTEM LAYOUT FOR LEVEL -1 PLAN SEGEMENT-H2 (PART-3 OF 4) SD H2 ELECTRICAL 27-Apr-14 Yes B 27-May-14 S

LIGHTING SYSTEM LAYOUT FOR LEVEL -1 PLAN SEGEMENT-H2 (PART-3 OF 4) SD H2 ELECTRICAL 23-Aug-14 Yes B 25-Aug-14 V

LIGHTING SYSTEM LAYOUT FOR LEVEL -1 PLAN SEGEMENT-H2 (PART-4 OF 4) SD H2 ELECTRICAL 12-Mar-14 Yes C 12-Mar-14 S

LIGHTING SYSTEM LAYOUT FOR LEVEL -1 PLAN SEGEMENT-H2 (PART-4 OF 4) SD H2 ELECTRICAL 27-Apr-14 Yes B 27-May-14 S

Page 47 of 114
H-STRUCTURAL SHOP DRAWINGS SUBMITTAL LOG
TED , S = SUPERCEDED , V = VALID 7-May-17

SEGMENT
RESPONSE DRAWING
DRAWING TITLE TYPE DISCIPLINE REPLY APPROVA REPLY DATE
REQUIRED BY STATUS
L STATUS

LIGHTING SYSTEM LAYOUT FOR LEVEL -1 PLAN SEGEMENT-H2 (PART-4 OF 4) SD H2 ELECTRICAL 23-Aug-14 Yes B 25-Aug-14 V

LIGHTING SYSTEM LAYOUT FOR LEVEL -1 MASTER PLAN (SEGMENT-H3) SD H3 ELECTRICAL 12-Mar-14 Yes C 12-Mar-14 S

LIGHTING SYSTEM LAYOUT FOR LEVEL -1 MASTER PLAN (SEGMENT-H3) SD H3 ELECTRICAL 27-Apr-14 Yes B 27-May-14 S

LIGHTING SYSTEM LAYOUT FOR LEVEL -1 MASTER PLAN (SEGMENT-H3) SD H3 ELECTRICAL 23-Aug-14 Yes B 25-Aug-14 V

LIGHTING SYSTEM LAYOUT FOR LEVEL -1 PLAN SEGEMENT-H3 (PART-1 OF 2) SD H3 ELECTRICAL 12-Mar-14 Yes C 12-Mar-14 S

LIGHTING SYSTEM LAYOUT FOR LEVEL -1 PLAN SEGEMENT-H3 (PART-1 OF 2) SD H3 ELECTRICAL 27-Apr-14 Yes B 27-May-14 S

LIGHTING SYSTEM LAYOUT FOR LEVEL -1 PLAN SEGEMENT-H3 (PART-1 OF 2) SD H3 ELECTRICAL 23-Aug-14 Yes B 25-Aug-14 V

LIGHTING SYSTEM LAYOUT FOR LEVEL -1 PLAN SEGEMENT-H3 (PART-2 OF2) SD H3 ELECTRICAL 12-Mar-14 Yes C 12-Mar-14 S

LIGHTING SYSTEM LAYOUT FOR LEVEL -1 PLAN SEGEMENT-H3 (PART-2 OF2) SD H3 ELECTRICAL 27-Apr-14 Yes B 27-May-14 S

LIGHTING SYSTEM LAYOUT FOR LEVEL -1 PLAN SEGEMENT-H3 (PART-2 OF2) SD H3 ELECTRICAL 23-Aug-14 Yes B 25-Aug-14 V

PUBLIC ADDRESS AND VOICE EVACUATION SYSTEM LAYOUT LEVEL-01 MASTER PLAN (SEGMENT-H1) SD H1 ELECTRICAL 15-Mar-14 Yes C 17-Mar-14 S

VOICE EVACUATION SYSTEM LAYOUT LEVEL-01 MASTER PLAN (SEGMENT-H1) SD H1 ELECTRICAL 30-Aug-14 Yes C 30-Aug-14 S

VOICE EVACUATION SYSTEM LAYOUT LEVEL-01 MASTER PLAN (SEGMENT-H1) SD H1 ELECTRICAL 5-Oct-14 Yes C 12-Oct-14 S

VOICE EVACUATION SYSTEM LAYOUT LEVEL-01 MASTER PLAN (SEGMENT-H1) SD H1 ELECTRICAL 22-Nov-14 Yes C 23-Nov-14 V

PUBLIC ADDRESS AND VOICE EVACUATION SYSTEM LAYOUT LEVEL-01 PLAN SEGMENT-H1 (PART-1/4) SD H1 ELECTRICAL 15-Mar-14 Yes C 17-Mar-14 S

VOICE EVACUATION SYSTEM LAYOUT LEVEL-01 PLAN SEGMENT-H1 (PART-1/4) SD H1 ELECTRICAL 30-Aug-14 Yes C 30-Aug-14 S

VOICE EVACUATION SYSTEM LAYOUT LEVEL-01 PLAN SEGMENT-H1 (PART-1/4) SD H1 ELECTRICAL 5-Oct-14 Yes C 12-Oct-14 S

VOICE EVACUATION SYSTEM LAYOUT LEVEL-01 PLAN SEGMENT-H1 (PART-1/4) SD H1 ELECTRICAL 22-Nov-14 Yes C 23-Nov-14 V

PUBLIC ADDRESS AND VOICE EVACUATION SYSTEM LAYOUT LEVEL-01 PLAN SEGMENT-H1 (PART-2/4) SD H1 ELECTRICAL 15-Mar-14 Yes C 17-Mar-14 S

VOICE EVACUATION SYSTEM LAYOUT LEVEL-01 PLAN SEGMENT-H1 (PART-2/4) SD H1 ELECTRICAL 30-Aug-14 Yes C 30-Aug-14 S

VOICE EVACUATION SYSTEM LAYOUT LEVEL-01 PLAN SEGMENT-H1 (PART-2/4) SD H1 ELECTRICAL 5-Oct-14 Yes C 12-Oct-14 S

VOICE EVACUATION SYSTEM LAYOUT LEVEL-01 PLAN SEGMENT-H1 (PART-2/4) SD H1 ELECTRICAL 22-Nov-14 Yes C 23-Nov-14 V

PUBLIC ADDRESS AND VOICE EVACUATION SYSTEM LAYOUT LEVEL-01 PLAN SEGMENT-H1 (PART-3/4) SD H1 ELECTRICAL 15-Mar-14 Yes C 17-Mar-14 S

VOICE EVACUATION SYSTEM LAYOUT LEVEL-01 PLAN SEGMENT-H1 (PART-3/4) SD H1 ELECTRICAL 30-Aug-14 Yes C 30-Aug-14 S

VOICE EVACUATION SYSTEM LAYOUT LEVEL-01 PLAN SEGMENT-H1 (PART-3/4) SD H1 ELECTRICAL 5-Oct-14 Yes C 12-Oct-14 S

Page 48 of 114
H-STRUCTURAL SHOP DRAWINGS SUBMITTAL LOG
TED , S = SUPERCEDED , V = VALID 7-May-17

SEGMENT
RESPONSE DRAWING
DRAWING TITLE TYPE DISCIPLINE REPLY APPROVA REPLY DATE
REQUIRED BY STATUS
L STATUS

VOICE EVACUATION SYSTEM LAYOUT LEVEL-01 PLAN SEGMENT-H1 (PART-3/4) SD H1 ELECTRICAL 22-Nov-14 Yes C 23-Nov-14 V

PUBLIC ADDRESS AND VOICE EVACUATION SYSTEM LAYOUT LEVEL-01 PLAN SEGMENT-H1 (PART-4/4) SD H1 ELECTRICAL 15-Mar-14 Yes C 17-Mar-14 S

VOICE EVACUATION SYSTEM LAYOUT LEVEL-01 PLAN SEGMENT-H1 (PART-4/4) SD H1 ELECTRICAL 30-Aug-14 Yes C 30-Aug-14 S

VOICE EVACUATION SYSTEM LAYOUT LEVEL-01 PLAN SEGMENT-H1 (PART-4/4) SD H1 ELECTRICAL 5-Oct-14 Yes C 12-Oct-14 S

VOICE EVACUATION SYSTEM LAYOUT LEVEL-01 PLAN SEGMENT-H1 (PART-4/4) SD H1 ELECTRICAL 22-Nov-14 Yes C 23-Nov-14 V

PUBLIC ADDRESS AND VOICE EVACUATION SYSTEM LAYOUT LEVEL-01 MASTER PLAN (SEGMENT-H2) SD H2 ELECTRICAL 15-Mar-14 Yes C 17-Mar-14 S

VOICE EVACUATION SYSTEM LAYOUT LEVEL-01 MASTER PLAN (SEGMENT-H2) SD H2 ELECTRICAL 30-Aug-14 Yes C 30-Aug-14 S

VOICE EVACUATION SYSTEM LAYOUT LEVEL-01 MASTER PLAN (SEGMENT-H2) SD H2 ELECTRICAL 5-Oct-14 Yes C 12-Oct-14 S

VOICE EVACUATION SYSTEM LAYOUT LEVEL-01 MASTER PLAN (SEGMENT-H2) SD H2 ELECTRICAL 22-Nov-14 Yes C 23-Nov-14 V

PUBLIC ADDRESS AND VOICE EVACUATION SYSTEM LAYOUT LEVEL-01 PLAN SEGMENT-H2 (PART-1/4) SD H2 ELECTRICAL 15-Mar-14 Yes C 17-Mar-14 S

VOICE EVACUATION SYSTEM LAYOUT LEVEL-01 PLAN SEGMENT-H2 (PART-1/4) SD H2 ELECTRICAL 30-Aug-14 Yes C 30-Aug-14 S

VOICE EVACUATION SYSTEM LAYOUT LEVEL-01 PLAN SEGMENT-H2 (PART-1/4) SD H2 ELECTRICAL 5-Oct-14 Yes C 12-Oct-14 S

VOICE EVACUATION SYSTEM LAYOUT LEVEL-01 PLAN SEGMENT-H2 (PART-1/4) SD H2 ELECTRICAL 22-Nov-14 Yes C 23-Nov-14 V

PUBLIC ADDRESS AND VOICE EVACUATION SYSTEM LAYOUT LEVEL-01 PLAN SEGMENT-H2 (PART-2/4) SD H2 ELECTRICAL 15-Mar-14 Yes C 17-Mar-14 S

VOICE EVACUATION SYSTEM LAYOUT LEVEL-01 PLAN SEGMENT-H2 (PART-2/4) SD H2 ELECTRICAL 30-Aug-14 Yes C 30-Aug-14 S

VOICE EVACUATION SYSTEM LAYOUT LEVEL-01 PLAN SEGMENT-H2 (PART-2/4) SD H2 ELECTRICAL 5-Oct-14 Yes C 12-Oct-14 S

VOICE EVACUATION SYSTEM LAYOUT LEVEL-01 PLAN SEGMENT-H2 (PART-2/4) SD H2 ELECTRICAL 22-Nov-14 Yes C 23-Nov-14 V

PUBLIC ADDRESS AND VOICE EVACUATION SYSTEM LAYOUT LEVEL-01 PLAN SEGMENT-H2 (PART-3/4) SD H2 ELECTRICAL 15-Mar-14 Yes C 17-Mar-14 S

VOICE EVACUATION SYSTEM LAYOUT LEVEL-01 PLAN SEGMENT-H2 (PART-3/4) SD H2 ELECTRICAL 30-Aug-14 Yes C 30-Aug-14 S

VOICE EVACUATION SYSTEM LAYOUT LEVEL-01 PLAN SEGMENT-H2 (PART-3/4) SD H2 ELECTRICAL 5-Oct-14 Yes C 12-Oct-14 S

VOICE EVACUATION SYSTEM LAYOUT LEVEL-01 PLAN SEGMENT-H2 (PART-3/4) SD H2 ELECTRICAL 22-Nov-14 Yes C 23-Nov-14 V

PUBLIC ADDRESS AND VOICE EVACUATION SYSTEM LAYOUT LEVEL-01 PLAN SEGMENT-H2 (PART-4/4) SD H2 ELECTRICAL 15-Mar-14 Yes C 17-Mar-14 S

VOICE EVACUATION SYSTEM LAYOUT LEVEL-01 PLAN SEGMENT-H2 (PART-4/4) SD H2 ELECTRICAL 30-Aug-14 Yes C 30-Aug-14 S

VOICE EVACUATION SYSTEM LAYOUT LEVEL-01 PLAN SEGMENT-H2 (PART-4/4) SD H2 ELECTRICAL 5-Oct-14 Yes C 12-Oct-14 S

VOICE EVACUATION SYSTEM LAYOUT LEVEL-01 PLAN SEGMENT-H2 (PART-4/4) SD H2 ELECTRICAL 22-Nov-14 Yes C 23-Nov-14 V

Page 49 of 114
H-STRUCTURAL SHOP DRAWINGS SUBMITTAL LOG
TED , S = SUPERCEDED , V = VALID 7-May-17

SEGMENT
RESPONSE DRAWING
DRAWING TITLE TYPE DISCIPLINE REPLY APPROVA REPLY DATE
REQUIRED BY STATUS
L STATUS

PUBLIC ADDRESS AND VOICE EVACUATION SYSTEM LAYOUT LEVEL-01 MASTER PLAN (SEGMENT-H3) SD H3 ELECTRICAL 15-Mar-14 Yes C 17-Mar-14 S

VOICE EVACUATION SYSTEM LAYOUT LEVEL-01 MASTER PLAN (SEGMENT-H3) SD H3 ELECTRICAL 30-Aug-14 Yes C 30-Aug-14 S

VOICE EVACUATION SYSTEM LAYOUT LEVEL-01 MASTER PLAN (SEGMENT-H3) SD H3 ELECTRICAL 5-Oct-14 Yes C 12-Oct-14 S

VOICE EVACUATION SYSTEM LAYOUT LEVEL-01 MASTER PLAN (SEGMENT-H3) SD H3 ELECTRICAL 22-Nov-14 Yes C 23-Nov-14 V

PUBLIC ADDRESS AND VOICE EVACUATION SYSTEM LAYOUT LEVEL-01 PLAN SEGMENT-H3 (PART-1/2) SD H3 ELECTRICAL 15-Mar-14 Yes C 17-Mar-14 S

VOICE EVACUATION SYSTEM LAYOUT LEVEL-01 PLAN SEGMENT-H3 (PART-1/2) SD H3 ELECTRICAL 30-Aug-14 Yes C 30-Aug-14 S

VOICE EVACUATION SYSTEM LAYOUT LEVEL-01 PLAN SEGMENT-H3 (PART-1/2) SD H3 ELECTRICAL 5-Oct-14 Yes C 12-Oct-14 S

VOICE EVACUATION SYSTEM LAYOUT LEVEL-01 PLAN SEGMENT-H3 (PART-1/2) SD H3 ELECTRICAL 22-Nov-14 Yes C 23-Nov-14 V

PUBLIC ADDRESS AND VOICE EVACUATION SYSTEM LAYOUT LEVEL-01 PLAN SEGMENT-H3 (PART-2/2) SD H3 ELECTRICAL 15-Mar-14 Yes C 17-Mar-14 S

VOICE EVACUATION SYSTEM LAYOUT LEVEL-01 PLAN SEGMENT-H3 (PART-2/2) SD H3 ELECTRICAL 30-Aug-14 Yes C 30-Aug-14 S

VOICE EVACUATION SYSTEM LAYOUT LEVEL-01 PLAN SEGMENT-H3 (PART-2/2) SD H3 ELECTRICAL 5-Oct-14 Yes C 12-Oct-14 S

VOICE EVACUATION SYSTEM LAYOUT LEVEL-01 PLAN SEGMENT-H3 (PART-2/2) SD H3 ELECTRICAL 22-Nov-14 Yes C 23-Nov-14 V

TYPICAL INSTALLATION DETAILS FOR FIRE ALARM SYSTEM SD 00 ELECTRICAL 30-Mar-14 Yes B 6-May-14 S

TYPICAL INSTALLATION DETAILS FOR FIRE ALARM SYSTEM SD 00 ELECTRICAL 25-Oct-14 Yes C 23-Oct-14 V

CABLE ROUTING SYSREM LAYOUT FOR LEVEL-S1 (SEGMENT-H1) SD H1 ELECTRICAL 25-Apr-14 Yes C 21-Apr-14 S

CABLE ROUTING SYSREM LAYOUT FOR LEVEL-S1 (SEGMENT-H1) SD H1 ELECTRICAL 28-Jul-14 Yes C 3-Aug-14 S

CABLE ROUTING SYSREM LAYOUT FOR LEVEL-S1 (SEGMENT-H1) SD H1 ELECTRICAL 5-Sep-14 Yes C 6-Sep-14 S

CABLE ROUTING SYSREM LAYOUT FOR LEVEL-S1 (SEGMENT-H1) SD H1 ELECTRICAL 29-Oct-14 Yes B 23-Oct-14 S

CABLE ROUTING SYSREM LAYOUT FOR LEVEL-S1 (SEGMENT-H1) SD H1 ELECTRICAL 7-Jan-15 Yes A 1-Jan-15 V

INFORMATION COMMUNICATION TECHNOGY LEVEL S1- MASTER PLAN (SEGMENT-H1 & H2) SD H0 ELECTRICAL 25-Apr-14 Yes D 20-May-14 S

INFORMATION COMMUNICATION TECHNOGY LEVEL S1- MASTER PLAN (SEGMENT-H1 & H2) SD H0 ELECTRICAL 31-Aug-14 Yes C 30-Aug-14 S

INFORMATION COMMUNICATION TECHNOGY LEVEL S1- MASTER PLAN (SEGMENT-H1 & H2) SD H0 ELECTRICAL 12-Oct-14 Yes C 16-Oct-14 S

INFORMATION COMMUNICATION TECHNOGY LEVEL S1- MASTER PLAN (SEGMENT-H1 & H2) SD H0 ELECTRICAL 24-Nov-14 Yes C 24-Nov-14 s

INFORMATION COMMUNICATION TECHNOGY LEVEL S1- MASTER PLAN (SEGMENT-H1 & H2) SD H0 ELECTRICAL 7-Jan-15 OverDue p V

INFORMATION COMMUNICATION TECHNOGY LEVEL S1 (SEGMENT-H1) SD H1 ELECTRICAL 25-Apr-14 Yes C 20-May-14 S

Page 50 of 114
H-STRUCTURAL SHOP DRAWINGS SUBMITTAL LOG
TED , S = SUPERCEDED , V = VALID 7-May-17

SEGMENT
RESPONSE DRAWING
DRAWING TITLE TYPE DISCIPLINE REPLY APPROVA REPLY DATE
REQUIRED BY STATUS
L STATUS

INFORMATION COMMUNICATION TECHNOGY LEVEL S1 (SEGMENT-H1) SD H1 ELECTRICAL 31-Aug-14 Yes C 30-Aug-14 S

INFORMATION COMMUNICATION TECHNOGY LEVEL S1 (SEGMENT-H1) SD H1 ELECTRICAL 12-Oct-14 Yes C 16-Oct-14 S

INFORMATION COMMUNICATION TECHNOGY LEVEL S1 (SEGMENT-H1) SD H1 ELECTRICAL 24-Nov-14 Yes C 24-Nov-14 s

INFORMATION COMMUNICATION TECHNOGY LEVEL S1 (SEGMENT-H1) SD H1 ELECTRICAL 7-Jan-15 OverDue p V

INFORMATION COMMUNICATION TECHNOGY LEVEL S1 (SEGMENT-H2) SD H2 ELECTRICAL 25-Apr-14 Yes C 20-May-14 S

INFORMATION COMMUNICATION TECHNOGY LEVEL S1 (SEGMENT-H2) SD H2 ELECTRICAL 31-Aug-14 Yes C 30-Aug-14 S

INFORMATION COMMUNICATION TECHNOGY LEVEL S1 (SEGMENT-H2) SD H2 ELECTRICAL 12-Oct-14 Yes C 16-Oct-14 S

INFORMATION COMMUNICATION TECHNOGY LEVEL S1 (SEGMENT-H2) SD H2 ELECTRICAL 24-Nov-14 Yes C 24-Nov-14 V

CABLE ROUTING SYSTEM LAYOUT FOR LEVEL-01 MASTER PLAN (SEGMENT-H1, H2 & H3) SD H0 ELECTRICAL 17-Jun-14 Yes C 21-Jun-14 S

CABLE ROUTING SYSTEM LAYOUT FOR LEVEL-01 MASTER PLAN (SEGMENT-H1, H2 & H3) SD H0 ELECTRICAL 31-Aug-14 Yes A 2-Sep-14 V

CABLE ROUTING SYSTEM LAYOUT FOR LEVEL-01 (SEGMENT-H1) SD H1 ELECTRICAL 17-Jun-14 Yes C 21-Jun-14 S

CABLE ROUTING SYSTEM LAYOUT FOR LEVEL-01 (SEGMENT-H1) SD H1 ELECTRICAL 31-Aug-14 Yes A 2-Sep-14 V

CABLE ROUTING SYSTEM LAYOUT FOR LEVEL-01 (SEGMENT-H2) SD H2 ELECTRICAL 17-Jun-14 Yes C 21-Jun-14 S

CABLE ROUTING SYSTEM LAYOUT FOR LEVEL-01 (SEGMENT-H2) SD H2 ELECTRICAL 31-Aug-14 Yes A 2-Sep-14 V

CABLE ROUTING SYSTEM LAYOUT FOR LEVEL-01 (SEGMENT-H3) SD H3 ELECTRICAL 17-Jun-14 Yes C 21-Jun-14 S

CABLE ROUTING SYSTEM LAYOUT FOR LEVEL-01 (SEGMENT-H3) SD H3 ELECTRICAL 31-Aug-14 Yes A 2-Sep-14 V

BUILDING MANAGEMENT SYSTEM FOR LEVEL 02, MASTER PLAN (SEGMENT-H1) SD H1 ELECTRICAL 19-Jul-14 Yes C 9-Aug-14 S

BUILDING MANAGEMENT SYSTEM FOR LEVEL 02, MASTER PLAN (SEGMENT-H1) SD H1 ELECTRICAL 23-Nov-14 Yes C 24-Nov-14 V

BUILDING MANAGEMENT SYSTEM FOR LEVEL 02, SEGMENT H1 (PART-3 OF 4) SD H1 ELECTRICAL 19-Jul-14 Yes C 9-Aug-14 S

BUILDING MANAGEMENT SYSTEM FOR LEVEL 02, SEGMENT H1 (PART-3 OF 4) SD H1 ELECTRICAL 23-Nov-14 Yes C 24-Nov-14 V

BUILDING MANAGEMENT SYSTEM FOR LEVEL 02, SEGMENT H1 (PART-4 OF 4) SD H1 ELECTRICAL 19-Jul-14 Yes C 9-Aug-14 S

BUILDING MANAGEMENT SYSTEM FOR LEVEL 02, SEGMENT H1 (PART-4 OF 4) SD H1 ELECTRICAL 23-Nov-14 Yes C 24-Nov-14 V

BUILDING MANAGEMENT SYSTEM FOR LEVEL 02, MASTER PLAN (SEGMENT-H2) SD H2 ELECTRICAL 19-Jul-14 Yes C 9-Aug-14 S

BUILDING MANAGEMENT SYSTEM FOR LEVEL 02, MASTER PLAN (SEGMENT-H2) SD H2 ELECTRICAL 23-Nov-14 Yes C 24-Nov-14 V

BUILDING MANAGEMENT SYSTEM FOR LEVEL 02, SEGMENT H2 (PART-1 OF 4) SD H2 ELECTRICAL 19-Jul-14 Yes C 9-Aug-14 S

Page 51 of 114
H-STRUCTURAL SHOP DRAWINGS SUBMITTAL LOG
TED , S = SUPERCEDED , V = VALID 7-May-17

SEGMENT
RESPONSE DRAWING
DRAWING TITLE TYPE DISCIPLINE REPLY APPROVA REPLY DATE
REQUIRED BY STATUS
L STATUS

BUILDING MANAGEMENT SYSTEM FOR LEVEL 02, SEGMENT H2 (PART-1 OF 4) SD H2 ELECTRICAL 23-Nov-14 Yes C 24-Nov-14 V

BUILDING MANAGEMENT SYSTEM FOR LEVEL 02, SEGMENT H2 (PART-2 OF 4) SD H2 ELECTRICAL 19-Jul-14 Yes C 9-Aug-14 S

BUILDING MANAGEMENT SYSTEM FOR LEVEL 02, SEGMENT H2 (PART-2 OF 4) SD H2 ELECTRICAL 23-Nov-14 Yes C 24-Nov-14 V

BUILDING MANAGEMENT SYSTEM FOR LEVEL 02, MASTER PLAN (SEGMENT-H3) SD H3 ELECTRICAL 19-Jul-14 Yes C 9-Aug-14 S

BUILDING MANAGEMENT SYSTEM FOR LEVEL 02, MASTER PLAN (SEGMENT-H3) SD H3 ELECTRICAL 23-Nov-14 Yes C 24-Nov-14 V

BUILDING MANAGEMENT SYSTEM FOR LEVEL 02, SEGMENT-H3 (PART-2 OF 2) SD H3 ELECTRICAL 19-Jul-14 Yes C 9-Aug-14 S

BUILDING MANAGEMENT SYSTEM FOR LEVEL 02, SEGMENT-H3 (PART-2 OF 2) SD H3 ELECTRICAL 23-Nov-14 Yes C 24-Nov-14 V

BUILDING MANAGEMENT SYSTEM FOR LEVEL 04 MASTER PLAN (SEGMENT - H1) SD H1 ELECTRICAL 16-Aug-14 Yes C 21-Aug-14 S

BUILDING MANAGEMENT SYSTEM FOR LEVEL 04 MASTER PLAN (SEGMENT - H1) SD H1 ELECTRICAL 23-Nov-14 Yes C 24-Nov-14 S

BUILDING MANAGEMENT SYSTEM FOR LEVEL 04 MASTER PLAN (SEGMENT - H1) SD H1 ELECTRICAL 20-Dec-14 Yes C 20-Dec-14 V

BUILDING MANAGEMENT SYSTEM FOR LEVEL-03 MASTER PLAN (SEGMENT - H1) SD H1 ELECTRICAL 16-Aug-14 Yes C 21-Aug-14 S

BUILDING MANAGEMENT SYSTEM FOR LEVEL-03 MASTER PLAN (SEGMENT - H1) SD H1 ELECTRICAL 23-Nov-14 Yes C 24-Nov-14 S

BUILDING MANAGEMENT SYSTEM FOR LEVEL-03 MASTER PLAN (SEGMENT - H1) SD H1 ELECTRICAL 13-Dec-14 Yes C 13-Dec-14 V

BUILDING MANAGEMENT SYSTEM FOR LEVEL-03-(SEGMENT -H1) PART-3 OF 4 SD H1 ELECTRICAL 16-Aug-14 Yes C 21-Aug-14 S

BUILDING MANAGEMENT SYSTEM FOR LEVEL-03-(SEGMENT -H1) PART-3 OF 4 SD H1 ELECTRICAL 23-Nov-14 Yes C 24-Nov-14 S

BUILDING MANAGEMENT SYSTEM FOR LEVEL-03-(SEGMENT -H1) PART-3 OF 4 SD H1 ELECTRICAL 13-Dec-14 Yes C 13-Dec-14 V

BUILDING MANAGEMENT SYSTEM FOR LEVEL-03-(SEGMENT -H1) PART-4 OF 4 SD H1 ELECTRICAL 16-Aug-14 Yes C 21-Aug-14 S

BUILDING MANAGEMENT SYSTEM FOR LEVEL-03-(SEGMENT -H1) PART-4 OF 4 SD H1 ELECTRICAL 23-Nov-14 Yes C 24-Nov-14 S

BUILDING MANAGEMENT SYSTEM FOR LEVEL-03-(SEGMENT -H1) PART-4 OF 4 SD H1 ELECTRICAL 13-Dec-14 Yes C 13-Dec-14 V

BUILDING MANAGEMENT SYSTE M FOR LEVEL -03 MASTER PLAN (SEGMENT - H2) SD H1 ELECTRICAL 16-Aug-14 Yes C 21-Aug-14 S

BUILDING MANAGEMENT SYSTE M FOR LEVEL -03 MASTER PLAN (SEGMENT - H2) SD H1 ELECTRICAL 23-Nov-14 Yes C 24-Nov-14 S

BUILDING MANAGEMENT SYSTE M FOR LEVEL -03 MASTER PLAN (SEGMENT - H2) SD H1 ELECTRICAL 13-Dec-14 Yes C 13-Dec-14 V

BUILDING MANAGEMENT SYSTE M FOR LEVEL -03 MASTER PLAN (SEGMENT - H2) PART 1 OF 4 SD H1 ELECTRICAL 16-Aug-14 Yes C 21-Aug-14 S

BUILDING MANAGEMENT SYSTE M FOR LEVEL -03 MASTER PLAN (SEGMENT - H2) PART 1 OF 4 SD H1 ELECTRICAL 23-Nov-14 Yes C 24-Nov-14 S

BUILDING MANAGEMENT SYSTE M FOR LEVEL -03 MASTER PLAN (SEGMENT - H2) PART 1 OF 4 SD H1 ELECTRICAL 13-Dec-14 Yes C 13-Dec-14 V

Page 52 of 114
H-STRUCTURAL SHOP DRAWINGS SUBMITTAL LOG
TED , S = SUPERCEDED , V = VALID 7-May-17

SEGMENT
RESPONSE DRAWING
DRAWING TITLE TYPE DISCIPLINE REPLY APPROVA REPLY DATE
REQUIRED BY STATUS
L STATUS

BUILDING MANAGEMENT SYSTE M FOR LEVEL -03 MASTER PLAN (SEGMENT - H2) PART 2 OF 4 SD H1 ELECTRICAL 16-Aug-14 Yes C 21-Aug-14 S

BUILDING MANAGEMENT SYSTE M FOR LEVEL -03 MASTER PLAN (SEGMENT - H2) PART 2 OF 4 SD H2 ELECTRICAL 23-Nov-14 Yes C 24-Nov-14 S

BUILDING MANAGEMENT SYSTE M FOR LEVEL -03 MASTER PLAN (SEGMENT - H2) PART 2 OF 4 SD H2 ELECTRICAL 13-Dec-14 Yes C 13-Dec-14 V

BUILDING MANAGEMENT SYSTEM FOR LEVEL-03 MASTER PLAN (SEGMENT -H3) SD H1 ELECTRICAL 16-Aug-14 Yes C 21-Aug-14 S

BUILDING MANAGEMENT SYSTEM FOR LEVEL-03 MASTER PLAN (SEGMENT -H3) SD H3 ELECTRICAL 23-Nov-14 Yes C 24-Nov-14 S

BUILDING MANAGEMENT SYSTEM FOR LEVEL-03 MASTER PLAN (SEGMENT -H3) SD H3 ELECTRICAL 13-Dec-14 Yes C 13-Dec-14 V

BUILDING MANAGEMENT SYSTEM FOR LEVEL-03 (SEGMENT -H3) PART 2 OF 2 SD H1 ELECTRICAL 16-Aug-14 Yes C 21-Aug-14 S

BUILDING MANAGEMENT SYSTEM FOR LEVEL-03 (SEGMENT -H3) PART 2 OF 2 SD H3 ELECTRICAL 23-Nov-14 Yes C 24-Nov-14 S

BUILDING MANAGEMENT SYSTEM FOR LEVEL-03 (SEGMENT -H3) PART 2 OF 2 SD H3 ELECTRICAL 13-Dec-14 Yes C 13-Dec-14 V

LIGHTING SYSTEM LAYOUT LEVEL -04 MASTER PLAN (SEGMENT -H1) SD H1 ELECTRICAL 23-Aug-14 Yes C 27-Aug-14 S

LIGHTING SYSTEM LAYOUT LEVEL -04 MASTER PLAN (SEGMENT -H1) SD H1 ELECTRICAL 24-Nov-14 Yes C 25-Nov-14 S

LIGHTING SYSTEM LAYOUT LEVEL -04 MASTER PLAN (SEGMENT -H1) SD H1 ELECTRICAL 23-Dec-14 Yes A 15-Dec-14 V

LIGHTING SYSTEM LAYOUT LEVEL -04 PLAN (SEGMENT -H1) PART 03 OF 04 SD H1 ELECTRICAL 23-Aug-14 Yes B 27-Aug-14 S

LIGHTING SYSTEM LAYOUT LEVEL -04 PLAN (SEGMENT -H1) PART 03 OF 04 SD H1 ELECTRICAL 23-Dec-14 Yes A 15-Dec-14 V

LIGHTING SYSTEM LAYOUT LEVEL -04 PLAN (SEGMENT -H1) PART 04 OF 04 SD H1 ELECTRICAL 23-Aug-14 Yes C 27-Aug-14 S

LIGHTING SYSTEM LAYOUT LEVEL -04 PLAN (SEGMENT -H1) PART 04 OF 04 SD H1 ELECTRICAL 24-Nov-14 Yes C 25-Nov-14 S

LIGHTING SYSTEM LAYOUT LEVEL -04 PLAN (SEGMENT -H1) PART 04 OF 04 SD H1 ELECTRICAL 23-Dec-14 Yes A 15-Dec-14 V

LIGHTING SYSTEM LAYOUT LEVEL -04 PLAN (SEGMENT -H3) PART 02 OF 02 SD H3 ELECTRICAL 23-Aug-14 Yes B 27-Aug-14 S

LIGHTING SYSTEM LAYOUT LEVEL -04 PLAN (SEGMENT -H3) PART 02 OF 02 SD H3 ELECTRICAL 23-Dec-14 Yes A 15-Dec-14 V

POWER SYSTEM LAYOUT LEVEL -02 (SEGMENT -H1, H2 & H3 ) MASTER PLAN SD H0 ELECTRICAL 23-Aug-14 Yes B 25-Aug-14 S

POWER SYSTEM LAYOUT LEVEL -02 (SEGMENT -H1, H2 & H3 ) MASTER PLAN SD H0 ELECTRICAL 10-Nov-14 Yes C 3-Nov-14 S

POWER SYSTEM LAYOUT LEVEL -02 (SEGMENT -H1, H2 & H3 ) MASTER PLAN SD H0 ELECTRICAL 9-Dec-14 Yes A 2-Dec-14 V

POWER SYSTEM LAYOUT LEVEL -002 (SEGMENT -H1 ) MASTER PLAN SD H1 ELECTRICAL 23-Aug-14 Yes B 25-Aug-14 S

POWER SYSTEM LAYOUT LEVEL -002 (SEGMENT -H1 ) MASTER PLAN SD H1 ELECTRICAL 10-Nov-14 Yes C 3-Nov-14 S

POWER SYSTEM LAYOUT LEVEL -002 (SEGMENT -H1 ) MASTER PLAN SD H1 ELECTRICAL 9-Dec-14 Yes A 2-Dec-14 V

Page 53 of 114
H-STRUCTURAL SHOP DRAWINGS SUBMITTAL LOG
TED , S = SUPERCEDED , V = VALID 7-May-17

SEGMENT
RESPONSE DRAWING
DRAWING TITLE TYPE DISCIPLINE REPLY APPROVA REPLY DATE
REQUIRED BY STATUS
L STATUS

POWER SYSTEM LAYOUT LEVEL-02 (SEGMENT -H2) MASTER PLAN SD H2 ELECTRICAL 23-Aug-14 Yes B 25-Aug-14 S

POWER SYSTEM LAYOUT LEVEL-02 (SEGMENT -H2) MASTER PLAN SD H2 ELECTRICAL 10-Nov-14 Yes C 3-Nov-14 S

POWER SYSTEM LAYOUT LEVEL-02 (SEGMENT -H2) MASTER PLAN SD H2 ELECTRICAL 9-Dec-14 Yes A 2-Dec-14 V

POWER SYSTEM LAYOUT LEVEL-02 (SEGMENT -H3) MASTER PLAN SD H3 ELECTRICAL 23-Aug-14 Yes B 25-Aug-14 S

POWER SYSTEM LAYOUT LEVEL-02 (SEGMENT -H3) MASTER PLAN SD H3 ELECTRICAL 10-Nov-14 Yes C 3-Nov-14 S

POWER SYSTEM LAYOUT LEVEL-02 (SEGMENT -H3) MASTER PLAN SD H3 ELECTRICAL 9-Dec-14 Yes A 2-Dec-14 V

LEVEL-S1 PANEL BOARD SCHEDULE -N12A-S1A SD H0 ELECTRICAL 23-Aug-14 Yes A 25-Aug-14 S

LEVEL-S1 PANEL BOARD SCHEDULE -N12A-S1A SD H0 ELECTRICAL 7-Jan-15 Yes D 1-Jan-15 V

LEVEL-02 PANEL BOARD SCHEDULE - CU12A-2 SD H0 ELECTRICAL 23-Aug-14 Yes C 25-Aug-14 V

LEVEL-02 PANEL BOARD SCHEDULE - N12A-2A SD H0 ELECTRICAL 23-Aug-14 Yes C 25-Aug-14 V

BUILDING MANAGEMENT SYSTEM FOR LEVEL -05- MASTER PLAN (SEGMENT-H1 ) SD H1 ELECTRICAL 24-Aug-14 Yes C 21-Aug-14 S

BUILDING MANAGEMENT SYSTEM FOR LEVEL -05- MASTER PLAN (SEGMENT-H1 ) SD H1 ELECTRICAL 23-Nov-14 Yes C 24-Nov-14 S

BUILDING MANAGEMENT SYSTEM FOR LEVEL -05- MASTER PLAN (SEGMENT-H1 ) SD H1 ELECTRICAL 14-Dec-14 Yes C 29-Dec-14 V

LIGHTING SYSTEM LAYOUT FOR LEVEL -5 ( MASTER PLAN ) (SEGMENT -H1) SD H1 ELECTRICAL 25-Aug-14 Yes C 28-Aug-14 S

LIGHTING SYSTEM LAYOUT FOR LEVEL -5 ( MASTER PLAN ) (SEGMENT -H1) SD H1 ELECTRICAL 24-Nov-14 Yes C 25-Nov-14 S

LIGHTING SYSTEM LAYOUT FOR LEVEL -5 ( MASTER PLAN ) (SEGMENT -H1) SD H1 ELECTRICAL 23-Dec-14 Yes A 15-Dec-14 V

LIGHTING SYSTEM LAYOUT FOR LEVEL -5 PLAN (SEGMENT -H1) PART 03 OF 04 SD H1 ELECTRICAL 25-Aug-14 Yes B 28-Aug-14 S

LIGHTING SYSTEM LAYOUT FOR LEVEL -5 PLAN (SEGMENT -H1) PART 03 OF 04 SD H1 ELECTRICAL 24-Nov-14 Yes C 25-Nov-14 S

LIGHTING SYSTEM LAYOUT FOR LEVEL -5 PLAN (SEGMENT -H1) PART 03 OF 04 SD H1 ELECTRICAL 23-Dec-14 Yes A 15-Dec-14 V

LIGHTING SYSTEM LAYOUT FOR LEVEL -5 PLAN (SEGMENT -H1) PART 04 OF 04 SD H1 ELECTRICAL 25-Aug-14 Yes C 28-Aug-14 S

LIGHTING SYSTEM LAYOUT FOR LEVEL -5 PLAN (SEGMENT -H1) PART 04 OF 04 SD H1 ELECTRICAL 24-Nov-14 Yes A 18-Dec-14 V

LIGHTING SYSTEM LAYOUT FOR LEVEL -5 PLAN (SEGMENT -H3) PART 02 OF 02 SD H3 ELECTRICAL 25-Aug-14 Yes B 28-Aug-14 S

LIGHTING SYSTEM LAYOUT FOR LEVEL -5 PLAN (SEGMENT -H3) PART 02 OF 02 SD H3 ELECTRICAL 23-Dec-14 Yes A 15-Dec-14 V

BUILDING MANAGEMENT SYSTEM FOR LEVEL -06 - MASTER PLAN (SEGMENT- H1) SD H1 ELECTRICAL 25-Aug-14 Yes C 6-Sep-14 S

BUILDING MANAGEMENT SYSTEM FOR LEVEL -06 - MASTER PLAN (SEGMENT- H1) SD H1 ELECTRICAL 23-Nov-14 Yes C 24-Nov-14 S

Page 54 of 114
H-STRUCTURAL SHOP DRAWINGS SUBMITTAL LOG
TED , S = SUPERCEDED , V = VALID 7-May-17

SEGMENT
RESPONSE DRAWING
DRAWING TITLE TYPE DISCIPLINE REPLY APPROVA REPLY DATE
REQUIRED BY STATUS
L STATUS

BUILDING MANAGEMENT SYSTEM FOR LEVEL -06 - MASTER PLAN (SEGMENT- H1) SD H1 ELECTRICAL 28-Dec-14 Yes C 29-Dec-14 V

POWER SYSTEM LAYOUT FOR LEVEL -1 (SEGMENT -H1) MASTER PLAN SD H1 ELECTRICAL 25-Aug-14 Yes B 30-Aug-14 V

POWER SYSTEM LAYOUT FOR LEVEL -1 (SEGMENT -H1) PART 01 OF 04 SD H1 ELECTRICAL 25-Aug-14 Yes A 30-Aug-14 V

POWER SYSTEM LAYOUT FOR LEVEL -1 (SEGMENT -H1) PART 02 OF 04 SD H1 ELECTRICAL 25-Aug-14 Yes A 30-Aug-14 V

POWER SYSTEM LAYOUT FOR LEVEL -1 (SEGMENT -H1) PART 03 OF 04 SD H1 ELECTRICAL 25-Aug-14 Yes A 30-Aug-14 V

POWER SYSTEM LAYOUT FOR LEVEL -1 (SEGMENT -H1) PART 04 OF 04 SD H1 ELECTRICAL 25-Aug-14 Yes A 30-Aug-14 V

POWER SYSTEM LAYOUT FOR LEVEL -1 (SEGMENT -H2) MASTER PLAN SD H2 ELECTRICAL 25-Aug-14 Yes C 30-Aug-14 S

POWER SYSTEM LAYOUT FOR LEVEL -1 (SEGMENT -H2) MASTER PLAN SD H2 ELECTRICAL 4-Nov-14 Yes C 2-Nov-14 V

POWER SYSTEM LAYOUT FOR LEVEL -1 (SEGMENT -H2) PART 01 OF 04 SD H2 ELECTRICAL 25-Aug-14 Yes C 30-Aug-14 S

POWER SYSTEM LAYOUT FOR LEVEL -1 (SEGMENT -H2) PART 01 OF 04 SD H2 ELECTRICAL 4-Nov-14 Yes C 2-Nov-14 V

POWER SYSTEM LAYOUT FOR LEVEL -1 (SEGMENT -H2) PART 02 OF 04 SD H2 ELECTRICAL 25-Aug-14 Yes A 30-Aug-14 V

POWER SYSTEM LAYOUT FOR LEVEL -1 (SEGMENT -H2) PART 03 OF 04 SD H2 ELECTRICAL 25-Aug-14 Yes B 30-Aug-14 V

POWER SYSTEM LAYOUT FOR LEVEL -1 (SEGMENT -H2) PART 04 OF 04 SD H2 ELECTRICAL 25-Aug-14 Yes A 30-Aug-14 V

POWER SYSTEM LAYOUT FOR LEVEL -1 (SEGMENT -H3) MASTER PLAN SD H3 ELECTRICAL 25-Aug-14 Yes C 30-Aug-14 S

POWER SYSTEM LAYOUT FOR LEVEL -1 (SEGMENT -H3) MASTER PLAN SD H3 ELECTRICAL 4-Nov-14 Yes C 2-Nov-14 V

POWER SYSTEM LAYOUT FOR LEVEL -1 (SEGMENT -H3) PART 01 OF 02 SD H3 ELECTRICAL 25-Aug-14 Yes A 30-Aug-14 V

POWER SYSTEM LAYOUT FOR LEVEL -1 (SEGMENT -H3) PART 02 OF 02 SD H3 ELECTRICAL 25-Aug-14 Yes C 30-Aug-14 S

POWER SYSTEM LAYOUT FOR LEVEL -1 (SEGMENT -H3) PART 02 OF 02 SD H3 ELECTRICAL 4-Nov-14 Yes C 2-Nov-14 V

POWER PLANT HVAC SYASTEM LAYOUT FOR LEVEL -03 (MASTER PLAN ) ( SEGMENT - H1, H2, & H3) SD H0 ELECTRICAL 27-Aug-14 Yes C 1-Sep-14 S

