Windex provided a badly edited and often incoherent tender with very little
evidence. The quality of editing in their tender application implies bad management and
bad teamwork for their team. Besides that, they did not show understanding of our
prototype. The tender application they submitted is short and unclear. Although they give
some suggestion for improvements, but our company thinks that they deliver a
perfunctory performance to our company.
Table of Contents
1.0
Introduction........4
2.0 Tender Review Summary..5
6.0 Summary..........12
7.0 Appendix....13-90
1.0 Introduction
This document contains review detail for all three tender companies that applied
for Phantoms Enterprise design. The three tender companies are RW Industries, Glasses
Republic and Windex. All three tender has been reviewed and mark is given according to
the Tender Evaluation Criteria (TEC) on Stage 1 Design Package.
The score for each tender companys tender application has been listed down in
below. Phantom Enterprise has decided to appoint RW Industries as the winning tender as
the score for the company is the highest. The awarded marks for the three tenders
company are shown in below:
The tender application for each company was reviewed and marks were awarded
for each criteria. The sums of marks from each criteria were calculated in percentage. The
final marks for each tender are then sorted in order of highest and lowest. The highest
rated tender company are announced to be the winning tender.
2.0 Tender Review Summary
The following table, Table 1, is a summary of the marking for the three submitted
tenders.
Review:
As Phantom Enterprise requested that the contractor whom going to construct the Mars
Rover must have advance communication and language skills, and as contractors from
RW Industries, they did discussion and research regarding the design of Mars Rover by
Phantom Enterprise before attending the meeting. Questions were prepared by the RW
Industries and feedback was given to them through communication gadget, WhatsApp
after the meeting. The contractors of RW Industries were able to give us prompt response
when message were send to them within one day. Besides that, the contractors of RW
Industries had showed that they have good language skills through WhatsApp. The
language is precise and understandable. Appendix A.1 and A.2 shows the question list of
design and written feedback to the design company. Based on this, designers of Phantom
Enterprise believe that contractors of RW Industries had fulfilled our expectation on their
communication and language skills.
Review:
The contractors of RW Industries are all capable and experienced in using the tools
required to construct the Mars Rover. They have the proper knowledge and skills in using
the tools such as hot glue gun, saw and driller so we believe that they will be able to
construct the Mars Rover. The contractors of RW Industries had showed that they have
the ability in using the tools. The appendix A.3, A.4 and A.5 are the photos of 8C
contractors using silicon seal to seal a car engine and engine cover, sawing wood for the
use of signboard for running event and drilling hole for the purpose of hanging the hanger
on the door of his room.
Review:
The contractors of RW Industries always show their responsive in any questions and
messages. They usually take less than two hours to reply to any question needed. Besides
that, they also provide the minutes of meetings for every meeting within 24 hours after
the meeting and emailed the design company to call in a meeting to suggest
improvements on the vehicle within two days. A screen shot of the chat between Phantom
Enterprises designers and RW Industries contractors for the arrangement of meeting
shows that the responsive and dedication of RW Industries. The appendix A.6 shows that
an email was sent to Phantom Enterprises designers to call for a meeting within 24 hours
after the revealed of tender allocation. The appendix A.7 shows that RW Industries
contractors provide Phantom Enterprises designers the minutes of the meeting within 24
hours after the meeting.
3.4 Punctuality
Review:
RW Industries contractors are punctual to every meeting and never leave the meetings
earlier. The contractors of RW Industries are also well prepared to complete the Mars
Rover in the given time as having great time management skill is one of the policy of the
company. The appendix A.8 shows that a screenshot of WhatsApp conversation to prove
that the RW Industries contractors are punctual in the meeting.
Review:
The RW Industries contractors are well experience in cost management. Besides that,
most of the materials used are recycled so it will cost less money for the Mars Rover to
construct. The appendix A.9 shows that the curriculum vitae of RW Industries
contractors. This shows that they have good ability in managing of their cost. But, they
did not able to give solution to reduce the cost of Mars Rover so some marks will be
reduced.
Review:
Review:
One of the contractors had built a laser security system in grade 12, which was shown in
Appendix B.4. This shows that the contractor is well trained and had multiple experiences
not only on construct a wooden project but also other type of project. Besides that,
another contractor had relevant experience on construct a puzzle box during his high
school, which was shown in Appendix B.5. This shows that the contractor has high
technical skill on how to construct the Mars Rover.
4.3 Responsive
Review:
The Glasses Republics contractors had finished the minutes of meetings and sent to the
Phantom Enterprises designers. This shows that they have fast response and were able to
complete the minutes of meeting within 24 hours. Appendix B.6 shows the screenshot of
the email.
Score achieved: 15 marks
4.4 Punctuality
Review:
Glasses Republics contractors punctual to every meeting and did not leave earlier for the
meeting. This shows that they very focus on the punctuality of team members. The
appendix B.7 shows the minutes of meeting that every member of Glasses Republic had
arrived on time and did not absent each meeting.
Review:
The estimated total cost in Phantom Enterprises design package is RM 21.29. The
contractors have confidence to reduce the cost until RM 15.50. The appendix B.8 shows
the table after they reduce the cost but they did not show the source of the material so
marks will be reduced.
Review:
Windexs contractors show their misunderstanding on the design package during the
minutes of meeting as shown in appendix C.1. Besides that, they provide their
certifications as their evidence to prove they can communicate fluently in English as
shown in appendix C.2. Although they show the minutes of meeting and certifications,
but compared to the other two groups they provide less evidence.
Review:
The contractors from Windex show they have ability and knowledge to handle all the
tools safely and construct the Mars Rover successfully. The appendix C.3 shows the
academic result of Lower Secondary Assessment (PMR) for living skills which sawing
work is compulsory project. Some marks will be reduced because they did not show any
skills in using hot glue gun and driller.
5.3 Responsive
Review:
The minutes of meeting were submitted to Phantom Enterprises designers for review
within 24 hours after the meeting. Appendix C.4 shows they fast response to Phantom
Enterprises designers. It was late for Windexs contractors submit their Tender
Evaluation Criteria to us, some marks will be reduced.
Review:
Windexs contractors submit everything on time or even earlier before the deadline. The
appendix C.5 shows the Weekly Progress Report of every contractor from Windex.
Furthermore, they also create a Gantt chart to set up schedule which is shown in appendix
C.6. The evidence given is less compared to other two groups.
Review:
The estimated total cost in Phantom Enterprises design package is RM 21.29. The
contractors have confidence to reduce the cost until RM 19.66. The appendix C.7 shows
the table after they reduce the cost but they did not show the source of the material so