POWER PLANT HVAC SYASTEM LAYOUT FOR LEVEL -03 (MASTER PLAN ) ( SEGMENT - H1, H2, & H3) SD H0 ELECTRICAL 22-Nov-14 Yes A 19-Nov-14 V

POWER PLANT HVAC SYASTEM LAYOUT FOR LEVEL -03 ( SEGMENT -H1) PART -3 SD H1 ELECTRICAL 27-Aug-14 Yes C 1-Sep-14 S

POWER PLANT HVAC SYASTEM LAYOUT FOR LEVEL -03 ( SEGMENT -H1) PART -3 SD H1 ELECTRICAL 22-Nov-14 Yes A 19-Nov-14 V

POWER PLANT HVAC SYASTEM LAYOUT FOR LEVEL -03 ( SEGMENT -H1) PART -4 SD H1 ELECTRICAL 27-Aug-14 Yes C 1-Sep-14 S

POWER PLANT HVAC SYASTEM LAYOUT FOR LEVEL -03 ( SEGMENT -H1) PART -4 SD H1 ELECTRICAL 22-Nov-14 Yes A 19-Nov-14 V

POWER PLANT HVAC SYASTEM LAYOUT FOR LEVEL -03 ( SEGMENT -H 2) PART -1 SD H2 ELECTRICAL 27-Aug-14 Yes C 1-Sep-14 S

Page 55 of 114
H-STRUCTURAL SHOP DRAWINGS SUBMITTAL LOG
TED , S = SUPERCEDED , V = VALID 7-May-17

SEGMENT
RESPONSE DRAWING
DRAWING TITLE TYPE DISCIPLINE REPLY APPROVA REPLY DATE
REQUIRED BY STATUS
L STATUS

POWER PLANT HVAC SYASTEM LAYOUT FOR LEVEL -03 ( SEGMENT -H 2) PART -1 SD H2 ELECTRICAL 22-Nov-14 Yes A 19-Nov-14 V

POWER PLANT HVAC SYASTEM LAYOUT FOR LEVEL -03 ( SEGMENT -H 2) PART -2 SD H2 ELECTRICAL 27-Aug-14 Yes C 1-Sep-14 S

POWER PLANT HVAC SYASTEM LAYOUT FOR LEVEL -03 ( SEGMENT -H 2) PART -2 SD H2 ELECTRICAL 22-Nov-14 Yes A 19-Nov-14 V

POWER PLANT HVAC SYASTEM LAYOUT FOR LEVEL -03 ( SEGMENT -H 3) PART -2 SD H3 ELECTRICAL 27-Aug-14 Yes C 1-Sep-14 S

POWER PLANT HVAC SYASTEM LAYOUT FOR LEVEL -03 ( SEGMENT -H 3) PART -2 SD H3 ELECTRICAL 22-Nov-14 Yes A 19-Nov-14 V

FIRE ALARM SYSTEM LAYOUT LEVEL -02 MASTER PLAN SEGMENT -H1 SD H1 ELECTRICAL 27-Aug-14 Yes C 30-Aug-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL -02 MASTER PLAN SEGMENT -H1 SD H1 ELECTRICAL 22-Nov-14 Yes C 25-Nov-14 V

FIRE ALARM SYSTEM LAYOUT LEVEL -02 SEGMENT -H1 (PART 01 OF 04) SD H1 ELECTRICAL 27-Aug-14 Yes C 30-Aug-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL -02 SEGMENT -H1 (PART 01 OF 04) SD H1 ELECTRICAL 22-Nov-14 Yes C 25-Nov-14 V

FIRE ALARM SYSTEM LAYOUT LEVEL -02 SEGMENT -H1 (PART 02 OF 04) SD H1 ELECTRICAL 27-Aug-14 Yes C 30-Aug-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL -02 SEGMENT -H1 (PART 02 OF 04) SD H1 ELECTRICAL 22-Nov-14 Yes C 25-Nov-14 V

FIRE ALARM SYSTEM LAYOUT LEVEL -02 SEGMENT -H1 (PART 03 OF 04) SD H1 ELECTRICAL 27-Aug-14 Yes C 30-Aug-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL -02 SEGMENT -H1 (PART 03 OF 04) SD H1 ELECTRICAL 22-Nov-14 Yes C 25-Nov-14 V

FIRE ALARM SYSTEM LAYOUT LEVEL -02 SEGMENT -H1 (PART 04 OF 04) SD H1 ELECTRICAL 27-Aug-14 Yes C 30-Aug-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL -02 SEGMENT -H1 (PART 04 OF 04) SD H1 ELECTRICAL 22-Nov-14 Yes C 25-Nov-14 V

FIRE ALARM SYSTEM LAYOUT LEVEL -02 MASTER PLAN SEGMENT -H2 SD H2 ELECTRICAL 27-Aug-14 Yes C 30-Aug-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL -02 MASTER PLAN SEGMENT -H2 SD H2 ELECTRICAL 22-Nov-14 Yes C 25-Nov-14 V

FIRE ALARM SYSTEM LAYOUT LEVEL -02 SEGMENT -H2 (PART-01 OF 02) SD H2 ELECTRICAL 27-Aug-14 Yes C 30-Aug-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL -02 SEGMENT -H2 (PART-01 OF 02) SD H2 ELECTRICAL 22-Nov-14 Yes C 25-Nov-14 V

FIRE ALARM SYSTEM LAYOUT LEVEL -02 SEGMENT -H2 (PART-02 OF 02) SD H2 ELECTRICAL 27-Aug-14 Yes C 30-Aug-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL -02 SEGMENT -H2 (PART-02 OF 02) SD H2 ELECTRICAL 22-Nov-14 Yes C 25-Nov-14 V

FIRE ALARM SYSTEM LAYOUT LEVEL -02 MASTER PLAN SEGMENT -H3 SD H3 ELECTRICAL 27-Aug-14 Yes C 30-Aug-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL -02 MASTER PLAN SEGMENT -H3 SD H3 ELECTRICAL 22-Nov-14 Yes C 25-Nov-14 V

FIRE ALARM SYSTEM LAYOUT LEVEL -02 SEGMENT -H3 (PART-01 OF 02) SD H3 ELECTRICAL 27-Aug-14 Yes C 30-Aug-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL -02 SEGMENT -H3 (PART-01 OF 02) SD H3 ELECTRICAL 22-Nov-14 Yes C 25-Nov-14 V

Page 56 of 114
H-STRUCTURAL SHOP DRAWINGS SUBMITTAL LOG
TED , S = SUPERCEDED , V = VALID 7-May-17

SEGMENT
RESPONSE DRAWING
DRAWING TITLE TYPE DISCIPLINE REPLY APPROVA REPLY DATE
REQUIRED BY STATUS
L STATUS

FIRE ALARM SYSTEM LAYOUT LEVEL -02 SEGMENT -H3 (PART-02 OF 02) SD H3 ELECTRICAL 27-Aug-14 Yes C 30-Aug-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL -02 SEGMENT -H3 (PART-02 OF 02) SD H3 ELECTRICAL 22-Nov-14 Yes C 25-Nov-14 V

INFORMATION AND COMMUNICATION TECHNOLOGY LEVEL-1 (SEGMENT -H1) MASTER PLAN SD H1 ELECTRICAL 31-Aug-14 Yes C 30-Aug-14 S

INFORMATION AND COMMUNICATION TECHNOLOGY LEVEL-1 (SEGMENT -H1) MASTER PLAN SD H1 ELECTRICAL 23-Nov-14 Yes B 24-Nov-14 V

INFORMATION AND COMMUNICATION TECHNOLOGY LEVEL-1 PLAN (SEGMENT -H1) PART-1 SD H1 ELECTRICAL 31-Aug-14 Yes C 30-Aug-14 S

INFORMATION AND COMMUNICATION TECHNOLOGY LEVEL-1 PLAN (SEGMENT -H1) PART-1 SD H1 ELECTRICAL 23-Nov-14 Yes B 24-Nov-14 V

INFORMATION AND COMMUNICATION TECHNOLOGY LEVEL-1 PLAN (SEGMENT -H1) PART-2 SD H1 ELECTRICAL 31-Aug-14 Yes C 30-Aug-14 S

INFORMATION AND COMMUNICATION TECHNOLOGY LEVEL-1 PLAN (SEGMENT -H1) PART-2 SD H1 ELECTRICAL 23-Nov-14 Yes B 24-Nov-14 V

INFORMATION AND COMMUNICATION TECHNOLOGY LEVEL-1 PLAN (SEGMENT -H1) PART-3 SD H1 ELECTRICAL 31-Aug-14 Yes C 30-Aug-14 S

INFORMATION AND COMMUNICATION TECHNOLOGY LEVEL-1 PLAN (SEGMENT -H1) PART-3 SD H1 ELECTRICAL 23-Nov-14 Yes B 24-Nov-14 V

INFORMATION AND COMMUNICATION TECHNOLOGY LEVEL-1 PLAN (SEGMENT -H1) PART-4 SD H1 ELECTRICAL 31-Aug-14 Yes C 30-Aug-14 S

INFORMATION AND COMMUNICATION TECHNOLOGY LEVEL-1 PLAN (SEGMENT -H1) PART-4 SD H1 ELECTRICAL 23-Nov-14 Yes B 24-Nov-14 V

INFORMATION AND COMMUNICATION TECHNOLOGY LEVEL-1 PLAN (SEGMENT -H2) MASTER PLAN SD H2 ELECTRICAL 31-Aug-14 Yes C 30-Aug-14 S

INFORMATION AND COMMUNICATION TECHNOLOGY LEVEL-1 PLAN (SEGMENT -H2) MASTER PLAN SD H2 ELECTRICAL 23-Nov-14 Yes C 24-Nov-14 V

INFORMATION AND COMMUNICATION TECHNOLOGY LEVEL-1 PLAN (SEGMENT -H2) PART-1 SD H2 ELECTRICAL 31-Aug-14 Yes C 30-Aug-14 S

INFORMATION AND COMMUNICATION TECHNOLOGY LEVEL-1 PLAN (SEGMENT -H2) PART-1 SD H2 ELECTRICAL 23-Nov-14 Yes B 24-Nov-14 V

INFORMATION AND COMMUNICATION TECHNOLOGY LEVEL-1 PLAN (SEGMENT -H2) PART-2 SD H2 ELECTRICAL 31-Aug-14 Yes C 30-Aug-14 S

INFORMATION AND COMMUNICATION TECHNOLOGY LEVEL-1 PLAN (SEGMENT -H2) PART-2 SD H2 ELECTRICAL 23-Nov-14 Yes C 24-Nov-14 V

INFORMATION AND COMMUNICATION TECHNOLOGY LEVEL-1 PLAN (SEGMENT -H2) PART-3 SD H2 ELECTRICAL 31-Aug-14 Yes C 30-Aug-14 S

INFORMATION AND COMMUNICATION TECHNOLOGY LEVEL-1 PLAN (SEGMENT -H2) PART-3 SD H2 ELECTRICAL 23-Nov-14 Yes B 24-Nov-14 V

INFORMATION AND COMMUNICATION TECHNOLOGY LEVEL-1 PLAN (SEGMENT -H2) PART-4 SD H2 ELECTRICAL 31-Aug-14 Yes C 30-Aug-14 S

INFORMATION AND COMMUNICATION TECHNOLOGY LEVEL-1 PLAN (SEGMENT -H2) PART-4 SD H2 ELECTRICAL 23-Nov-14 Yes B 24-Nov-14 V

INFORMATION AND COMMUNICATION TECHNOLOGY LEVEL-1 PLAN (SEGMENT -H3) MASTER PLAN SD H3 ELECTRICAL 31-Aug-14 Yes C 30-Aug-14 S

INFORMATION AND COMMUNICATION TECHNOLOGY LEVEL-1 PLAN (SEGMENT -H3) MASTER PLAN SD H3 ELECTRICAL 23-Nov-14 Yes B 24-Nov-14 V

INFORMATION AND COMMUNICATION TECHNOLOGY LEVEL-1 PLAN (SEGMENT -H3) PART-1 SD H3 ELECTRICAL 31-Aug-14 Yes C 30-Aug-14 S

Page 57 of 114
H-STRUCTURAL SHOP DRAWINGS SUBMITTAL LOG
TED , S = SUPERCEDED , V = VALID 7-May-17

SEGMENT
RESPONSE DRAWING
DRAWING TITLE TYPE DISCIPLINE REPLY APPROVA REPLY DATE
REQUIRED BY STATUS
L STATUS

INFORMATION AND COMMUNICATION TECHNOLOGY LEVEL-1 PLAN (SEGMENT -H3) PART-1 SD H3 ELECTRICAL 23-Nov-14 Yes B 24-Nov-14 V

INFORMATION AND COMMUNICATION TECHNOLOGY LEVEL-1 PLAN (SEGMENT -H3) PART-2 SD H3 ELECTRICAL 31-Aug-14 Yes C 30-Aug-14 S

INFORMATION AND COMMUNICATION TECHNOLOGY LEVEL-1 PLAN (SEGMENT -H3) PART-2 SD H3 ELECTRICAL 23-Nov-14 Yes B 24-Nov-14 V

INFORMATION AND COMMUNICATION TECHNOLOGY LEVEL-02 (SEGMENT -H1) MASTER PLAN SD H1 ELECTRICAL 31-Aug-14 Yes C 30-Aug-14 S

INFORMATION AND COMMUNICATION TECHNOLOGY LEVEL-02 (SEGMENT -H1) MASTER PLAN SD H1 ELECTRICAL 26-Oct-14 Yes C 27-Oct-14 V

INFORMATION AND COMMUNICATION TECHNOLOGY LEVEL-02 PLAN (SEGMENT -H1) PART- 3 OF 4 SD H1 ELECTRICAL 31-Aug-14 Yes C 30-Aug-14 S

INFORMATION AND COMMUNICATION TECHNOLOGY LEVEL-02 PLAN (SEGMENT -H1) PART- 3 OF 4 SD H1 ELECTRICAL 26-Oct-14 Yes C 27-Oct-14 V

INFORMATION AND COMMUNICATION TECHNOLOGY LEVEL-02 PLAN (SEGMENT -H1) PART- 4 OF 4 SD H1 ELECTRICAL 31-Aug-14 Yes C 30-Aug-14 S

INFORMATION AND COMMUNICATION TECHNOLOGY LEVEL-02 PLAN (SEGMENT -H1) PART- 4 OF 4 SD H1 ELECTRICAL 26-Oct-14 Yes C 27-Oct-14 V

INFORMATION AND COMMUNICATION TECHNOLOGY LEVEL-02 (SEGMENT -H2) MASTER PLAN SD H2 ELECTRICAL 31-Aug-14 Yes C 30-Aug-14 S

INFORMATION AND COMMUNICATION TECHNOLOGY LEVEL-02 (SEGMENT -H2) MASTER PLAN SD H2 ELECTRICAL 26-Oct-14 Yes C 27-Oct-14 V

INFORMATION AND COMMUNICATION TECHNOLOGY LEVEL-02 PLAN (SEGMENT -H2) PART 01 OF 04 SD H2 ELECTRICAL 31-Aug-14 Yes C 30-Aug-14 S

INFORMATION AND COMMUNICATION TECHNOLOGY LEVEL-02 PLAN (SEGMENT -H2) PART 01 OF 04 SD H2 ELECTRICAL 26-Oct-14 Yes C 27-Oct-14 V

INFORMATION AND COMMUNICATION TECHNOLOGY LEVEL-02 PLAN (SEGMENT -H2) PART 04 OF 04 SD H2 ELECTRICAL 31-Aug-14 Yes C 30-Aug-14 S

INFORMATION AND COMMUNICATION TECHNOLOGY LEVEL-02 PLAN (SEGMENT -H2) PART 04 OF 04 SD H2 ELECTRICAL 26-Oct-14 Yes C 27-Oct-14 V

INFORMATION AND COMMUNICATION TECHNOLOGY LEVEL-02 PLAN (SEGMENT -H3) PART 02 OF 04 SD H3 ELECTRICAL 31-Aug-14 Yes C 30-Aug-14 S

INFORMATION AND COMMUNICATION TECHNOLOGY LEVEL-02 PLAN (SEGMENT -H3) PART 02 OF 04 SD H3 ELECTRICAL 26-Oct-14 Yes C 27-Oct-14 V

LIGHTING SYSTEM LAYOUT MASTER PLAN LEVEL-2 ( SEGMENT - H1, H2 & H3) SD H0 ELECTRICAL 31-Aug-14 Yes C 3-Sep-14 S

LIGHTING SYSTEM LAYOUT MASTER PLAN LEVEL-2 ( SEGMENT - H1, H2 & H3) SD H0 ELECTRICAL 22-Nov-14 Yes A 19-Nov-14 V

LIGHTING SYSTEM LAYOUT LEVEL-2 ( SEGMENT - H1) PART-3 OF 4 SD H1 ELECTRICAL 31-Aug-14 Yes B 3-Sep-14 V

LIGHTING SYSTEM LAYOUT LEVEL-2 ( SEGMENT - H1) PART-4 OF 4 SD H1 ELECTRICAL 31-Aug-14 Yes C 3-Sep-14 S

LIGHTING SYSTEM LAYOUT LEVEL-2 ( SEGMENT - H1) PART-4 OF 4 SD H1 ELECTRICAL 22-Nov-14 Yes A 19-Nov-14 V

LIGHTING SYSTEM LAYOUT LEVEL-2 ( SEGMENT - H2) PART-1 OF 4 SD H2 ELECTRICAL 31-Aug-14 Yes B 3-Sep-14 V

LIGHTING SYSTEM LAYOUT LEVEL-2 ( SEGMENT - H2) PART-2 OF 4 SD H2 ELECTRICAL 31-Aug-14 Yes A 3-Sep-14 V

LIGHTING SYSTEM LAYOUT LEVEL-2 ( SEGMENT - H3) PART-2 OF 2 SD H3 ELECTRICAL 31-Aug-14 Yes C 3-Sep-14 S

Page 58 of 114
H-STRUCTURAL SHOP DRAWINGS SUBMITTAL LOG
TED , S = SUPERCEDED , V = VALID 7-May-17

SEGMENT
RESPONSE DRAWING
DRAWING TITLE TYPE DISCIPLINE REPLY APPROVA REPLY DATE
REQUIRED BY STATUS
L STATUS

LIGHTING SYSTEM LAYOUT LEVEL-2 ( SEGMENT - H3) PART-2 OF 2 SD H3 ELECTRICAL 22-Nov-14 Yes A 19-Nov-14 V

LIGHTING SYSTEM LAYOUT MASTER LEVEL -2 MEZZANINE (SEGMENT-H1,H3 & H3) SD H0 ELECTRICAL 31-Aug-14 Yes C 3-Sep-14 S

LIGHTING SYSTEM LAYOUT MASTER LEVEL -2 MEZZANINE (SEGMENT-H1,H3 & H3) SD H0 ELECTRICAL 22-Nov-14 Yes A 19-Nov-14 V

POWER SYSTEM LAYOUT FOR LEVEL -03 MASTER PLAN ( SEGMENT - H1 & H3) SD H1 ELECTRICAL 31-Aug-14 Yes C 2-Sep-14 V

POWER SYSTEM LAYOUT FOR LEVEL -03 PLAN ( SEGMENT -H1) PART-3 OF 4 SD H1 ELECTRICAL 31-Aug-14 Yes C 2-Sep-14 V

POWER SYSTEM LAYOUT FOR LEVEL -03 PLAN ( SEGMENT -H1) PART-4 OF 4 SD H1 ELECTRICAL 31-Aug-14 Yes C 2-Sep-14 V

POWER SYSTEM LAYOUT FOR LEVEL -03 PLAN ( SEGMENT -H3) PART-2 OF 2 SD H3 ELECTRICAL 31-Aug-14 Yes C 2-Sep-14 V

FIRE ALARM SYSTEM LAYOUT LEVEL -03 MASTER PLAN (SEGMENT - H1 , H2 & H3) SD H0 ELECTRICAL 31-Aug-14 Yes C 30-Aug-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL -03 MASTER PLAN (SEGMENT - H1 , H2 & H3) SD H0 ELECTRICAL 10-Nov-14 Yes C 12-Nov-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL -03 MASTER PLAN (SEGMENT - H1 , H2 & H3) SD H0 ELECTRICAL 3-Dec-14 Yes C 2-Dec-14 V

FIRE ALARM SYSTEM LAYOUT LEVEL -03 (SEGMENT - H1 ) PART 3 OF 4 SD H1 ELECTRICAL 31-Aug-14 Yes C 30-Aug-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL -03 (SEGMENT - H1 ) PART 3 OF 4 SD H1 ELECTRICAL 10-Nov-14 Yes C 12-Nov-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL -03 (SEGMENT - H1 ) PART 3 OF 4 SD H1 ELECTRICAL 3-Dec-14 Yes C 2-Dec-14 V

FIRE ALARM SYSTEM LAYOUT LEVEL -03 (SEGMENT - H1 ) PART 4 OF 4 SD H1 ELECTRICAL 31-Aug-14 Yes C 30-Aug-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL -03 (SEGMENT - H1 ) PART 4 OF 4 SD H1 ELECTRICAL 10-Nov-14 Yes C 12-Nov-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL -03 (SEGMENT - H1 ) PART 4 OF 4 SD H1 ELECTRICAL 3-Dec-14 Yes C 2-Dec-14 V

FIRE ALARM SYSTEM LAYOUT LEVEL -03 (SEGMENT - H2 ) PART 1 OF 4 SD H2 ELECTRICAL 31-Aug-14 Yes C 30-Aug-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL -03 (SEGMENT - H2 ) PART 1 OF 4 SD H2 ELECTRICAL 10-Nov-14 Yes C 12-Nov-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL -03 (SEGMENT - H2 ) PART 1 OF 4 SD H2 ELECTRICAL 3-Dec-14 Yes C 2-Dec-14 V

FIRE ALARM SYSTEM LAYOUT LEVEL -03 (SEGMENT - H2 ) PART 2 OF 4 SD H2 ELECTRICAL 31-Aug-14 Yes C 30-Aug-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL -03 (SEGMENT - H2 ) PART 2 OF 4 SD H2 ELECTRICAL 10-Nov-14 Yes C 12-Nov-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL -03 (SEGMENT - H2 ) PART 2 OF 4 SD H2 ELECTRICAL 3-Dec-14 Yes C 2-Dec-14 V

FIRE ALARM SYSTEM LAYOUT LEVEL -03 (SEGMENT - H3 ) PART 2 OF 2 SD H3 ELECTRICAL 31-Aug-14 Yes C 30-Aug-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL -03 (SEGMENT - H3 ) PART 2 OF 2 SD H3 ELECTRICAL 10-Nov-14 Yes C 12-Nov-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL -03 (SEGMENT - H3 ) PART 2 OF 2 SD H3 ELECTRICAL 3-Dec-14 Yes C 2-Dec-14 V

Page 59 of 114
H-STRUCTURAL SHOP DRAWINGS SUBMITTAL LOG
TED , S = SUPERCEDED , V = VALID 7-May-17

SEGMENT
RESPONSE DRAWING
DRAWING TITLE TYPE DISCIPLINE REPLY APPROVA REPLY DATE
REQUIRED BY STATUS
L STATUS

LIGHTING SYSTEM LAYOUT LEVEL-03 MASTER PLAN (SEGMENT -H1 & H3) SD H0 ELECTRICAL 31-Aug-14 Yes C 6-Sep-14 S

LIGHTING SYSTEM LAYOUT LEVEL-03 MASTER PLAN (SEGMENT -H1 & H3) SD H0 ELECTRICAL 22-Nov-14 Yes A 19-Nov-14 V

LIGHTING SYSTEM LAYOUT LEVEL-03 PLAN (SEGMENT -H1) PART- 3 OF 4 SD H1 ELECTRICAL 31-Aug-14 Yes C 6-Sep-14 S

LIGHTING SYSTEM LAYOUT LEVEL-03 PLAN (SEGMENT -H1) PART- 3 OF 4 SD H1 ELECTRICAL 22-Nov-14 Yes A 19-Nov-14 V

LIGHTING SYSTEM LAYOUT LEVEL-03 PLAN (SEGMENT -H1) PART- 4 OF 4 SD H1 ELECTRICAL 31-Aug-14 Yes C 6-Sep-14 S

LIGHTING SYSTEM LAYOUT LEVEL-03 PLAN (SEGMENT -H1) PART- 4 OF 4 SD H1 ELECTRICAL 22-Nov-14 Yes A 19-Nov-14 V

LIGHTING SYSTEM LAYOUT LEVEL-03 PLAN (SEGMENT -H3 ) PART- 2 OF 2 SD H3 ELECTRICAL 31-Aug-14 Yes C 6-Sep-14 S

LIGHTING SYSTEM LAYOUT LEVEL-03 PLAN (SEGMENT -H3 ) PART- 2 OF 2 SD H3 ELECTRICAL 22-Nov-14 Yes A 19-Nov-14 V

LEVEL-S1 PANEL BOARD SCHEDULE C12B- S1 SD H0 ELECTRICAL 31-Aug-14 Yes B 6-Sep-14 S

LEVEL-S1 PANEL BOARD SCHEDULE C12B- S1 SD H0 ELECTRICAL 7-Jan-15 Yes D 1-Jan-15 V

LEVEL-S1 PANEL BOARD SCHEDULE E12B- S1 SD H0 ELECTRICAL 31-Aug-14 Yes B 6-Sep-14 S

LEVEL-S1 PANEL BOARD SCHEDULE E12B- S1 SD H0 ELECTRICAL 7-Jan-15 Yes D 1-Jan-15 V

BUILDING MANAGEMENT SYSTEM FOR LEVEL 07- MASTER PLAN (SEGMENT -H1|) SD H1 ELECTRICAL 2-Sep-14 Yes C 3-Sep-14 S

BUILDING MANAGEMENT SYSTEM FOR LEVEL 07- MASTER PLAN (SEGMENT -H1|) SD H1 ELECTRICAL 24-Nov-14 Yes C 24-Nov-14 V

BUILDING MANGEMENT SYSTEM FOR LEVEL -08- MASTER PLAN (SEGMENT-H1) SD H1 ELECTRICAL 2-Sep-14 Yes C 3-Sep-14 S

BUILDING MANGEMENT SYSTEM FOR LEVEL -08- MASTER PLAN (SEGMENT-H1) SD H1 ELECTRICAL 24-Nov-14 Yes C 24-Nov-14 V

POWER SYSTEM LAYOUT LEVEL -07 (SEGMENT -H1) SD H0 ELECTRICAL 6-Sep-14 Yes C 6-Sep-14 S

POWER SYSTEM LAYOUT LEVEL -07 (SEGMENT -H1) SD H0 ELECTRICAL 24-Nov-14 Yes A 22-Nov-14 V

LEVEL-07 PANEL BOARD SCHEDULE -N12A-RF SD H0 ELECTRICAL 6-Sep-14 Yes C 6-Sep-14 V

LIGHTING SYSTEM LAYOUT LEVEL-07 PLAN (SEGMENT-H1) SD H1 ELECTRICAL 6-Sep-14 Yes C 6-Sep-14 S

LIGHTING SYSTEM LAYOUT LEVEL-07 PLAN (SEGMENT-H1) SD H1 ELECTRICAL 24-Nov-14 Yes C 24-Nov-14 V

LIGHTING SYSTEM LAYOUT LEVEL-08 PLAN (SEGMENT-H1) SD H1 ELECTRICAL 6-Sep-14 Yes C 6-Sep-14 S

LIGHTING SYSTEM LAYOUT LEVEL-08 PLAN (SEGMENT-H1) SD H1 ELECTRICAL 24-Nov-14 Yes C 24-Nov-14 V

POWER FOR HVAC SYSTEM LAYOUT LEVEL-04 (MASTER PLAN ) SEGMENT - H1, H2, & H3) SD H0 ELECTRICAL 6-Sep-14 Yes C 6-Sep-14 S

POWER FOR HVAC SYSTEM LAYOUT LEVEL-04 (MASTER PLAN ) SEGMENT - H1, H2, & H3) SD H0 ELECTRICAL 24-Nov-14 Yes A 22-Nov-14 V

Page 60 of 114
H-STRUCTURAL SHOP DRAWINGS SUBMITTAL LOG
TED , S = SUPERCEDED , V = VALID 7-May-17

SEGMENT
RESPONSE DRAWING
DRAWING TITLE TYPE DISCIPLINE REPLY APPROVA REPLY DATE
REQUIRED BY STATUS
L STATUS

POWER FOR HVAC SYSTEM LAYOUT LEVEL-04 PLAN SEGMENT - H1 -PART 3 OF 4 SD H1 ELECTRICAL 6-Sep-14 Yes C 6-Sep-14 S

POWER FOR HVAC SYSTEM LAYOUT LEVEL-04 PLAN SEGMENT - H1 -PART 3 OF 4 SD H1 ELECTRICAL 24-Nov-14 Yes A 22-Nov-14 V

POWER FOR HVAC SYSTEM LAYOUT LEVEL-04 PLAN SEGMENT - H1 -PART 4 OF 4 SD H1 ELECTRICAL 6-Sep-14 Yes C 6-Sep-14 S

POWER FOR HVAC SYSTEM LAYOUT LEVEL-04 PLAN SEGMENT - H1 -PART 4 OF 4 SD H1 ELECTRICAL 24-Nov-14 Yes A 22-Nov-14 V

POWER FOR HVAC SYSTEM LAYOUT LEVEL-04 PLAN SEGMENT - H3 -PART 2 OF 2 SD H3 ELECTRICAL 6-Sep-14 Yes C 6-Sep-14 S

POWER FOR HVAC SYSTEM LAYOUT LEVEL-04 PLAN SEGMENT - H3 -PART 2 OF 2 SD H3 ELECTRICAL 24-Nov-14 Yes A 22-Nov-14 V

FIRE ALARM SYSTEM LAYOUT LEVEL-04 MASTER PLAN ( SEGMENT- H1,H2 & H3) SD H0 ELECTRICAL 8-Sep-14 Yes C 10-Sep-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL-04 MASTER PLAN ( SEGMENT- H1,H2 & H3) SD H0 ELECTRICAL 22-Nov-14 Yes C 1-Dec-14 V

FIRE ALARM SYSTEM LAYOUT LEVEL-04 PLAN ( SEGMENT- H1) PART-3 OF 4 SD H1 ELECTRICAL 8-Sep-14 Yes C 10-Sep-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL-04 PLAN ( SEGMENT- H1) PART-3 OF 4 SD H1 ELECTRICAL 22-Nov-14 Yes C 1-Dec-14 V

FIRE ALARM SYSTEM LAYOUT LEVEL-04 PLAN ( SEGMENT- H1) PART-4 OF 4 SD H1 ELECTRICAL 8-Sep-14 Yes C 10-Sep-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL-04 PLAN ( SEGMENT- H1) PART-4 OF 4 SD H1 ELECTRICAL 22-Nov-14 Yes C 1-Dec-14 V

FIRE ALARM SYSTEM LAYOUT LEVEL-04 PLAN ( SEGMENT- H2) PART-1 OF 4 SD H2 ELECTRICAL 8-Sep-14 Yes C 10-Sep-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL-04 PLAN ( SEGMENT- H2) PART-1 OF 4 SD H2 ELECTRICAL 22-Nov-14 Yes C 1-Dec-14 V

FIRE ALARM SYSTEM LAYOUT LEVEL-04 PLAN ( SEGMENT- H2) PART-2 OF 4 SD H2 ELECTRICAL 8-Sep-14 Yes C 10-Sep-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL-04 PLAN ( SEGMENT- H2) PART-2 OF 4 SD H2 ELECTRICAL 22-Nov-14 Yes C 1-Dec-14 V

FIRE ALARM SYSTEM LAYOUT LEVEL-04 PLAN ( SEGMENT- H3) PART-2 OF 2 SD H3 ELECTRICAL 8-Sep-14 Yes C 10-Sep-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL-04 PLAN ( SEGMENT- H3) PART-2 OF 2 SD H3 ELECTRICAL 22-Nov-14 Yes C 1-Dec-14 V

VOICE EVACAUTION SYSTEM LAYOUT LEVEL -02 MASTER PLAN (SEGMENT - H1, H2 & H3) SD H0 ELECTRICAL 8-Sep-14 Yes C 10-Sep-14 S

VOICE EVACAUTION SYSTEM LAYOUT LEVEL -02 MASTER PLAN (SEGMENT - H1, H2 & H3) SD H0 ELECTRICAL 26-Oct-14 Yes C 23-Oct-14 S

VOICE EVACAUTION SYSTEM LAYOUT LEVEL -02 MASTER PLAN (SEGMENT - H1, H2 & H3) SD H0 ELECTRICAL 25-Nov-14 Yes C 23-Nov-14 V

VOICE EVACAUTION SYSTEM LAYOUT LEVEL -02 PLAN (SEGMENT - H1) (PART 4 OF 4) SD H1 ELECTRICAL 8-Sep-14 Yes C 10-Sep-14 S

VOICE EVACAUTION SYSTEM LAYOUT LEVEL -02 PLAN (SEGMENT - H1) (PART 4 OF 4) SD H1 ELECTRICAL 26-Oct-14 Yes C 23-Oct-14 S

VOICE EVACAUTION SYSTEM LAYOUT LEVEL -02 PLAN (SEGMENT - H1) (PART 4 OF 4) SD H1 ELECTRICAL 25-Nov-14 Yes C 23-Nov-14 V

VOICE EVACAUTION SYSTEM LAYOUT LEVEL -02 PLAN (SEGMENT - H2) (PART 1 OF 4) SD H2 ELECTRICAL 8-Sep-14 Yes C 10-Sep-14 S

Page 61 of 114
H-STRUCTURAL SHOP DRAWINGS SUBMITTAL LOG
TED , S = SUPERCEDED , V = VALID 7-May-17

SEGMENT
RESPONSE DRAWING
DRAWING TITLE TYPE DISCIPLINE REPLY APPROVA REPLY DATE
REQUIRED BY STATUS
L STATUS

VOICE EVACAUTION SYSTEM LAYOUT LEVEL -02 PLAN (SEGMENT - H2) (PART 1 OF 4) SD H2 ELECTRICAL 26-Oct-14 Yes C 23-Oct-14 S

VOICE EVACAUTION SYSTEM LAYOUT LEVEL -02 PLAN (SEGMENT - H2) (PART 1 OF 4) SD H2 ELECTRICAL 25-Nov-14 Yes C 23-Nov-14 V

VOICE EVACAUTION SYSTEM LAYOUT LEVEL -02 PLAN (SEGMENT - H2) (PART 2 OF 4) SD H2 ELECTRICAL 8-Sep-14 Yes C 10-Sep-14 S

VOICE EVACAUTION SYSTEM LAYOUT LEVEL -02 PLAN (SEGMENT - H2) (PART 2 OF 4) SD H2 ELECTRICAL 26-Oct-14 Yes C 23-Oct-14 S

VOICE EVACAUTION SYSTEM LAYOUT LEVEL -02 PLAN (SEGMENT - H2) (PART 2 OF 4) SD H2 ELECTRICAL 25-Nov-14 Yes C 23-Nov-14 V

VOICE EVACAUTION SYSTEM LAYOUT LEVEL -02 PLAN (SEGMENT - H2) (PART 4 OF 4) SD H2 ELECTRICAL 8-Sep-14 Yes C 10-Sep-14 S

VOICE EVACAUTION SYSTEM LAYOUT LEVEL -02 PLAN (SEGMENT - H2) (PART 4 OF 4) SD H2 ELECTRICAL 26-Oct-14 Yes C 23-Oct-14 S

VOICE EVACAUTION SYSTEM LAYOUT LEVEL -02 PLAN (SEGMENT - H2) (PART 4 OF 4) SD H2 ELECTRICAL 25-Nov-14 Yes C 23-Nov-14 V

VOICE EVACAUTION SYSTEM LAYOUT LEVEL -02 PLAN (SEGMENT - H3 ) (PART 2 OF 2) SD H3 ELECTRICAL 8-Sep-14 Yes C 10-Sep-14 S

VOICE EVACAUTION SYSTEM LAYOUT LEVEL -02 PLAN (SEGMENT - H3 ) (PART 2 OF 2) SD H3 ELECTRICAL 26-Oct-14 Yes C 23-Oct-14 S

VOICE EVACAUTION SYSTEM LAYOUT LEVEL -02 PLAN (SEGMENT - H3 ) (PART 2 OF 2) SD H3 ELECTRICAL 25-Nov-14 Yes C 23-Nov-14 V

VOICE EVACAUTION SYSTEM LAYOUT LEVEL -03 MASTER PLAN (SEGMENT - H1, H2 & H3) SD H0 ELECTRICAL 8-Sep-14 Yes C 10-Sep-14 S

VOICE EVACAUTION SYSTEM LAYOUT LEVEL -03 MASTER PLAN (SEGMENT - H1, H2 & H3) SD H0 ELECTRICAL 24-Nov-14 Yes C 23-Nov-14 V

VOICE EVACAUTION SYSTEM LAYOUT LEVEL -03 (SEGMENT - H1) PART 3 OF 4 SD H1 ELECTRICAL 8-Sep-14 Yes C 10-Sep-14 S

VOICE EVACAUTION SYSTEM LAYOUT LEVEL -03 (SEGMENT - H1) PART 3 OF 4 SD H1 ELECTRICAL 24-Nov-14 Yes C 23-Nov-14 V

VOICE EVACAUTION SYSTEM LAYOUT LEVEL -03 (SEGMENT - H1) PART 4 OF 4 SD H1 ELECTRICAL 8-Sep-14 Yes C 10-Sep-14 S

VOICE EVACAUTION SYSTEM LAYOUT LEVEL -03 (SEGMENT - H1) PART 4 OF 4 SD H1 ELECTRICAL 24-Nov-14 Yes C 23-Nov-14 V

VOICE EVACAUTION SYSTEM LAYOUT LEVEL -03 (SEGMENT - H2) PART 1 OF 4 SD H2 ELECTRICAL 8-Sep-14 Yes C 10-Sep-14 S

VOICE EVACAUTION SYSTEM LAYOUT LEVEL -03 (SEGMENT - H2) PART 1 OF 4 SD H2 ELECTRICAL 24-Nov-14 Yes C 23-Nov-14 V

VOICE EVACAUTION SYSTEM LAYOUT LEVEL -03 (SEGMENT - H2) PART 2 OF 4 SD H2 ELECTRICAL 8-Sep-14 Yes C 10-Sep-14 S

VOICE EVACAUTION SYSTEM LAYOUT LEVEL -03 (SEGMENT - H2) PART 2 OF 4 SD H2 ELECTRICAL 24-Nov-14 Yes C 23-Nov-14 V

VOICE EVACAUTION SYSTEM LAYOUT LEVEL -03 (SEGMENT - H3) PART 2 OF 2 SD H3 ELECTRICAL 8-Sep-14 Yes C 10-Sep-14 S

VOICE EVACAUTION SYSTEM LAYOUT LEVEL -03 (SEGMENT - H3) PART 2 OF 2 SD H3 ELECTRICAL 24-Nov-14 Yes C 23-Nov-14 V

LIGHTING SYSTEM LAYOUT LEVEL - 06 MASTER PLAN (SEGMENT-H1) SD H1 ELECTRICAL 8-Sep-14 Yes C 9-Sep-14 S

LIGHTING SYSTEM LAYOUT LEVEL - 06 MASTER PLAN (SEGMENT-H1) SD H1 ELECTRICAL 24-Nov-14 Yes A 22-Nov-14 V

Page 62 of 114
H-STRUCTURAL SHOP DRAWINGS SUBMITTAL LOG
TED , S = SUPERCEDED , V = VALID 7-May-17

SEGMENT
RESPONSE DRAWING
DRAWING TITLE TYPE DISCIPLINE REPLY APPROVA REPLY DATE
REQUIRED BY STATUS
L STATUS

LIGHTING SYSTEM LAYOUT LEVEL - 06 PLAN SD H1 ELECTRICAL 8-Sep-14 Yes C 9-Sep-14 S

LIGHTING SYSTEM LAYOUT LEVEL - 06 PLAN SD H1 ELECTRICAL 24-Nov-14 Yes A 22-Nov-14 V

LIGHTING SYSTEM LAYOUT LEVEL - 06 MASTER PLAN (SEGMENT-H1) SD H1 ELECTRICAL 8-Sep-14 Yes C 9-Sep-14 S

LIGHTING SYSTEM LAYOUT LEVEL - 06 MASTER PLAN (SEGMENT-H1) SD H1 ELECTRICAL 24-Nov-14 Yes A 22-Nov-14 V

LIGHTING SYSTEM LAYOUT LEVEL - 06 MASTER PLAN (SEGMENT-H1) SD H1 ELECTRICAL 8-Sep-14 Yes C 9-Sep-14 S

LIGHTING SYSTEM LAYOUT LEVEL - 06 MASTER PLAN (SEGMENT-H1) SD H1 ELECTRICAL 24-Nov-14 Yes A 22-Nov-14 V

CABLE ROUTING SYSTEM FOR LEVEL-03 (MASTER PLAN) SD H0 ELECTRICAL 13-Sep-14 Yes D 2-Sep-14 S

CABLE ROUTING SYSTEM FOR LEVEL-03 (MASTER PLAN) SD H0 ELECTRICAL 24-Nov-14 Yes C 25-Nov-14 V

FIRE ALARM SYSTEM LAYOUT LEVEL-2M SEGMENT-H3 & H2 MASTER PLAN SD H0 ELECTRICAL 14-Sep-14 Yes C 13-Sep-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL-2M SEGMENT-H3 & H2 MASTER PLAN SD H0 ELECTRICAL 22-Nov-14 Yes C 25-Nov-14 V

FIRE ALARM SYSTEM LAYOUT LEVEL-2M SEGMENT-H3 PART-2 H3 SD H3 ELECTRICAL 14-Sep-14 Yes C 13-Sep-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL-2M SEGMENT-H3 PART-2 H3 SD H3 ELECTRICAL 22-Nov-14 Yes C 25-Nov-14 V

FIRE ALARM SYSTEM LAYOUT LEVEL-2M SEGMENT-H2 PART-1 H2 SD H2 ELECTRICAL 14-Sep-14 Yes C 13-Sep-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL-2M SEGMENT-H2 PART-1 H2 SD H2 ELECTRICAL 22-Nov-14 Yes C 25-Nov-14 V

VOICE EVACUATION SYSTEM LAYOUT LEVEL-04 PLAN (SEGMENT-H1, H2 & H3) (MASTER PLAN) SD H0 ELECTRICAL 14-Sep-14 Yes C 13-Sep-14 S

VOICE EVACUATION SYSTEM LAYOUT LEVEL-04 PLAN (SEGMENT-H1, H2 & H3) (MASTER PLAN) SD H0 ELECTRICAL 23-Nov-14 Yes C 2-Dec-14 V

VOICE EVACUATION SYSTEM LAYOUT LEVEL-04 PLAN (SEGMENT-H1) (PART-3 OF 4) SD H1 ELECTRICAL 14-Sep-14 Yes C 13-Sep-14 S

VOICE EVACUATION SYSTEM LAYOUT LEVEL-04 PLAN (SEGMENT-H1) (PART-3 OF 4) SD H1 ELECTRICAL 23-Nov-14 Yes C 2-Dec-14 V

VOICE EVACUATION SYSTEM LAYOUT LEVEL-04 PLAN (SEGMENT-H1) (PART-4 OF 4) SD H1 ELECTRICAL 14-Sep-14 Yes C 13-Sep-14 S

VOICE EVACUATION SYSTEM LAYOUT LEVEL-04 PLAN (SEGMENT-H1) (PART-4 OF 4) SD H1 ELECTRICAL 23-Nov-14 Yes C 2-Dec-14 V

VOICE EVACUATION SYSTEM LAYOUT LEVEL-04 PLAN (SEGMENT-H2) (PART-1 OF 4) SD H2 ELECTRICAL 14-Sep-14 Yes C 13-Sep-14 S

VOICE EVACUATION SYSTEM LAYOUT LEVEL-04 PLAN (SEGMENT-H2) (PART-1 OF 4) SD H2 ELECTRICAL 23-Nov-14 Yes C 2-Dec-14 V

VOICE EVACUATION SYSTEM LAYOUT LEVEL-04 PLAN (SEGMENT-H2) (PART-2 OF 4) SD H2 ELECTRICAL 14-Sep-14 Yes C 13-Sep-14 S

VOICE EVACUATION SYSTEM LAYOUT LEVEL-04 PLAN (SEGMENT-H2) (PART-2 OF 4) SD H2 ELECTRICAL 23-Nov-14 Yes C 2-Dec-14 V

VOICE EVACUATION SYSTEM LAYOUT LEVEL-04 PLAN (SEGMENT-H3) (PART-2 OF 2) SD H3 ELECTRICAL 14-Sep-14 Yes C 13-Sep-14 S

Page 63 of 114
H-STRUCTURAL SHOP DRAWINGS SUBMITTAL LOG
TED , S = SUPERCEDED , V = VALID 7-May-17

SEGMENT
RESPONSE DRAWING
DRAWING TITLE TYPE DISCIPLINE REPLY APPROVA REPLY DATE
REQUIRED BY STATUS
L STATUS

VOICE EVACUATION SYSTEM LAYOUT LEVEL-04 PLAN (SEGMENT-H3) (PART-2 OF 2) SD H3 ELECTRICAL 23-Nov-14 Yes C 2-Dec-14 V

VOICE EVACUATION SYSTEM LAYOUT LEVEL-06 PLAN (SEGMENT-H1,H2 & H3) (MASTER PLAN) SD H0 ELECTRICAL 14-Sep-14 Yes C 13-Sep-14 S

VOICE EVACUATION SYSTEM LAYOUT LEVEL-06 PLAN (SEGMENT-H1,H2 & H3) (MASTER PLAN) SD H0 ELECTRICAL 23-Nov-14 Yes C 2-Dec-14 V

VOICE EVACUATION SYSTEM LAYOUT LEVEL-06 PLAN (SEGMENT-H1) (PART-3 OF 4) SD H1 ELECTRICAL 14-Sep-14 Yes C 13-Sep-14 S

VOICE EVACUATION SYSTEM LAYOUT LEVEL-06 PLAN (SEGMENT-H1) (PART-3 OF 4) SD H1 ELECTRICAL 23-Nov-14 Yes C 2-Dec-14 V

VOICE EVACUATION SYSTEM LAYOUT LEVEL-06 PLAN (SEGMENT-H1) (PART-4 OF 4) SD H1 ELECTRICAL 14-Sep-14 Yes C 13-Sep-14 S

VOICE EVACUATION SYSTEM LAYOUT LEVEL-06 PLAN (SEGMENT-H1) (PART-4 OF 4) SD H1 ELECTRICAL 23-Nov-14 Yes C 2-Dec-14 V

VOICE EVACUATION SYSTEM LAYOUT LEVEL-06 PLAN (SEGMENT-H2) (PART-1 OF 4) SD H2 ELECTRICAL 14-Sep-14 Yes C 13-Sep-14 S

VOICE EVACUATION SYSTEM LAYOUT LEVEL-06 PLAN (SEGMENT-H2) (PART-1 OF 4) SD H2 ELECTRICAL 23-Nov-14 Yes C 2-Dec-14 V

VOICE EVACUATION SYSTEM LAYOUT LEVEL-06 PLAN (SEGMENT-H2) (PART-2 OF 4) SD H2 ELECTRICAL 14-Sep-14 Yes C 13-Sep-14 S

VOICE EVACUATION SYSTEM LAYOUT LEVEL-06 PLAN (SEGMENT-H2) (PART-2 OF 4) SD H2 ELECTRICAL 23-Nov-14 Yes C 2-Dec-14 V

VOICE EVACUATION SYSTEM LAYOUT LEVEL-06 PLAN (SEGMENT-H3) (PART-2 OF 2) SD H3 ELECTRICAL 14-Sep-14 Yes C 13-Sep-14 S

VOICE EVACUATION SYSTEM LAYOUT LEVEL-06 PLAN (SEGMENT-H3) (PART-2 OF 2) SD H3 ELECTRICAL 23-Nov-14 Yes C 2-Dec-14 V

VOICE EVACUATION SYSTEM LAYOUT LEVEL-05 PLAN (SEGMENT-H1,H2 & H3) (MASTER PLAN) SD H0 ELECTRICAL 14-Sep-14 Yes C 13-Sep-14 S

VOICE EVACUATION SYSTEM LAYOUT LEVEL-05 PLAN (SEGMENT-H1,H2 & H3) (MASTER PLAN) SD H0 ELECTRICAL 23-Nov-14 Yes C 2-Dec-14 V

VOICE EVACUATION SYSTEM LAYOUT LEVEL-05 PLAN (SEGMENT-H1) (PART-3 OF 4) SD H1 ELECTRICAL 14-Sep-14 Yes C 13-Sep-14 S

VOICE EVACUATION SYSTEM LAYOUT LEVEL-05 PLAN (SEGMENT-H1) (PART-3 OF 4) SD H1 ELECTRICAL 23-Nov-14 Yes C 2-Dec-14 V

VOICE EVACUATION SYSTEM LAYOUT LEVEL-05 PLAN (SEGMENT-H1) (PART-4 OF 4) SD H1 ELECTRICAL 14-Sep-14 Yes C 13-Sep-14 S

VOICE EVACUATION SYSTEM LAYOUT LEVEL-05 PLAN (SEGMENT-H1) (PART-4 OF 4) SD H1 ELECTRICAL 23-Nov-14 Yes C 2-Dec-14 V

VOICE EVACUATION SYSTEM LAYOUT LEVEL-05 PLAN (SEGMENT-H2) (PART-1 OF 4) SD H2 ELECTRICAL 14-Sep-14 Yes C 13-Sep-14 S

VOICE EVACUATION SYSTEM LAYOUT LEVEL-05 PLAN (SEGMENT-H2) (PART-1 OF 4) SD H2 ELECTRICAL 23-Nov-14 Yes C 2-Dec-14 V

VOICE EVACUATION SYSTEM LAYOUT LEVEL-05 PLAN (SEGMENT-H2) (PART-2 OF 4) SD H2 ELECTRICAL 14-Sep-14 Yes C 13-Sep-14 S

VOICE EVACUATION SYSTEM LAYOUT LEVEL-05 PLAN (SEGMENT-H2) (PART-2 OF 4) SD H2 ELECTRICAL 23-Nov-14 Yes C 2-Dec-14 V

VOICE EVACUATION SYSTEM LAYOUT LEVEL-05 PLAN (SEGMENT-H3) (PART-2 OF 2) SD H3 ELECTRICAL 14-Sep-14 Yes C 13-Sep-14 S

VOICE EVACUATION SYSTEM LAYOUT LEVEL-05 PLAN (SEGMENT-H3) (PART-2 OF 2) SD H3 ELECTRICAL 23-Nov-14 Yes C 2-Dec-14 V

Page 64 of 114
H-STRUCTURAL SHOP DRAWINGS SUBMITTAL LOG
TED , S = SUPERCEDED , V = VALID 7-May-17

SEGMENT
RESPONSE DRAWING
DRAWING TITLE TYPE DISCIPLINE REPLY APPROVA REPLY DATE
REQUIRED BY STATUS
L STATUS

POWER SYSTEM LAYOUT LEVEL-4 (MASTER PLAN) (SEGMENT-H1 & H3) SD H0 ELECTRICAL 15-Sep-14 Yes C 11-Sep-14 S

POWER SYSTEM LAYOUT LEVEL-4 (MASTER PLAN) (SEGMENT-H1 & H3) SD H0 ELECTRICAL 24-Nov-14 Yes A 24-Nov-14 V

POWER SYSTEM LAYOUT LEVEL-4 PLAN (SEGMENT-H1) (PART-3 OF 4) SD H1 ELECTRICAL 15-Sep-14 Yes C 11-Sep-14 S

POWER SYSTEM LAYOUT LEVEL-4 PLAN (SEGMENT-H1) (PART-3 OF 4) SD H1 ELECTRICAL 24-Nov-14 Yes A 24-Nov-14 V

POWER SYSTEM LAYOUT LEVEL-4 PLAN (SEGMENT-H1) (PART-4 OF 4) SD H1 ELECTRICAL 15-Sep-14 Yes C 11-Sep-14 S

POWER SYSTEM LAYOUT LEVEL-4 PLAN (SEGMENT-H1) (PART-4 OF 4) SD H1 ELECTRICAL 24-Nov-14 Yes A 24-Nov-14 V

POWER SYSTEM LAYOUT LEVEL-4 PLAN (SEGMENT-H3) (PART-2 OF 2) SD H3 ELECTRICAL 15-Sep-14 Yes C 11-Sep-14 S

POWER SYSTEM LAYOUT LEVEL-4 PLAN (SEGMENT-H3) (PART-2 OF 2) SD H3 ELECTRICAL 24-Nov-14 Yes A 24-Nov-14 V

FIRE ALARM SYSTEM LAYOUT LEVEL-05 MASTER PLAN (SEGMNET- H1, H2 & H3) SD H0 ELECTRICAL 19-Sep-14 Yes C 20-Sep-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL-05 MASTER PLAN (SEGMNET- H1, H2 & H3) SD H0 ELECTRICAL 22-Nov-14 Yes C 1-Dec-14 V

FIRE ALARM SYSTEM LAYOUT LEVEL-05 PLAN (SEGMNET- H1) PART- 3 OF 4 SD H1 ELECTRICAL 19-Sep-14 Yes C 20-Sep-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL-05 PLAN (SEGMNET- H1) PART- 3 OF 4 SD H1 ELECTRICAL 22-Nov-14 Yes C 1-Dec-14 V

FIRE ALARM SYSTEM LAYOUT LEVEL-05 PLAN (SEGMNET- H1) PART- 4 OF 4 SD H1 ELECTRICAL 19-Sep-14 Yes C 20-Sep-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL-05 PLAN (SEGMNET- H1) PART- 4 OF 4 SD H1 ELECTRICAL 22-Nov-14 Yes C 1-Dec-14 V

FIRE ALARM SYSTEM LAYOUT LEVEL-05 PLAN (SEGMNET- H2) PART- 1 OF 4 SD H2 ELECTRICAL 19-Sep-14 Yes C 20-Sep-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL-05 PLAN (SEGMNET- H2) PART- 1 OF 4 SD H2 ELECTRICAL 22-Nov-14 Yes C 1-Dec-14 V

FIRE ALARM SYSTEM LAYOUT LEVEL-05 PLAN (SEGMNET- H2) PART- 2 OF 4 SD H2 ELECTRICAL 19-Sep-14 Yes C 20-Sep-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL-05 PLAN (SEGMNET- H2) PART- 2 OF 4 SD H2 ELECTRICAL 22-Nov-14 Yes C 1-Dec-14 V

FIRE ALARM SYSTEM LAYOUT LEVEL-05 PLAN (SEGMNET- H3) PART- 2 OF 2 SD H3 ELECTRICAL 19-Sep-14 Yes C 20-Sep-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL-05 PLAN (SEGMNET- H3) PART- 2 OF 2 SD H3 ELECTRICAL 22-Nov-14 Yes C 1-Dec-14 V

POWER SYSTEM LAYOUT FOR LEVEL-05 MASGTER PLAN ( SEGMENT -H1 & H3) SD H0 ELECTRICAL 22-Sep-14 Yes C 18-Sep-14 S

POWER SYSTEM LAYOUT FOR LEVEL-05 MASGTER PLAN ( SEGMENT -H1 & H3) SD H0 ELECTRICAL 24-Nov-14 Yes A 24-Nov-14 V

POWER SYSTEM LAYOUT FOR LEVEL -05 PLAN ( SEGMENT -G1) PART 3 OF 4 SD H1 ELECTRICAL 22-Sep-14 Yes B 18-Sep-14 V

POWER SYSTEM LAYOUT FOR LEVEL -05 PLAN ( SEGMENT -G1) PART 4 OF 4 SD H1 ELECTRICAL 22-Sep-14 Yes B 18-Sep-14 V

POWER SYSTEM LAYOUT FOR LEVEL-05 PLAN (SEGMENT - H3) PART 2 OF 2 SD H3 ELECTRICAL 22-Sep-14 Yes C 18-Sep-14 S

Page 65 of 114
H-STRUCTURAL SHOP DRAWINGS SUBMITTAL LOG
TED , S = SUPERCEDED , V = VALID 7-May-17

SEGMENT
RESPONSE DRAWING
DRAWING TITLE TYPE DISCIPLINE REPLY APPROVA REPLY DATE
REQUIRED BY STATUS
L STATUS

POWER SYSTEM LAYOUT FOR LEVEL-05 PLAN (SEGMENT - H3) PART 2 OF 2 SD H3 ELECTRICAL 24-Nov-14 Yes A 24-Nov-14 V

FIRE ALARM SYSTEM LAYOUT LEVEL-06 MASTER PLAN ( SEGMENT- H1 H2 & H3) SD H0 ELECTRICAL 22-Sep-14 Yes C 24-Sep-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL-06 MASTER PLAN ( SEGMENT- H1 H2 & H3) SD H0 ELECTRICAL 22-Nov-14 Yes C 1-Dec-14 V

FIRE ALARM SYSTEM LAYOUT LEVEL-06 PLAN ( SEGMENT- H1) PLAN-3 OF 4 SD H1 ELECTRICAL 22-Sep-14 Yes C 24-Sep-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL-06 PLAN ( SEGMENT- H1) PLAN-3 OF 4 SD H1 ELECTRICAL 22-Nov-14 Yes C 1-Dec-14 V

FIRE ALARM SYSTEM LAYOUT LEVEL-06 PLAN ( SEGMENT- H1) PLAN- 4 OF 4 SD H1 ELECTRICAL 22-Sep-14 Yes C 24-Sep-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL-06 PLAN ( SEGMENT- H1) PLAN- 4 OF 4 SD H1 ELECTRICAL 22-Nov-14 Yes C 1-Dec-14 V

FIRE ALARM SYSTEM LAYOUT LEVEL-06 PLAN ( SEGMENT- H2) PLAN- 1 OF 4 SD H2 ELECTRICAL 22-Sep-14 Yes C 24-Sep-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL-06 PLAN ( SEGMENT- H2) PLAN- 1 OF 4 SD H2 ELECTRICAL 22-Nov-14 Yes C 1-Dec-14 V

FIRE ALARM SYSTEM LAYOUT LEVEL-06 PLAN ( SEGMENT- H2) PLAN- 2 OF 4 SD H2 ELECTRICAL 22-Sep-14 Yes C 24-Sep-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL-06 PLAN ( SEGMENT- H2) PLAN- 2 OF 4 SD H2 ELECTRICAL 22-Nov-14 Yes C 1-Dec-14 V

FIRE ALARM SYSTEM LAYOUT LEVEL-06 PLAN ( SEGMENT- H3) PLAN- 2 OF 2 SD H3 ELECTRICAL 22-Sep-14 Yes C 24-Sep-14 S

FIRE ALARM SYSTEM LAYOUT LEVEL-06 PLAN ( SEGMENT- H3) PLAN- 2 OF 2 SD H3 ELECTRICAL 22-Nov-14 Yes C 1-Dec-14 V

POWER FOR HVAC SYSTEM LAYOUT FOR LEVEL-07 PLAN (SEGMENT- H1) SD H1 ELECTRICAL 22-Sep-14 Yes C 24-Sep-14 S

POWER FOR HVAC SYSTEM LAYOUT FOR LEVEL-07 PLAN (SEGMENT- H1) SD H1 ELECTRICAL 24-Nov-14 Yes C 24-Nov-14 V

POWER FOR HVAC SYSTEM LAYOUT FOR LEVEL-08 PLAN ( SEGMENT-H1) SD H1 ELECTRICAL 22-Sep-14 Yes C 24-Sep-14 S

POWER FOR HVAC SYSTEM LAYOUT FOR LEVEL-08 PLAN ( SEGMENT-H1) SD H1 ELECTRICAL 24-Nov-14 Yes A 24-Nov-14 V

POWER FOR HVAC SYSTEM LAYOUT LEVEL-5 (MASTER PLAN) (SEGMENT-H1, H2, H3) SD H0 ELECTRICAL 3-Oct-14 Yes A 27-Sep-14 V

POWER FOR HVAC SYSTEM LAYOUT LEVEL-5 PLAN (SEGMENT-H1) (PART-3 OF 4) SD H1 ELECTRICAL 3-Oct-14 Yes A 27-Sep-14 V

POWER FOR HVAC SYSTEM LAYOUT LEVEL-5 PLAN (SEGMENT-H1) (PART-4 OF 4) SD H1 ELECTRICAL 3-Oct-14 Yes A 27-Sep-14 V

POWER FOR HVAC SYSTEM LAYOUT LEVEL-5 (SEGMENT-H3) (PART-2 OF 2) SD H3 ELECTRICAL 3-Oct-14 Yes A 27-Sep-14 V

POWER FOR HVAC SYSTEM LAYOUT LEVEL-6 (MASTER PLAN) (SEGMENT-H1, H2, H3) SD H0 ELECTRICAL 3-Oct-14 Yes B 29-Sep-14 V

POWER FOR HVAC SYSTEM LAYOUT LEVEL-6 (SEGMENT-H1) PART-3 OF 4 SD H1 ELECTRICAL 3-Oct-14 Yes B 29-Sep-14 V

POWER FOR HVAC SYSTEM LAYOUT LEVEL-6 (SEGMENT-H1) PART-4 OF 4 SD H1 ELECTRICAL 3-Oct-14 Yes B 29-Sep-14 V

POWER FOR HVAC SYSTEM LAYOUT LEVEL-6 PLAN (SEGMENT-H3) PART-2 OF 2 SD H3 ELECTRICAL 3-Oct-14 Yes B 29-Sep-14 V

Page 66 of 114
H-STRUCTURAL SHOP DRAWINGS SUBMITTAL LOG
TED , S = SUPERCEDED , V = VALID 7-May-17

SEGMENT
RESPONSE DRAWING
DRAWING TITLE TYPE DISCIPLINE REPLY APPROVA REPLY DATE
REQUIRED BY STATUS
L STATUS

VOICE EVACUATION SYSTEM SINGLE LINE DIAGRAM FOR LEVEL -01 SD H0 ELECTRICAL 12-Oct-14 Yes C 16-Oct-14 V

VOICE EVACUATION SYSTEM LAYOUT MASTER PLAN LEVEL - S1 SEGMENT-H1 & H2 SD H0 ELECTRICAL 25-Oct-14 Yes C 23-Oct-14 S

VOICE EVACUATION SYSTEM LAYOUT MASTER PLAN LEVEL - S1 SEGMENT-H1 & H2 SD H0 ELECTRICAL 26-Nov-14 Yes B 24-Nov-14 S

VOICE EVACUATION SYSTEM LAYOUT MASTER PLAN LEVEL - S1 SEGMENT-H1 & H2 SD H0 ELECTRICAL 7-Jan-15 OverDue P V

VOICE EVACUATION SYSTEM LAYOUT LEVEL - S1 SEGMENT-H1 SD H1 ELECTRICAL 25-Oct-14 Yes C 23-Oct-14 S

VOICE EVACUATION SYSTEM LAYOUT LEVEL - S1 SEGMENT-H1 SD H1 ELECTRICAL 26-Nov-14 Yes B 24-Nov-14 S

VOICE EVACUATION SYSTEM LAYOUT LEVEL - S1 SEGMENT-H1 SD H1 ELECTRICAL 7-Jan-15 OverDue P V

VOICE EVACUATION SYSTEM LAYOUT LEVEL - S1 SEGMENT-H2 SD H2 ELECTRICAL 25-Oct-14 Yes C 23-Oct-14 S

VOICE EVACUATION SYSTEM LAYOUT LEVEL - S1 SEGMENT-H2 SD H2 ELECTRICAL 26-Nov-14 Yes B 24-Nov-14 V

INFORMATION & COMMUNICATION TECHNOLOGY LEVEL-02 PLAN (SEGMENT-H3) PART-1 OF 2 SD H3 ELECTRICAL 26-Oct-14 Yes C 27-Oct-14 V

INFORMATION & COMMUNICATION TECHNOLOGY LEVEL-02 PLAN (SEGMENT-H3) MASTER PLAN SD H3 ELECTRICAL 26-Oct-14 Yes C 27-Oct-14 V

INFORMATION & COMMUNICATION TECHNOLOGY LEVEL-02 PLAN (SEGMENT-H2) PART-2 OF 4 SD H2 ELECTRICAL 26-Oct-14 Yes C 27-Oct-14 V

INFORMATION & COMMUNICATION TECHNOLOGY LEVEL-02 MEZZ. (SEGMENT-H2 & H3) MASTER PLAN SD H0 ELECTRICAL 26-Oct-14 Yes C 27-Oct-14 V

INFORMATION & COMMUNICATION TECHNOLOGY LEVEL-02 MEZZ. (SEGMENT-H2) PART-1 OF 4 SD H2 ELECTRICAL 26-Oct-14 Yes C 27-Oct-14 V

INFORMATION & COMMUNICATION TECHNOLOGY LEVEL-02 MEZZ. (SEGMENT-H3) PART-2 OF 2 SD H3 ELECTRICAL 26-Oct-14 Yes C 27-Oct-14 V

POWER FOR HVAC SYTEM LAYOUT LEVEL - 1 (SEGMENT - H1) MASTER PLAN SD H1 ELECTRICAL 29-Oct-14 Yes C 25-Oct-14 S

POWER FOR HVAC SYTEM LAYOUT LEVEL - 1 (SEGMENT - H1) MASTER PLAN SD H1 ELECTRICAL 29-Nov-14 Yes A 27-Nov-14 V

POWER FOR HVAC SYTEM LAYOUT LEVEL - 1 (SEGMENT - H1) PART 1 OF 4 SD H1 ELECTRICAL 29-Oct-14 Yes C 25-Oct-14 S

POWER FOR HVAC SYTEM LAYOUT LEVEL - 1 (SEGMENT - H1) PART 1 OF 4 SD H1 ELECTRICAL 29-Nov-14 Yes A 27-Nov-14 V

POWER FOR HVAC SYTEM LAYOUT LEVEL - 1 (SEGMENT - H1) PART 2 OF 4 SD H1 ELECTRICAL 29-Oct-14 Yes C 25-Oct-14 S

POWER FOR HVAC SYTEM LAYOUT LEVEL - 1 (SEGMENT - H1) PART 2 OF 4 SD H1 ELECTRICAL 29-Nov-14 Yes A 27-Nov-14 V

POWER FOR HVAC SYTEM LAYOUT LEVEL - 1 (SEGMENT - H1) PART 3 OF 4 SD H1 ELECTRICAL 29-Oct-14 Yes C 25-Oct-14 S

POWER FOR HVAC SYTEM LAYOUT LEVEL - 1 (SEGMENT - H1) PART 3 OF 4 SD H1 ELECTRICAL 29-Nov-14 Yes A 27-Nov-14 V

POWER FOR HVAC SYTEM LAYOUT LEVEL - 1 (SEGMENT - H1) PART 4 OF 4 SD H1 ELECTRICAL 29-Oct-14 Yes C 25-Oct-14 S

POWER FOR HVAC SYTEM LAYOUT LEVEL - 1 (SEGMENT - H1) PART 4 OF 4 SD H1 ELECTRICAL 29-Nov-14 Yes A 27-Nov-14 V

Page 67 of 114
H-STRUCTURAL SHOP DRAWINGS SUBMITTAL LOG
TED , S = SUPERCEDED , V = VALID 7-May-17

SEGMENT
RESPONSE DRAWING
DRAWING TITLE TYPE DISCIPLINE REPLY APPROVA REPLY DATE
REQUIRED BY STATUS
L STATUS

POWER FOR HVAC SYTEM LAYOUT LEVEL - 1 (SEGMENT - H2) MASTER PLAN SD H2 ELECTRICAL 29-Oct-14 Yes C 25-Oct-14 S

POWER FOR HVAC SYTEM LAYOUT LEVEL - 1 (SEGMENT - H2) MASTER PLAN SD H2 ELECTRICAL 29-Nov-14 Yes A 27-Nov-14 V

POWER FOR HVAC SYTEM LAYOUT LEVEL - 1 (SEGMENT - H2) PART 1 OF 4 SD H2 ELECTRICAL 29-Oct-14 Yes C 25-Oct-14 S

POWER FOR HVAC SYTEM LAYOUT LEVEL - 1 (SEGMENT - H2) PART 1 OF 4 SD H2 ELECTRICAL 29-Nov-14 Yes A 27-Nov-14 V

POWER FOR HVAC SYTEM LAYOUT LEVEL - 1 (SEGMENT - H2) PART 2 OF 4 SD H2 ELECTRICAL 29-Oct-14 Yes C 25-Oct-14 S

POWER FOR HVAC SYTEM LAYOUT LEVEL - 1 (SEGMENT - H2) PART 2 OF 4 SD H2 ELECTRICAL 29-Nov-14 Yes A 27-Nov-14 V

POWER FOR HVAC SYTEM LAYOUT LEVEL - 1 (SEGMENT - H2) PART 3 OF 4 SD H2 ELECTRICAL 29-Oct-14 Yes C 25-Oct-14 S

POWER FOR HVAC SYTEM LAYOUT LEVEL - 1 (SEGMENT - H2) PART 3 OF 4 SD H2 ELECTRICAL 29-Nov-14 Yes A 27-Nov-14 V

POWER FOR HVAC SYTEM LAYOUT LEVEL - 1 (SEGMENT - H2) PART 4 OF 4 SD H2 ELECTRICAL 29-Oct-14 Yes C 25-Oct-14 S

POWER FOR HVAC SYTEM LAYOUT LEVEL - 1 (SEGMENT - H2) PART 4 OF 4 SD H2 ELECTRICAL 29-Nov-14 Yes A 27-Nov-14 V

POWER FOR HVAC SYTEM LAYOUT LEVEL - 1 (SEGMENT - H3) MASTER PLAN SD H3 ELECTRICAL 29-Oct-14 Yes C 25-Oct-14 S

POWER FOR HVAC SYTEM LAYOUT LEVEL - 1 (SEGMENT - H3) MASTER PLAN SD H3 ELECTRICAL 29-Nov-14 Yes A 27-Nov-14 V

POWER FOR HVAC SYTEM LAYOUT LEVEL - 1 (SEGMENT - H3) PART 1 OF 2 SD H3 ELECTRICAL 29-Oct-14 Yes C 25-Oct-14 S

POWER FOR HVAC SYTEM LAYOUT LEVEL - 1 (SEGMENT - H3) PART 1 OF 2 SD H3 ELECTRICAL 29-Nov-14 Yes A 27-Nov-14 V

POWER FOR HVAC SYTEM LAYOUT LEVEL - 1 (SEGMENT - H3) PART 2 OF 2 SD H3 ELECTRICAL 29-Oct-14 Yes C 25-Oct-14 S

POWER FOR HVAC SYTEM LAYOUT LEVEL - 1 (SEGMENT - H3) PART 2 OF 2 SD H3 ELECTRICAL 29-Nov-14 Yes A 27-Nov-14 V

LEVEL - 01 DATA ROOM # TR - 836 L.C. EQUIPMENT LAYOUT & DETAILS SD 00 ELECTRICAL 29-Oct-14 Yes C 28-Oct-14 V

LEVEL - 01 DATA ROOM # TR - 2638 L.C. EQUIPMENT LAYOUT & DETAILS SD 00 ELECTRICAL 29-Oct-14 Yes C 28-Oct-14 V

LEVEL - 01 DATA ROOM # TR - 2617 L.C. EQUIPMENT LAYOUT & DETAILS SD 00 ELECTRICAL 29-Oct-14 Yes C 28-Oct-14 V

LEVEL - 02 DATA ROOM # TR - 2487 L.C. EQUIPMENT LAYOUT & DETAILS SD 00 ELECTRICAL 29-Oct-14 Yes C 28-Oct-14 V

LEVEL - 03 DATA ROOM # TR - 1071 L.C. EQUIPMENT LAYOUT & DETAILS SD 00 ELECTRICAL 29-Oct-14 Yes C 28-Oct-14 V

POWER SYSTEM LAYOUT LEVEL - 6 MASTER PLAN (SEGMENT - H1 & H3) SD H0 ELECTRICAL 29-Oct-14 Yes C 25-Oct-14 V

POWER SYSTEM LAYOUT LEVEL - 6 MASTER PLAN (SEGMENT - H1 & H3) SD H0 ELECTRICAL 6-Dec-14 Yes A 2-Dec-14 V

POWER SYSTEM LAYOUT LEVEL - 6 PLAN (SEGMENT - H1) PART 3 OF 4 SD H1 ELECTRICAL 29-Oct-14 Yes C 25-Oct-14 V

POWER SYSTEM LAYOUT LEVEL - 6 PLAN (SEGMENT - H1) PART 3 OF 4 SD H1 ELECTRICAL 6-Dec-14 Yes A 2-Dec-14 V

Page 68 of 114
H-STRUCTURAL SHOP DRAWINGS SUBMITTAL LOG
TED , S = SUPERCEDED , V = VALID 7-May-17

SEGMENT
RESPONSE DRAWING
DRAWING TITLE TYPE DISCIPLINE REPLY APPROVA REPLY DATE
REQUIRED BY STATUS
L STATUS

POWER SYSTEM LAYOUT LEVEL - 6 PLAN (SEGMENT - H1) PART 4 OF 4 SD H1 ELECTRICAL 29-Oct-14 Yes C 25-Oct-14 V

POWER SYSTEM LAYOUT LEVEL - 6 PLAN (SEGMENT - H1) PART 4 OF 4 SD H1 ELECTRICAL 6-Dec-14 Yes A 2-Dec-14 V

POWER SYSTEM LAYOUT LEVEL - 6 PLAN (SEGMENT - H3) PART 2 OF 2 SD H3 ELECTRICAL 29-Oct-14 Yes C 25-Oct-14 V

POWER SYSTEM LAYOUT LEVEL - 6 PLAN (SEGMENT - H3) PART 2 OF 2 SD H3 ELECTRICAL 6-Dec-14 Yes A 2-Dec-14 V

LEVEL - 01 PANEL BOARD SCHEDULE - N12A - 1F SD H0 ELECTRICAL 4-Nov-14 Yes C 27-Oct-14 S

LEVEL - 01 PANEL BOARD SCHEDULE - N12A - 1F SD H0 ELECTRICAL 17-Jan-15 OverDue p V

LEVEL - 01 PANEL BOARD SCHEDULE - N12A - 1G SD H0 ELECTRICAL 4-Nov-14 Yes C 27-Oct-14 S

LEVEL - 01 PANEL BOARD SCHEDULE - N12A - 1G SD H0 ELECTRICAL 17-Jan-15 OverDue p V

LEVEL - 01 PANEL BOARD SCHEDULE - N12A - 1E SD H0 ELECTRICAL 4-Nov-14 Yes C 27-Oct-14 S

LEVEL - 01 PANEL BOARD SCHEDULE - N12A - 1E SD H0 ELECTRICAL 17-Jan-15 OverDue p V

LEVEL - 01 PANEL BOARD SCHEDULE - N12A - 1H SD H0 ELECTRICAL 4-Nov-14 Yes C 27-Oct-14 S

LEVEL - 01 PANEL BOARD SCHEDULE - N12A - 1H SD H0 ELECTRICAL 17-Jan-15 OverDue p V

LEVEL - 01 PANEL BOARD SCHEDULE - N12A - 1I SD H0 ELECTRICAL 4-Nov-14 Yes C 27-Oct-14 S

LEVEL - 01 PANEL BOARD SCHEDULE - N12A - 1I SD H0 ELECTRICAL 17-Jan-15 OverDue p V

LEVEL - 01 PANEL BOARD SCHEDULE - CU12A - 1A SD H0 ELECTRICAL 4-Nov-14 Yes C 27-Oct-14 S

LEVEL - 01 PANEL BOARD SCHEDULE - CU12A - 1A SD H0 ELECTRICAL 17-Jan-15 OverDue p V

LEVEL - 01 PANEL BOARD SCHEDULE - CU12A - 1C SD H0 ELECTRICAL 4-Nov-14 Yes C 27-Oct-14 S

LEVEL - 01 PANEL BOARD SCHEDULE - CU12A - 1C SD H0 ELECTRICAL 17-Jan-15 OverDue p V

LEVEL - 01 PANEL BOARD SCHEDULE - C12B - 1C SD H0 ELECTRICAL 4-Nov-14 Yes C 27-Oct-14 S

LEVEL - 01 PANEL BOARD SCHEDULE - C12B - 1C SD H0 ELECTRICAL 17-Jan-15 OverDue p V

LEVEL - 01 PANEL BOARD SCHEDULE - C12B - 1D SD H0 ELECTRICAL 4-Nov-14 Yes C 27-Oct-14 V

LEVEL - 01 PANEL BOARD SCHEDULE - C12B - 1E SD H0 ELECTRICAL 4-Nov-14 Yes C 27-Oct-14 V

LEVEL-01 PANEL BOARD SCHEDULED - LS12A-1 SD H0 ELECTRICAL 9-Nov-14 Yes C 1-Nov-14 V

LEVEL-02 PANEL BOARD SCHEDULED - LS12A-2 SD H0 ELECTRICAL 9-Nov-14 Yes C 1-Nov-14 V

LEVEL-03 PANEL BOARD SCHEDULED - LS12A-3 SD H0 ELECTRICAL 9-Nov-14 Yes C 1-Nov-14 V

Page 69 of 114
H-STRUCTURAL SHOP DRAWINGS SUBMITTAL LOG
TED , S = SUPERCEDED , V = VALID 7-May-17

SEGMENT
RESPONSE DRAWING
DRAWING TITLE TYPE DISCIPLINE REPLY APPROVA REPLY DATE
REQUIRED BY STATUS
L STATUS

LEVEL-04 PANEL BOARD SCHEDULED - LS12A-4 SD H0 ELECTRICAL 9-Nov-14 Yes C 1-Nov-14 V

LEVEL-05 PANEL BOARD SCHEDULED - LS12A-5 SD H0 ELECTRICAL 9-Nov-14 Yes C 1-Nov-14 V

LEVEL-05 PANEL BOARD SCHEDULED - LS12A-5 SD H0 ELECTRICAL 9-Nov-14 Yes C 1-Nov-14 V

LEVEL-01 PANEL BOARD SCHEDULED - C12B-1B SD H0 ELECTRICAL 9-Nov-14 Yes C 1-Nov-14 V

LEVEL-01 PANEL BOARD SCHEDULED - C12B-1F SD H0 ELECTRICAL 9-Nov-14 Yes C 1-Nov-14 V

LEVEL-01 PANEL BOARD SCHEDULED - N12A-1C SD H0 ELECTRICAL 9-Nov-14 Yes C 1-Nov-14 V

LEVEL-01 PANEL BOARD SCHEDULED - CU12A-1B SD H0 ELECTRICAL 9-Nov-14 Yes C 6-Nov-14 V

FRE ALARM SYSTEM SINGLE LINE DIAGRAM (PART-3) SD H0 ELECTRICAL 10-Nov-14 Yes C 12-Nov-14 V

CABLE ROUTING SYSTEM LAYOUT FOR LEVEL - 02 (MASTER PALN - SEGMENT 0 H1, H2 & H3) SD H0 ELECTRICAL 22-Nov-14 Yes C 17-Nov-14 V

CABLE ROUTING SYSTEM LAYOUT FOR LEVEL - 02 SEGMENT - H1 SD H1 ELECTRICAL 22-Nov-14 Yes C 17-Nov-14 V

CABLE ROUTING SYSTEM LAYOUT FOR LEVEL - 02 SEGMENT - H2 SD H2 ELECTRICAL 22-Nov-14 Yes C 17-Nov-14 V

CABLE ROUTING SYSTEM LAYOUT FOR LEVEL - 02 SEGMENT - H3 SD H3 ELECTRICAL 22-Nov-14 Yes C 17-Nov-14 V
SUBSTATION CABLE ROUTING LAYOUT (SS-TR-12A & SS-TR-12B) (UNDER RAISED FLOOR) LEVEL-02,
SD H2 ELECTRICAL 22-Nov-14 Yes C 17-Nov-14 V
SEGMENT - H2
SUBSTATION EQUIPMENT & CABLE ROUTING LAYOUT (SS-TR-12A & SS-TR-12B) (HIGH LEVEL) LEVEL-02
SD H2 ELECTRICAL 22-Nov-14 Yes C 17-Nov-14 V
SEGMENT-H2.
SUBSTATION CABLE ROUTING LAYOUT (SS-TR-12a & SS-TR-12B) LEVEL-02 MEZZ. FLOOR SEGMENT-H2 SD H2 ELECTRICAL 22-Nov-14 Yes C 17-Nov-14 V

FIRE ALARM SYSTEM SINGLE LINE DIAGRAM (LEVEL- L02 & L2M) SD H0 ELECTRICAL 22-Nov-14 Yes C 25-Nov-14 V
INFORMATION COMMUNICATION TECHNOLOGY SYSTEM FOR LEVEL-06 - MASTER PLAN (SEGMENT-H1,
SD H0 ELECTRICAL 23-Nov-14 Yes C 1-Dec-14 V
H2 & H3)
INFORMATION COMMUNICATION TECHNOLOGY SYSTEM FOR LEVEL-06 -PLAN (SEGMENT-H1) PART - 3
SD H1 ELECTRICAL 23-Nov-14 Yes C 1-Dec-14 V
OF 4
INFORMATION COMMUNICATION TECHNOLOGY SYSTEM FOR LEVEL-06 -PLAN (SEGMENT-H1) PART - 4
SD H1 ELECTRICAL 23-Nov-14 Yes C 1-Dec-14 V
OF 4
INFORMATION COMMUNICATION TECHNOLOGY SYSTEM FOR LEVEL-06 -PLAN (SEGMENT-H2) PART - 1
SD H2 ELECTRICAL 23-Nov-14 Yes C 1-Dec-14 V
OF 2
INFORMATION COMMUNICATION TECHNOLOGY SYSTEM FOR LEVEL-06 -PLAN (SEGMENT-H2) PART - 2
SD H2 ELECTRICAL 23-Nov-14 Yes C 1-Dec-14 V
OF 2
INFORMATION COMMUNICATION TECHNOLOGY SYSTEM FOR LEVEL-06 -PLAN (SEGMENT-H3) PART - 2
SD H3 ELECTRICAL 23-Nov-14 Yes C 1-Dec-14 V
OF 2
INFORMATION COMMUNICATION TECHNOLOGY SYSTEM FOR LEVEL-05 - MASTER PLAN (SEGMENT-H1,
SD H0 ELECTRICAL 23-Nov-14 Yes C 1-Dec-14 V
H2 & H3)
INFORMATION COMMUNICATION TECHNOLOGY SYSTEM FOR LEVEL-05 -PLAN (SEGMENT-H1) PART - 3
SD H1 ELECTRICAL 23-Nov-14 Yes C 1-Dec-14 V
OF 4
INFORMATION COMMUNICATION TECHNOLOGY SYSTEM FOR LEVEL-05 -PLAN (SEGMENT-H1) PART - 4
SD H1 ELECTRICAL 23-Nov-14 Yes C 1-Dec-14 V
OF 4

Page 70 of 114
H-STRUCTURAL SHOP DRAWINGS SUBMITTAL LOG
TED , S = SUPERCEDED , V = VALID 7-May-17

SEGMENT
RESPONSE DRAWING
DRAWING TITLE TYPE DISCIPLINE REPLY APPROVA REPLY DATE
REQUIRED BY STATUS
L STATUS

INFORMATION COMMUNICATION TECHNOLOGY SYSTEM FOR LEVEL-05 -PLAN (SEGMENT-H2) PART - 1


SD H2 ELECTRICAL 23-Nov-14 Yes C 1-Dec-14 V
OF 2
INFORMATION COMMUNICATION TECHNOLOGY SYSTEM FOR LEVEL-05 -PLAN (SEGMENT-H2) PART - 2
SD H2 ELECTRICAL 23-Nov-14 Yes C 1-Dec-14 V
OF 2
INFORMATION COMMUNICATION TECHNOLOGY SYSTEM FOR LEVEL-05 -PLAN (SEGMENT-H3) PART - 2
SD H3 ELECTRICAL 23-Nov-14 Yes C 1-Dec-14 V
OF 2
INFORMATION COMMUNICATION TECHNOLOGY SYSTEM FOR LEVEL-03 - MASTER PLAN (SEGMENT-H1,
SD H0 ELECTRICAL 23-Nov-14 Yes B 1-Dec-14 V
H2 & H3)
INFORMATION COMMUNICATION TECHNOLOGY SYSTEM FOR LEVEL-03 -PLAN (SEGMENT-H1) PART - 3
SD H1 ELECTRICAL 23-Nov-14 Yes B 1-Dec-14 V
OF 4
INFORMATION COMMUNICATION TECHNOLOGY SYSTEM FOR LEVEL-03 -PLAN (SEGMENT-H1) PART - 4
SD H1 ELECTRICAL 23-Nov-14 Yes B 1-Dec-14 V
OF 4
INFORMATION COMMUNICATION TECHNOLOGY SYSTEM FOR LEVEL-03 -PLAN (SEGMENT-H2) PART - 1
SD H2 ELECTRICAL 23-Nov-14 Yes B 1-Dec-14 V
OF 2
INFORMATION COMMUNICATION TECHNOLOGY SYSTEM FOR LEVEL-03 -PLAN (SEGMENT-H2) PART - 2
SD H2 ELECTRICAL 23-Nov-14 Yes B 1-Dec-14 V
OF 2
INFORMATION COMMUNICATION TECHNOLOGY SYSTEM FOR LEVEL-03 -PLAN (SEGMENT-H3) PART - 2
SD H3 ELECTRICAL 23-Nov-14 Yes B 1-Dec-14 V
OF 2
INFORMATION COMMUNICATION TECHNOLOGY SYSTEM FOR LEVEL-04 - MASTER PLAN (SEGMENT-H1,
SD H0 ELECTRICAL 23-Nov-14 Yes C 1-Dec-14 V
H2 & H3)
INFORMATION COMMUNICATION TECHNOLOGY SYSTEM FOR LEVEL-04 -PLAN (SEGMENT-H1) PART - 3
SD H1 ELECTRICAL 23-Nov-14 Yes C 1-Dec-14 V
OF 4
INFORMATION COMMUNICATION TECHNOLOGY SYSTEM FOR LEVEL-04 -PLAN (SEGMENT-H1) PART - 4
SD H1 ELECTRICAL 23-Nov-14 Yes C 1-Dec-14 V
OF 4
INFORMATION COMMUNICATION TECHNOLOGY SYSTEM FOR LEVEL-04 -PLAN (SEGMENT-H2) PART - 1
SD H2 ELECTRICAL 23-Nov-14 Yes C 1-Dec-14 V
OF 2
INFORMATION COMMUNICATION TECHNOLOGY SYSTEM FOR LEVEL-04 -PLAN (SEGMENT-H2) PART - 2
SD H2 ELECTRICAL 23-Nov-14 Yes C 1-Dec-14 V
OF 2
INFORMATION COMMUNICATION TECHNOLOGY SYSTEM FOR LEVEL-04 -PLAN (SEGMENT-H3) PART - 2
SD H3 ELECTRICAL 23-Nov-14 Yes C 1-Dec-14 V
OF 2
INFORMATION COMMUNICATION TECHNOLOGY SYSTEM FOR LEVEL-07 -(SEGMENT-H1, H2 & H3) SD H0 ELECTRICAL 23-Nov-14 Yes C 1-Dec-14 V

FIRE ALARM SYSTEM LAYOUT MASTER LEVEL 07 (SEGMENT-H1) SD H1 ELECTRICAL 23-Nov-14 Yes C 1-Dec-14 V

VOICE EVACAUATION SYSTEM LAYOUT MASTER PLAN LEVEL 07 FOR (SEGMENT- H1 & H2) SD H1 ELECTRICAL 24-Nov-14 Yes B 24-Nov-14 V

CABLE ROUTING SYSTEM LAYOUT LEVEL-04 MASTER PLAN (SEGMENT-H1) SD H1 ELECTRICAL 24-Nov-14 Yes C 25-Nov-14 V

CABLE ROUTING SYSTEM LAYOUT LEVEL-05 MASTER PLAN (SEGMENT-H1) SD H1 ELECTRICAL 24-Nov-14 Yes C 25-Nov-14 V

CABLE ROUTING SYSTEM LAYOUT LEVEL-06 MASTER PLAN (SEGMENT-H1) SD H1 ELECTRICAL 24-Nov-14 Yes C 25-Nov-14 V

GROUNDING SYSTEM LAYOUT D&T MASTER PLAN LEVEL 01 SD BC ELECTRICAL 16-Dec-14 Yes C 14-Dec-14 S

GROUNDING SYSTEM LAYOUT D&T MASTER PLAN LEVEL 01 SD BC ELECTRICAL 4-Jan-15 Yes A 30-Dec-14 V

GROUNDING SYSTEM LAYOUT D&T SEGMENT (B1)LEVEL 01 SD B1 ELECTRICAL 16-Dec-14 Yes A 14-Dec-14 S

GROUNDING SYSTEM LAYOUT D&T SEGMENT (B1)LEVEL 01 SD B1 ELECTRICAL 4-Jan-15 Yes A 30-Dec-14 V

Page 71 of 114
H-STRUCTURAL SHOP DRAWINGS SUBMITTAL LOG
TED , S = SUPERCEDED , V = VALID 7-May-17

SEGMENT
RESPONSE DRAWING
DRAWING TITLE TYPE DISCIPLINE REPLY APPROVA REPLY DATE
REQUIRED BY STATUS
L STATUS

GROUNDING SYSTEM LAYOUT D&T SEGMENT (B2)LEVEL 01 SD B2 ELECTRICAL 16-Dec-14 Yes A 14-Dec-14 V

GROUNDING SYSTEM LAYOUT D&T SEGMENT (B3)LEVEL 01 SD B3 ELECTRICAL 16-Dec-14 Yes A 14-Dec-14 V

GROUNDING SYSTEM LAYOUT D&T SEGMENT (C1)LEVEL 01 SD C1 ELECTRICAL 16-Dec-14 Yes A 14-Dec-14 V

GROUNDING SYSTEM LAYOUT D&T SEGMENT (C2)LEVEL 01 SD C2 ELECTRICAL 16-Dec-14 Yes A 14-Dec-14 V

GROUNDING SYSTEM LAYOUT D&T SEGMENT (C3)LEVEL 01 SD C3 ELECTRICAL 16-Dec-14 Yes A 14-Dec-14 V

LIGHTING PROTECTION SYSTEM LAYOUT D&T MASTER PLAN LEVEL-02 SD BC ELECTRICAL 24-Dec-14 Yes C 18-Dec-14 V

LIGHTING PROTECTION SYSTEM LAYOUT LEVEL -02 FLOOR PLAN D&T (SEGMENT -B1) SD B1 ELECTRICAL 24-Dec-14 Yes C 18-Dec-14 V

LIGHTING PROTECTION SYSTEM LAYOUT LEVEL -02 FLOOR PLAN D&T (SEGMENT -B2) SD B2 ELECTRICAL 24-Dec-14 Yes C 18-Dec-14 V

LIGHTING PROTECTION SYSTEM LAYOUT LEVEL -02 FLOOR PLAN D&T (SEGMENT -B3) SD B3 ELECTRICAL 24-Dec-14 Yes C 18-Dec-14 V

LIGHTING PROTECTION SYSTEM LAYOUT LEVEL -02 FLOOR PLAN D&T (SEGMENT -C1) SD C1 ELECTRICAL 24-Dec-14 Yes C 18-Dec-14 V

LIGHTING PROTECTION SYSTEM LAYOUT LEVEL -02 FLOOR PLAN D&T (SEGMENT -C2) SD C2 ELECTRICAL 24-Dec-14 Yes C 18-Dec-14 V

LIGHTING PROTECTION SYSTEM LAYOUT LEVEL -02 FLOOR PLAN D&T (SEGMENT -C3) SD C3 ELECTRICAL 24-Dec-14 Yes C 18-Dec-14 V

LIGHTING PROTECTION SYSTEM LAYOUT LEVEL -03 FLOOR PLAN D&T (MASTER PLAN) SD BC ELECTRICAL 24-Dec-14 Yes A 18-Dec-14 V

LIGHTING PROTECTION SYSTEM LAYOUT LEVEL -03 FLOOR PLAN D&T (SEGMENT-B1) SD B1 ELECTRICAL 24-Dec-14 Yes A 18-Dec-14 V

LIGHTING PROTECTION SYSTEM LAYOUT LEVEL -03 FLOOR PLAN D&T (SEGMENT-B2) SD B2 ELECTRICAL 24-Dec-14 Yes A 18-Dec-14 V

LIGHTING PROTECTION SYSTEM LAYOUT LEVEL -03 FLOOR PLAN D&T (SEGMENT-C1) SD C1 ELECTRICAL 24-Dec-14 Yes A 18-Dec-14 V

LIGHTING PROTECTION SYSTEM LAYOUT LEVEL -03 FLOOR PLAN D&T (SEGMENT-C2) SD C2 ELECTRICAL 24-Dec-14 Yes A 18-Dec-14 V

LIGHTING PROTECTION SYSTEM LAYOUT D&T MASTER PLAN LEVEL-04 SD BC ELECTRICAL 24-Dec-14 Yes A 18-Dec-14 V

LIGHTING PROTECTION SYSTEM LAYOUT LEVEL 04 FLOOR PLAN D&T ( SEGMENT-B1) SD B1 ELECTRICAL 24-Dec-14 Yes A 18-Dec-14 V

LIGHTING PROTECTION SYSTEM LAYOUT LEVEL 04 FLOOR PLAN D&T ( SEGMENT-B2) SD B2 ELECTRICAL 24-Dec-14 Yes A 18-Dec-14 V

LIGHTING PROTECTION SYSTEM LAYOUT LEVEL 04 FLOOR PLAN D&T ( SEGMENT-C1) SD C1 ELECTRICAL 24-Dec-14 Yes A 18-Dec-14 V

LIGHTING PROTECTION SYSTEM LAYOUT LEVEL 04 FLOOR PLAN D&T ( SEGMENT-C2) SD C2 ELECTRICAL 24-Dec-14 Yes A 18-Dec-14 V

LIGHTING PROTECTION SYSTEM LAYOUT D&T MASTER PLAN LEVEL-06 SD BC ELECTRICAL 24-Dec-14 Yes A 18-Dec-14 V

LIGHTING PROTECTION SYSTEM LAYOUT LEVEL 06 FLOOR PLAN D&T (SEGMENT-B1) SD B1 ELECTRICAL 24-Dec-14 Yes A 18-Dec-14 V

LIGHTING PROTECTION SYSTEM LAYOUT LEVEL 06 FLOOR PLAN D&T (SEGMENT-B2) SD B2 ELECTRICAL 24-Dec-14 Yes A 18-Dec-14 V

LIGHTING PROTECTION SYSTEM LAYOUT LEVEL 06 FLOOR PLAN D&T (SEGMENT-C1) SD C1 ELECTRICAL 24-Dec-14 Yes A 18-Dec-14 V

Page 72 of 114
H-STRUCTURAL SHOP DRAWINGS SUBMITTAL LOG
TED , S = SUPERCEDED , V = VALID 7-May-17

SEGMENT
RESPONSE DRAWING
DRAWING TITLE TYPE DISCIPLINE REPLY APPROVA REPLY DATE
REQUIRED BY STATUS
L STATUS

LIGHTING PROTECTION SYSTEM LAYOUT LEVEL 06 FLOOR PLAN D&T (SEGMENT-C2) SD C2 ELECTRICAL 24-Dec-14 Yes A 18-Dec-14 V

LIGHTING PROTECTION SYSTEM LAYOUT D&T MASTER PLAN LEVEL07 SD BC ELECTRICAL 24-Dec-14 Yes A 18-Dec-14 V

LIGHTING PROTECTION YSTEM LAYOUT LEVEL 07 FLOOR PLAN D&T (SEGMENT -B1) SD B1 ELECTRICAL 24-Dec-14 Yes A 18-Dec-14 V

LIGHTING PROTECTION SYSTEM LAYOUT LEVEL-07 FLOOR PLAN D&T (SEGMENT-B2) SD B2 ELECTRICAL 24-Dec-14 Yes A 18-Dec-14 V
GROUNDING SYSTEM LAYOUT MASTER FOUNDATION AND LEVEL 01 FLOOR MASTER PLAN ( SEGMENT
SD A ELECTRICAL 30-Dec-14 Yes A 24-Dec-14 V
- A1, A2&A3)
GROUNDING SYSTEM LAYOUT MASTER FOUNDATION AND LEVEL 01 FLOOR PLAN ( SEGMENT - A1) SD A1 ELECTRICAL 30-Dec-14 Yes A 24-Dec-14 V

GROUNDING SYSTEM LAYOUT MASTER FOUNDATION AND LEVEL 01 FLOOR PLAN ( SEGMENT - A2) SD A2 ELECTRICAL 30-Dec-14 Yes A 24-Dec-14 V

GROUNDING SYSTEM LAYOUT MASTER FOUNDATION AND LEVEL 01 FLOOR PLAN ( SEGMENT - A3) SD A3 ELECTRICAL 30-Dec-14 Yes A 24-Dec-14 V

GROUNDING SYSTEM LAYOUT MASTER LEVEL-S1 SD A0 ELECTRICAL 30-Dec-14 Yes A 24-Dec-14 V

GROUNDING SYSTEM LAYOUT MASTER ROOF FLOOR PLAN SD A0 ELECTRICAL 30-Dec-14 Yes A 24-Dec-14 V

B08 - WATER TANK EARTHING SYSTEM SCHEMATIC SD A0 ELECTRICAL 5-Jan-15 Yes D 24-Dec-14 V

GROUNDING SYSTEM LAYOUT MASTER LEVEL 03 - FLOOR PLAN SD A0 ELECTRICAL 17-Jan-15 OverDue P V

GROUNDING SYSTEM LAYOUT LEVEL 03 - FLOOR PLAN (SEGMENT A1) SD A1 ELECTRICAL 17-Jan-15 OverDue P V

GROUNDING SYSTEM LAYOUT LEVEL 03 - FLOOR PLAN (SEGMENT A2) SD A2 ELECTRICAL 17-Jan-15 OverDue P V

LIGHTNING PROTECTION SYSTEM FOR LEVEL - 02 (MASTER PLAN) SD A0 ELECTRICAL 17-Jan-15 OverDue P V

LIGHTNING PROTECTION SYSTEM FOR LEVEL - 02 (SEGMENT A2) SD A2 ELECTRICAL 17-Jan-15 OverDue P V

LIGHTNING PROTECTION SYSTEM FOR LEVEL - 02 (SEGMENT A3) SD A3 ELECTRICAL 17-Jan-15 OverDue P V

LIGHTNING PROTECTION SYSTEM LAYOUT - FOR LEVEL - 08 (MASTER PLAN) SD A0 ELECTRICAL 17-Jan-15 OverDue P V

LIGHTNING PROTECTION SYSTEM LAYOUT FOR LEVEL - 08 (SEGMENT A1) SD A1 ELECTRICAL 17-Jan-15 OverDue P V

LIGHTNING PROTECTION SYSTEM LAYOUT FOR LEVEL - 08 (SEGMENT A2) SD A2 ELECTRICAL 17-Jan-15 OverDue P V

AMBULATORY CARE CENTER EARTHING SYSTEM SCHEMATICS PART -1 SD A1 ELECTRICAL 17-Jan-15 OverDue P V

AMBULATORY CARE CENTER EARTHING SYSTEM SCHEMATICS PART -2 SD A2 ELECTRICAL 17-Jan-15 OverDue P V

LIGHTING PROTECTION SYSTEM LAYOUT MASTER PLAN LEVEL 01 SD B7 ELECTRICAL 17-Jan-15 OverDue P V

LIGHTING PROTECTION SYSTEM LAYOUT MASTER PLAN ROOF PLAN SD B7 ELECTRICAL 17-Jan-15 OverDue P V

LEVEL-01 PANEL BOARD SCHEDULE - N12A-1N SD H0 ELECTRICAL 17-Jan-15 OverDue P V

LEVEL-01 PANEL BOARD SCHEDULE - N12A-1L SD H0 ELECTRICAL 17-Jan-15 OverDue P V

Page 73 of 114
H-STRUCTURAL SHOP DRAWINGS SUBMITTAL LOG
TED , S = SUPERCEDED , V = VALID 7-May-17

SEGMENT
RESPONSE DRAWING
DRAWING TITLE TYPE DISCIPLINE REPLY APPROVA REPLY DATE
REQUIRED BY STATUS
L STATUS

LEVEL-01 PANEL BOARD SCHEDULE - C12B-A1 SD H0 ELECTRICAL 17-Jan-15 OverDue P V

LEVEL-01 PANEL BOARD SCHEDULE - N12B-1G SD H0 ELECTRICAL 17-Jan-15 OverDue P V

LEVEL-01 PANEL BOARD SCHEDULE - N12B-1C SD H0 ELECTRICAL 17-Jan-15 OverDue P V

LEVEL-01 PANEL BOARD SCHEDULE - N12B-1A SD H0 ELECTRICAL 17-Jan-15 OverDue P V

LEVEL-01 PANEL BOARD SCHEDULE - N12B-1B SD H0 ELECTRICAL 17-Jan-15 OverDue P V

LEVEL-01 PANEL BOARD SCHEDULE - N12B-1F SD H0 ELECTRICAL 17-Jan-15 OverDue P V

Page 74 of 114
KING FAISAL SPECIALIST HOSPITAL & RESEARCH CENTER, JEDDAH
KFSH-STRUCTURAL SHOP DRAW
ABREVIATIONS USED : A = APPROVED , B = APPROVED AS NOTED , C = REVISE & RESUBMIT , D = REJECTED , S = SUPERCEDED , V = VALID

SUB.CON.CODE
PROJECT NO

DWG TYPE
SEGMENT

S.TRADE

SERIAL
TRADE
DWG

LEVEL
ZONE
SUB Date of
Sl.No SUBMITTAL NO CONTRACTOR REV
REV NO submission
NO

1 DW/CN1169P01/00695 0 5-Mar-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD M MH 401111 0

2 DW/CN1169P01/00695 1 16-Apr-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD M MH 401111 1

3 DW/CN1169P01/00695 2 9-Jul-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD M MH 401111 2

4 DW/CN1169P01/00695 3 24-Dec-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD M MH 401111 3

5 DW/CN1169P01/00696 0 5-Mar-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD M MH 401112 0

6 DW/CN1169P01/00696 1 16-Apr-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD M MH 401112 1

7 DW/CN1169P01/00696 2 9-Jul-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD M MH 401112 2

8 DW/CN1169P01/00696 3 24-Dec-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD M MH 401112 3

9 DW/CN1169P01/00697 0 5-Mar-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD M MH 401113 0

10 DW/CN1169P01/00697 1 16-Apr-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD M MH 401113 1

11 DW/CN1169P01/00697 2 9-Jul-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD M MH 401113 2

12 DW/CN1169P01/00697 3 24-Dec-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD M MH 401113 3

13 DW/CN1169P01/00698 0 5-Mar-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD M MH 401114 0

14 DW/CN1169P01/00698 1 5-Mar-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD M MH 401114 1

15 DW/CN1169P01/00698 2 9-Jul-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD M MH 401114 2

16 DW/CN1169P01/00698 3 24-Dec-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD M MH 401114 3

17 DW/CN1169P01/00699 0 5-Mar-14 SBG-PBAD 1169 01 Z1 H2 LS1 SD M MH 401116 0

18 DW/CN1169P01/00699 1 5-Mar-14 SBG-PBAD 1169 01 Z1 H2 LS1 SD M MH 401116 1

19 DW/CN1169P01/00699 2 9-Jul-14 SBG-PBAD 1169 01 Z1 H2 LS1 SD M MH 401116 2

20 DW/CN1169P01/00700 0 5-Mar-14 SBG-PBAD 1169 01 Z1 H2 LS1 SD M MH 401117 0

21 DW/CN1169P01/00700 1 5-Mar-14 SBG-PBAD 1169 01 Z1 H2 LS1 SD M MH 401117 1

22 DW/CN1169P01/00700 2 9-Jul-14 SBG-PBAD 1169 01 Z1 H2 LS1 SD M MH 401117 2

23 DW/CN1169P01/00701 0 5-Mar-14 SBG-PBAD 1169 01 Z1 H2 LS1 SD M MH 401119 0

24 DW/CN1169P01/00701 1 5-Mar-14 SBG-PBAD 1169 01 Z1 H2 LS1 SD M MH 401119 1

25 DW/CN1169P01/00701 2 9-Jul-14 SBG-PBAD 1169 01 Z1 H2 LS1 SD M MH 401119 2

Page 75 of 114
KING FAISAL SPECIALIST HOSPITAL & RESEARCH CENTER, JEDDAH
KFSH-STRUCTURAL SHOP DRAW
ABREVIATIONS USED : A = APPROVED , B = APPROVED AS NOTED , C = REVISE & RESUBMIT , D = REJECTED , S = SUPERCEDED , V = VALID

SUB.CON.CODE
PROJECT NO

DWG TYPE
SEGMENT

S.TRADE

SERIAL
TRADE
DWG

LEVEL
ZONE
SUB Date of
Sl.No SUBMITTAL NO CONTRACTOR REV
REV NO submission
NO

26 DW/CN1169P01/00729 0 16-Apr-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD M MP 401251 0

27 DW/CN1169P01/00729 1 9-Jul-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD M MP 401251 1

28 DW/CN1169P01/00729 2 24-Dec-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD M MP 401251 2

29 DW/CN1169P01/00730 0 16-Apr-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD M MP 401252 0

30 DW/CN1169P01/00730 1 9-Jul-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD M MP 401252 1

31 DW/CN1169P01/00730 2 24-Dec-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD M MP 401252 2

32 DW/CN1169P01/00731 0 16-Apr-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD M MP 401254 0

33 DW/CN1169P01/00731 1 9-Jul-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD M MP 401254 1

34 DW/CN1169P01/00731 2 24-Dec-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD M MP 401254 2

35 DW/CN1169P01/00732 0 16-Apr-14 SBG-PBAD 1169 01 Z1 H2 LS1 SD M MP 401256 0

36 DW/CN1169P01/00732 1 9-Jul-14 SBG-PBAD 1169 01 Z1 H2 LS1 SD M MP 401256 1

37 DW/CN1169P01/00733 0 16-Apr-14 SBG-PBAD 1169 01 Z1 H2 LS1 SD M MP 401257 0

38 DW/CN1169P01/00733 1 9-Jul-14 SBG-PBAD 1169 01 Z1 H2 LS1 SD M MP 401257 1

39 DW/CN1169P01/00824 0 9-Jul-14 SBG-PBAD 1169 01 Z1 00 000 SD M DT 402101 0

40 DW/CN1169P01/00825 0 9-Jul-14 SBG-PBAD 1169 01 Z1 00 000 SD M DT 402102 0

41 DW/CN1169P01/00917 0 10-Aug-14 SBG-PBAD 1169 01 Z1 H1 L01 SD M MH 401127 0

42 DW/CN1169P01/00917 1 14-Oct-14 SBG-PBAD 1169 01 Z1 H1 L01 SD M MH 401127 1

43 DW/CN1169P01/00918 0 10-Aug-14 SBG-PBAD 1169 01 Z1 H1 L01 SD M MH 401128 0

44 DW/CN1169P01/00918 1 14-Oct-14 SBG-PBAD 1169 01 Z1 H1 L01 SD M MH 401128 1

45 DW/CN1169P01/00919 0 10-Aug-14 SBG-PBAD 1169 01 Z1 H1 L01 SD M MH 401129 0

46 DW/CN1169P01/00919 1 14-Oct-14 SBG-PBAD 1169 01 Z1 H1 L01 SD M MH 401129 1

47 DW/CN1169P01/00920 0 10-Aug-14 SBG-PBAD 1169 01 Z1 H1 L01 SD M MH 401130 0

48 DW/CN1169P01/00920 1 14-Oct-14 SBG-PBAD 1169 01 Z1 H1 L01 SD M MH 401130 1

49 DW/CN1169P01/00921 0 10-Aug-14 SBG-PBAD 1169 01 Z1 H2 L01 SD M MH 401132 0

50 DW/CN1169P01/00921 1 14-Oct-14 SBG-PBAD 1169 01 Z1 H2 L01 SD M MH 401132 1

Page 76 of 114
KING FAISAL SPECIALIST HOSPITAL & RESEARCH CENTER, JEDDAH
KFSH-STRUCTURAL SHOP DRAW
ABREVIATIONS USED : A = APPROVED , B = APPROVED AS NOTED , C = REVISE & RESUBMIT , D = REJECTED , S = SUPERCEDED , V = VALID

SUB.CON.CODE
PROJECT NO

DWG TYPE
SEGMENT

S.TRADE

SERIAL
TRADE
DWG

LEVEL
ZONE
SUB Date of
Sl.No SUBMITTAL NO CONTRACTOR REV
REV NO submission
NO

51 DW/CN1169P01/00922 0 10-Aug-14 SBG-PBAD 1169 01 Z1 H2 L01 SD M MH 401133 0

52 DW/CN1169P01/00922 1 14-Oct-14 SBG-PBAD 1169 01 Z1 H2 L01 SD M MH 401133 1

53 DW/CN1169P01/00923 0 10-Aug-14 SBG-PBAD 1169 01 Z1 H2 L01 SD M MH 401134 0

54 DW/CN1169P01/00923 1 14-Oct-14 SBG-PBAD 1169 01 Z1 H2 L01 SD M MH 401134 1

55 DW/CN1169P01/00924 0 10-Aug-14 SBG-PBAD 1169 01 Z1 H2 L01 SD M MH 401135 0

56 DW/CN1169P01/00924 1 14-Oct-14 SBG-PBAD 1169 01 Z1 H2 L01 SD M MH 401135 1

57 DW/CN1169P01/00925 0 10-Aug-14 SBG-PBAD 1169 01 Z1 H3 L01 SD M MH 401137 0

58 DW/CN1169P01/00925 1 14-Oct-14 SBG-PBAD 1169 01 Z1 H3 L01 SD M MH 401137 1

59 DW/CN1169P01/00926 0 10-Aug-14 SBG-PBAD 1169 01 Z1 H3 L01 SD M MH 401138 0

60 DW/CN1169P01/00926 1 14-Oct-14 SBG-PBAD 1169 01 Z1 H3 L01 SD M MH 401138 1

61 DW/CN1169P01/01018 0 16-Aug-14 SBG-PBAD 1169 01 Z1 H1 L01 SD M MP 401268 0

62 DW/CN1169P01/01018 1 8-Nov-14 SBG-PBAD 1169 01 Z1 H1 L01 SD M MP 401268 1

63 DW/CN1169P01/01019 0 16-Aug-14 SBG-PBAD 1169 01 Z1 H3 L01 SD M MP 401278 0

64 DW/CN1169P01/01019 1 8-Nov-14 SBG-PBAD 1169 01 Z1 H3 L01 SD M MP 401278 1

65 DW/CN1169P01/01065 0 20-Aug-14 SBG-PBAD 1169 01 Z1 H1 L02 SD M MP 401283 0

66 DW/CN1169P01/01065 1 8-Nov-14 SBG-PBAD 1169 01 Z1 H1 L02 SD M MP 401283 1

67 DW/CN1169P01/01066 0 20-Aug-14 SBG-PBAD 1169 01 Z1 H2 L02 SD M MP 401286 0

68 DW/CN1169P01/01066 1 8-Nov-14 SBG-PBAD 1169 01 Z1 H2 L02 SD M MP 401286 1

69 DW/CN1169P01/01067 0 20-Aug-14 SBG-PBAD 1169 01 Z1 H2 L02 SD M MP 401287 0

70 DW/CN1169P01/01067 1 8-Nov-14 SBG-PBAD 1169 01 Z1 H2 L02 SD M MP 401287 1

71 DW/CN1169P01/01068 0 20-Aug-14 SBG-PBAD 1169 01 Z1 H3 L02 SD M MP 401292 0

72 DW/CN1169P01/01068 1 8-Nov-14 SBG-PBAD 1169 01 Z1 H3 L02 SD M MP 401292 1

73 DW/CN1169P01/01069 0 20-Aug-14 SBG-PBAD 1169 01 Z1 H1 L2M SD M MP 401296 0

74 DW/CN1169P01/01069 1 8-Nov-14 SBG-PBAD 1169 01 Z1 H1 L2M SD M MP 401296 1

75 DW/CN1169P01/01070 0 20-Aug-14 SBG-PBAD 1169 01 Z1 H1 L2M SD M MP 401297 0

Page 77 of 114
KING FAISAL SPECIALIST HOSPITAL & RESEARCH CENTER, JEDDAH
KFSH-STRUCTURAL SHOP DRAW
ABREVIATIONS USED : A = APPROVED , B = APPROVED AS NOTED , C = REVISE & RESUBMIT , D = REJECTED , S = SUPERCEDED , V = VALID

SUB.CON.CODE
PROJECT NO

DWG TYPE
SEGMENT

S.TRADE

SERIAL
TRADE
DWG

LEVEL
ZONE
SUB Date of
Sl.No SUBMITTAL NO CONTRACTOR REV
REV NO submission
NO

76 DW/CN1169P01/01070 1 8-Nov-14 SBG-PBAD 1169 01 Z1 H1 L2M SD M MP 401297 1

77 DW/CN1169P01/01071 0 20-Aug-14 SBG-PBAD 1169 01 Z1 H2 L2M SD M MP 401299 0

78 DW/CN1169P01/01071 1 8-Nov-14 SBG-PBAD 1169 01 Z1 H2 L2M SD M MP 401299 1

79 DW/CN1169P01/01072 0 20-Aug-14 SBG-PBAD 1169 01 Z1 H2 L2M SD M MP 401300 0

80 DW/CN1169P01/01072 1 8-Nov-14 SBG-PBAD 1169 01 Z1 H2 L2M SD M MP 401300 1

81 DW/CN1169P01/01073 0 20-Aug-14 SBG-PBAD 1169 01 Z1 H3 L2M SD M MP 401305 0

82 DW/CN1169P01/01073 1 8-Nov-14 SBG-PBAD 1169 01 Z1 H3 L2M SD M MP 401305 1

83 DW/CN1169P01/01169 0 6-Sep-14 SBG-PBAD 1169 01 Z1 H1 L03 SD M MH 401172 0

84 DW/CN1169P01/01170 0 6-Sep-14 SBG-PBAD 1169 01 Z1 H1 L03 SD M MH 401173 0

85 DW/CN1169P01/01171 0 6-Sep-14 SBG-PBAD 1169 01 Z1 H2 L03 SD M MH 401175 0

86 DW/CN1169P01/01172 0 6-Sep-14 SBG-PBAD 1169 01 Z1 H2 L03 SD M MH 401176 0

87 DW/CN1169P01/01173 0 6-Sep-14 SBG-PBAD 1169 01 Z1 H3 L03 SD M MH 401181 0

88 DW/CN1169P01/01215 0 27-Sep-14 SBG-PBAD 1169 01 Z1 H1 L02 SD M MH 401144 0

89 DW/CN1169P01/01215 1 8-Nov-14 SBG-PBAD 1169 01 Z1 H1 L02 SD M MH 401144 1

90 DW/CN1169P01/01216 0 27-Sep-14 SBG-PBAD 1169 01 Z1 H1 L02 SD M MH 401145 0

91 DW/CN1169P01/01216 1 8-Nov-14 SBG-PBAD 1169 01 Z1 H1 L02 SD M MH 401145 1

92 DW/CN1169P01/01217 0 27-Sep-14 SBG-PBAD 1169 01 Z1 H2 L02 SD M MH 401147 0

93 DW/CN1169P01/01217 1 8-Nov-14 SBG-PBAD 1169 01 Z1 H2 L02 SD M MH 401147 1

94 DW/CN1169P01/01218 0 27-Sep-14 SBG-PBAD 1169 01 Z1 H2 L02 SD M MH 401148 0

95 DW/CN1169P01/01218 1 8-Nov-14 SBG-PBAD 1169 01 Z1 H2 L02 SD M MH 401148 1

96 DW/CN1169P01/01219 0 27-Sep-14 SBG-PBAD 1169 01 Z1 H2 L02 SD M MH 401150 0

97 DW/CN1169P01/01219 1 8-Nov-14 SBG-PBAD 1169 01 Z1 H2 L02 SD M MH 401150 1

98 DW/CN1169P01/01220 0 27-Sep-14 SBG-PBAD 1169 01 Z1 H3 L02 SD M MH 401153 0

99 DW/CN1169P01/01220 1 8-Nov-14 SBG-PBAD 1169 01 Z1 H3 L02 SD M MH 401153 1

100 DW/CN1169P01/01221 0 27-Sep-14 SBG-PBAD 1169 01 Z1 H1 L2M SD M MH 401158 0

Page 78 of 114
KING FAISAL SPECIALIST HOSPITAL & RESEARCH CENTER, JEDDAH
KFSH-STRUCTURAL SHOP DRAW
ABREVIATIONS USED : A = APPROVED , B = APPROVED AS NOTED , C = REVISE & RESUBMIT , D = REJECTED , S = SUPERCEDED , V = VALID

SUB.CON.CODE
PROJECT NO

DWG TYPE
SEGMENT

S.TRADE

SERIAL
TRADE
DWG

LEVEL
ZONE
SUB Date of
Sl.No SUBMITTAL NO CONTRACTOR REV
REV NO submission
NO

101 DW/CN1169P01/01221 1 8-Nov-14 SBG-PBAD 1169 01 Z1 H1 L2M SD M MH 401158 1

102 DW/CN1169P01/01222 0 27-Sep-14 SBG-PBAD 1169 01 Z1 H1 L2M SD M MH 401159 0

103 DW/CN1169P01/01222 1 8-Nov-14 SBG-PBAD 1169 01 Z1 H1 L2M SD M MH 401159 1

104 DW/CN1169P01/01223 0 27-Sep-14 SBG-PBAD 1169 01 Z1 H2 L2M SD M MH 401161 0

105 DW/CN1169P01/01223 1 8-Nov-14 SBG-PBAD 1169 01 Z1 H2 L2M SD M MH 401161 1

106 DW/CN1169P01/01224 0 27-Sep-14 SBG-PBAD 1169 01 Z1 H2 L2M SD M MH 401162 0

107 DW/CN1169P01/01224 1 8-Nov-14 SBG-PBAD 1169 01 Z1 H2 L2M SD M MH 401162 1

108 DW/CN1169P01/01225 0 27-Sep-14 SBG-PBAD 1169 01 Z1 H2 L2M SD M MH 401164 0

109 DW/CN1169P01/01225 1 8-Nov-14 SBG-PBAD 1169 01 Z1 H2 L2M SD M MH 401164 1

110 DW/CN1169P01/01226 0 27-Sep-14 SBG-PBAD 1169 01 Z1 H3 L2M SD M MH 401167 0

111 DW/CN1169P01/01226 1 8-Nov-14 SBG-PBAD 1169 01 Z1 H3 L2M SD M MH 401167 1

112 DW/CN1169P01/01345 0 14-Oct-14 SBG-PBAD 1169 01 Z1 H1 L01 SD M MH 401126 0

113 DW/CN1169P01/01346 0 14-Oct-14 SBG-PBAD 1169 01 Z1 H2 L01 SD M MH 401131 0

114 DW/CN1169P01/01347 0 14-Oct-14 SBG-PBAD 1169 01 Z1 H3 L01 SD M MH 401136 0

115 DW/CN1169P01/01667 0 8-Nov-14 SBG-PBAD 1169 01 Z1 H1 L04 SD M MH 401187 0

116 DW/CN1169P01/01668 0 8-Nov-14 SBG-PBAD 1169 01 Z1 H1 L04 SD M MH 401188 0

117 DW/CN1169P01/01684 0 8-Nov-14 SBG-PBAD 1169 01 Z1 H1 L01 SD M MP 401266 0

Page 79 of 114
H-STRUCTURAL SHOP DRAWINGS SUBMITTAL LOG
CTED , S = SUPERCEDED , V = VALID 7-May-17

SEGMENT
RESPONSE DRAWING
DRAWING TITLE TYPE DISCIPLINE REPLY APPROVA REPLY DATE
REQUIRED BY STATUS
L STATUS

HVAC SYSTEM LAY OUT FOR LEVEL-S1 PLAN (MASTER PLAN) SEGMENT-H1 SD H1 MECHANICAL 18-Mar-14 Yes C 17-Mar-14 S

HVAC SYSTEM LAY OUT FOR LEVEL-S1 PLAN (MASTER PLAN) SEGMENT-H1 SD H1 MECHANICAL 30-Apr-14 Yes A 28-Apr-14 S

HVAC SYSTEM LAY OUT FOR LEVEL-S1 PLAN (MASTER PLAN) SEGMENT-H1 SD H1 MECHANICAL 22-Jul-14 Yes A 2-Aug-14 S

HVAC SYSTEM LAY OUT FOR LEVEL-S1 PLAN (MASTER PLAN) SEGMENT-H1 SD H1 MECHANICAL 7-Jan-15 Yes A 30-Dec-14 V

HVAC SYSTEM LAY OUT FOR LEVEL-S1 PLAN SEGMENT-H1 (PART-1/4) SD H1 MECHANICAL 18-Mar-14 Yes C 17-Mar-14 S

HVAC SYSTEM LAY OUT FOR LEVEL-S1 PLAN SEGMENT-H1 (PART-1/4) SD H1 MECHANICAL 30-Apr-14 Yes A 28-Apr-14 S

HVAC SYSTEM LAY OUT FOR LEVEL-S1 PLAN SEGMENT-H1 (PART-1/4) SD H1 MECHANICAL 22-Jul-14 Yes A 2-Aug-14 S

HVAC SYSTEM LAY OUT FOR LEVEL-S1 PLAN SEGMENT-H1 (PART-1/4) SD H1 MECHANICAL 7-Jan-15 Yes A 30-Dec-14 V

HVAC SYSTEM LAY OUT FOR LEVEL-S1 PLAN SEGMENT-H1 (PART-2/4) SD H1 MECHANICAL 18-Mar-14 Yes C 17-Mar-14 S

HVAC SYSTEM LAY OUT FOR LEVEL-S1 PLAN SEGMENT-H1 (PART-2/4) SD H1 MECHANICAL 30-Apr-14 Yes A 28-Apr-14 S

HVAC SYSTEM LAY OUT FOR LEVEL-S1 PLAN SEGMENT-H1 (PART-2/4) SD H1 MECHANICAL 22-Jul-14 Yes A 2-Aug-14 S

HVAC SYSTEM LAY OUT FOR LEVEL-S1 PLAN SEGMENT-H1 (PART-2/4) SD H1 MECHANICAL 7-Jan-15 Yes A 30-Dec-14 V

HVAC SYSTEM LAY OUT FOR LEVEL-S1 PLAN SEGMENT-H1 (PART-3/4) SD H1 MECHANICAL 18-Mar-14 Yes C 17-Mar-14 S

HVAC SYSTEM LAY OUT FOR LEVEL-S1 PLAN SEGMENT-H1 (PART-3/4) SD H1 MECHANICAL 30-Apr-14 Yes B 28-Apr-14 S

HVAC SYSTEM LAY OUT FOR LEVEL-S1 PLAN SEGMENT-H1 (PART-3/4) SD H1 MECHANICAL 22-Jul-14 Yes A 2-Aug-14 S

HVAC SYSTEM LAY OUT FOR LEVEL-S1 PLAN SEGMENT-H1 (PART-3/4) SD H1 MECHANICAL 7-Jan-15 Yes A 30-Dec-14 V

HVAC SYSTEM LAY OUT FOR LEVEL-S1 PLAN (MASTER PLAN) SEGMENT-H2 SD H2 MECHANICAL 18-Mar-14 Yes C 17-Mar-14 S

HVAC SYSTEM LAY OUT FOR LEVEL-S1 PLAN (MASTER PLAN) SEGMENT-H2 SD H2 MECHANICAL 30-Apr-14 Yes A 28-Apr-14 S

HVAC SYSTEM LAY OUT FOR LEVEL-S1 PLAN (MASTER PLAN) SEGMENT-H2 SD H2 MECHANICAL 22-Jul-14 Yes C 2-Aug-14 V

HVAC SYSTEM LAY OUT FOR LEVEL-S1 PLAN SEGMENT-H2 (PART-1/4) SD H2 MECHANICAL 18-Mar-14 Yes C 17-Mar-14 S

HVAC SYSTEM LAY OUT FOR LEVEL-S1 PLAN SEGMENT-H2 (PART-1/4) SD H2 MECHANICAL 30-Apr-14 Yes A 28-Apr-14 S

HVAC SYSTEM LAY OUT FOR LEVEL-S1 PLAN SEGMENT-H2 (PART-1/4) SD H2 MECHANICAL 22-Jul-14 Yes C 2-Aug-14 V

HVAC SYSTEM LAY OUT FOR LEVEL-S1 PLAN SEGMENT-H2 (PART-3/4) SD H2 MECHANICAL 18-Mar-14 Yes C 17-Mar-14 S

HVAC SYSTEM LAY OUT FOR LEVEL-S1 PLAN SEGMENT-H2 (PART-3/4) SD H2 MECHANICAL 30-Apr-14 Yes A 28-Apr-14 S

HVAC SYSTEM LAY OUT FOR LEVEL-S1 PLAN SEGMENT-H2 (PART-3/4) SD H2 MECHANICAL 22-Jul-14 Yes C 2-Aug-14 V

Page 80 of 114
H-STRUCTURAL SHOP DRAWINGS SUBMITTAL LOG
CTED , S = SUPERCEDED , V = VALID 7-May-17

SEGMENT
RESPONSE DRAWING
DRAWING TITLE TYPE DISCIPLINE REPLY APPROVA REPLY DATE
REQUIRED BY STATUS
L STATUS

CHILLED WATER PIPING LAYOUT FOR LEVEL-S1 MASTER PLAN (SEGMENT-H1) SD H1 MECHANICAL 30-Apr-14 Yes A 28-Apr-14 S

CHILLED WATER PIPING LAYOUT FOR LEVEL-S1 MASTER PLAN (SEGMENT-H1) SD H1 MECHANICAL 22-Jul-14 Yes B 2-Aug-14 S

CHILLED WATER PIPING LAYOUT FOR LEVEL-S1 MASTER PLAN (SEGMENT-H1) SD H1 MECHANICAL 7-Jan-15 Yes A 30-Dec-14 V

CHILLED WATER PIPING LAYOUT FOR LEVEL-S1 MASTER PLAN (SEGMENT-H1) PART-1 / 4 SD H1 MECHANICAL 30-Apr-14 Yes A 28-Apr-14 S

CHILLED WATER PIPING LAYOUT FOR LEVEL-S1 MASTER PLAN (SEGMENT-H1) PART-1 / 4 SD H1 MECHANICAL 22-Jul-14 Yes B 2-Aug-14 S

CHILLED WATER PIPING LAYOUT FOR LEVEL-S1 MASTER PLAN (SEGMENT-H1) PART-1 / 4 SD H1 MECHANICAL 7-Jan-15 Yes A 30-Dec-14 V

CHILLED WATER PIPING LAYOUT FOR LEVEL-S1 MASTER PLAN (SEGMENT-H1) PART- 3 / 4 SD H1 MECHANICAL 30-Apr-14 Yes A 28-Apr-14 S

CHILLED WATER PIPING LAYOUT FOR LEVEL-S1 MASTER PLAN (SEGMENT-H1) PART- 3 / 4 SD H1 MECHANICAL 22-Jul-14 Yes B 2-Aug-14 S

CHILLED WATER PIPING LAYOUT FOR LEVEL-S1 MASTER PLAN (SEGMENT-H1) PART- 3 / 4 SD H1 MECHANICAL 7-Jan-15 Yes A 30-Dec-14 V

CHILLED WATER PIPING LAYOUT FOR LEVEL-S1 MASTER PLAN (SEGMENT-H2) SD H2 MECHANICAL 30-Apr-14 Yes A 28-Apr-14 S

CHILLED WATER PIPING LAYOUT FOR LEVEL-S1 MASTER PLAN (SEGMENT-H2) SD H2 MECHANICAL 22-Jul-14 Yes C 2-Aug-14 V

CHILLED WATER PIPING LAYOUT FOR LEVEL-S1 MASTER PLAN (SEGMENT-H2) PART-1 / 4 SD H2 MECHANICAL 30-Apr-14 Yes A 28-Apr-14 S

CHILLED WATER PIPING LAYOUT FOR LEVEL-S1 MASTER PLAN (SEGMENT-H2) PART-1 / 4 SD H2 MECHANICAL 22-Jul-14 Yes C 2-Aug-14 V

HVAC MECHANICAL DETAILS (DUCT) SD 00 MECHANICAL 22-Jul-14 Yes A 2-Aug-14 V

HVAC MECHANICAL DETAILS (PIPING) SD 00 MECHANICAL 22-Jul-14 Yes C 2-Aug-14 V

HVAC SYSTEM LAYOUT FOR LEVEL-01 PLAN ( SEGMENT -H1 ) PART-01 OF 04 SD H1 MECHANICAL 24-Aug-14 Yes C 25-Aug-14 S

HVAC SYSTEM LAYOUT FOR LEVEL-01 PLAN ( SEGMENT -H1 ) PART-01 OF 04 SD H1 MECHANICAL 28-Oct-14 Yes B 30-Oct-14 V

HVAC SYSTEM LAYOUT FOR LEVEL-01 PLAN ( SEGMENT -H1 ) PART-02 OF 04 SD H1 MECHANICAL 24-Aug-14 Yes C 25-Aug-14 S

HVAC SYSTEM LAYOUT FOR LEVEL-01 PLAN ( SEGMENT -H1 ) PART-02 OF 04 SD H1 MECHANICAL 28-Oct-14 Yes B 30-Oct-14 V

HVAC SYSTEM LAYOUT FOR LEVEL-01 PLAN ( SEGMENT -H1 ) PART-03 OF 04 SD H1 MECHANICAL 24-Aug-14 Yes C 25-Aug-14 S

HVAC SYSTEM LAYOUT FOR LEVEL-01 PLAN ( SEGMENT -H1 ) PART-03 OF 04 SD H1 MECHANICAL 28-Oct-14 Yes B 30-Oct-14 V

HVAC SYSTEM LAYOUT FOR LEVEL-01 PLAN ( SEGMENT -H1 ) PART-04 OF 04 SD H1 MECHANICAL 24-Aug-14 Yes C 25-Aug-14 S

HVAC SYSTEM LAYOUT FOR LEVEL-01 PLAN ( SEGMENT -H1 ) PART-04 OF 04 SD H1 MECHANICAL 28-Oct-14 Yes B 30-Oct-14 V

HVAC SYSTEM LAYOUT FOR LEVEL-01 PLAN ( SEGMENT -H2 ) PART-01 OF 04 SD H2 MECHANICAL 24-Aug-14 Yes C 25-Aug-14 S

HVAC SYSTEM LAYOUT FOR LEVEL-01 PLAN ( SEGMENT -H2 ) PART-01 OF 04 SD H2 MECHANICAL 28-Oct-14 Yes B 30-Oct-14 V

Page 81 of 114
H-STRUCTURAL SHOP DRAWINGS SUBMITTAL LOG
CTED , S = SUPERCEDED , V = VALID 7-May-17

SEGMENT
RESPONSE DRAWING
DRAWING TITLE TYPE DISCIPLINE REPLY APPROVA REPLY DATE
REQUIRED BY STATUS
L STATUS

HVAC SYSTEM LAYOUT FOR LEVEL-01 PLAN ( SEGMENT -H2 ) PART-02 OF 04 SD H2 MECHANICAL 24-Aug-14 Yes C 25-Aug-14 S

HVAC SYSTEM LAYOUT FOR LEVEL-01 PLAN ( SEGMENT -H2 ) PART-02 OF 04 SD H2 MECHANICAL 28-Oct-14 Yes B 30-Oct-14 V

HVAC SYSTEM LAYOUT FOR LEVEL-01 PLAN ( SEGMENT -H2 ) PART-03 OF 04 SD H2 MECHANICAL 24-Aug-14 Yes C 25-Aug-14 S

HVAC SYSTEM LAYOUT FOR LEVEL-01 PLAN ( SEGMENT -H2 ) PART-03 OF 04 SD H2 MECHANICAL 28-Oct-14 Yes B 30-Oct-14 V

HVAC SYSTEM LAYOUT FOR LEVEL-01 PLAN ( SEGMENT -H2 ) PART-04 OF 04 SD H2 MECHANICAL 24-Aug-14 Yes C 25-Aug-14 S

HVAC SYSTEM LAYOUT FOR LEVEL-01 PLAN ( SEGMENT -H2 ) PART-04 OF 04 SD H2 MECHANICAL 28-Oct-14 Yes B 30-Oct-14 V

HVAC SYSTEM LAYOUT FOR LEVEL-01 PLAN ( SEGMENT -H3 ) PART-01 OF 02 SD H3 MECHANICAL 24-Aug-14 Yes C 25-Aug-14 S

HVAC SYSTEM LAYOUT FOR LEVEL-01 PLAN ( SEGMENT -H3 ) PART-01 OF 02 SD H3 MECHANICAL 28-Oct-14 Yes B 30-Oct-14 V

HVAC SYSTEM LAYOUT FOR LEVEL-01 PLAN ( SEGMENT -H3 ) PART -02 OF 02 SD H3 MECHANICAL 24-Aug-14 Yes C 25-Aug-14 S

HVAC SYSTEM LAYOUT FOR LEVEL-01 PLAN ( SEGMENT -H3 ) PART -02 OF 02 SD H3 MECHANICAL 28-Oct-14 Yes B 30-Oct-14 V

CHILLED WATER LAYOUT FOR LEVEL-01 PLAN (SEGMENT-H1 ) PART-2 SD H1 MECHANICAL 30-Aug-14 Yes C 30-Aug-14 S

CHILLED WATER LAYOUT FOR LEVEL-01 PLAN (SEGMENT-H1 ) PART-2 SD H1 MECHANICAL 22-Nov-14 Yes C 24-Nov-14 V

CHILLED WATER LAYOUT FOR LEVEL-01 PLAN (SEGMENT-H3 ) PART-2 SD H3 MECHANICAL 30-Aug-14 Yes C 30-Aug-14 S

CHILLED WATER LAYOUT FOR LEVEL-01 PLAN (SEGMENT-H3 ) PART-2 SD H3 MECHANICAL 22-Nov-14 Yes C 24-Nov-14 V

CHILLED WATER PIPING FOR LEVEL-02 PLAN (SEGMENT-H1) PART-3 OF 4) SD H1 MECHANICAL 2-Sep-14 Yes C 2-Sep-14 S

CHILLED WATER PIPING FOR LEVEL-02 PLAN (SEGMENT-H1) PART-3 OF 4) SD H1 MECHANICAL 22-Nov-14 Yes C 24-Nov-14 V

CHILLED WATER PIPING FOR LEVEL-02 PLAN (SEGMENT-H2) PART-1 OF 4) SD H2 MECHANICAL 2-Sep-14 Yes C 2-Sep-14 S

CHILLED WATER PIPING FOR LEVEL-02 PLAN (SEGMENT-H2) PART-1 OF 4) SD H2 MECHANICAL 22-Nov-14 Yes C 24-Nov-14 V

CHILLED WATER PIPING FOR LEVEL-02 PLAN (SEGMENT-H2) PART-2 OF 4) SD H2 MECHANICAL 2-Sep-14 Yes C 2-Sep-14 S

CHILLED WATER PIPING FOR LEVEL-02 PLAN (SEGMENT-H2) PART-2 OF 4) SD H2 MECHANICAL 22-Nov-14 Yes C 24-Nov-14 V

CHILLED WATER PIPING FOR LEVEL-02 PLAN (SEGMENT-H3) PART-2 OF 2) SD H3 MECHANICAL 2-Sep-14 Yes C 2-Sep-14 S

CHILLED WATER PIPING FOR LEVEL-02 PLAN (SEGMENT-H3) PART-2 OF 2) SD H3 MECHANICAL 22-Nov-14 Yes C 24-Nov-14 V

CHILLED WATER PIPING FOR LEVEL-02 MEZZ. PLAN (SEGMENT-H1) PART 3 OF 4 SD H1 MECHANICAL 2-Sep-14 Yes C 2-Sep-14 S

CHILLED WATER PIPING FOR LEVEL-02 MEZZ. PLAN (SEGMENT-H1) PART 3 OF 4 SD H1 MECHANICAL 22-Nov-14 Yes C 24-Nov-14 V

CHILLED WATER PIPING FOR LEVEL-02 MEZZ. PLAN (SEGMENT-H1) PART 4 OF 4 SD H1 MECHANICAL 2-Sep-14 Yes C 2-Sep-14 S

Page 82 of 114
H-STRUCTURAL SHOP DRAWINGS SUBMITTAL LOG
CTED , S = SUPERCEDED , V = VALID 7-May-17

SEGMENT
RESPONSE DRAWING
DRAWING TITLE TYPE DISCIPLINE REPLY APPROVA REPLY DATE
REQUIRED BY STATUS
L STATUS

CHILLED WATER PIPING FOR LEVEL-02 MEZZ. PLAN (SEGMENT-H1) PART 4 OF 4 SD H1 MECHANICAL 22-Nov-14 Yes C 24-Nov-14 V

CHILLED WATER PIPING FOR LEVEL-02 MEZZ. PLAN (SEGMENT-H2) PART 1 OF 4 SD H2 MECHANICAL 2-Sep-14 Yes C 2-Sep-14 S

CHILLED WATER PIPING FOR LEVEL-02 MEZZ. PLAN (SEGMENT-H2) PART 1 OF 4 SD H2 MECHANICAL 22-Nov-14 Yes C 24-Nov-14 V

CHILLED WATER PIPING FOR LEVEL-02 MEZZ. PLAN (SEGMENT-H2) PART 2 OF 4 SD H2 MECHANICAL 2-Sep-14 Yes C 2-Sep-14 S

CHILLED WATER PIPING FOR LEVEL-02 MEZZ. PLAN (SEGMENT-H2) PART 2 OF 4 SD H2 MECHANICAL 22-Nov-14 Yes C 24-Nov-14 V

CHILLED WATER PIPING FOR LEVEL -02 MEZZ. PLAN (SEGMENT-H3) PART-2 OF 2 SD H3 MECHANICAL 2-Sep-14 Yes C 2-Sep-14 S

CHILLED WATER PIPING FOR LEVEL -02 MEZZ. PLAN (SEGMENT-H3) PART-2 OF 2 SD H3 MECHANICAL 22-Nov-14 Yes C 24-Nov-14 V

HVAC SYSTEM LAYOUT FOR LEVEL -03 PLAN (SEGNMENT-H1) PART-3 OF 4 SD H1 MECHANICAL 19-Sep-14 Yes C 20-Sep-14 V

HVAC SYSTEM LAYOUT FOR LEVEL -03 PLAN (SEGMENT-H1) PART- 4 OF 4 SD H1 MECHANICAL 19-Sep-14 Yes C 20-Sep-14 V

HVAC SYSTEM LAYOUT FOR LEVEL -03 PLAN (SEGMENT-H2) PART- 1 OF 4 SD H2 MECHANICAL 19-Sep-14 Yes C 20-Sep-14 V

HVAC SYSTEM LAYOUT FOR LEVEL -03 PLAN (SEGMENT-H2) PART- 2 OF 4 SD H2 MECHANICAL 19-Sep-14 Yes C 20-Sep-14 V

HVAC SYSTEM LAYOUT FOR LEVEL -03 PLAN (SEGMENT-H3) PART- 2 OF 2 SD H3 MECHANICAL 19-Sep-14 Yes C 20-Sep-14 V

HVAC SYSTEM LAYOUT FOR LEVEL -02 PLAN (SEGMENT-H1) PART-3 OF 4 SD H1 MECHANICAL 11-Oct-14 Yes C 23-Oct-14 S

HVAC SYSTEM LAYOUT FOR LEVEL -02 PLAN (SEGMENT-H1) PART-3 OF 4 SD H1 MECHANICAL 22-Nov-14 Yes C 25-Nov-14 V

HVAC SYSTEM LAYOUT FOR LEVEL -02 PLAN (SEGMENT-H1) PART-4 OF 4 SD H1 MECHANICAL 11-Oct-14 Yes C 23-Oct-14 S

HVAC SYSTEM LAYOUT FOR LEVEL -02 PLAN (SEGMENT-H1) PART-4 OF 4 SD H1 MECHANICAL 22-Nov-14 Yes C 25-Nov-14 V

HVAC SYSTEM LAYOUT FOR LEVEL -02 PLAN (SEGMENT-H2) PART-1 OF 4 SD H2 MECHANICAL 11-Oct-14 Yes C 23-Oct-14 S

HVAC SYSTEM LAYOUT FOR LEVEL -02 PLAN (SEGMENT-H2) PART-1 OF 4 SD H2 MECHANICAL 22-Nov-14 Yes C 25-Nov-14 V

HVAC SYSTEM LAYOUT FOR LEVEL -02 PLAN (SEGMENT-H2) PART-2 OF 4 SD H2 MECHANICAL 11-Oct-14 Yes C 23-Oct-14 S

HVAC SYSTEM LAYOUT FOR LEVEL -02 PLAN (SEGMENT-H2) PART-2 OF 4 SD H2 MECHANICAL 22-Nov-14 Yes C 25-Nov-14 V

HVAC SYSTEM LAYOUT FOR LEVEL -02 PLAN (SEGMENT-H2) PART-4 OF 4 SD H2 MECHANICAL 11-Oct-14 Yes C 23-Oct-14 S

HVAC SYSTEM LAYOUT FOR LEVEL -02 PLAN (SEGMENT-H2) PART-4 OF 4 SD H2 MECHANICAL 22-Nov-14 Yes C 25-Nov-14 V

HVAC SYSTEM LAYOUT FOR LEVEL -02 PLAN (SEGMENT-H3) PART-2 OF 2 SD H3 MECHANICAL 11-Oct-14 Yes C 23-Oct-14 S

HVAC SYSTEM LAYOUT FOR LEVEL -02 PLAN (SEGMENT-H3) PART-2 OF 2 SD H3 MECHANICAL 22-Nov-14 Yes C 25-Nov-14 V

HVAC SYSTEM LAYOUT FOR LEVEL -02 MEZZ. PLAN (SEGMENT-H1) PART-3 OF 4 SD H1 MECHANICAL 11-Oct-14 Yes C 23-Oct-14 S

Page 83 of 114
H-STRUCTURAL SHOP DRAWINGS SUBMITTAL LOG
CTED , S = SUPERCEDED , V = VALID 7-May-17

SEGMENT
RESPONSE DRAWING
DRAWING TITLE TYPE DISCIPLINE REPLY APPROVA REPLY DATE
REQUIRED BY STATUS
L STATUS

HVAC SYSTEM LAYOUT FOR LEVEL -02 MEZZ. PLAN (SEGMENT-H1) PART-3 OF 4 SD H1 MECHANICAL 22-Nov-14 Yes C 25-Nov-14 V

HVAC SYSTEM LAYOUT FOR LEVEL -02 MEZZ. PLAN (SEGMENT-H1) PART-4 OF 4 SD H1 MECHANICAL 11-Oct-14 Yes C 23-Oct-14 S

HVAC SYSTEM LAYOUT FOR LEVEL -02 MEZZ. PLAN (SEGMENT-H1) PART-4 OF 4 SD H1 MECHANICAL 22-Nov-14 Yes C 25-Nov-14 V

HVAC SYSTEM LAYOUT FOR LEVEL -02 MEZZ. PLAN (SEGMENT-H2) PART-1 OF 4 SD H2 MECHANICAL 11-Oct-14 Yes C 23-Oct-14 S

HVAC SYSTEM LAYOUT FOR LEVEL -02 MEZZ. PLAN (SEGMENT-H2) PART-1 OF 4 SD H2 MECHANICAL 22-Nov-14 Yes C 25-Nov-14 V

HVAC SYSTEM LAYOUT FOR LEVEL -02 MEZZ. PLAN (SEGMENT-H2) PART- 2 OF 4 SD H2 MECHANICAL 11-Oct-14 Yes C 23-Oct-14 S

HVAC SYSTEM LAYOUT FOR LEVEL -02 MEZZ. PLAN (SEGMENT-H2) PART- 2 OF 4 SD H2 MECHANICAL 22-Nov-14 Yes C 25-Nov-14 V

HVAC SYSTEM LAYOUT FOR LEVEL -02 MEZZ. PLAN (SEGMENT-H2) PART- 4 OF 4 SD H2 MECHANICAL 11-Oct-14 Yes C 23-Oct-14 S

HVAC SYSTEM LAYOUT FOR LEVEL -02 MEZZ. PLAN (SEGMENT-H2) PART- 4 OF 4 SD H2 MECHANICAL 22-Nov-14 Yes C 25-Nov-14 V

HVAC SYSTEM LAYOUT FOR LEVEL -02 MEZZ. PLAN (SEGMENT-H3) PART- 2 OF 2 SD H3 MECHANICAL 11-Oct-14 Yes C 23-Oct-14 S

HVAC SYSTEM LAYOUT FOR LEVEL -02 MEZZ. PLAN (SEGMENT-H3) PART- 2 OF 2 SD H3 MECHANICAL 22-Nov-14 Yes C 25-Nov-14 V

HVAC SYSTEM LAYOUT FOR LEVEL-01 PLAN (SEGMENT -H1) MASTER PLAN SD H1 MECHANICAL 28-Oct-14 Yes B 30-Oct-14 V

HVAC SYSTEM LAYOUT FOR LEVEL-01 PLAN (SEGMENT -H2) MASTER PLAN SD H2 MECHANICAL 28-Oct-14 Yes B 30-Oct-14 V

HVAC SYSTEM LAYOUT FOR LEVEL-01 PLAN (SEGMENT -H3) MASTER PLAN SD H3 MECHANICAL 28-Oct-14 Yes B 30-Oct-14 V

HVAC SYSTEM LAYOUT FOR LEVEL-04 PLAN (SEGMENT- H1) PART -3 OF 4 SD H1 MECHANICAL 22-Nov-14 Yes C 24-Nov-14 V

HVAC SYSTEM LAYOUT FOR LEVEL-04 PLAN (SEGMENT- H1) PART 4 OF 4 SD H1 MECHANICAL 22-Nov-14 Yes C 24-Nov-14 V

CHILLED WATER LAYOUT FOR LEVEL -01 MASTER PLAN (SEGMENT - H1) SD H1 MECHANICAL 22-Nov-14 Yes C 24-Nov-14 V

Page 84 of 114
KING FAISAL SPECIALIST HOSPITAL & RESEARCH CENTER, JEDDAH
KFSH-STRUCTURAL SHOP DRAWIN
ABREVIATIONS USED : A = APPROVED , B = APPROVED AS NOTED , C = REVISE & RESUBMIT , D = REJECTED , S = SUPERCEDED , V = VALID

SUB.CON.CODE
PROJECT NO

DWG TYPE
SEGMENT

S.TRADE

SERIAL
TRADE
DWG

LEVEL
ZONE
SUB Date of
Sl.No SUBMITTAL NO CONTRACTOR REV
REV NO submission
NO

1 DW/CN1169P01/00197 0 18-Nov-13 SBG-PBAD 1169 01 Z1 H0 L01 SD P DR 101122 0

2 DW/CN1169P01/00197 1 7-Dec-13 SBG-PBAD 1169 01 Z1 H0 L01 SD P DR 101122 1

3 DW/CN1169P01/00197 2 2-Mar-14 SBG-PBAD 1169 01 Z1 H1 L01 SD P DR 101122 2

4 DW/CN1169P01/00197 3 19-Mar-14 SBG-PBAD 1169 01 Z1 H1 L01 SD P DR 101122 3

5 DW/CN1169P01/00197 4 25-Jun-14 SBG-PBAD 1169 01 Z1 H1 L01 SD P DR 101122 4

6 DW/CN1169P01/00198 0 18-Nov-13 SBG-PBAD 1169 01 Z1 H0 L01 SD P DR 101123 0

7 DW/CN1169P01/00198 1 7-Dec-13 SBG-PBAD 1169 01 Z1 H0 L01 SD P DR 101123 1

8 DW/CN1169P01/00198 2 2-Mar-14 SBG-PBAD 1169 01 Z1 H1 L01 SD P DR 101123 2

9 DW/CN1169P01/00198 3 19-Mar-14 SBG-PBAD 1169 01 Z1 H1 L01 SD P DR 101123 3

10 DW/CN1169P01/00198 4 25-Jun-14 SBG-PBAD 1169 01 Z1 H1 L01 SD P DR 101123 4

11 DW/CN1169P01/00199 0 18-Nov-13 SBG-PBAD 1169 01 Z1 H0 L01 SD P DR 101124 0

12 DW/CN1169P01/00199 1 7-Dec-13 SBG-PBAD 1169 01 Z1 H0 L01 SD P DR 101124 1

13 DW/CN1169P01/00199 2 2-Mar-14 SBG-PBAD 1169 01 Z1 H1 L01 SD P DR 101124 2

14 DW/CN1169P01/00199 3 19-Mar-14 SBG-PBAD 1169 01 Z1 H1 L01 SD P DR 101124 3

15 DW/CN1169P01/00199 4 25-Jun-14 SBG-PBAD 1169 01 Z1 H1 L01 SD P DR 101124 4

16 DW/CN1169P01/00200 0 18-Nov-13 SBG-PBAD 1169 01 Z1 H0 L01 SD P DR 101125 0

17 DW/CN1169P01/00200 1 7-Dec-13 SBG-PBAD 1169 01 Z1 H0 L01 SD P DR 101125 1

18 DW/CN1169P01/00200 2 2-Mar-14 SBG-PBAD 1169 01 Z1 H1 L01 SD P DR 101125 2

19 DW/CN1169P01/00200 3 19-Mar-14 SBG-PBAD 1169 01 Z1 H1 L01 SD P DR 101125 3

20 DW/CN1169P01/00200 4 25-Jun-14 SBG-PBAD 1169 01 Z1 H1 L01 SD P DR 101125 4

21 DW/CN1169P01/00304 0 7-Dec-13 SBG-PBAD 1169 01 Z1 H0 L01 SD P DR 101121 0

22 DW/CN1169P01/00304 1 2-Mar-14 SBG-PBAD 1169 01 Z1 H1 L01 SD P DR 101121 1

23 DW/CN1169P01/00304 2 19-Mar-14 SBG-PBAD 1169 01 Z1 H1 L01 SD P DR 101121 2

24 DW/CN1169P01/00304 3 25-Jun-14 SBG-PBAD 1169 01 Z1 H1 L01 SD P DR 101121 3

25 DW/CN1169P01/00305 0 7-Dec-13 SBG-PBAD 1169 01 Z1 H0 L01 SD P DR 101131 0

Page 85 of 114
KING FAISAL SPECIALIST HOSPITAL & RESEARCH CENTER, JEDDAH
KFSH-STRUCTURAL SHOP DRAWIN
ABREVIATIONS USED : A = APPROVED , B = APPROVED AS NOTED , C = REVISE & RESUBMIT , D = REJECTED , S = SUPERCEDED , V = VALID

SUB.CON.CODE
PROJECT NO

DWG TYPE
SEGMENT

S.TRADE

SERIAL
TRADE
DWG

LEVEL
ZONE
SUB Date of
Sl.No SUBMITTAL NO CONTRACTOR REV
REV NO submission
NO

26 DW/CN1169P01/00305 1 2-Mar-14 SBG-PBAD 1169 01 Z1 H3 L01 SD P DR 101131 1

27 DW/CN1169P01/00305 2 25-Jun-14 SBG-PBAD 1169 01 Z1 H3 L01 SD P DR 101131 2

28 DW/CN1169P01/00305 3 24-Jul-14 SBG-PBAD 1169 01 Z1 H3 L01 SD P DR 101131 3

29 DW/CN1169P01/00306 0 7-Dec-13 SBG-PBAD 1169 01 Z1 H3 L01 SD P DR 101133 0

30 DW/CN1169P01/00306 1 2-Mar-14 SBG-PBAD 1169 01 Z1 H3 L01 SD P DR 101133 1

31 DW/CN1169P01/00306 2 25-Jun-14 SBG-PBAD 1169 01 Z1 H3 L01 SD P DR 101133 2

32 DW/CN1169P01/00306 3 24-Jul-14 SBG-PBAD 1169 01 Z1 H3 L01 SD P DR 101133 3

33 DW/CN1169P01/00320 0 8-Dec-13 SBG-PBAD 1169 01 Z1 H0 LS1 SD P DR 101112 0

34 DW/CN1169P01/00320 1 3-Aug-14 SBG-PBAD 1169 01 Z1 H0 LS1 SD P DR 101112 1

35 DW/CN1169P01/00320 2 24-Dec-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD P DR 101112 2

36 DW/CN1169P01/00321 0 8-Dec-13 SBG-PBAD 1169 01 Z1 H0 LS1 SD P DR 101113 0

37 DW/CN1169P01/00321 1 3-Aug-14 SBG-PBAD 1169 01 Z1 H0 LS1 SD P DR 101113 1

38 DW/CN1169P01/00321 2 24-Dec-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD P DR 101113 2

39 DW/CN1169P01/00322 0 8-Dec-13 SBG-PBAD 1169 01 Z1 H1 LS1 SD P DR 101114 0

40 DW/CN1169P01/00322 1 3-Aug-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD P DR 101114 1

41 DW/CN1169P01/00322 2 24-Dec-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD P DR 101114 2

42 DW/CN1169P01/00323 0 8-Dec-13 SBG-PBAD 1169 01 Z1 H2 LS1 SD P DR 101116 0

43 DW/CN1169P01/00323 1 3-Aug-14 SBG-PBAD 1169 01 Z1 H2 LS1 SD P DR 101116 1

44 DW/CN1169P01/00323 2 24-Dec-14 SBG-PBAD 1169 01 Z1 H2 LS1 SD P DR 101116 2

45 DW/CN1169P01/00324 0 8-Dec-13 SBG-PBAD 1169 01 Z1 H1 LS1 SD P DR 101118 0

46 DW/CN1169P01/00324 1 3-Aug-14 SBG-PBAD 1169 01 Z1 H2 LS1 SD P DR 101118 1

47 DW/CN1169P01/00324 2 24-Dec-14 SBG-PBAD 1169 01 Z1 H2 LS1 SD P DR 101118 2

48 DW/CN1169P01/00390 0 15-Dec-13 SBG-PBAD 1169 01 Z1 H1 L01 SD P DR 101126 0

49 DW/CN1169P01/00390 1 19-Feb-14 SBG-PBAD 1169 01 Z1 H2 L01 SD P DR 101126 1

50 DW/CN1169P01/00390 2 17-Mar-14 SBG-PBAD 1169 01 Z1 H2 L01 SD P DR 101126 2

Page 86 of 114
KING FAISAL SPECIALIST HOSPITAL & RESEARCH CENTER, JEDDAH
KFSH-STRUCTURAL SHOP DRAWIN
ABREVIATIONS USED : A = APPROVED , B = APPROVED AS NOTED , C = REVISE & RESUBMIT , D = REJECTED , S = SUPERCEDED , V = VALID

SUB.CON.CODE
PROJECT NO

DWG TYPE
SEGMENT

S.TRADE

SERIAL
TRADE
DWG

LEVEL
ZONE
SUB Date of
Sl.No SUBMITTAL NO CONTRACTOR REV
REV NO submission
NO

51 DW/CN1169P01/00390 3 21-Jun-14 SBG-PBAD 1169 01 Z1 H2 L01 SD P DR 101126 3

52 DW/CN1169P01/00391 0 15-Dec-13 SBG-PBAD 1169 01 Z1 H1 L01 SD P DR 101127 0

53 DW/CN1169P01/00391 1 19-Feb-14 SBG-PBAD 1169 01 Z1 H2 L01 SD P DR 101127 1

54 DW/CN1169P01/00391 2 17-Mar-14 SBG-PBAD 1169 01 Z1 H2 L01 SD P DR 101127 2

55 DW/CN1169P01/00391 3 21-Jun-14 SBG-PBAD 1169 01 Z1 H2 L01 SD P DR 101127 3

56 DW/CN1169P01/00392 0 15-Dec-13 SBG-PBAD 1169 01 Z1 H1 L01 SD P DR 101128 0

57 DW/CN1169P01/00392 1 19-Feb-14 SBG-PBAD 1169 01 Z1 H2 L01 SD P DR 101128 1

58 DW/CN1169P01/00392 2 17-Mar-14 SBG-PBAD 1169 01 Z1 H2 L01 SD P DR 101128 2

59 DW/CN1169P01/00392 3 21-Jun-14 SBG-PBAD 1169 01 Z1 H2 L01 SD P DR 101128 3

60 DW/CN1169P01/00393 0 15-Dec-13 SBG-PBAD 1169 01 Z1 H1 L01 SD P DR 101129 0

61 DW/CN1169P01/00393 1 19-Feb-14 SBG-PBAD 1169 01 Z1 H2 L01 SD P DR 101129 1

62 DW/CN1169P01/00393 2 17-Mar-14 SBG-PBAD 1169 01 Z1 H2 L01 SD P DR 101129 2

63 DW/CN1169P01/00393 3 21-Jun-14 SBG-PBAD 1169 01 Z1 H2 L01 SD P DR 101129 3

64 DW/CN1169P01/00394 0 15-Dec-13 SBG-PBAD 1169 01 Z1 H1 L01 SD P DR 101130 0

65 DW/CN1169P01/00394 1 19-Feb-14 SBG-PBAD 1169 01 Z1 H2 L01 SD P DR 101130 1

66 DW/CN1169P01/00394 2 17-Mar-14 SBG-PBAD 1169 01 Z1 H2 L01 SD P DR 101130 2

67 DW/CN1169P01/00394 3 21-Jun-14 SBG-PBAD 1169 01 Z1 H2 L01 SD P DR 101130 3

68 DW/CN1169P01/00483 0 13-Jan-14 SBG-PBAD 1169 01 Z1 H0 LS1 SD P BW 001112 0

69 DW/CN1169P01/00483 1 24-Dec-14 SBG-PBAD 1169 01 Z1 H0 LS1 SD P BW 001112 1

70 DW/CN1169P01/00484 0 13-Jan-14 SBG-PBAD 1169 01 Z1 H0 LS1 SD P BW 001113 0

71 DW/CN1169P01/00484 1 21-Jun-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD P BW 001113 1

72 DW/CN1169P01/00484 2 24-Aug-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD P BW 001113 2

73 DW/CN1169P01/00484 3 24-Dec-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD P BW 001113 3

74 DW/CN1169P01/00485 0 13-Jan-14 SBG-PBAD 1169 01 Z1 H0 LS1 SD P BW 001114 0

75 DW/CN1169P01/00485 1 15-Mar-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD P BW 001114 1

Page 87 of 114
KING FAISAL SPECIALIST HOSPITAL & RESEARCH CENTER, JEDDAH
KFSH-STRUCTURAL SHOP DRAWIN
ABREVIATIONS USED : A = APPROVED , B = APPROVED AS NOTED , C = REVISE & RESUBMIT , D = REJECTED , S = SUPERCEDED , V = VALID

SUB.CON.CODE
PROJECT NO

DWG TYPE
SEGMENT

S.TRADE

SERIAL
TRADE
DWG

LEVEL
ZONE
SUB Date of
Sl.No SUBMITTAL NO CONTRACTOR REV
REV NO submission
NO

76 DW/CN1169P01/00485 2 21-Jun-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD P BW 001114 2

77 DW/CN1169P01/00485 3 24-Dec-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD P BW 001114 3

78 DW/CN1169P01/00486 0 13-Jan-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD P BW 001116 0

79 DW/CN1169P01/00486 1 15-Mar-14 SBG-PBAD 1169 01 Z1 H2 LS1 SD P BW 001116 1

80 DW/CN1169P01/00486 2 27-May-14 SBG-PBAD 1169 01 Z1 H2 LS1 SD P BW 001116 2

81 DW/CN1169P01/00486 3 24-Dec-14 SBG-PBAD 1169 01 Z1 H2 LS1 SD P BW 001116 3

82 DW/CN1169P01/00487 0 13-Jan-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD P BW 001118 0

83 DW/CN1169P01/00487 1 15-Mar-14 SBG-PBAD 1169 01 Z1 H2 LS1 SD P BW 001118 1

84 DW/CN1169P01/00487 2 27-May-14 SBG-PBAD 1169 01 Z1 H2 LS1 SD P BW 001118 2

85 DW/CN1169P01/00487 3 18-Jun-14 SBG-PBAD 1169 01 Z1 H2 LS1 SD P BW 001118 3

86 DW/CN1169P01/00487 4 24-Dec-14 SBG-PBAD 1169 01 Z1 H2 LS1 SD P BW 001118 4

87 DW/CN1169P01/00488 0 13-Jan-14 SBG-PBAD 1169 01 Z1 H0 LS1 SD P BW 001111 0

88 DW/CN1169P01/00488 1 15-Mar-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD P BW 001111 1

89 DW/CN1169P01/00488 2 21-Jun-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD P BW 001111 2

90 DW/CN1169P01/00488 3 24-Dec-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD P BW 001111 3

91 DW/CN1169P01/00489 0 13-Jan-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD P BW 001120 0

92 DW/CN1169P01/00489 1 15-Mar-14 SBG-PBAD 1169 01 Z1 H2 LS1 SD P BW 001120 1

93 DW/CN1169P01/00489 2 27-May-14 SBG-PBAD 1169 01 Z1 H2 LS1 SD P BW 001120 2

94 DW/CN1169P01/00489 3 18-Jun-14 SBG-PBAD 1169 01 Z1 H2 LS1 SD P BW 001120 3

95 DW/CN1169P01/00489 4 24-Dec-14 SBG-PBAD 1169 01 Z1 H2 LS1 SD P BW 001120 4

96 DW/CN1169P01/00639 0 24-Feb-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD P WS 201111 0

97 DW/CN1169P01/00639 1 24-Jul-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD P WS 201111 1

98 DW/CN1169P01/00639 2 24-Dec-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD P WS 201111 2

99 DW/CN1169P01/00640 0 24-Feb-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD P WS 201112 0

100 DW/CN1169P01/00640 1 24-Jul-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD P WS 201112 1

Page 88 of 114
KING FAISAL SPECIALIST HOSPITAL & RESEARCH CENTER, JEDDAH
KFSH-STRUCTURAL SHOP DRAWIN
ABREVIATIONS USED : A = APPROVED , B = APPROVED AS NOTED , C = REVISE & RESUBMIT , D = REJECTED , S = SUPERCEDED , V = VALID

SUB.CON.CODE
PROJECT NO

DWG TYPE
SEGMENT

S.TRADE

SERIAL
TRADE
DWG

LEVEL
ZONE
SUB Date of
Sl.No SUBMITTAL NO CONTRACTOR REV
REV NO submission
NO

101 DW/CN1169P01/00640 2 24-Dec-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD P WS 201112 2

102 DW/CN1169P01/00641 0 24-Feb-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD P WS 201114 0

103 DW/CN1169P01/00641 1 24-Jul-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD P WS 201114 1

104 DW/CN1169P01/00641 2 24-Dec-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD P WS 201114 2

105 DW/CN1169P01/00642 0 24-Feb-14 SBG-PBAD 1169 01 Z1 H2 LS1 SD P WS 201116 0

106 DW/CN1169P01/00642 1 24-Jul-14 SBG-PBAD 1169 01 Z1 H2 LS1 SD P WS 201116 1

107 DW/CN1169P01/00642 2 17-Sep-14 SBG-PBAD 1169 01 Z1 H2 LS1 SD P WS 201116 2

108 DW/CN1169P01/00643 0 24-Feb-14 SBG-PBAD 1169 01 Z1 H2 LS1 SD P WS 201117 0

109 DW/CN1169P01/00643 1 24-Jul-14 SBG-PBAD 1169 01 Z1 H2 LS1 SD P WS 201117 1

110 DW/CN1169P01/00643 2 17-Sep-14 SBG-PBAD 1169 01 Z1 H2 LS1 SD P WS 201117 2

111 DW/CN1169P01/00644 0 24-Feb-14 SBG-PBAD 1169 01 Z1 H2 LS1 SD P WS 201119 0

112 DW/CN1169P01/00644 1 24-Feb-14 SBG-PBAD 1169 01 Z1 H2 LS1 SD P WS 201119 1

113 DW/CN1169P01/00644 2 17-Sep-14 SBG-PBAD 1169 01 Z1 H2 LS1 SD P WS 201119 2

114 DW/CN1169P01/00672 0 2-Mar-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD P FF 301111 0

115 DW/CN1169P01/00672 1 12-Apr-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD P FF 301111 1

116 DW/CN1169P01/00672 2 24-Jul-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD P FF 301111 2

117 DW/CN1169P01/00672 3 24-Dec-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD P FF 301111 3

118 DW/CN1169P01/00673 0 2-Mar-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD P FF 301112 0

119 DW/CN1169P01/00673 1 12-Apr-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD P FF 301112 1

120 DW/CN1169P01/00673 2 24-Jul-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD P FF 301112 2

121 DW/CN1169P01/00673 3 24-Dec-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD P FF 301112 3

122 DW/CN1169P01/00674 0 2-Mar-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD P FF 301113 0

123 DW/CN1169P01/00674 1 12-Apr-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD P FF 301113 1

124 DW/CN1169P01/00674 2 24-Jul-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD P FF 301113 2

125 DW/CN1169P01/00674 3 24-Dec-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD P FF 301113 3

Page 89 of 114
KING FAISAL SPECIALIST HOSPITAL & RESEARCH CENTER, JEDDAH
KFSH-STRUCTURAL SHOP DRAWIN
ABREVIATIONS USED : A = APPROVED , B = APPROVED AS NOTED , C = REVISE & RESUBMIT , D = REJECTED , S = SUPERCEDED , V = VALID

SUB.CON.CODE
PROJECT NO

DWG TYPE
SEGMENT

S.TRADE

SERIAL
TRADE
DWG

LEVEL
ZONE
SUB Date of
Sl.No SUBMITTAL NO CONTRACTOR REV
REV NO submission
NO

126 DW/CN1169P01/00675 0 2-Mar-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD P FF 301114 0

127 DW/CN1169P01/00675 1 12-Apr-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD P FF 301114 1

128 DW/CN1169P01/00675 2 24-Jul-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD P FF 301114 2

129 DW/CN1169P01/00675 3 24-Dec-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD P FF 301114 3

130 DW/CN1169P01/00676 0 2-Mar-14 SBG-PBAD 1169 01 Z1 H2 LS1 SD P FF 301116 0

131 DW/CN1169P01/00676 1 12-Apr-14 SBG-PBAD 1169 01 Z1 H2 LS1 SD P FF 301116 1

132 DW/CN1169P01/00676 2 24-Jul-14 SBG-PBAD 1169 01 Z1 H2 LS1 SD P FF 301116 2

133 DW/CN1169P01/00676 3 17-Sep-14 SBG-PBAD 1169 01 Z1 H2 LS1 SD P FF 301116 3

134 DW/CN1169P01/00677 0 2-Mar-14 SBG-PBAD 1169 01 Z1 H2 LS1 SD P FF 301117 0

135 DW/CN1169P01/00677 1 12-Apr-14 SBG-PBAD 1169 01 Z1 H2 LS1 SD P FF 301117 1

136 DW/CN1169P01/00677 2 24-Jul-14 SBG-PBAD 1169 01 Z1 H2 LS1 SD P FF 301117 2

137 DW/CN1169P01/00677 3 17-Sep-14 SBG-PBAD 1169 01 Z1 H2 LS1 SD P FF 301117 3

138 DW/CN1169P01/00678 0 2-Mar-14 SBG-PBAD 1169 01 Z1 H2 LS1 SD P FF 301119 0

139 DW/CN1169P01/00678 1 12-Apr-14 SBG-PBAD 1169 01 Z1 H2 LS1 SD P FF 301119 1

140 DW/CN1169P01/00678 2 24-Jul-14 SBG-PBAD 1169 01 Z1 H2 LS1 SD P FF 301119 2

141 DW/CN1169P01/00678 3 17-Sep-14 SBG-PBAD 1169 01 Z1 H2 LS1 SD P FF 301119 3

142 DW/CN1169P01/00679 0 2-Mar-14 SBG-PBAD 1169 01 00 00 000 SD P DT 202501 0

143 DW/CN1169P01/00680 0 2-Mar-14 SBG-PBAD 1169 01 Z1 H3 L01 SD P DR 101132 0

144 DW/CN1169P01/00680 1 25-Jun-14 SBG-PBAD 1169 01 Z1 H3 L01 SD P DR 101132 1

145 DW/CN1169P01/00680 2 24-Jul-14 SBG-PBAD 1169 01 Z1 H3 L01 SD P DR 101132 2

146 DW/CN1169P01/00703 0 17-Mar-14 SBG-PBAD 1169 01 Z1 H2 L01 SD P BW 001126 0

147 DW/CN1169P01/00704 0 17-Mar-14 SBG-PBAD 1169 01 Z1 H2 L01 SD P BW 001127 0

148 DW/CN1169P01/00705 0 17-Mar-14 SBG-PBAD 1169 01 Z1 H2 L01 SD P BW 001128 0

149 DW/CN1169P01/00706 0 17-Mar-14 SBG-PBAD 1169 01 Z1 H2 L01 SD P BW 001129 0

150 DW/CN1169P01/00707 0 17-Mar-14 SBG-PBAD 1169 01 Z1 H2 L01 SD P BW 001130 0

Page 90 of 114
KING FAISAL SPECIALIST HOSPITAL & RESEARCH CENTER, JEDDAH
KFSH-STRUCTURAL SHOP DRAWIN
ABREVIATIONS USED : A = APPROVED , B = APPROVED AS NOTED , C = REVISE & RESUBMIT , D = REJECTED , S = SUPERCEDED , V = VALID

SUB.CON.CODE
PROJECT NO

DWG TYPE
SEGMENT

S.TRADE

SERIAL
TRADE
DWG

LEVEL
ZONE
SUB Date of
Sl.No SUBMITTAL NO CONTRACTOR REV
REV NO submission
NO

151 DW/CN1169P01/00710 0 2-Apr-14 SBG-PBAD 1169 01 Z1 H1 L01 SD P DR 101136 0

152 DW/CN1169P01/00710 1 21-Aug-14 SBG-PBAD 1169 01 Z1 H1 L01 SD P DR 101136 1

153 DW/CN1169P01/00710 2 21-Oct-14 SBG-PBAD 1169 01 Z1 H1 L01 SD P DR 101136 2

154 DW/CN1169P01/00711 0 2-Apr-14 SBG-PBAD 1169 01 Z1 H1 L01 SD P DR 101137 0

155 DW/CN1169P01/00711 1 21-Aug-14 SBG-PBAD 1169 01 Z1 H1 L01 SD P DR 101137 1

156 DW/CN1169P01/00711 2 21-Oct-14 SBG-PBAD 1169 01 Z1 H1 L01 SD P DR 101137 2

157 DW/CN1169P01/00712 0 2-Apr-14 SBG-PBAD 1169 01 Z1 H1 L01 SD P DR 101138 0

158 DW/CN1169P01/00712 1 21-Aug-14 SBG-PBAD 1169 01 Z1 H1 L01 SD P DR 101138 1

159 DW/CN1169P01/00712 2 21-Oct-14 SBG-PBAD 1169 01 Z1 H1 L01 SD P DR 101138 2

160 DW/CN1169P01/00713 0 2-Apr-14 SBG-PBAD 1169 01 Z1 H1 L01 SD P DR 101139 0

161 DW/CN1169P01/00713 1 21-Aug-14 SBG-PBAD 1169 01 Z1 H1 L01 SD P DR 101139 1

162 DW/CN1169P01/00713 2 21-Oct-14 SBG-PBAD 1169 01 Z1 H1 L01 SD P DR 101139 2

163 DW/CN1169P01/00714 0 2-Apr-14 SBG-PBAD 1169 01 Z1 H1 L01 SD P DR 101140 0

164 DW/CN1169P01/00714 1 21-Aug-14 SBG-PBAD 1169 01 Z1 H1 L01 SD P DR 101140 1

165 DW/CN1169P01/00714 2 21-Oct-14 SBG-PBAD 1169 01 Z1 H1 L01 SD P DR 101140 2

166 DW/CN1169P01/00715 0 2-Apr-14 SBG-PBAD 1169 01 Z1 H2 L01 SD P DR 101141 0

167 DW/CN1169P01/00715 1 21-Aug-14 SBG-PBAD 1169 01 Z1 H2 L01 SD P DR 101141 1

168 DW/CN1169P01/00715 2 21-Oct-14 SBG-PBAD 1169 01 Z1 H2 L01 SD P DR 101141 2

169 DW/CN1169P01/00716 0 2-Apr-14 SBG-PBAD 1169 01 Z1 H2 L01 SD P DR 101142 0

170 DW/CN1169P01/00716 1 21-Aug-14 SBG-PBAD 1169 01 Z1 H2 L01 SD P DR 101142 1

171 DW/CN1169P01/00716 2 21-Oct-14 SBG-PBAD 1169 01 Z1 H2 L01 SD P DR 101142 2

172 DW/CN1169P01/00717 0 2-Apr-14 SBG-PBAD 1169 01 Z1 H2 L01 SD P DR 101143 0

173 DW/CN1169P01/00717 1 21-Aug-14 SBG-PBAD 1169 01 Z1 H2 L01 SD P DR 101143 1

174 DW/CN1169P01/00717 2 21-Oct-14 SBG-PBAD 1169 01 Z1 H2 L01 SD P DR 101143 2

175 DW/CN1169P01/00718 0 2-Apr-14 SBG-PBAD 1169 01 Z1 H2 L01 SD P DR 101144 0

Page 91 of 114
KING FAISAL SPECIALIST HOSPITAL & RESEARCH CENTER, JEDDAH
KFSH-STRUCTURAL SHOP DRAWIN
ABREVIATIONS USED : A = APPROVED , B = APPROVED AS NOTED , C = REVISE & RESUBMIT , D = REJECTED , S = SUPERCEDED , V = VALID

SUB.CON.CODE
PROJECT NO

DWG TYPE
SEGMENT

S.TRADE

SERIAL
TRADE
DWG

LEVEL
ZONE
SUB Date of
Sl.No SUBMITTAL NO CONTRACTOR REV
REV NO submission
NO

176 DW/CN1169P01/00718 1 21-Aug-14 SBG-PBAD 1169 01 Z1 H2 L01 SD P DR 101144 1

177 DW/CN1169P01/00718 2 21-Oct-14 SBG-PBAD 1169 01 Z1 H2 L01 SD P DR 101144 2

178 DW/CN1169P01/00719 0 2-Apr-14 SBG-PBAD 1169 01 Z1 H2 L01 SD P DR 101145 0

179 DW/CN1169P01/00719 1 21-Aug-14 SBG-PBAD 1169 01 Z1 H2 L01 SD P DR 101145 1

180 DW/CN1169P01/00719 2 21-Oct-14 SBG-PBAD 1169 01 Z1 H2 L01 SD P DR 101145 2

181 DW/CN1169P01/00720 0 2-Apr-14 SBG-PBAD 1169 01 Z1 H3 L01 SD P DR 101146 0

182 DW/CN1169P01/00720 1 21-Aug-14 SBG-PBAD 1169 01 Z1 H3 L01 SD P DR 101146 1

183 DW/CN1169P01/00720 2 21-Oct-14 SBG-PBAD 1169 01 Z1 H3 L01 SD P DR 101146 2

184 DW/CN1169P01/00721 0 2-Apr-14 SBG-PBAD 1169 01 Z1 H3 L01 SD P DR 101147 0

185 DW/CN1169P01/00721 1 21-Aug-14 SBG-PBAD 1169 01 Z1 H3 L01 SD P DR 101147 1

186 DW/CN1169P01/00721 2 21-Oct-14 SBG-PBAD 1169 01 Z1 H3 L01 SD P DR 101147 2

187 DW/CN1169P01/00722 0 2-Apr-14 SBG-PBAD 1169 01 Z1 H3 L01 SD P DR 101148 0

188 DW/CN1169P01/00722 1 21-Aug-14 SBG-PBAD 1169 01 Z1 H3 L01 SD P DR 101148 1

189 DW/CN1169P01/00722 2 21-Oct-14 SBG-PBAD 1169 01 Z1 H3 L01 SD P DR 101148 2

190 DW/CN1169P01/00752 0 12-May-14 SBG-PBAD 1169 01 Z1 H2 L02 SD P BW 001146 0

191 DW/CN1169P01/00752 1 11-Aug-14 SBG-PBAD 1169 01 Z1 H2 L02 SD P BW 001146 1

192 DW/CN1169P01/00752 2 19-Oct-14 SBG-PBAD 1169 01 Z1 H2 L02 SD P BW 001146 2

193 DW/CN1169P01/00752 3 2-Nov-14 SBG-PBAD 1169 01 Z1 H2 L02 SD P BW 001146 3

194 DW/CN1169P01/00753 0 12-May-14 SBG-PBAD 1169 01 Z1 H2 L02 SD P BW 001147 0

195 DW/CN1169P01/00753 1 11-Aug-14 SBG-PBAD 1169 01 Z1 H2 L02 SD P BW 001147 1

196 DW/CN1169P01/00753 2 19-Oct-14 SBG-PBAD 1169 01 Z1 H2 L02 SD P BW 001147 2

197 DW/CN1169P01/00753 3 2-Nov-14 SBG-PBAD 1169 01 Z1 H2 L02 SD P BW 001147 3

198 DW/CN1169P01/00754 0 12-May-14 SBG-PBAD 1169 01 Z1 H2 L02 SD P BW 001148 0

199 DW/CN1169P01/00754 1 11-Aug-14 SBG-PBAD 1169 01 Z1 H2 L02 SD P BW 001148 1

200 DW/CN1169P01/00754 2 19-Oct-14 SBG-PBAD 1169 01 Z1 H2 L02 SD P BW 001148 2

Page 92 of 114
KING FAISAL SPECIALIST HOSPITAL & RESEARCH CENTER, JEDDAH
KFSH-STRUCTURAL SHOP DRAWIN
ABREVIATIONS USED : A = APPROVED , B = APPROVED AS NOTED , C = REVISE & RESUBMIT , D = REJECTED , S = SUPERCEDED , V = VALID

SUB.CON.CODE
PROJECT NO

DWG TYPE
SEGMENT

S.TRADE

SERIAL
TRADE
DWG

LEVEL
ZONE
SUB Date of
Sl.No SUBMITTAL NO CONTRACTOR REV
REV NO submission
NO

201 DW/CN1169P01/00754 3 2-Nov-14 SBG-PBAD 1169 01 Z1 H2 L02 SD P BW 001148 3

202 DW/CN1169P01/00755 0 12-May-14 SBG-PBAD 1169 01 Z1 H2 L02 SD P BW 001149 0

203 DW/CN1169P01/00755 1 11-Aug-14 SBG-PBAD 1169 01 Z1 H2 L02 SD P BW 001149 1

204 DW/CN1169P01/00755 2 19-Oct-14 SBG-PBAD 1169 01 Z1 H2 L02 SD P BW 001149 2

205 DW/CN1169P01/00755 3 2-Nov-14 SBG-PBAD 1169 01 Z1 H2 L02 SD P BW 001149 3

206 DW/CN1169P01/00756 0 12-May-14 SBG-PBAD 1169 01 Z1 H2 L02 SD P DR 101156 0

207 DW/CN1169P01/00756 1 6-Nov-14 SBG-PBAD 1169 01 Z1 H2 L02 SD P DR 101156 1

208 DW/CN1169P01/00757 0 12-May-14 SBG-PBAD 1169 01 Z1 H2 L02 SD P DR 101157 0

209 DW/CN1169P01/00757 1 6-Nov-14 SBG-PBAD 1169 01 Z1 H2 L02 SD P DR 101157 1

210 DW/CN1169P01/00758 0 12-May-14 SBG-PBAD 1169 01 Z1 H2 L02 SD P DR 101158 0

211 DW/CN1169P01/00758 1 6-Nov-14 SBG-PBAD 1169 01 Z1 H2 L02 SD P DR 101158 1

212 DW/CN1169P01/00759 0 12-May-14 SBG-PBAD 1169 01 Z1 H2 L02 SD P DR 101159 0

213 DW/CN1169P01/00759 1 6-Nov-14 SBG-PBAD 1169 01 Z1 H2 L02 SD P DR 101159 1

214 DW/CN1169P01/00760 0 12-May-14 SBG-PBAD 1169 01 Z1 H2 L02 SD P DR 101160 0

215 DW/CN1169P01/00760 1 6-Nov-14 SBG-PBAD 1169 01 Z1 H2 L02 SD P DR 101160 1

216 DW/CN1169P01/00761 0 12-May-14 SBG-PBAD 1169 01 Z1 H2 L02 SD P BW 001150 0

217 DW/CN1169P01/00761 1 11-Aug-14 SBG-PBAD 1169 01 Z1 H2 L02 SD P BW 001150 1

218 DW/CN1169P01/00761 2 19-Oct-14 SBG-PBAD 1169 01 Z1 H2 L02 SD P BW 001150 2

219 DW/CN1169P01/00761 3 2-Nov-14 SBG-PBAD 1169 01 Z1 H2 L02 SD P BW 001150 3

220 DW/CN1169P01/00806 0 25-Jun-14 SBG-PBAD 1169 01 00 00 000 SD P DT 105101 0

221 DW/CN1169P01/00832 0 20-Jul-14 SBG-PBAD 1169 01 Z1 H1 L01 SD P BW 001121 0

222 DW/CN1169P01/00832 1 13-Aug-14 SBG-PBAD 1169 01 Z1 H1 L01 SD P BW 001121 1

223 DW/CN1169P01/00833 0 20-Jul-14 SBG-PBAD 1169 01 Z1 H1 L01 SD P BW 001122 0

224 DW/CN1169P01/00833 1 13-Aug-14 SBG-PBAD 1169 01 Z1 H1 L01 SD P BW 001122 1

225 DW/CN1169P01/00834 0 20-Jul-14 SBG-PBAD 1169 01 Z1 H1 L01 SD P BW 001123 0

Page 93 of 114
KING FAISAL SPECIALIST HOSPITAL & RESEARCH CENTER, JEDDAH
KFSH-STRUCTURAL SHOP DRAWIN
ABREVIATIONS USED : A = APPROVED , B = APPROVED AS NOTED , C = REVISE & RESUBMIT , D = REJECTED , S = SUPERCEDED , V = VALID

SUB.CON.CODE
PROJECT NO

DWG TYPE
SEGMENT

S.TRADE

SERIAL
TRADE
DWG

LEVEL
ZONE
SUB Date of
Sl.No SUBMITTAL NO CONTRACTOR REV
REV NO submission
NO

226 DW/CN1169P01/00834 1 13-Aug-14 SBG-PBAD 1169 01 Z1 H1 L01 SD P BW 001123 1

227 DW/CN1169P01/00834 2 24-Aug-14 SBG-PBAD 1169 01 Z1 H1 L01 SD P BW 001123 2

228 DW/CN1169P01/00835 0 20-Jul-14 SBG-PBAD 1169 01 Z1 H1 L01 SD P BW 001124 0

229 DW/CN1169P01/00835 1 13-Aug-14 SBG-PBAD 1169 01 Z1 H1 L01 SD P BW 001124 1

230 DW/CN1169P01/00836 0 20-Jul-14 SBG-PBAD 1169 01 Z1 H1 L01 SD P BW 001125 0

231 DW/CN1169P01/00836 1 13-Aug-14 SBG-PBAD 1169 01 Z1 H1 L01 SD P BW 001125 1

232 DW/CN1169P01/00854 0 24-Jul-14 SBG-PBAD 1169 01 Z1 H3 L01 SD P BW 001131 0

233 DW/CN1169P01/00855 0 24-Jul-14 SBG-PBAD 1169 01 Z1 H3 L01 SD P BW 001132 0

234 DW/CN1169P01/00856 0 24-Jul-14 SBG-PBAD 1169 01 Z1 H3 L01 SD P BW 001133 0

235 DW/CN1169P01/00857 0 3-Aug-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD P DR 101111 0

236 DW/CN1169P01/00857 1 24-Dec-14 SBG-PBAD 1169 01 Z1 H1 LS1 SD P DR 101111 1

237 DW/CN1169P01/00858 0 3-Aug-14 SBG-PBAD 1169 01 Z1 H2 LS1 SD P DR 101120 0

238 DW/CN1169P01/00858 1 24-Dec-14 SBG-PBAD 1169 01 Z1 H2 LS1 SD P DR 101120 1

239 DW/CN1169P01/01129 0 1-Sep-14 SBG-PBAD 1169 01 Z1 H1 L01 SD P WS 201121 0

240 DW/CN1169P01/01129 1 22-Oct-14 SBG-PBAD 1169 01 Z1 H1 L01 SD P WS 201121 1

241 DW/CN1169P01/01130 0 1-Sep-14 SBG-PBAD 1169 01 Z1 H1 L01 SD P WS 201122 0

242 DW/CN1169P01/01130 1 22-Oct-14 SBG-PBAD 1169 01 Z1 H1 L01 SD P WS 201122 1

243 DW/CN1169P01/01131 0 1-Sep-14 SBG-PBAD 1169 01 Z1 H1 L01 SD P WS 201123 0

244 DW/CN1169P01/01131 1 22-Oct-14 SBG-PBAD 1169 01 Z1 H1 L01 SD P WS 201123 1

245 DW/CN1169P01/01132 0 1-Sep-14 SBG-PBAD 1169 01 Z1 H1 L01 SD P WS 201124 0

246 DW/CN1169P01/01132 1 22-Oct-14 SBG-PBAD 1169 01 Z1 H1 L01 SD P WS 201124 1

247 DW/CN1169P01/01133 0 1-Sep-14 SBG-PBAD 1169 01 Z1 H1 L01 SD P WS 201125 0

248 DW/CN1169P01/01133 1 22-Oct-14 SBG-PBAD 1169 01 Z1 H1 L01 SD P WS 201125 1

249 DW/CN1169P01/01134 0 1-Sep-14 SBG-PBAD 1169 01 Z1 H2 L01 SD P WS 201126 0

250 DW/CN1169P01/01134 1 22-Oct-14 SBG-PBAD 1169 01 Z1 H2 L01 SD P WS 201126 1

Page 94 of 114
KING FAISAL SPECIALIST HOSPITAL & RESEARCH CENTER, JEDDAH
KFSH-STRUCTURAL SHOP DRAWIN
ABREVIATIONS USED : A = APPROVED , B = APPROVED AS NOTED , C = REVISE & RESUBMIT , D = REJECTED , S = SUPERCEDED , V = VALID

SUB.CON.CODE
PROJECT NO

DWG TYPE
SEGMENT

S.TRADE

SERIAL
TRADE
DWG

LEVEL
ZONE
SUB Date of
Sl.No SUBMITTAL NO CONTRACTOR REV
REV NO submission
NO

251 DW/CN1169P01/01135 0 1-Sep-14 SBG-PBAD 1169 01 Z1 H2 L01 SD P WS 201127 0

252 DW/CN1169P01/01135 1 22-Oct-14 SBG-PBAD 1169 01 Z1 H2 L01 SD P WS 201127 1

253 DW/CN1169P01/01136 0 1-Sep-14 SBG-PBAD 1169 01 Z1 H2 L01 SD P WS 201128 0

254 DW/CN1169P01/01136 1 22-Oct-14 SBG-PBAD 1169 01 Z1 H2 L01 SD P WS 201128 1

255 DW/CN1169P01/01137 0 1-Sep-14 SBG-PBAD 1169 01 Z1 H2 L01 SD P WS 201129 0

256 DW/CN1169P01/01137 1 22-Oct-14 SBG-PBAD 1169 01 Z1 H2 L01 SD P WS 201129 1

257 DW/CN1169P01/01138 0 1-Sep-14 SBG-PBAD 1169 01 Z1 H2 L01 SD P WS 201130 0

258 DW/CN1169P01/01138 1 22-Oct-14 SBG-PBAD 1169 01 Z1 H2 L01 SD P WS 201130 1

259 DW/CN1169P01/01139 0 1-Sep-14 SBG-PBAD 1169 01 Z1 H3 L01 SD P WS 201131 0

260 DW/CN1169P01/01139 1 22-Oct-14 SBG-PBAD 1169 01 Z1 H3 L01 SD P WS 201131 1

261 DW/CN1169P01/01140 0 1-Sep-14 SBG-PBAD 1169 01 Z1 H3 L01 SD P WS 201132 0

262 DW/CN1169P01/01140 1 22-Oct-14 SBG-PBAD 1169 01 Z1 H3 L01 SD P WS 201132 1

263 DW/CN1169P01/01141 0 1-Sep-14 SBG-PBAD 1169 01 Z1 H3 L01 SD P WS 201133 0

264 DW/CN1169P01/01141 1 22-Oct-14 SBG-PBAD 1169 01 Z1 H3 L01 SD P WS 201133 1

265 DW/CN1169P01/01228 0 28-Sep-14 SBG-PBAD 1169 01 Z6 B8 S01 SD P BW 001121 0

266 DW/CN1169P01/01519 0 28-Oct-14 SBG-PBAD 1169 01 Z1 H2 L03 SD P BW 001166 0

267 DW/CN1169P01/01520 0 28-Oct-14 SBG-PBAD 1169 01 Z1 H2 L03 SD P BW 001167 0

268 DW/CN1169P01/01521 0 28-Oct-14 SBG-PBAD 1169 01 Z1 H2 L03 SD P BW 001168 0

269 DW/CN1169P01/01522 0 28-Oct-14 SBG-PBAD 1169 01 Z1 H2 L03 SD P BW 001170 0

270 DW/CN1169P01/01591 0 6-Nov-14 SBG-PBAD 1169 01 Z1 H1 L01 SD P FF 301135 0

271 DW/CN1169P01/01592 0 6-Nov-14 SBG-PBAD 1169 01 Z1 H1 L01 SD P FF 301136 0

272 DW/CN1169P01/01593 0 6-Nov-14 SBG-PBAD 1169 01 Z1 H1 L01 SD P FF 301137 0

273 DW/CN1169P01/01594 0 6-Nov-14 SBG-PBAD 1169 01 Z1 H1 L01 SD P FF 301138 0

274 DW/CN1169P01/01595 0 6-Nov-14 SBG-PBAD 1169 01 Z1 H1 L01 SD P FF 301139 0

275 DW/CN1169P01/01596 0 6-Nov-14 SBG-PBAD 1169 01 Z1 H2 L01 SD P FF 301140 0

Page 95 of 114
KING FAISAL SPECIALIST HOSPITAL & RESEARCH CENTER, JEDDAH
KFSH-STRUCTURAL SHOP DRAWIN
ABREVIATIONS USED : A = APPROVED , B = APPROVED AS NOTED , C = REVISE & RESUBMIT , D = REJECTED , S = SUPERCEDED , V = VALID

SUB.CON.CODE
PROJECT NO

DWG TYPE
SEGMENT

S.TRADE

SERIAL
TRADE
DWG

LEVEL
ZONE
SUB Date of
Sl.No SUBMITTAL NO CONTRACTOR REV
REV NO submission
NO

276 DW/CN1169P01/01597 0 6-Nov-14 SBG-PBAD 1169 01 Z1 H2 L01 SD P FF 301141 0

277 DW/CN1169P01/01598 0 6-Nov-14 SBG-PBAD 1169 01 Z1 H2 L01 SD P FF 301142 0

278 DW/CN1169P01/01599 0 6-Nov-14 SBG-PBAD 1169 01 Z1 H2 L01 SD P FF 301143 0

279 DW/CN1169P01/01600 0 6-Nov-14 SBG-PBAD 1169 01 Z1 H2 L01 SD P FF 301144 0

280 DW/CN1169P01/01601 0 6-Nov-14 SBG-PBAD 1169 01 Z1 H3 L01 SD P FF 301145 0

281 DW/CN1169P01/01602 0 6-Nov-14 SBG-PBAD 1169 01 Z1 H3 L01 SD P FF 301146 0

282 DW/CN1169P01/01603 0 6-Nov-14 SBG-PBAD 1169 01 Z1 H3 L01 SD P FF 301147 0

283 DW/CN1169P01/01604 0 6-Nov-14 SBG-PBAD 1169 01 Z1 H1 L02 SD P WS 201135 0

284 DW/CN1169P01/01605 0 6-Nov-14 SBG-PBAD 1169 01 Z1 H1 L02 SD P WS 201138 0

285 DW/CN1169P01/01606 0 6-Nov-14 SBG-PBAD 1169 01 Z1 H1 L02 SD P WS 201139 0

286 DW/CN1169P01/01607 0 6-Nov-14 SBG-PBAD 1169 01 Z1 H2 L02 SD P WS 201140 0

287 DW/CN1169P01/01608 0 6-Nov-14 SBG-PBAD 1169 01 Z1 H2 L02 SD P WS 201141 0

288 DW/CN1169P01/01609 0 6-Nov-14 SBG-PBAD 1169 01 Z1 H3 L02 SD P WS 201145 0

289 DW/CN1169P01/01610 0 6-Nov-14 SBG-PBAD 1169 01 Z1 H3 L02 SD P WS 201147 0

290 DW/CN1169P01/01611 0 6-Nov-14 SBG-PBAD 1169 01 Z1 H1 L02 SD P DR 101151 0

291 DW/CN1169P01/01612 0 6-Nov-14 SBG-PBAD 1169 01 Z1 H1 L02 SD P DR 101152 0

292 DW/CN1169P01/01613 0 6-Nov-14 SBG-PBAD 1169 01 Z1 H1 L02 SD P DR 101153 0

293 DW/CN1169P01/01614 0 6-Nov-14 SBG-PBAD 1169 01 Z1 H1 L02 SD P DR 101154 0

294 DW/CN1169P01/01615 0 6-Nov-14 SBG-PBAD 1169 01 Z1 H1 L02 SD P DR 101155 0

295 DW/CN1169P01/01616 0 6-Nov-14 SBG-PBAD 1169 01 Z1 H3 L02 SD P DR 101161 0

296 DW/CN1169P01/01617 0 6-Nov-14 SBG-PBAD 1169 01 Z1 H3 L02 SD P DR 101162 0

297 DW/CN1169P01/01618 0 6-Nov-14 SBG-PBAD 1169 01 Z1 H3 L02 SD P DR 101163 0

298 DW/CN1169P01/01619 0 6-Nov-14 SBG-PBAD 1169 01 Z1 H1 L2M SD P WS 201150 0

299 DW/CN1169P01/01620 0 6-Nov-14 SBG-PBAD 1169 01 Z1 H1 L2M SD P WS 201153 0

300 DW/CN1169P01/01621 0 6-Nov-14 SBG-PBAD 1169 01 Z1 H1 L2M SD P WS 201154 0

Page 96 of 114
KING FAISAL SPECIALIST HOSPITAL & RESEARCH CENTER, JEDDAH
KFSH-STRUCTURAL SHOP DRAWIN
ABREVIATIONS USED : A = APPROVED , B = APPROVED AS NOTED , C = REVISE & RESUBMIT , D = REJECTED , S = SUPERCEDED , V = VALID

SUB.CON.CODE
PROJECT NO

DWG TYPE
SEGMENT

S.TRADE

SERIAL
TRADE
DWG

LEVEL
ZONE
SUB Date of
Sl.No SUBMITTAL NO CONTRACTOR REV
REV NO submission
NO

301 DW/CN1169P01/01622 0 6-Nov-14 SBG-PBAD 1169 01 Z1 H2 L2M SD P WS 201155 0

302 DW/CN1169P01/01623 0 6-Nov-14 SBG-PBAD 1169 01 Z1 H2 L2M SD P WS 201156 0

303 DW/CN1169P01/01624 0 6-Nov-14 SBG-PBAD 1169 01 Z1 H2 L2M SD P WS 201157 0

304 DW/CN1169P01/01625 0 6-Nov-14 SBG-PBAD 1169 01 Z1 H2 L2M SD P WS 201159 0

305 DW/CN1169P01/01626 0 6-Nov-14 SBG-PBAD 1169 01 Z1 H3 L2M SD P WS 201160 0

306 DW/CN1169P01/01627 0 6-Nov-14 SBG-PBAD 1169 01 Z1 H3 L2M SD P WS 201161 0

307 DW/CN1169P01/01643 0 8-Nov-14 SBG-PBAD 1169 01 Z1 H1 L01 SD P MG 202525 0

308 DW/CN1169P01/01644 0 8-Nov-14 SBG-PBAD 1169 01 Z1 H1 L01 SD P MG 202526 0

309 DW/CN1169P01/01645 0 8-Nov-14 SBG-PBAD 1169 01 Z1 H1 L01 SD P MG 202527 0

310 DW/CN1169P01/01646 0 8-Nov-14 SBG-PBAD 1169 01 Z1 H1 L01 SD P MG 202528 0

311 DW/CN1169P01/01647 0 8-Nov-14 SBG-PBAD 1169 01 Z1 H1 L01 SD P MG 202529 0

312 DW/CN1169P01/01648 0 8-Nov-14 SBG-PBAD 1169 01 Z1 H2 L01 SD P MG 202530 0

313 DW/CN1169P01/01649 0 8-Nov-14 SBG-PBAD 1169 01 Z1 H2 L01 SD P MG 202531 0

314 DW/CN1169P01/01650 0 8-Nov-14 SBG-PBAD 1169 01 Z1 H2 L01 SD P MG 202532 0

315 DW/CN1169P01/01651 0 8-Nov-14 SBG-PBAD 1169 01 Z1 H2 L01 SD P MG 202533 0

316 DW/CN1169P01/01652 0 8-Nov-14 SBG-PBAD 1169 01 Z1 H3 L01 SD P MG 202535 0

317 DW/CN1169P01/01653 0 8-Nov-14 SBG-PBAD 1169 01 Z1 H3 L01 SD P MG 202536 0

318 DW/CN1169P01/01654 0 8-Nov-14 SBG-PBAD 1169 01 Z1 H3 L01 SD P MG 202537 0

319 DW/CN1169P01/01655 0 8-Nov-14 SBG-PBAD 1169 01 Z1 H1 L02 SD P BW 001141 0

320 DW/CN1169P01/01656 0 8-Nov-14 SBG-PBAD 1169 01 Z1 H1 L02 SD P BW 001142 0

321 DW/CN1169P01/01657 0 8-Nov-14 SBG-PBAD 1169 01 Z1 H1 L02 SD P BW 001143 0

322 DW/CN1169P01/01658 0 8-Nov-14 SBG-PBAD 1169 01 Z1 H1 L02 SD P BW 001144 0

323 DW/CN1169P01/01659 0 8-Nov-14 SBG-PBAD 1169 01 Z1 H1 L02 SD P BW 001145 0

324 DW/CN1169P01/01660 0 8-Nov-14 SBG-PBAD 1169 01 Z1 H3 L02 SD P BW 001151 0

325 DW/CN1169P01/01661 0 8-Nov-14 SBG-PBAD 1169 01 Z1 H3 L02 SD P BW 001152 0

Page 97 of 114
KING FAISAL SPECIALIST HOSPITAL & RESEARCH CENTER, JEDDAH
KFSH-STRUCTURAL SHOP DRAWIN
ABREVIATIONS USED : A = APPROVED , B = APPROVED AS NOTED , C = REVISE & RESUBMIT , D = REJECTED , S = SUPERCEDED , V = VALID

SUB.CON.CODE
PROJECT NO

DWG TYPE
SEGMENT

S.TRADE

SERIAL
TRADE
DWG

LEVEL
ZONE
SUB Date of
Sl.No SUBMITTAL NO CONTRACTOR REV
REV NO submission
NO

326 DW/CN1169P01/01662 0 8-Nov-14 SBG-PBAD 1169 01 Z1 H3 L02 SD P BW 001153 0

327 DW/CN1169P01/01663 0 8-Nov-14 SBG-PBAD 1169 01 Z1 H2 L2M SD P BW 001156 0

328 DW/CN1169P01/01664 0 8-Nov-14 SBG-PBAD 1169 01 Z1 H2 L2M SD P BW 001157 0

329 DW/CN1169P01/01665 0 8-Nov-14 SBG-PBAD 1169 01 Z1 H2 L2M SD P BW 001158 0

330 DW/CN1169P01/01666 0 8-Nov-14 SBG-PBAD 1169 01 Z1 H3 L2M SD P BW 001160 0

331 DW/CN1169P01/01669 0 8-Nov-14 SBG-PBAD 1169 01 Z1 H1 L02 SD P FF 301151 0

332 DW/CN1169P01/01670 0 8-Nov-14 SBG-PBAD 1169 01 Z1 H1 L02 SD P FF 301154 0

333 DW/CN1169P01/01671 0 8-Nov-14 SBG-PBAD 1169 01 Z1 H1 L02 SD P FF 301155 0

334 DW/CN1169P01/01672 0 8-Nov-14 SBG-PBAD 1169 01 Z1 H2 L02 SD P FF 301156 0

335 DW/CN1169P01/01673 0 8-Nov-14 SBG-PBAD 1169 01 Z1 H2 L02 SD P FF 301157 0

336 DW/CN1169P01/01674 0 8-Nov-14 SBG-PBAD 1169 01 Z1 H2 L02 SD P FF 301158 0

337 DW/CN1169P01/01675 0 8-Nov-14 SBG-PBAD 1169 01 Z1 H3 L02 SD P FF 301161 0

338 DW/CN1169P01/01676 0 8-Nov-14 SBG-PBAD 1169 01 Z1 H3 L02 SD P FF 301163 0

339 DW/CN1169P01/02353 0 21-Dec-14 SBG-PBAD 1169 01 Z3 E1 LS1 SD P BW 4101 0

340 DW/CN1169P01/02393 0 29-Dec-14 SBG-PBAD 1169 01 Z2 A LS1 SD P BW 002100 0

341 DW/CN1169P01/02394 0 29-Dec-14 SBG-PBAD 1169 01 Z2 A1 LS1 SD P BW 002101 0

342 DW/CN1169P01/02395 0 29-Dec-14 SBG-PBAD 1169 01 Z2 A1 LS1 SD P BW 002102 0

343 DW/CN1169P01/02396 0 29-Dec-14 SBG-PBAD 1169 01 Z2 A2 LS1 SD P BW 002103 0

344 DW/CN1169P01/02397 0 29-Dec-14 SBG-PBAD 1169 01 Z2 A3 LS1 SD P BW 002105 0

345 DW/CN1169P01/02398 0 29-Dec-14 SBG-PBAD 1169 01 Z2 A3 LS1 SD P BW 002106 0

346 DW/CN1169P01/02399 0 29-Dec-14 SBG-PBAD 1169 01 Z2 A3 LS1 SD P BW 002107 0

347 DW/CN1169P01/02400 0 29-Dec-14 SBG-PBAD 1169 01 Z2 A3 LS1 SD P BW 002108 0

348 DW/CN1169P01/02401 0 29-Dec-14 SBG-PBAD 1169 01 Z2 A0 LS1 SD P BW 002109 0

349 DW/CN1169P01/02402 00 29-Dec-14 SBG-PBAD 1169 01 Z2 A LS1 SD P DR 102100 0

350 DW/CN1169P01/02403 00 29-Dec-14 SBG-PBAD 1169 01 Z2 A1 LS1 SD P DR 102101 0

Page 98 of 114
KING FAISAL SPECIALIST HOSPITAL & RESEARCH CENTER, JEDDAH
KFSH-STRUCTURAL SHOP DRAWIN
ABREVIATIONS USED : A = APPROVED , B = APPROVED AS NOTED , C = REVISE & RESUBMIT , D = REJECTED , S = SUPERCEDED , V = VALID

SUB.CON.CODE
PROJECT NO

DWG TYPE
SEGMENT

S.TRADE

SERIAL
TRADE
DWG

LEVEL
ZONE
SUB Date of
Sl.No SUBMITTAL NO CONTRACTOR REV
REV NO submission
NO

351 DW/CN1169P01/02404 00 29-Dec-14 SBG-PBAD 1169 01 Z2 A1 LS1 SD P DR 102102 0

352 DW/CN1169P01/02405 00 29-Dec-14 SBG-PBAD 1169 01 Z2 A2 LS1 SD P DR 102103 0

353 DW/CN1169P01/02406 00 29-Dec-14 SBG-PBAD 1169 01 Z2 A2 LS1 SD P DR 102104 0

354 DW/CN1169P01/02407 00 29-Dec-14 SBG-PBAD 1169 01 Z2 A3 LS1 SD P DR 102105 0

355 DW/CN1169P01/02408 00 29-Dec-14 SBG-PBAD 1169 01 Z2 A3 LS1 SD P DR 102106 0

356 DW/CN1169P01/02409 00 29-Dec-14 SBG-PBAD 1169 01 Z2 A3 LS1 SD P DR 102107 0

357 DW/CN1169P01/02410 00 29-Dec-14 SBG-PBAD 1169 01 Z2 A3 LS1 SD P DR 102108 0

358 DW/CN1169P01/02411 00 29-Dec-14 SBG-PBAD 1169 01 Z2 A LS1 SD P DR 102109 0

359 DW/CN1169P01/02412 00 28-Dec-14 SBG-PBAD 1169 01 Z2 A LS1 SD P WS 202120 0

360 DW/CN1169P01/02413 00 28-Dec-14 SBG-PBAD 1169 01 Z2 A1 LS1 SD P WS 202121 0

361 DW/CN1169P01/02414 00 28-Dec-14 SBG-PBAD 1169 01 Z2 A1 LS1 SD P WS 202122 0

362 DW/CN1169P01/02415 00 28-Dec-14 SBG-PBAD 1169 01 Z2 A2 LS1 SD P WS 202123 0

363 DW/CN1169P01/02416 00 28-Dec-14 SBG-PBAD 1169 01 Z2 A2 LS1 SD P WS 202124 0

364 DW/CN1169P01/02417 00 28-Dec-14 SBG-PBAD 1169 01 Z2 A3 LS1 SD P WS 202125 0

365 DW/CN1169P01/02418 00 28-Dec-14 SBG-PBAD 1169 01 Z2 A3 LS1 SD P WS 202126 0

366 DW/CN1169P01/02419 00 28-Dec-14 SBG-PBAD 1169 01 Z2 A3 LS1 SD P WS 202127 0

367 DW/CN1169P01/02420 00 28-Dec-14 SBG-PBAD 1169 01 Z2 A3 LS1 SD P WS 202128 0

368 DW/CN1169P01/02433 00 29-Dec-14 SBG-PBAD 1169 01 Z2 A2 LS1 SD P BW 002104 0

Page 99 of 114
-STRUCTURAL SHOP DRAWINGS SUBMITTAL LOG
CTED , S = SUPERCEDED , V = VALID 7-May-17

SEGMENT
RESPONSE
DRAWING
DRAWING TITLE TYPE DISCIPLINE REQUIRED REPLY APPROVA REPLY DATE
STATUS
BY L STATUS

DRAINAGE SYSTEM LAYOUT LEVEL 01 FLOOR PLAN UNDER GROUND PIPING (PART 1/4) SD H0 PLUMBING 1-Dec-13 Yes C 24-Nov-13 S

DRAINAGE SYSTEM LAYOUT LEVEL 01 FLOOR PLAN UNDER GROUND PIPING (PART 1/4) SD H0 PLUMBING 19-Dec-13 Yes B 15-Dec-13 S

DRAINAGE SYSTEM LAYOUT LEVEL 01 FLOOR PLAN UNDER GROUND PIPING (PART 1/4) SD H1 plumbing 15-Mar-14 Yes B 11-Mar-14 S

DRAINAGE SYSTEM LAYOUT LEVEL 01 FLOOR PLAN UNDER GROUND PIPING (PART 1/4) SD H1 plumbing 1-Apr-14 Yes B 31-Mar-14 S

DRAINAGE SYSTEM LAYOUT LEVEL 01 FLOOR PLAN UNDER GROUND PIPING (PART 1/4) SD H1 PLUMBING 8-Jul-14 Yes A 12-Jul-14 V

DRAINAGE SYSTEM LAYOUT LEVEL 01 FLOOR PLAN UNDER GROUND PIPING (PART 2/4) SD H0 PLUMBING 1-Dec-13 Yes C 24-Nov-13 S

DRAINAGE SYSTEM LAYOUT LEVEL 01 FLOOR PLAN UNDER GROUND PIPING (PART 2/4) SD H0 PLUMBING 19-Dec-13 Yes B 15-Dec-13 S

DRAINAGE SYSTEM LAYOUT LEVEL 01 FLOOR PLAN UNDER GROUND PIPING (PART 2/4) SD H1 plumbing 15-Mar-14 Yes C 11-Mar-14 S

DRAINAGE SYSTEM LAYOUT LEVEL 01 FLOOR PLAN UNDER GROUND PIPING (PART 2/4) SD H1 plumbing 1-Apr-14 Yes B 31-Mar-14 S

DRAINAGE SYSTEM LAYOUT LEVEL 01 FLOOR PLAN UNDER GROUND PIPING (PART 2/4) SD H1 PLUMBING 8-Jul-14 Yes B 12-Jul-14 V

DRAINAGE SYSTEM LAYOUT LEVEL 01 FLOOR PLAN UNDER GROUND PIPING (PART 3/4) SD H0 PLUMBING 1-Dec-13 Yes C 1-Dec-13 S

DRAINAGE SYSTEM LAYOUT LEVEL 01 FLOOR PLAN UNDER GROUND PIPING (PART 3/4) SD H0 PLUMBING 19-Dec-13 Yes B 15-Dec-13 S

DRAINAGE SYSTEM LAYOUT LEVEL 01 FLOOR PLAN UNDER GROUND PIPING (PART 3/4) SD H1 PLUMBING 15-Mar-14 Yes B 11-Mar-14 S

DRAINAGE SYSTEM LAYOUT LEVEL 01 FLOOR PLAN UNDER GROUND PIPING (PART 3/4) SD H1 PLUMBING 1-Apr-14 Yes B 31-Mar-14 S

DRAINAGE SYSTEM LAYOUT LEVEL 01 FLOOR PLAN UNDER GROUND PIPING (PART 3/4) SD H1 PLUMBING 8-Jul-14 Yes A 12-Jul-14 V

DRAINAGE SYSTEM LAYOUT LEVEL 01 FLOOR PLAN UNDER GROUND PIPING (PART 4/4) SD H0 PLUMBING 1-Dec-13 Yes C 1-Dec-13 S

DRAINAGE SYSTEM LAYOUT LEVEL 01 FLOOR PLAN UNDER GROUND PIPING (PART 4/4) SD H0 PLUMBING 19-Dec-13 Yes B 15-Dec-13 S

DRAINAGE SYSTEM LAYOUT LEVEL 01 FLOOR PLAN UNDER GROUND PIPING (PART 4/4) SD H1 PLUMBING 15-Mar-14 Yes B 11-Mar-14 S

DRAINAGE SYSTEM LAYOUT LEVEL 01 FLOOR PLAN UNDER GROUND PIPING (PART 4/4) SD H1 PLUMBING 1-Apr-14 Yes B 31-Mar-14 S

DRAINAGE SYSTEM LAYOUT LEVEL 01 FLOOR PLAN UNDER GROUND PIPING (PART 4/4) SD H1 PLUMBING 8-Jul-14 Yes B 12-Jul-14 V

DRAINAGE SYSTEM LAYOUT LEVEL 01 FLOOR PLAN UNDER GROUND PIPING MASTER PLAN SD H0 PLUMBING 22-Dec-13 Yes B 15-Dec-13 S

DRAINAGE SYSTEM LAYOUT LEVEL 01 FLOOR PLAN UNDER GROUND PIPING MASTER PLAN SD H1 PLUMBING 15-Mar-14 Yes C 11-Mar-14 S

DRAINAGE SYSTEM LAYOUT LEVEL 01 FLOOR PLAN UNDER GROUND PIPING MASTER PLAN SD H1 PLUMBING 1-Apr-14 Yes B 31-Mar-14 S

DRAINAGE SYSTEM LAYOUT LEVEL 01 FLOOR PLAN UNDER GROUND PIPING-SEGMENT-H1 MASTER PLAN SD H1 PLUMBING 8-Jul-14 Yes A 12-Jul-14 V

DRAINAGE SYSTEM LAYOUT LEVEL 01 FLOOR PLAN UNDER GROUND PIPING SEGMENT 2 PART1/2 SD H0 PLUMBING 22-Dec-13 Yes B 15-Dec-13 S

Page 100 of 114


-STRUCTURAL SHOP DRAWINGS SUBMITTAL LOG
CTED , S = SUPERCEDED , V = VALID 7-May-17

SEGMENT
RESPONSE
DRAWING
DRAWING TITLE TYPE DISCIPLINE REQUIRED REPLY APPROVA REPLY DATE
STATUS
BY L STATUS

DRAINAGE SYSTEM LAYOUT LEVEL 01 FLOOR PLAN UNDER GROUND PIPING SEGMENT 2 PART1/2 SD H3 PLUMBING 15-Mar-14 Yes B 11-Mar-14 S

DRAINAGE SYSTEM LAYOUT LEVEL 01 FLOOR PLAN UNDER GROUND PIPING SEGMENT 3 MASTER PLAN SD H3 PLUMBING 8-Jul-14 Yes C 12-Jul-14 S

DRAINAGE SYSTEM LAYOUT LEVEL 01 FLOOR PLAN UNDER GROUND PIPING SEGMENT 3 MASTER PLAN SD H3 PLUMBING 8-Aug-14 Yes A 18-Aug-14 V

DRAINAGE SYSTEM LAYOUT LEVEL 01 FLOOR PLAN UNDER GROUND PIPING SEGMENT 2 PART2/2 SD H3 PLUMBING 22-Dec-13 Yes B 15-Dec-13 S

DRAINAGE SYSTEM LAYOUT LEVEL 01 FLOOR PLAN UNDER GROUND PIPING SEGMENT 2 PART2/2 SD H3 PLUMBING 15-Mar-14 Yes B 11-Mar-14 S

DRAINAGE SYSTEM LAYOUT LEVEL 01 FLOOR PLAN UNDER GROUND PIPING SEGMENT 2 PART2/2 SD H3 PLUMBING 8-Jul-14 Yes C 12-Jul-14 S

DRAINAGE SYSTEM LAYOUT LEVEL 01 FLOOR PLAN UNDER GROUND PIPING SEGMENT 2 PART2/2 SD H3 PLUMBING 8-Aug-14 Yes A 18-Aug-14 V

DRAINAGE SYSTEM LAYOUT LEVEL S1 FLOOR PLAN SEGMENT-H (PART 1/4) SD H0 PLUMBING 22-Dec-13 Yes B 18-Dec-13 S

DRAINAGE SYSTEM LAYOUT LEVEL S1 FLOOR PLAN SEGMENT-H (PART 1/4) SD H0 PLUMBING 16-Aug-14 Yes B 21-Aug-14 S

DRAINAGE SYSTEM LAYOUT LEVEL S1 FLOOR PLAN SEGMENT-H (PART 1/4) SD H0 PLUMBING 7-Jan-15 Yes A 31-Dec-14 V

DRAINAGE SYSTEM LAYOUT LEVEL S1 FLOOR PLAN SEGMENT-H (PART 2/4) SD H0 PLUMBING 22-Dec-13 Yes B 18-Dec-13 S

DRAINAGE SYSTEM LAYOUT LEVEL S1 FLOOR PLAN SEGMENT-H (PART 2/4) SD H0 PLUMBING 16-Aug-14 Yes B 21-Aug-14 S

DRAINAGE SYSTEM LAYOUT LEVEL S1 FLOOR PLAN SEGMENT-H1 (PART 2/4) SD H1 PLUMBING 7-Jan-15 Yes A 31-Dec-14 V

DRAINAGE SYSTEM LAYOUT LEVEL S1 FLOOR PLAN SEGMENT-H (PART 3/4) SD H0 PLUMBING 22-Dec-13 Yes B 18-Dec-13 S

DRAINAGE SYSTEM LAYOUT LEVEL S1 FLOOR PLAN SEGMENT-H (PART 3/4) SD H0 PLUMBING 16-Aug-14 Yes B 21-Aug-14 S

DRAINAGE SYSTEM LAYOUT LEVEL S1 FLOOR PLAN SEGMENT-H1 (PART 3/4) SD H1 PLUMBING 7-Jan-15 Yes A 31-Dec-14 V

DRAINAGE SYSTEM LAYOUT LEVEL S1 FLOOR PLAN SEGMENT-H2 (PART 1/4) SD H2 PLUMBING 22-Dec-13 Yes B 18-Dec-13 S

DRAINAGE SYSTEM LAYOUT LEVEL S1 FLOOR PLAN SEGMENT-H2 (PART 1/4) SD H2 PLUMBING 16-Aug-14 Yes B 21-Aug-14 S

DRAINAGE SYSTEM LAYOUT LEVEL S1 FLOOR PLAN SEGMENT-H2 (PART 1/4) SD H2 PLUMBING 7-Jan-15 Yes A 31-Dec-14 V

DRAINAGE SYSTEM LAYOUT LEVEL S1 FLOOR PLAN SEGMENT-H1 (PART 3/4) SD H1 PLUMBING 22-Dec-13 Yes B 18-Dec-13 S

DRAINAGE SYSTEM LAYOUT LEVEL S1 FLOOR PLAN SEGMENT-H2 (PART 3/4) SD H1 PLUMBING 16-Aug-14 Yes B 21-Aug-14 S

DRAINAGE SYSTEM LAYOUT LEVEL S1 FLOOR PLAN SEGMENT-H2 (PART 3/4) SD H2 PLUMBING 7-Jan-15 Yes A 31-Dec-14 V

DRAINAGE SYSTEM LAYOUT LEVEL 01 FLOOR PLAN UNDER GROUND PIPING MASTER PLAN-SEGMENT H1 SD H1 PLUMBING 29-Dec-13 Yes B 24-Dec-13 S

DRAINAGE SYSTEM LAYOUT LEVEL 01 FLOOR PLAN UNDER GROUND PIPING MASTER PLAN-SEGMENT H2 SD H2 PLUMBING 5-Mar-14 Yes C 2-Mar-14 S

DRAINAGE SYSTEM LAYOUT LEVEL 01 FLOOR PLAN UNDER GROUND PIPING MASTER PLAN-SEGMENT H2 SD H2 PLUMBING 30-Mar-14 Yes B 24-Mar-14 S

Page 101 of 114


-STRUCTURAL SHOP DRAWINGS SUBMITTAL LOG
CTED , S = SUPERCEDED , V = VALID 7-May-17

SEGMENT
RESPONSE
DRAWING
DRAWING TITLE TYPE DISCIPLINE REQUIRED REPLY APPROVA REPLY DATE
STATUS
BY L STATUS

DRAINAGE SYSTEM LAYOUT LEVEL 01 FLOOR PLAN UNDER GROUND PIPING MASTER PLAN-SEGMENT H2 SD H2 PLUMBING 5-Jul-14 Yes A 1-Jul-14 V

DRAINAGE SYSTEM LAYOUT LEVEL 01 FLOOR PLAN UNDER GROUND PIPING-SEGMENT H1 (PART 1/4) SD H1 PLUMBING 29-Dec-13 Yes B 24-Dec-13 S

DRAINAGE SYSTEM LAYOUT LEVEL 01 FLOOR PLAN UNDER GROUND PIPING-SEGMENT H2 (PART 1/4) SD H2 PLUMBING 5-Mar-14 Yes C 2-Mar-14 S

DRAINAGE SYSTEM LAYOUT LEVEL 01 FLOOR PLAN UNDER GROUND PIPING-SEGMENT H2 (PART 1/4) SD H2 PLUMBING 30-Mar-14 Yes B 24-Mar-14 S

DRAINAGE SYSTEM LAYOUT LEVEL 01 FLOOR PLAN UNDER GROUND PIPING-SEGMENT H2 (PART 1/4) SD H2 PLUMBING 5-Jul-14 Yes A 1-Jul-14 V

DRAINAGE SYSTEM LAYOUT LEVEL 01 FLOOR PLAN UNDER GROUND PIPING-SEGMENT H1 (PART 2/4) SD H1 PLUMBING 29-Dec-13 Yes B 24-Dec-13 S

DRAINAGE SYSTEM LAYOUT LEVEL 01 FLOOR PLAN UNDER GROUND PIPING-SEGMENT H2 (PART 2/4) SD H2 PLUMBING 5-Mar-14 Yes C 2-Mar-14 S

DRAINAGE SYSTEM LAYOUT LEVEL 01 FLOOR PLAN UNDER GROUND PIPING-SEGMENT H2 (PART 2/4) SD H2 PLUMBING 30-Mar-14 Yes B 24-Mar-14 S

DRAINAGE SYSTEM LAYOUT LEVEL 01 FLOOR PLAN UNDER GROUND PIPING-SEGMENT H2 (PART 2/4) SD H2 PLUMBING 5-Jul-14 Yes A 1-Jul-14 V

DRAINAGE SYSTEM LAYOUT LEVEL 01 FLOOR PLAN UNDER GROUND PIPING-SEGMENT H1 (PART 3/4) SD H1 PLUMBING 29-Dec-13 Yes B 24-Dec-13 S

DRAINAGE SYSTEM LAYOUT LEVEL 01 FLOOR PLAN UNDER GROUND PIPING-SEGMENT H2 (PART 3/4) SD H2 PLUMBING 5-Mar-14 Yes C 2-Mar-14 S

DRAINAGE SYSTEM LAYOUT LEVEL 01 FLOOR PLAN UNDER GROUND PIPING-SEGMENT H2 (PART 3/4) SD H2 PLUMBING 30-Mar-14 Yes B 24-Mar-14 S

DRAINAGE SYSTEM LAYOUT LEVEL 01 FLOOR PLAN UNDER GROUND PIPING-SEGMENT H2 (PART 3/4) SD H2 PLUMBING 5-Jul-14 Yes A 1-Jul-14 V

DRAINAGE SYSTEM LAYOUT LEVEL 01 FLOOR PLAN UNDER GROUND PIPING-SEGMENT H1 (PART 4/4) SD H1 PLUMBING 29-Dec-13 Yes B 24-Dec-13 S

DRAINAGE SYSTEM LAYOUT LEVEL 01 FLOOR PLAN UNDER GROUND PIPING-SEGMENT H2 (PART 4/4) SD H2 PLUMBING 5-Jan-14 Yes C 2-Mar-14 S

DRAINAGE SYSTEM LAYOUT LEVEL 01 FLOOR PLAN UNDER GROUND PIPING-SEGMENT H2 (PART 4/4) SD H2 PLUMBING 30-Mar-14 Yes B 24-Mar-14 S

DRAINAGE SYSTEM LAYOUT LEVEL 01 FLOOR PLAN UNDER GROUND PIPING-SEGMENT H2 (PART 4/4) SD H2 PLUMBING 5-Jul-14 Yes A 1-Jul-14 V

BUILDERS WORK LAYOUT LEVEL - S1 FLOOR PLAN SEGMENT - H (PART-1/4) SD H0 PLUMBING 23-Jan-14 Yes B 26-Jan-14 V

BUILDERS WORK LAYOUT LEVEL - S1 FLOOR PLAN SEGMENT - H (PART-1/4) SD H0 PLUMBING 7-Jan-15 Yes B 3-Jan-15 V

BUILDERS WORK LAYOUT LEVEL - S1 FLOOR PLAN SEGMENT - H (PART-2/4) SD H0 PLUMBING 23-Jan-14 Yes A 26-Jan-14 S

BUILDERS WORK LAYOUT LEVEL - S1 FLOOR PLAN SEGMENT - H (PART-2/4) SD H1 PLUMBING 5-Jul-14 Yes B 1-Jul-14 S

BUILDERS WORK LAYOUT LEVEL - S1 FLOOR PLAN SEGMENT - H (PART-2/4) SD H1 PLUMBING 6-Sep-14 Yes B 6-Sep-14 V

BUILDERS WORK LAYOUT LEVEL - S1 FLOOR PLAN SEGMENT - H (PART-2/4) SD H1 PLUMBING 7-Jan-15 Yes B 3-Jan-15 V

BUILDERS WORK LAYOUT LEVEL - S1 FLOOR PLAN SEGMENT - H (PART-3/4) SD H0 PLUMBING 23-Jan-14 Yes C 26-Jan-14 S

BUILDERS WORK LAYOUT LEVEL - S1 FLOOR PLAN SEGMENT - H1 (PART-3/4) SD H1 PLUMBING 28-Mar-14 Yes B 29-Mar-14 S

Page 102 of 114


-STRUCTURAL SHOP DRAWINGS SUBMITTAL LOG
CTED , S = SUPERCEDED , V = VALID 7-May-17

SEGMENT
RESPONSE
DRAWING
DRAWING TITLE TYPE DISCIPLINE REQUIRED REPLY APPROVA REPLY DATE
STATUS
BY L STATUS

BUILDERS WORK LAYOUT LEVEL - S1 FLOOR PLAN SEGMENT - H1 (PART-3/4) SD H1 PLUMBING 5-Jul-14 Yes B 1-Jul-14 V

BUILDERS WORK LAYOUT LEVEL - S1 FLOOR PLAN SEGMENT - H1 (PART-3/4) SD H1 PLUMBING 7-Jan-15 Yes B 3-Jan-15 V

BUILDERS WORK LAYOUT LEVEL - S1 FLOOR PLAN SEGMENT - H1 (PART-1/4) SD H1 PLUMBING 23-Jan-14 Yes C 26-Jan-14 S

BUILDERS WORK LAYOUT LEVEL - S1 FLOOR PLAN SEGMENT - H2 (PART-1/4) SD H2 pLUMBING 28-Mar-14 Yes B 29-Mar-14 S

BUILDERS WORK LAYOUT LEVEL - S1 FLOOR PLAN SEGMENT - H2 (PART-1/4) SD H2 PLUMBING 10-Jun-14 Yes B 7-Jun-14 V

BUILDERS WORK LAYOUT LEVEL - S1 FLOOR PLAN SEGMENT - H2 (PART-1/4) SD H2 PLUMBING 7-Jan-15 Yes B 3-Jan-15 V

BUILDERS WORK LAYOUT LEVEL - S1 FLOOR PLAN SEGMENT - H1 (PART-3/4) SD H1 PLUMBING 23-Jan-14 Yes C 26-Jan-14 S

BUILDERS WORK LAYOUT LEVEL - S1 FLOOR PLAN SEGMENT - H2 (PART-3/4) SD H2 pLUMBING 28-Mar-14 Yes B 29-Mar-14 S

BUILDERS WORK LAYOUT LEVEL - S1 FLOOR PLAN SEGMENT - H2 (PART-3/4) SD H2 PLUMBING 10-Jun-14 Yes B 7-Jun-14 S

BUILDERS WORK LAYOUT LEVEL - S1 FLOOR PLAN SEGMENT - H2 (PART-3/4) SD H2 PLUMBING 1-Jul-14 Yes B 26-Jun-14 V

BUILDERS WORK LAYOUT LEVEL - S1 FLOOR PLAN SEGMENT - H2 (PART-3/4) SD H2 PLUMBING 7-Jan-15 Yes B 3-Jan-15 V

BUILDERS WORK LAYOUT LEVEL - S1 FLOOR PLAN - MASTER PLAN (SEGMENT - H) SD H0 PLUMBING 28-Jan-14 Yes C 26-Jan-14 S

BUILDERS WORK LAYOUT LEVEL - S1 FLOOR PLAN - MASTER PLAN (SEGMENT - H1) SD H1 PLUMBING 28-Mar-14 Yes B 29-Mar-14 S

BUILDERS WORK LAYOUT LEVEL - S1 FLOOR PLAN - MASTER PLAN (SEGMENT - H1) SD H1 PLUMBING 5-Jul-14 Yes B 1-Jul-14 V

BUILDERS WORK LAYOUT LEVEL - S1 FLOOR PLAN - MASTER PLAN (SEGMENT - H1) SD H1 PLUMBING 7-Jan-15 Yes B 3-Jan-15 V

BUILDERS WORK LAYOUT LEVEL - S1 FLOOR PLAN - MASTER PLAN (SEGMENT - H1) SD H1 PLUMBING 28-Jan-14 Yes C 26-Jan-14 S

BUILDERS WORK LAYOUT LEVEL - S1 FLOOR PLAN - MASTER PLAN (SEGMENT - H2) SD H2 pLUMBING 28-Mar-14 Yes B 29-Mar-14 S

BUILDERS WORK LAYOUT LEVEL - S1 FLOOR PLAN - MASTER PLAN (SEGMENT - H2) SD H2 PLUMBING 10-Jun-14 Yes B 7-Jun-14 S

BUILDERS WORK LAYOUT LEVEL - S1 FLOOR PLAN - MASTER PLAN (SEGMENT - H2) SD H2 PLUMBING 1-Jul-14 Yes B 2-Jun-14 V

BUILDERS WORK LAYOUT LEVEL - S1 FLOOR PLAN - MASTER PLAN (SEGMENT - H2) SD H2 PLUMBING 7-Jan-15 Yes B 3-Jan-15 V

WATER SUPPLY SYSTEM LAYOUT LEVEL S1 FLOOR PLAN - SEGMENT-H1 (MASTER PLAN) SD H1 PLUMBING 9-Mar-14 Yes B 8-Mar-14 S

WATER SUPPLY SYSTEM LAYOUT LEVEL S1 FLOOR PLAN - SEGMENT-H1 (MASTER PLAN) SD H1 PLUMBING 8-Aug-14 Yes B 12-Aug-14 S

WATER SUPPLY SYSTEM LAYOUT LEVEL S1 FLOOR PLAN - SEGMENT-H1 (MASTER PLAN) SD H1 PLUMBING 7-Jan-15 Yes B 31-Dec-14 V

WATER SUPPLY SYSTEM LAYOUT LEVEL S1 FLOOR PLAN - SEGMENT-H1 (PART-1/4) SD H1 PLUMBING 9-Mar-14 Yes B 8-Mar-14 S

WATER SUPPLY SYSTEM LAYOUT LEVEL S1 FLOOR PLAN - SEGMENT-H1 (PART-1/4) SD H1 PLUMBING 8-Aug-14 Yes B 12-Aug-14 S

Page 103 of 114


-STRUCTURAL SHOP DRAWINGS SUBMITTAL LOG
CTED , S = SUPERCEDED , V = VALID 7-May-17

SEGMENT
RESPONSE
DRAWING
DRAWING TITLE TYPE DISCIPLINE REQUIRED REPLY APPROVA REPLY DATE
STATUS
BY L STATUS

WATER SUPPLY SYSTEM LAYOUT LEVEL S1 FLOOR PLAN - SEGMENT-H1 (PART-1/4) SD H1 PLUMBING 7-Jan-15 Yes B 31-Dec-14 V

WATER SUPPLY SYSTEM LAYOUT LEVEL S1 FLOOR PLAN - SEGMENT-H1 (PART-3/4) SD H1 PLUMBING 9-Mar-14 Yes B 8-Mar-14 S

WATER SUPPLY SYSTEM LAYOUT LEVEL S1 FLOOR PLAN - SEGMENT-H1 (PART-3/4) SD H1 PLUMBING 8-Aug-14 Yes B 12-Aug-14 S

WATER SUPPLY SYSTEM LAYOUT LEVEL S1 FLOOR PLAN - SEGMENT-H1 (PART-3/4) SD H1 PLUMBING 7-Jan-15 Yes B 31-Dec-14 V

WATER SUPPLY SYSTEM LAYOUT LEVEL S1 FLOOR PLAN - SEGMENT-H2 (MASTER PLAN) SD H2 PLUMBING 9-Mar-14 Yes B 8-Mar-14 S

WATER SUPPLY SYSTEM LAYOUT LEVEL S1 FLOOR PLAN - SEGMENT-H2 (MASTER PLAN) SD H2 PLUMBING 8-Aug-14 Yes C 12-Aug-14 V

WATER SUPPLY SYSTEM LAYOUT LEVEL S1 FLOOR PLAN - SEGMENT-H2 (MASTER PLAN) SD H2 PLUMBING 30-Sep-14 Yes A 30-Sep-14 V

WATER SUPPLY SYSTEM LAYOUT LEVEL S1 FLOOR PLAN - SEGMENT-H2 (PART-1/4) SD H2 PLUMBING 9-Mar-14 Yes B 8-Mar-14 S

WATER SUPPLY SYSTEM LAYOUT LEVEL S1 FLOOR PLAN - SEGMENT-H2 (PART-1/4) SD H2 PLUMBING 8-Aug-14 Yes C 12-Aug-14 V

WATER SUPPLY SYSTEM LAYOUT LEVEL S1 FLOOR PLAN - SEGMENT-H2 (PART-1/4) SD H2 PLUMBING 30-Sep-14 Yes A 30-Sep-14 V

WATER SUPPLY SYSTEM LAYOUT LEVEL S1 FLOOR PLAN - SEGMENT-H2 (PART-3/4) SD H2 PLUMBING 9-Mar-14 Yes B 8-Mar-14 S

WATER SUPPLY SYSTEM LAYOUT LEVEL S1 FLOOR PLAN - SEGMENT-H2 (PART-3/4) SD H2 PLUMBING 8-Aug-14 Yes C 12-Aug-14 V

WATER SUPPLY SYSTEM LAYOUT LEVEL S1 FLOOR PLAN - SEGMENT-H2 (PART-3/4) SD H2 PLUMBING 30-Sep-14 Yes A 30-Sep-14 V

FIRE FIGHTING SYSTEM LAYOUT LEVEL -S1 FLOOR PLAN SEGMENT-H1 (MASTER PLAN) SD H1 PLUMBING 15-Mar-14 Yes C 12-Mar-14 S

FIRE FIGHTING SYSTEM LAYOUT LEVEL -S1 FLOOR PLAN SEGMENT-H1 (MASTER PLAN) SD H1 PLUMBING 26-Apr-14 Yes A 30-Apr-14 S

FIRE FIGHTING SYSTEM LAYOUT LEVEL -S1 FLOOR PLAN SEGMENT-H1 (MASTER PLAN) SD H1 PLUMBING 8-Aug-14 Yes A 12-Aug-14 S

FIRE FIGHTING SYSTEM LAYOUT LEVEL -S1 FLOOR PLAN SEGMENT-H1 (MASTER PLAN) SD H1 PLUMBING 7-Jan-15 Yes A 31-Dec-14 V

FIRE FIGHTING SYSTEM LAYOUT LEVEL -S1 FLOOR PLAN SEGMENT-H1 (PART-1/4) SD H1 PLUMBING 15-Mar-14 Yes C 12-Mar-14 S

FIRE FIGHTING SYSTEM LAYOUT LEVEL -S1 FLOOR PLAN SEGMENT-H1 (PART-1/4) SD H1 PLUMBING 26-Apr-14 Yes A 30-Apr-14 S

FIRE FIGHTING SYSTEM LAYOUT LEVEL -S1 FLOOR PLAN SEGMENT-H1 (PART-1/4) SD H1 PLUMBING 8-Aug-14 Yes A 12-Aug-14 S

FIRE FIGHTING SYSTEM LAYOUT LEVEL -S1 FLOOR PLAN SEGMENT-H1 (PART-1/4) SD H1 PLUMBING 7-Jan-15 Yes A 31-Dec-14 V

FIRE FIGHTING SYSTEM LAYOUT LEVEL -S1 FLOOR PLAN SEGMENT-H1 (PART-2/4) SD H1 PLUMBING 15-Mar-14 Yes C 12-Mar-14 S

FIRE FIGHTING SYSTEM LAYOUT LEVEL -S1 FLOOR PLAN SEGMENT-H1 (PART-2/4) SD H1 PLUMBING 26-Apr-14 Yes A 30-Apr-14 S

FIRE FIGHTING SYSTEM LAYOUT LEVEL -S1 FLOOR PLAN SEGMENT-H1 (PART-2/4) SD H1 PLUMBING 8-Aug-14 Yes A 12-Aug-14 S

FIRE FIGHTING SYSTEM LAYOUT LEVEL -S1 FLOOR PLAN SEGMENT-H1 (PART-2/4) SD H1 PLUMBING 7-Jan-15 Yes A 31-Dec-14 V

Page 104 of 114


-STRUCTURAL SHOP DRAWINGS SUBMITTAL LOG
CTED , S = SUPERCEDED , V = VALID 7-May-17

SEGMENT
RESPONSE
DRAWING
DRAWING TITLE TYPE DISCIPLINE REQUIRED REPLY APPROVA REPLY DATE
STATUS
BY L STATUS

FIRE FIGHTING SYSTEM LAYOUT LEVEL -S1 FLOOR PLAN SEGMENT-H1 (PART-3/4) SD H1 PLUMBING 15-Mar-14 Yes C 12-Mar-14 S

FIRE FIGHTING SYSTEM LAYOUT LEVEL -S1 FLOOR PLAN SEGMENT-H1 (PART-3/4) SD H1 PLUMBING 26-Apr-14 Yes A 30-Apr-14 S

FIRE FIGHTING SYSTEM LAYOUT LEVEL -S1 FLOOR PLAN SEGMENT-H1 (PART-3/4) SD H1 PLUMBING 8-Aug-14 Yes A 12-Aug-14 S

FIRE FIGHTING SYSTEM LAYOUT LEVEL -S1 FLOOR PLAN SEGMENT-H1 (PART-3/4) SD H1 PLUMBING 7-Jan-15 Yes A 31-Dec-14 V

FIRE FIGHTING SYSTEM LAYOUT LEVEL -S1 FLOOR PLAN SEGMENT-H2 (MASTER PLAN) SD H2 PLUMBING 15-Mar-14 Yes C 12-Mar-14 S

FIRE FIGHTING SYSTEM LAYOUT LEVEL -S1 FLOOR PLAN SEGMENT-H2 (MASTER PLAN) SD H2 PLUMBING 26-Apr-14 Yes A 30-Apr-14 S

FIRE FIGHTING SYSTEM LAYOUT LEVEL -S1 FLOOR PLAN SEGMENT-H2 (MASTER PLAN) SD H2 PLUMBING 8-Aug-14 Yes C 12-Aug-14 V

FIRE FIGHTING SYSTEM LAYOUT LEVEL -S1 FLOOR PLAN SEGMENT-H2 (MASTER PLAN) SD H2 PLUMBING 30-Sep-14 Yes A 30-Sep-14 V

FIRE FIGHTING SYSTEM LAYOUT LEVEL -S1 FLOOR PLAN SEGMENT-H2 (PART-1/4) SD H2 PLUMBING 15-Mar-14 Yes C 12-Mar-14 S

FIRE FIGHTING SYSTEM LAYOUT LEVEL -S1 FLOOR PLAN SEGMENT-H2 (PART-1/4) SD H2 PLUMBING 26-Apr-14 Yes A 1-May-14 S

FIRE FIGHTING SYSTEM LAYOUT LEVEL -S1 FLOOR PLAN SEGMENT-H2 (PART-1/4) SD H2 PLUMBING 8-Aug-14 Yes C 12-Aug-14 V

FIRE FIGHTING SYSTEM LAYOUT LEVEL -S1 FLOOR PLAN SEGMENT-H2 (PART-1/4) SD H2 PLUMBING 30-Sep-14 Yes A 30-Sep-14 V

FIRE FIGHTING SYSTEM LAYOUT LEVEL -S1 FLOOR PLAN SEGMENT-H2 (PART-3/4) SD H2 PLUMBING 15-Mar-14 Yes C 12-Mar-14 S

FIRE FIGHTING SYSTEM LAYOUT LEVEL -S1 FLOOR PLAN SEGMENT-H2 (PART-3/4) SD H2 PLUMBING 26-Apr-14 Yes A 30-Apr-14 S

FIRE FIGHTING SYSTEM LAYOUT LEVEL -S1 FLOOR PLAN SEGMENT-H2 (PART-3/4) SD H2 PLUMBING 8-Aug-14 Yes C 12-Aug-14 V

FIRE FIGHTING SYSTEM LAYOUT LEVEL -S1 FLOOR PLAN SEGMENT-H2 (PART-3/4) SD H2 PLUMBING 30-Sep-14 Yes A 30-Sep-14 V

PLUMBING DETAILS - 1 SD 00 PLUMBING 15-Mar-14 Yes B 11-Mar-14 S

DRAINAGE SYSTEM LAYOUT LEVEL-01 FLOOR PLAN UNDER GROUND PIPING SEGMENT-H3 (PART-1/2) SD H3 PLUMBING 15-Mar-14 Yes B 11-Mar-14 S

DRAINAGE SYSTEM LAYOUT LEVEL-01 FLOOR PLAN UNDER GROUND PIPING SEGMENT-H3 (PART-1/2) SD H3 PLUMBING 8-Jul-14 Yes C 12-Jul-14 S

DRAINAGE SYSTEM LAYOUT LEVEL-01 FLOOR PLAN UNDER GROUND PIPING SEGMENT-H3 (PART-1/2) SD H3 PLUMBING 8-Aug-14 Yes A 18-Aug-14 V

BUILDERS WORK LAYOUT LEVEL-01 FLOOR PLAN SEGMENT-H2 (MASTER PLAN) SD H2 PLUMBING 30-Mar-14 Yes B 31-Mar-14 V

BUILDERS WORK LAYOUT LEVEL-01 FLOOR PLAN SEGMENT-H2 (PART-1/4) SD H2 PLUMBING 30-Mar-14 Yes B 31-Mar-14 V

BUILDERS WORK LAYOUT LEVEL-01 FLOOR PLAN SEGMENT-H2 (PART-2/4) SD H2 PLUMBING 30-Mar-14 Yes B 31-Mar-14 V

BUILDERS WORK LAYOUT LEVEL-01 FLOOR PLAN SEGMENT-H2 (PART-3/4) SD H2 PLUMBING 30-Mar-14 Yes B 31-Mar-14 V

BUILDERS WORK LAYOUT LEVEL-01 FLOOR PLAN SEGMENT-H2 (PART-4/4) SD H2 PLUMBING 30-Mar-14 Yes B 31-Mar-14 V

Page 105 of 114


-STRUCTURAL SHOP DRAWINGS SUBMITTAL LOG
CTED , S = SUPERCEDED , V = VALID 7-May-17

SEGMENT
RESPONSE
DRAWING
DRAWING TITLE TYPE DISCIPLINE REQUIRED REPLY APPROVA REPLY DATE
STATUS
BY L STATUS

DRAINAGE SYSTEM LAYOUT LEVEL-01 FLOOR PLAN HIGH LEVEL PIPING SEGMENT-H1 (MASTER PLAN) SD H1 PLUMBING 16-Apr-14 Yes B 12-Apr-14 s

DRAINAGE SYSTEM LAYOUT LEVEL-01 FLOOR PLAN HIGH LEVEL PIPING SEGMENT-H1 (MASTER PLAN) SD H1 PLUMBING 4-Sep-14 Yes C 4-Sep-14 S

DRAINAGE SYSTEM LAYOUT LEVEL-01 FLOOR PLAN HIGH LEVEL PIPING SEGMENT-H1 (MASTER PLAN) SD H1 PLUMBING 4-Nov-14 Yes C 5-Nov-14 V

DRAINAGE SYSTEM LAYOUT LEVEL-01 FLOOR PLAN HIGH LEVEL PIPING SEGMENT-H1 (PART-1/4) SD H1 PLUMBING 16-Apr-14 Yes B 9-Apr-14 s

DRAINAGE SYSTEM LAYOUT LEVEL-01 FLOOR PLAN HIGH LEVEL PIPING SEGMENT-H1 (PART-1/4) SD H1 PLUMBING 4-Sep-14 Yes C 4-Sep-14 S

DRAINAGE SYSTEM LAYOUT LEVEL-01 FLOOR PLAN HIGH LEVEL PIPING SEGMENT-H1 (PART-1/4) SD H1 PLUMBING 4-Nov-14 Yes C 5-Nov-14 V

DRAINAGE SYSTEM LAYOUT LEVEL-01 FLOOR PLAN HIGH LEVEL PIPING SEGMENT-H1 (PART-2/4) SD H1 PLUMBING 16-Apr-14 Yes B 12-Apr-14 s

DRAINAGE SYSTEM LAYOUT LEVEL-01 FLOOR PLAN HIGH LEVEL PIPING SEGMENT-H1 (PART-2/4) SD H1 PLUMBING 4-Sep-14 Yes C 4-Sep-14 S

DRAINAGE SYSTEM LAYOUT LEVEL-01 FLOOR PLAN HIGH LEVEL PIPING SEGMENT-H1 (PART-2/4) SD H1 PLUMBING 4-Nov-14 Yes C 5-Nov-14 V

DRAINAGE SYSTEM LAYOUT LEVEL-01 FLOOR PLAN HIGH LEVEL PIPING SEGMENT-H1 (PART-3/4) SD H1 PLUMBING 16-Apr-14 Yes B 12-Apr-14 s

DRAINAGE SYSTEM LAYOUT LEVEL-01 FLOOR PLAN HIGH LEVEL PIPING SEGMENT-H1 (PART-3/4) SD H1 PLUMBING 4-Sep-14 Yes C 4-Sep-14 S

DRAINAGE SYSTEM LAYOUT LEVEL-01 FLOOR PLAN HIGH LEVEL PIPING SEGMENT-H1 (PART-3/4) SD H1 PLUMBING 4-Nov-14 Yes C 5-Nov-14 V

DRAINAGE SYSTEM LAYOUT LEVEL-01 FLOOR PLAN HIGH LEVEL PIPING SEGMENT-H1 (PART-4/4) SD H1 PLUMBING 16-Apr-14 Yes B 12-Apr-14 s

DRAINAGE SYSTEM LAYOUT LEVEL-01 FLOOR PLAN HIGH LEVEL PIPING SEGMENT-H1 (PART-4/4) SD H1 PLUMBING 4-Sep-14 Yes C 4-Sep-14 S

DRAINAGE SYSTEM LAYOUT LEVEL-01 FLOOR PLAN HIGH LEVEL PIPING SEGMENT-H1 (PART-4/4) SD H1 PLUMBING 4-Nov-14 Yes C 5-Nov-14 V

DRAINAGE SYSTEM LAYOUT LEVEL-01 FLOOR PLAN HIGH LEVEL PIPING SEGMENT-H2 (MASTER PLAN) SD H2 PLUMBING 16-Apr-14 Yes B 12-Apr-14 s

DRAINAGE SYSTEM LAYOUT LEVEL-01 FLOOR PLAN HIGH LEVEL PIPING SEGMENT-H2 (MASTER PLAN) SD H2 PLUMBING 4-Sep-14 Yes C 4-Sep-14 S

DRAINAGE SYSTEM LAYOUT LEVEL-01 FLOOR PLAN HIGH LEVEL PIPING SEGMENT-H2 (MASTER PLAN) SD H2 PLUMBING 4-Nov-14 Yes C 5-Nov-14 V

DRAINAGE SYSTEM LAYOUT LEVEL-01 FLOOR PLAN HIGH LEVEL PIPING SEGMENT-H2 (PART-1/4) SD H2 PLUMBING 16-Apr-14 Yes B 12-Apr-14 s

DRAINAGE SYSTEM LAYOUT LEVEL-01 FLOOR PLAN HIGH LEVEL PIPING SEGMENT-H2 (PART-1/4) SD H2 PLUMBING 4-Sep-14 Yes C 4-Sep-14 S

DRAINAGE SYSTEM LAYOUT LEVEL-01 FLOOR PLAN HIGH LEVEL PIPING SEGMENT-H2 (PART-1/4) SD H2 PLUMBING 4-Nov-14 Yes C 5-Nov-14 V

DRAINAGE SYSTEM LAYOUT LEVEL-01 FLOOR PLAN HIGH LEVEL PIPING SEGMENT-H2 (PART-2/4) SD H2 PLUMBING 16-Apr-14 Yes B 12-Apr-14 s

DRAINAGE SYSTEM LAYOUT LEVEL-01 FLOOR PLAN HIGH LEVEL PIPING SEGMENT-H2 (PART-2/4) SD H2 PLUMBING 4-Sep-14 Yes C 4-Sep-14 S

DRAINAGE SYSTEM LAYOUT LEVEL-01 FLOOR PLAN HIGH LEVEL PIPING SEGMENT-H2 (PART-2/4) SD H2 PLUMBING 4-Nov-14 Yes C 5-Nov-14 V

DRAINAGE SYSTEM LAYOUT LEVEL-01 FLOOR PLAN HIGH LEVEL PIPING SEGMENT-H2 (PART-3/4) SD H2 PLUMBING 16-Apr-14 Yes B 12-Apr-14 s

Page 106 of 114


-STRUCTURAL SHOP DRAWINGS SUBMITTAL LOG
CTED , S = SUPERCEDED , V = VALID 7-May-17

SEGMENT
RESPONSE
DRAWING
DRAWING TITLE TYPE DISCIPLINE REQUIRED REPLY APPROVA REPLY DATE
STATUS
BY L STATUS

DRAINAGE SYSTEM LAYOUT LEVEL-01 FLOOR PLAN HIGH LEVEL PIPING SEGMENT-H2 (PART-3/4) SD H2 PLUMBING 4-Sep-14 Yes C 4-Sep-14 S

DRAINAGE SYSTEM LAYOUT LEVEL-01 FLOOR PLAN HIGH LEVEL PIPING SEGMENT-H2 (PART-3/4) SD H2 PLUMBING 4-Nov-14 Yes C 5-Nov-14 V

DRAINAGE SYSTEM LAYOUT LEVEL-01 FLOOR PLAN HIGH LEVEL PIPING SEGMENT-H2 (PART-4/4) SD H2 PLUMBING 16-Apr-14 Yes B 12-Apr-14 s

DRAINAGE SYSTEM LAYOUT LEVEL-01 FLOOR PLAN HIGH LEVEL PIPING SEGMENT-H2 (PART-4/4) SD H2 PLUMBING 4-Sep-14 Yes C 4-Sep-14 S

DRAINAGE SYSTEM LAYOUT LEVEL-01 FLOOR PLAN HIGH LEVEL PIPING SEGMENT-H2 (PART-4/4) SD H2 PLUMBING 4-Nov-14 Yes C 5-Nov-14 V

DRAINAGE SYSTEM LAYOUT LEVEL-01 FLOOR PLAN HIGH LEVEL PIPING SEGMENT-H3 (MASTER PLAN) SD H3 PLUMBING 16-Apr-14 Yes B 12-Apr-14 S

DRAINAGE SYSTEM LAYOUT LEVEL-01 FLOOR PLAN HIGH LEVEL PIPING SEGMENT-H3 (MASTER PLAN) SD H3 PLUMBING 4-Sep-14 Yes C 4-Sep-14 S

DRAINAGE SYSTEM LAYOUT LEVEL-01 FLOOR PLAN HIGH LEVEL PIPING SEGMENT-H3 (MASTER PLAN) SD H3 PLUMBING 4-Nov-14 Yes C 5-Nov-14 V

DRAINAGE SYSTEM LAYOUT LEVEL-01 FLOOR PLAN HIGH LEVEL PIPING SEGMENT-H3 (PART-1/2) SD H3 PLUMBING 16-Apr-14 Yes B 12-Apr-14 S

DRAINAGE SYSTEM LAYOUT LEVEL-01 FLOOR PLAN HIGH LEVEL PIPING SEGMENT-H3 (PART-1/2) SD H3 PLUMBING 4-Sep-14 Yes C 4-Sep-14 S

DRAINAGE SYSTEM LAYOUT LEVEL-01 FLOOR PLAN HIGH LEVEL PIPING SEGMENT-H3 (PART-1/2) SD H3 PLUMBING 4-Nov-14 Yes C 5-Nov-14 V

DRAINAGE SYSTEM LAYOUT LEVEL-01 FLOOR PLAN HIGH LEVEL PIPING SEGMENT-H3 (PART-2/2) SD H3 PLUMBING 16-Apr-14 Yes B 12-Apr-14 S

DRAINAGE SYSTEM LAYOUT LEVEL-01 FLOOR PLAN HIGH LEVEL PIPING SEGMENT-H3 (PART-2/2) SD H3 PLUMBING 4-Sep-14 Yes C 4-Sep-14 S

DRAINAGE SYSTEM LAYOUT LEVEL-01 FLOOR PLAN HIGH LEVEL PIPING SEGMENT-H3 (PART-2/2) SD H3 PLUMBING 4-Nov-14 Yes C 5-Nov-14 V

BUILDERS WORK LAYOUT LEVEL 02 FLOOR PLAN SEGMENT-H2 (MASTER PLAN) SD H2 PLUMBING 26-May-14 Yes C 22-May-14 S

BUILDERS WORK LAYOUT LEVEL 02 FLOOR PLAN SEGMENT-H2 (MASTER PLAN) SD H2 PLUMBING 25-Aug-14 Yes C 30-Aug-14 S

BUILDERS WORK LAYOUT LEVEL 02 FLOOR PLAN SEGMENT-H2 (MASTER PLAN) SD H2 PLUMBING 2-Nov-14 Yes C 3-Nov-14 V

BUILDERS WORK LAYOUT LEVEL 02 FLOOR PLAN SEGMENT-H2 (MASTER PLAN) SD H2 PLUMBING 16-Nov-14 Yes A 13-Nov-14 V

BUILDERS WORK LAYOUT LEVEL 02 FLOOR PLAN SEGMENT-H2 (PART-1/4) SD H2 PLUMBING 26-May-14 Yes C 22-May-14 S

BUILDERS WORK LAYOUT LEVEL 02 FLOOR PLAN SEGMENT-H2 (PART-1/4) SD H2 PLUMBING 25-Aug-14 Yes C 30-Aug-14 S

BUILDERS WORK LAYOUT LEVEL 02 FLOOR PLAN SEGMENT-H2 (PART-1/4) SD H2 PLUMBING 2-Nov-14 Yes C 3-Nov-14 V

BUILDERS WORK LAYOUT LEVEL 02 FLOOR PLAN SEGMENT-H2 (PART-1/4) SD H2 PLUMBING 16-Nov-14 Yes A 13-Nov-14 V

BUILDERS WORK LAYOUT LEVEL 02 FLOOR PLAN SEGMENT-H2 (PART-2/4) SD H2 PLUMBING 26-May-14 Yes C 22-May-14 S

BUILDERS WORK LAYOUT LEVEL 02 FLOOR PLAN SEGMENT-H2 (PART-2/4) SD H2 PLUMBING 25-Aug-14 Yes C 30-Aug-14 S

BUILDERS WORK LAYOUT LEVEL 02 FLOOR PLAN SEGMENT-H2 (PART-2/4) SD H2 PLUMBING 2-Nov-14 Yes C 3-Nov-14 V

Page 107 of 114


-STRUCTURAL SHOP DRAWINGS SUBMITTAL LOG
CTED , S = SUPERCEDED , V = VALID 7-May-17

SEGMENT
RESPONSE
DRAWING
DRAWING TITLE TYPE DISCIPLINE REQUIRED REPLY APPROVA REPLY DATE
STATUS
BY L STATUS

BUILDERS WORK LAYOUT LEVEL 02 FLOOR PLAN SEGMENT-H2 (PART-2/4) SD H2 PLUMBING 16-Nov-14 Yes A 13-Nov-14 V

BUILDERS WORK LAYOUT LEVEL 02 FLOOR PLAN SEGMENT-H2 (PART-3/4) SD H2 PLUMBING 26-May-14 Yes C 22-May-14 S

BUILDERS WORK LAYOUT LEVEL 02 FLOOR PLAN SEGMENT-H2 (PART-3/4) SD H2 PLUMBING 25-Aug-14 Yes C 30-Aug-14 S

BUILDERS WORK LAYOUT LEVEL 02 FLOOR PLAN SEGMENT-H2 (PART-3/4) SD H2 PLUMBING 2-Nov-14 Yes C 3-Nov-14 V

BUILDERS WORK LAYOUT LEVEL 02 FLOOR PLAN SEGMENT-H2 (PART-3/4) SD H2 PLUMBING 16-Nov-14 Yes A 13-Nov-14 V

DRAINAGE SYSTEM LAHYOUT LEVEL-02 FLOOR PLAN SEGMENT- H2 (MASTER PLAN) SD H2 PLUMBING 26-May-14 Yes C 22-May-14 S

DRAINAGE SYSTEM LAHYOUT LEVEL-02 FLOOR PLAN SEGMENT- H2 (MASTER PLAN) SD H2 PLUMBING 20-Nov-14 Yes A 22-Nov-14 V

DRAINAGE SYTEM LAYOUT LEVEL-01 FLOOR PLAN SEGMENT-H2 PART 1 OF 4 SD H2 PLUMBING 26-May-14 Yes C 22-May-14 S

DRAINAGE SYTEM LAYOUT LEVEL-01 FLOOR PLAN SEGMENT-H2 PART 1 OF 4 SD H2 PLUMBING 20-Nov-14 Yes A 22-Nov-14 V

DRAINAGE SYSTEM LAYOUT LEVEL -01 FLOOR PLAN SEGMENT -H2 PART 2 OF 4 SD H2 PLUMBING 26-May-14 Yes C 22-May-14 S

DRAINAGE SYSTEM LAYOUT LEVEL -01 FLOOR PLAN SEGMENT -H2 PART 2 OF 4 SD H2 PLUMBING 20-Nov-14 Yes A 22-Nov-14 V

DRAINAGE SYSTEM LAYOUT LEVEL -01 FLOOR PLAN SEGMENT -H2 PART 3 OF 4 SD H2 PLUMBING 26-May-14 Yes C 22-May-14 S

DRAINAGE SYSTEM LAYOUT LEVEL -01 FLOOR PLAN SEGMENT -H2 PART 3 OF 4 SD H2 PLUMBING 20-Nov-14 Yes A 22-Nov-14 V

DRAINAGE SYSTEM LAYOUT LEVEL -01 FLOOR PLAN SEGMENT -H2 PART 4 OF 4 SD H2 PLUMBING 26-May-14 Yes C 22-May-14 S

DRAINAGE SYSTEM LAYOUT LEVEL -01 FLOOR PLAN SEGMENT -H2 PART 4 OF 4 SD H2 PLUMBING 20-Nov-14 Yes A 22-Nov-14 V

BUILDERS WORK LAYOUT LEVEL 02 FLOOR PLAN SEGMENT-H2 (PART-4/4) SD H2 PLUMBING 26-May-14 Yes C 22-May-14 S

BUILDERS WORK LAYOUT LEVEL 02 FLOOR PLAN SEGMENT-H2 (PART-4/4) SD H2 PLUMBING 25-Aug-14 Yes C 30-Aug-14 S

BUILDERS WORK LAYOUT LEVEL 02 FLOOR PLAN SEGMENT-H2 (PART-4/4) SD H2 PLUMBING 2-Nov-14 Yes C 3-Nov-14 V

BUILDERS WORK LAYOUT LEVEL 02 FLOOR PLAN SEGMENT-H2 (PART-4/4) SD H2 PLUMBING 16-Nov-14 Yes A 13-Nov-14 V

PLUMBIN G ENLARGED DETAIL SAND INTERCEPTOR DETAIL SD 00 PLUMBING 8-Jul-14 Yes B 12-Jul-14 V

B UILDER WORK LAYOUT LEVEL 01 FLOOR PLAN SEGMENT - H1 (MASTER PLAN ) SD H1 PLUMBING 2-Aug-14 Yes C 2-Aug-14 S

B UILDER WORK LAYOUT LEVEL 01 FLOOR PLAN SEGMENT - H1 (MASTER PLAN ) SD H1 PLUMBING 27-Aug-14 Yes B 28-Aug-14 V

BUILDER WORK LAYOUT LEVEL- 01 FLOOR PLAN SEGMENT - H1 (PART-1 / 4) SD H1 PLUMBING 2-Aug-14 Yes C 2-Aug-14 S

BUILDER WORK LAYOUT LEVEL- 01 FLOOR PLAN SEGMENT - H1 (PART-1 / 4) SD H1 PLUMBING 27-Aug-14 Yes B 28-Aug-14 V

BUILDER WORK LAYOUT LEVEL 01 FLOOR PLAN SEGMENT -H1 (PART-2/4) SD H1 PLUMBING 2-Aug-14 Yes C 2-Aug-14 S

Page 108 of 114


-STRUCTURAL SHOP DRAWINGS SUBMITTAL LOG
CTED , S = SUPERCEDED , V = VALID 7-May-17

SEGMENT
RESPONSE
DRAWING
DRAWING TITLE TYPE DISCIPLINE REQUIRED REPLY APPROVA REPLY DATE
STATUS
BY L STATUS

BUILDER WORK LAYOUT LEVEL 01 FLOOR PLAN SEGMENT -H1 (PART-2/4) SD H1 PLUMBING 27-Aug-14 Yes B 28-Aug-14 V

BUILDER WORK LAYOUT LEVEL 01 FLOOR PLAN SEGMENT -H1 (PART-2/4) SD H1 PLUMBING 6-Sep-14 Yes B 6-Sep-14 V

BUILDER WORK LAYOUT LEVEL 01 FLOOR PLAN SEGMENT -H1 ( PLAN - 3 / 4) SD H1 PLUMBING 2-Aug-14 Yes C 2-Aug-14 S

BUILDER WORK LAYOUT LEVEL 01 FLOOR PLAN SEGMENT -H1 ( PLAN - 3 / 4) SD H1 PLUMBING 27-Aug-14 Yes B 28-Aug-14 V

BUILDER WORK LAYOUT LEVEL 01 FLOOR PLAN SEGMENT -H1 ( PART-4 / 4 ) SD H1 PLUMBING 2-Aug-14 Yes C 2-Aug-14 S

BUILDER WORK LAYOUT LEVEL 01 FLOOR PLAN SEGMENT -H1 ( PART-4 / 4 ) SD H1 PLUMBING 27-Aug-14 Yes B 28-Aug-14 V

BUILDER WORK LAYOUT LEVEL -01 FLOOR PLAN - MASTER PLAN (SEGMENT-H3) SD H3 PLUMBING 8-Aug-14 Yes B 18-Aug-14 V

BUILDER WORK LAYOUT LEVEL -01 FLOOR PLAN - MASTER PLAN (SEGMENT-H3) PART -01 OF 02 SD H3 PLUMBING 8-Aug-14 Yes B 18-Aug-14 V

BUILDER WORK LAYOUT LEVEL -01 FLOOR PLAN - MASTER PLAN (SEGMENT-H3) PART -02 OF 02 SD H3 PLUMBING 8-Aug-14 Yes B 18-Aug-14 V

DRAINAGE SYSTEM LAYOUT FOR LEVEL-S1, MASTER PLAN (SEGMENT - H1) SD H1 PLUMBING 16-Aug-14 Yes B 21-Aug-14 S

DRAINAGE SYSTEM LAYOUT FOR LEVEL-S1, MASTER PLAN (SEGMENT - H1) SD H1 PLUMBING 7-Jan-15 Yes A 31-Dec-14 V

DRAINAGE SYSTEM LAYOUT FOR LEVEL-S1, MASTER PLAN (SEGMENT - H2) SD H2 PLUMBING 16-Aug-14 Yes B 21-Aug-14 S

DRAINAGE SYSTEM LAYOUT FOR LEVEL-S1, MASTER PLAN (SEGMENT - H2) SD H2 PLUMBING 7-Jan-15 Yes A 31-Dec-14 V

WATER SUPPLY SYSTEM LAYOUT LEVEL 01 FLOOR PLAN SEGEMENT-H1 (MASTER PLAN) SD H1 PLUMBING 14-Sep-14 Yes C 13-Sep-14 S

WATER SUPPLY SYSTEM LAYOUT LEVEL 01 FLOOR PLAN SEGEMENT-H1 (MASTER PLAN) SD H1 PLUMBING 5-Nov-14 Yes C 5-Nov-14 V

WATER SUPPLY SYSTEM LAYOUT LEVEL 01 FLOOR PLAN SEGEMENT-H1 (PART-1/4) SD H1 PLUMBING 14-Sep-14 Yes C 13-Sep-14 S

WATER SUPPLY SYSTEM LAYOUT LEVEL 01 FLOOR PLAN SEGEMENT-H1 (PART-1/4) SD H1 PLUMBING 5-Nov-14 Yes C 5-Nov-14 V

WATER SUPPLY SYSTEM LAYOUT LEVEL 01 FLOOR PLAN SEGEMENT-H1 (PART-2/4) SD H1 PLUMBING 14-Sep-14 Yes C 13-Sep-14 S

WATER SUPPLY SYSTEM LAYOUT LEVEL 01 FLOOR PLAN SEGEMENT-H1 (PART-2/4) SD H1 PLUMBING 5-Nov-14 Yes C 5-Nov-14 V

WATER SUPPLY SYSTEM LAYOUT LEVEL 01 FLOOR PLAN SEGEMENT-H1 (PART-3/4) SD H1 PLUMBING 14-Sep-14 Yes C 13-Sep-14 S

WATER SUPPLY SYSTEM LAYOUT LEVEL 01 FLOOR PLAN SEGEMENT-H1 (PART-3/4) SD H1 PLUMBING 5-Nov-14 Yes C 5-Nov-14 V

WATER SUPPLY SYSTEM LAYOUT LEVEL 01 FLOOR PLAN SEGEMENT-H1 (PART-4/4) SD H1 PLUMBING 14-Sep-14 Yes C 13-Sep-14 S

WATER SUPPLY SYSTEM LAYOUT LEVEL 01 FLOOR PLAN SEGEMENT-H1 (PART-4/4) SD H1 PLUMBING 5-Nov-14 Yes C 5-Nov-14 V

WATER SUPPLY SYSTEM LAYOUT LEVEL 01 FLOOR PLAN SEGEMENT-H2 (MASTER PLAN) SD H2 PLUMBING 14-Sep-14 Yes C 13-Sep-14 S

WATER SUPPLY SYSTEM LAYOUT LEVEL 01 FLOOR PLAN SEGEMENT-H2 (MASTER PLAN) SD H2 PLUMBING 5-Nov-14 Yes C 5-Nov-14 V

Page 109 of 114


-STRUCTURAL SHOP DRAWINGS SUBMITTAL LOG
CTED , S = SUPERCEDED , V = VALID 7-May-17

SEGMENT
RESPONSE
DRAWING
DRAWING TITLE TYPE DISCIPLINE REQUIRED REPLY APPROVA REPLY DATE
STATUS
BY L STATUS

WATER SUPPLY SYSTEM LAYOUT LEVEL 01 FLOOR PLAN SEGEMENT-H2 (PART-1/4) SD H2 PLUMBING 14-Sep-14 Yes C 13-Sep-14 S

WATER SUPPLY SYSTEM LAYOUT LEVEL 01 FLOOR PLAN SEGEMENT-H2 (PART-1/4) SD H2 PLUMBING 5-Nov-14 Yes C 5-Nov-14 V

WATER SUPPLY SYSTEM LAYOUT LEVEL 01 FLOOR PLAN SEGEMENT-H2 (PART-2/4) SD H2 PLUMBING 14-Sep-14 Yes C 13-Sep-14 S

WATER SUPPLY SYSTEM LAYOUT LEVEL 01 FLOOR PLAN SEGEMENT-H2 (PART-2/4) SD H2 PLUMBING 5-Nov-14 Yes C 5-Nov-14 V

WATER SUPPLY SYSTEM LAYOUT LEVEL 01 FLOOR PLAN SEGEMENT-H2 (PART-3/4) SD H2 PLUMBING 14-Sep-14 Yes C 13-Sep-14 S

WATER SUPPLY SYSTEM LAYOUT LEVEL 01 FLOOR PLAN SEGEMENT-H2 (PART-3/4) SD H2 PLUMBING 5-Nov-14 Yes C 5-Nov-14 V

WATER SUPPLY SYSTEM LAYOUT LEVEL 01 FLOOR PLAN SEGEMENT-H2 (PART-4/4) SD H2 PLUMBING 14-Sep-14 Yes C 13-Sep-14 S

WATER SUPPLY SYSTEM LAYOUT LEVEL 01 FLOOR PLAN SEGEMENT-H2 (PART-4/4) SD H2 PLUMBING 5-Nov-14 Yes C 5-Nov-14 V

WATER SUPPLY SYSTEM LAYOUT LEVEL 01 FLOOR PLAN SEGEMENT-H3 (MASTER PLAN) SD H3 PLUMBING 14-Sep-14 Yes C 13-Sep-14 S

WATER SUPPLY SYSTEM LAYOUT LEVEL 01 FLOOR PLAN SEGEMENT-H3 (MASTER PLAN) SD H3 PLUMBING 5-Nov-14 Yes C 5-Nov-14 V

WATER SUPPLY SYSTEM LAYOUT LEVEL 01 FLOOR PLAN SEGEMENT-H3 (PART-1/2) SD H3 PLUMBING 14-Sep-14 Yes C 13-Sep-14 S

WATER SUPPLY SYSTEM LAYOUT LEVEL 01 FLOOR PLAN SEGEMENT-H3 (PART-1/2) SD H3 PLUMBING 5-Nov-14 Yes C 5-Nov-14 V

WATER SUPPLY SYSTEM LAYOUT LEVEL 01 FLOOR PLAN SEGEMENT-H3 (PART-2/2) SD H3 PLUMBING 14-Sep-14 Yes C 13-Sep-14 S

WATER SUPPLY SYSTEM LAYOUT LEVEL 01 FLOOR PLAN SEGEMENT-H3 (PART-2/2) SD H3 PLUMBING 5-Nov-14 Yes C 5-Nov-14 V

B # 08 WATER TANK CENTRAL UTILITY PLANT BUILDERS WORK SD B8 PLUMBING 12-Oct-14 Yes C 3-Nov-14 V

BUILDERS WORK LAYOUT LEVEL -03 FLOOR PLAN SEGMENT -H2 ( MASTER PLAN ) SD H2 PLUMBING 11-Nov-14 Yes B 9-Nov-14 V

BUILDERS WORK LAYOUT LEVEL -03 FLOOR PLAN SEGMENT -H2 (PART- 1-4) SD H2 PLUMBING 11-Nov-14 Yes B 9-Nov-14 V

BUILDERS WORK LAYOUT LEVEL -03 FLOOR PLAN SEGMENT -H2 (PART- 2-4) SD H2 PLUMBING 11-Nov-14 Yes B 9-Nov-14 V

BUILDERS WORK LAYOUT LEVEL -03 FLOOR PLAN SEGMENT -H2 (PART- 4-4) SD H2 PLUMBING 11-Nov-14 Yes B 9-Nov-14 V

FIRE FIGHTING LAYOUT LEVEL- 01 MASTER PLAN (HIGH LEVEL PIPING) SEGMENT- H1 SD H1 PLUMBING 20-Nov-14 Yes C 19-Nov-14 V

FIRE FIGHTING LAYOUT FOR LEVEL- 01 PLAN (HIGH LEVEL PIPING) SEGMENT- H1 - PART- 1 OF 4 SD H1 PLUMBING 20-Nov-14 Yes C 19-Nov-14 V

FIRE FIGHTING LAYOUT FOR LEVEL- 01 PLAN (HIGH LEVEL PIPING) SEGMENT- H1 - PART- 2 OF 4 SD H1 PLUMBING 20-Nov-14 Yes C 19-Nov-14 V

FIRE FIGHTING LAYOUT FOR LEVEL- 01 PLAN (HIGH LEVEL PIPING) SEGMENT- H1 - PART- 3 OF 4 SD H1 PLUMBING 20-Nov-14 Yes C 19-Nov-14 V

FIRE FIGHTING FOR LAYOUT LEVEL- 01 PLAN (HIGH LEVEL PIPING) SEGMENT- H1 - PART- 4 OF 4 SD H1 PLUMBING 20-Nov-14 Yes C 19-Nov-14 V

FIRE FIGHTING FOR LAYOUT LEVEL- 01 MASTER PLAN (HIGH LEVEL PIPING) SEGMENT- H2 SD H2 PLUMBING 20-Nov-14 Yes C 19-Nov-14 V

Page 110 of 114


-STRUCTURAL SHOP DRAWINGS SUBMITTAL LOG
CTED , S = SUPERCEDED , V = VALID 7-May-17

SEGMENT
RESPONSE
DRAWING
DRAWING TITLE TYPE DISCIPLINE REQUIRED REPLY APPROVA REPLY DATE
STATUS
BY L STATUS

FIRE FIGHTING FOR LAYOUT LEVEL- 01 PLAN (HIGH LEVEL PIPING) SEGMENT- H2 - PART- 1 OF 4 SD H2 PLUMBING 20-Nov-14 Yes C 19-Nov-14 V

FIRE FIGHTING FOR LAYOUT LEVEL- 01 PLAN (HIGH LEVEL PIPING) SEGMENT- H2 - PART- 2 OF 4 SD H2 PLUMBING 20-Nov-14 Yes C 19-Nov-14 V

FIRE FIGHTING FOR LAYOUT LEVEL- 01 PLAN (HIGH LEVEL PIPING) SEGMENT- H2 - PART- 3 OF 4 SD H2 PLUMBING 20-Nov-14 Yes C 19-Nov-14 V

FIRE FIGHTING FOR LAYOUT LEVEL- 01 PLAN (HIGH LEVEL PIPING) SEGMENT- H2 - PART- 4 OF 4 SD H2 PLUMBING 20-Nov-14 Yes C 19-Nov-14 V

FIRE FIGHTING LAYOUT LEVEL- 01 MASTER PLAN (HIGH LEVEL PIPING) SEGMENT- H3 SD H3 PLUMBING 20-Nov-14 Yes C 20-Nov-14 V

FIRE FIGHTING LAYOUT LEVEL- 01 PLAN (HIGH LEVEL PIPING) SEGMENT- H3 - PART- 1 OF 2 SD H3 PLUMBING 20-Nov-14 Yes C 20-Nov-14 V

FIRE FIGHTING LAYOUT LEVEL- 01 PLAN (HIGH LEVEL PIPING) SEGMENT- H3 - PART- 2 OF 2 SD H3 PLUMBING 20-Nov-14 Yes C 20-Nov-14 V

Water Supply layout for level -02 high level piping master plan segment H1 SD H1 PLUMBING 20-Nov-14 Yes C 15-Nov-14 V

Water Supply layout for level -02 high level piping segment H1 part 3\4 SD H1 PLUMBING 20-Nov-14 Yes C 15-Nov-14 V

Water Supply layout for level -02 high level piping segment H1 part 4\4 SD H1 PLUMBING 20-Nov-14 Yes C 15-Nov-14 V

Water Supply layout for level -02 high level piping master plan segment H2 SD H2 PLUMBING 20-Nov-14 Yes C 15-Nov-14 V

Water Supply layout for level -02 high level piping segment H2 Part 1\4 SD H2 PLUMBING 20-Nov-14 Yes C 15-Nov-14 V

Water Supply layout for level -02 high level piping master plan segment H3 SD H3 PLUMBING 20-Nov-14 Yes C 15-Nov-14 V

Water Supply layout for level -02 high level piping segment H2 Part 2\2 SD H3 PLUMBING 20-Nov-14 Yes C 15-Nov-14 V

Drainage layout for level -02 master plan segment H1 SD H1 PLUMBING 20-Nov-14 Yes C 22-Nov-14 V

Drainage layout for level -02 plan segment H1 Part -1\4 SD H1 PLUMBING 20-Nov-14 Yes C 22-Nov-14 V

Drainage layout for level -02 plan segment H1 Part -2\4 SD H1 PLUMBING 20-Nov-14 Yes C 22-Nov-14 V

Drainage layout for level -02 plan segment H1 Part -3\4 SD H1 PLUMBING 20-Nov-14 Yes C 22-Nov-14 V

Drainage layout for level -02 plan segment H1 Part -4\4 SD H1 PLUMBING 20-Nov-14 Yes C 22-Nov-14 V

Drainage layout for level -02 master plan segment H3 SD H3 PLUMBING 20-Nov-14 Yes C 22-Nov-14 V

Drainage layout for level -02 plan segment H3 Part 1\2 SD H3 PLUMBING 20-Nov-14 Yes C 22-Nov-14 V

Drainage layout for level -02 plan segment H3 Part 2\2 SD H3 PLUMBING 20-Nov-14 Yes C 22-Nov-14 V

WATER SUPPLY LAYOUT FOR LEVEL- 02 MASTER PLAN (SEGMENT-H1) SD H1 PLUMBING 20-Nov-14 Yes C 17-Nov-14 V

WATER SUPPLY LAYOUT FOR LEVEL- 02 PLAN (SEGMENT-H1) PART- 3 OF 4 SD H1 PLUMBING 20-Nov-14 Yes C 17-Nov-14 V

WATER SUPPLY LAYOUT FOR LEVEL- 02 PLAN (SEGMENT-H1) PART- 4 OF 4 SD H1 PLUMBING 20-Nov-14 Yes C 17-Nov-14 V

Page 111 of 114


-STRUCTURAL SHOP DRAWINGS SUBMITTAL LOG
CTED , S = SUPERCEDED , V = VALID 7-May-17

SEGMENT
RESPONSE
DRAWING
DRAWING TITLE TYPE DISCIPLINE REQUIRED REPLY APPROVA REPLY DATE
STATUS
BY L STATUS

WATER SUPPLY LAYOUT FOR LEVEL- 02 MASTER PLAN (SEGMENT-H2) SD H2 PLUMBING 20-Nov-14 Yes C 17-Nov-14 V

WATER SUPPLY LAYOUT FOR LEVEL- 02 PLAN (SEGMENT-H2) PART- 1 OF 4 SD H2 PLUMBING 20-Nov-14 Yes C 17-Nov-14 V

WATER SUPPLY LAYOUT FOR LEVEL- 02 PLAN (SEGMENT-H2) PART- 2 OF 4 SD H2 PLUMBING 20-Nov-14 Yes C 17-Nov-14 V

WATER SUPPLY LAYOUT FOR LEVEL- 02 PLAN (SEGMENT-H2) PART- 4 OF 4 SD H2 PLUMBING 20-Nov-14 Yes C 17-Nov-14 V

WATER SUPPLY LAYOUT FOR LEVEL- 02 MASTER PLAN (SEGMENT-H3) SD H3 PLUMBING 20-Nov-14 Yes C 17-Nov-14 V

WATER SUPPLY LAYOUT FOR LEVEL- 02 PLAN (SEGMENT-H3) PART- 2 OF 2 SD H3 PLUMBING 20-Nov-14 Yes C 17-Nov-14 V

MEDICAL GASES PIPING LAYOUT FOR LEVEL - 1, MASTER PLAN (SEGMENT - H1) SD H1 PLUMBING 22-Nov-14 Yes C 27-Nov-14 V

MEDICAL GASES PIPING LAYOUT FOR LEVEL -1 PLAN (SEGMENT - H1) (PART - 1 OF 4) SD H1 PLUMBING 22-Nov-14 Yes C 27-Nov-14 V

MEDICAL GASES PIPING LAYOUT FOR LEVEL - 1, PLAN (SEGMENT - H1) (PART - 3 OF 4) SD H1 PLUMBING 22-Nov-14 Yes C 27-Nov-14 V

MEDICAL GASES PIPING LAYOUT FOR LEVEL-1 PLAN (SEGMENT - H1) (PART - 2 OF 4) SD H1 PLUMBING 22-Nov-14 Yes C 27-Nov-14 V

MEDICAL GASES PIPING LAYOUT FOR LEVEL - 1, PLAN (SEGMENT - H1) (PART - 4 OF 4) SD H1 PLUMBING 22-Nov-14 Yes C 27-Nov-14 V

MEDICAL GASES PIPING LAYOUT FOR LEVEL - 1, MASTER PLAN (SEGMENT - H2) SD H2 PLUMBING 22-Nov-14 Yes C 27-Nov-14 V

MEDICAL GASES PIPING LAYOUT FOR LEVEL - 1 PLAN (SEGMENT-H2) (PART-1 OF 4) SD H2 PLUMBING 22-Nov-14 Yes C 27-Nov-14 V

MEDICAL GASES PIPING LAYOUT FOR LEVEL - 1 PLAN (SEGMENT-H2) (PART-2 OF 4) SD H2 PLUMBING 22-Nov-14 Yes C 27-Nov-14 V

MEDICAL GASES PIPING LAYOUT FOR LEVEL - 1 PLAN (SEGMENT-H2) (PART-3 OF 4) SD H2 PLUMBING 22-Nov-14 Yes C 27-Nov-14 V

MEDICAL GASES PIPING LAYOUT FOR LEVEL - 1, MASTER PLAN (SEGMENT - H3) SD H3 PLUMBING 22-Nov-14 Yes C 27-Nov-14 V

MEDICAL GASES PIPING LAYOUT FOR LEVEL - 1 PLAN (SEGMENT - H3) (PART - 1 OF 2) SD H3 PLUMBING 22-Nov-14 Yes C 27-Nov-14 V

MEDICAL GASES PIPING LAYOUT FOR LEVEL - 1, PLAN (SEGMENT - H3) (PART - 2 OF 2) SD H3 PLUMBING 22-Nov-14 Yes C 27-Nov-14 V

BUILDERS WORK LAYOUT FOR LEVEL - 2, MASTER PLAN (SEGMENT-H1) SD H1 PLUMBING 22-Nov-14 Yes C 20-Nov-14 V

BUILDERS WORK LAYOUT FOR LEVEL - 2, PLAN (SEGMENT - H1) / (PART - 1/4) SD H1 PLUMBING 22-Nov-14 Yes C 20-Nov-14 V

BUILDERS WORK LAYOUT FOR LEVEL - 2, PLAN (SEGMENT - H1) / (PART - 2/4) SD H1 PLUMBING 22-Nov-14 Yes C 20-Nov-14 V

BUILDERS WORK LAYOUT FOR LEVEL - 2, PLAN (SEGMENT - H1) / (PART - 3/4) SD H1 PLUMBING 22-Nov-14 Yes C 20-Nov-14 V

BUILDERS WORK LAYOUT FOR LEVEL - 2, PLAN (SEGMENT - H1) / (PART - 4/4) SD H1 PLUMBING 22-Nov-14 Yes C 20-Nov-14 V

BUILDERS WORK LAYOUT FOR LEVEL - 2, MASTER PLAN (SEGMENT-H3) SD H3 PLUMBING 22-Nov-14 Yes C 20-Nov-14 V

BUILDERS WORK LAYOUT FOR LEVEL - 2 PLAN (SEGMENT - H3) / (PART - 1/2) SD H3 PLUMBING 22-Nov-14 Yes C 20-Nov-14 V

Page 112 of 114


-STRUCTURAL SHOP DRAWINGS SUBMITTAL LOG
CTED , S = SUPERCEDED , V = VALID 7-May-17

SEGMENT
RESPONSE
DRAWING
DRAWING TITLE TYPE DISCIPLINE REQUIRED REPLY APPROVA REPLY DATE
STATUS
BY L STATUS

BUILDERS WORK LAYOUT FOR LEVEL - 2 PLAN (SEGMENT - H3) / (PART - 2/2) SD H3 PLUMBING 22-Nov-14 Yes C 20-Nov-14 V

BUILDERS WORK LAYOUT FOR LEVEL -2 MASTER PLAN (SEGMENT -H2) SD H2 PLUMBING 22-Nov-14 Yes C 20-Nov-14 V

BUILDERS WORK LAYOUT FOR LEVEL -2 (SEGMENT -H2) PART 1 OF 4 SD H2 PLUMBING 22-Nov-14 Yes C 20-Nov-14 V

BUILDERS WORK LAYOUT FOR LEVEL -2 (SEGMENT -H2) PART 2 OF 4 SD H2 PLUMBING 22-Nov-14 Yes C 20-Nov-14 V

BUILDERS WORK LAYOUT FOR LEVEL -2 (SEGMENT -H3) PART 2 OF 2 SD H3 PLUMBING 22-Nov-14 Yes C 20-Nov-14 V
FIRE FIGHTING SYSTEM LAYOUTFOR LEVEL- 02 FLOOR PLAN - MASTER PLAN
SD H1 PLUMBING 22-Nov-14 Yes C 20-Nov-14 V
SEGMENT - H1
FIRE FIGHTING SYSTEM LAYOUT LEVEL- 02 PLAN - SEGMENT- H1
SD H1 PLUMBING 22-Nov-14 Yes C 20-Nov-14 V
PART- 3 OF 4
FIRE FIGHTING SYSTEM LAYOUT LEVEL- 02 PLAN - SEGMENT- H1
SD H1 PLUMBING 22-Nov-14 Yes C 20-Nov-14 V
PART- 4 OF 4
FIRE FIGHTING SYSTEM LAYOUT LEVEL- 02 FLOOR PLAN - MASTER PLAN - SEGMENT- H2 SD H2 PLUMBING 22-Nov-14 Yes C 20-Nov-14 V

FIRE FIGHTING SYSTEM LAYOUT LEVEL- 02 FLOOR PLAN - SEGMENT- H2 PART- 1 OF 4 SD H2 PLUMBING 22-Nov-14 Yes C 20-Nov-14 V
FIRE FIGHTING SYSTEM LAYOUT LEVEL- 02 PLAN - SEGMENT- H2
SD H2 PLUMBING 22-Nov-14 Yes C 20-Nov-14 V
PART- 2 OF 4
FIRE FIGHTING SYSTEM LAYOUT LEVEL- 02 FLOOR PLAN - MASTER PLAN - SEGMENT- H3 SD H3 PLUMBING 22-Nov-14 Yes C 20-Nov-14 V

FIRE FIGHTING SYSTEM LAYOUT LEVEL- 02 FLOOR PLAN - SEGMENT- H3 PART- 2 OF 2 SD H3 PLUMBING 22-Nov-14 Yes C 20-Nov-14 V

BUILDERS WORK LAYOUT LEVEL S1 FLOOR PLAN (TUNNEL AREA) SEGMENT - E1 (ICU) SD E1 PLUMBING 4-Jan-15 Yes C 29-Dec-14 V
BUILDERS WORK LAYOUT MASTER FOUNDATION AND LEVEL - S01 FLOOR MASTER PLAN (SEGMENT A-1,
SD A PLUMBING 12-Jan-15 OverDue P V
A2 & A3)
BUILDERS WORK LAYOUT MASTER FOUNDATION AND LEVEL - S01 FLOOR MASTER PLAN (SEGMENT A-1)
SD A1 PLUMBING 12-Jan-15 OverDue P V
(PART 1/2)
BUILDERS WORK LAYOUT MASTER FOUNDATION AND LEVEL - S01 FLOOR MASTER PLAN (SEGMENT A-1)
SD A1 PLUMBING 12-Jan-15 OverDue P V
(PART 2/2)
BUILDERS WORK LAYOUT MASTER FOUNDATION AND LEVEL - S01 FLOOR MASTER PLAN (SEGMENT A-2)
SD A2 PLUMBING 12-Jan-15 OverDue P V
(PART 1/2)
BUILDERS WORK LAYOUT MASTER FOUNDATION AND LEVEL - S01 FLOOR MASTER PLAN (SEGMENT A-3)
SD A3 PLUMBING 12-Jan-15 OverDue P V
(PART 1/4)
BUILDERS WORK LAYOUT MASTER FOUNDATION AND LEVEL - S01 FLOOR MASTER PLAN (SEGMENT A-3)
SD A3 PLUMBING 12-Jan-15 OverDue P V
(PART 2/4)
BUILDERS WORK LAYOUT MASTER FOUNDATION AND LEVEL - S01 FLOOR MASTER PLAN (SEGMENT A-3)
SD A3 PLUMBING 12-Jan-15 OverDue P V
(PART 3/4)
BUILDERS WORK LAYOUT MASTER FOUNDATION AND LEVEL - S01 FLOOR MASTER PLAN (SEGMENT A-3)
SD A3 PLUMBING 12-Jan-15 OverDue P V
(PART 4/4)
BUILDERS WORK LAYOUT MASTER FOUNDATION DETAILS SD A0 PLUMBING 12-Jan-15 OverDue P V
DRAINAGE SYSTEM LAYOUT MASTER FOUNDATION AND LEVEL - S01 FLOOR MASTER PLAN (SEGMENT -
SD A PLUMBING 12-Jan-15 OverDue P V
A, A2 & A3)
DRAINAGE SYSTEM LAYOUT MASTER FOUNDATION AND LEVEL - S01 FLOOR MASTER PLAN (SEGMENT -
SD A1 PLUMBING 12-Jan-15 OverDue P V
A1) (PART 1/2)

Page 113 of 114


-STRUCTURAL SHOP DRAWINGS SUBMITTAL LOG
CTED , S = SUPERCEDED , V = VALID 7-May-17

SEGMENT
RESPONSE
DRAWING
DRAWING TITLE TYPE DISCIPLINE REQUIRED REPLY APPROVA REPLY DATE
STATUS
BY L STATUS

DRAINAGE SYSTEM LAYOUT MASTER FOUNDATION AND LEVEL - S01 FLOOR MASTER PLAN (SEGMENT -
SD A1 PLUMBING 12-Jan-15 OverDue P V
A1) (PART 2/2)
DRAINAGE SYSTEM LAYOUT MASTER FOUNDATION AND LEVEL - S01 FLOOR MASTER PLAN (SEGMENT -
SD A2 PLUMBING 12-Jan-15 OverDue P V
A2) (PART 1/2)
DRAINAGE SYSTEM LAYOUT MASTER FOUNDATION AND LEVEL - S01 FLOOR MASTER PLAN (SEGMENT -
SD A2 PLUMBING 12-Jan-15 OverDue P V
A2) (PART 2/2)
DRAINAGE SYSTEM LAYOUT MASTER FOUNDATION AND LEVEL - S01 FLOOR MASTER PLAN (SEGMENT -
SD A3 PLUMBING 12-Jan-15 OverDue P V
A3) (PART 1/4)
DRAINAGE SYSTEM LAYOUT MASTER FOUNDATION AND LEVEL - S01 FLOOR MASTER PLAN (SEGMENT -
SD A3 PLUMBING 12-Jan-15 OverDue P V
A3) (PART 2/4)
DRAINAGE SYSTEM LAYOUT MASTER FOUNDATION AND LEVEL - S01 FLOOR MASTER PLAN (SEGMENT -
SD A3 PLUMBING 12-Jan-15 OverDue P V
A3) (PART 3/4)
DRAINAGE SYSTEM LAYOUT MASTER FOUNDATION AND LEVEL - S01 FLOOR MASTER PLAN (SEGMENT -
SD A3 PLUMBING 12-Jan-15 OverDue P V
A3) (PART 4/4)
DRAINAGE SYSTEM LAYOUT MASTER FOUNDATION TYPICAL DETAILS - (SEGMENT - A3) (PART 1/1) SD A PLUMBING 12-Jan-15 OverDue P V
WATER SYSTEM LAYOUT MASTER FOUNDATION AND LEVEL - S01 FLOOR MASTER PLAN (SEGMENT - A1,
SD A PLUMBING 11-Jan-15 OverDue P V
A2 & A3)
WATER SYSTEM LAYOUT MASTER FOUNDATION AND LEVEL - S01 FLOOR MASTER PLAN (SEGMENT - A1,
SD A1 PLUMBING 11-Jan-15 OverDue P V
A2 & A3) (PART 1/2)
WATER SYSTEM LAYOUT MASTER FOUNDATION AND LEVEL - S01 FLOOR MASTER PLAN (SEGMENT - A1)
SD A1 PLUMBING 11-Jan-15 OverDue P V
(PART 2/2)
WATER SYSTEM LAYOUT MASTER FOUNDATION AND LEVEL - S01 FLOOR MASTER PLAN (SEGMENT - A2)
SD A2 PLUMBING 11-Jan-15 OverDue P V
(PART 1/2)
WATER SYSTEM LAYOUT MASTER FOUNDATION AND LEVEL - S01 FLOOR MASTER PLAN (SEGMENT - A2)
SD A2 PLUMBING 11-Jan-15 OverDue P V
(PART 2/2)
WATER SYSTEM LAYOUT MASTER FOUNDATION AND LEVEL - S01 FLOOR MASTER PLAN (SEGMENT - A3)
SD A3 PLUMBING 11-Jan-15 OverDue P V
(PART 1/4)
WATER SYSTEM LAYOUT MASTER FOUNDATION AND LEVEL - S01 FLOOR MASTER PLAN (SEGMENT - A3)
SD A3 PLUMBING 11-Jan-15 OverDue P V
(PART 2/4)
WATER SYSTEM LAYOUT MASTER FOUNDATION AND LEVEL - S01 FLOOR MASTER PLAN (SEGMENT - A3)
SD A3 PLUMBING 11-Jan-15 OverDue P V
(PART 3/4)
WATER SYSTEM LAYOUT MASTER FOUNDATION AND LEVEL - S01 FLOOR MASTER PLAN (SEGMENT - A3)
SD A3 PLUMBING 11-Jan-15 OverDue P V
(PART 4/4)
BUILDERS WORK LAYOUT MASTER FOUNDATION AND LEVEL - S01 FLOOR MASTER PLAN (SEGMENT A-2)
SD A2 PLUMBING 12-Jan-15 OverDue P V
(PART 2/2)