0% found this document useful (0 votes)
101 views

Bus Rapid Transit (BRT) : An Efficient and Competitive Mode of Public Transport

This document is a working paper from 2013 by Robert Cervero that reviews experiences with designing and implementing Bus Rapid Transit (BRT) systems worldwide. It begins by defining BRT along a spectrum of service qualities and costs, with high-end BRT systems providing metro-level service through dedicated bus lanes and stations. The paper then reviews global BRT trends, system designs, costs relative to light rail and heavy rail, efforts to promote transit-oriented development around BRT stations, institutional arrangements for managing BRT services, and the future outlook for BRT given urbanization trends.

Uploaded by

gandalf500
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
101 views

Bus Rapid Transit (BRT) : An Efficient and Competitive Mode of Public Transport

This document is a working paper from 2013 by Robert Cervero that reviews experiences with designing and implementing Bus Rapid Transit (BRT) systems worldwide. It begins by defining BRT along a spectrum of service qualities and costs, with high-end BRT systems providing metro-level service through dedicated bus lanes and stations. The paper then reviews global BRT trends, system designs, costs relative to light rail and heavy rail, efforts to promote transit-oriented development around BRT stations, institutional arrangements for managing BRT services, and the future outlook for BRT given urbanization trends.

Uploaded by

gandalf500
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 47

Working Paper 2013-01

Bus Rapid Transit (BRT): An Efficient and


Competitive Mode of Public Transport

Robert Cervero
August 2013

UNIVERSITY OF CALIFORNIA























Report prepared for
European Automobile
Manufacturers Association










0

1. Introduction: Rationale and Main Objectives

Bus Rapid Transit (BRT) systems have gained popularity worldwide as a cost-effective
alternative to far more expensive urban rail investments. High-quality bus-based systems also
better serve the low-density settlement patterns of many suburban markets and small-to-
medium size cities due to the inherent flexibility advantages of rubber-tire systems the same
vehicle that provides speedy line-haul services on a dedicated bus lane or busway can morph
into a feeder vehicle, collecting and distributing customers on local streets.

This report reviews experiences with designing and implementing BRT systems worldwide. BRT
is first defined across a spectrum of service qualities and costs. Global trends are next
reviewed, highlighting cities and regions of the world with the most extensive and advanced
systems. Relationships between urban densities and BRT cost-effectiveness are noted. System
designs and operations in terms of running ways, rolling stock, route configurations, stations,
fare collections, and the like are then reviewed. This is followed by a comparison of BRTs
cost and performance relative to urban rail transit systems. Information on the cost-
effectiveness of heavy-rail, light-rail, and BRT systems relative to urban densities are also
compared. The report then turns to efforts among a handful to cities to proactively promote
transit oriented development (TOD) near BRT stations and along corridors. This is followed by
discussions on the institutional arrangements that have been introduced to effectively manage
BRT services. The report closes with discussions on BRTs likely future given global growth
projections and other pressing policy agendas in the foreseeable future.


2. BRT: A Suite of High-Quality, Bus-Based Mobility Options

Dozens of definitions can be found on BRT however they all frame BRT as a bus-based system
that mimics the high-capacity, high-performance characteristics of urban rail systems at a much
lower price. Curitiba, Brazil is credited with pioneering BRT and its mayor at the time, Jaime
Lerner, referred to the citys BRT system as a surface metro a high-quality bus service with
similar performance of a subway but at a fraction of the cost (Cervero, 1998). In terms of
service quality and costs, then, BRT is often thought of as occupying the middle ground
between urban rail and traditional bus systems. In ways, it offers the best of both worlds: the
speed and reliability of rail and the operating flexibility and lower cost of a conventional bus
(Deng and Nelson, 2011).

New York-based Institute of Transportation & Development Policy (ITDP), which has emerged
as one of the technologys strongest proponents, defines BRT as a high-quality bus-based
transit system that delivers fast, comfortable and cost-effective urban mobility through the
provision of segregated right-of-way infrastructure, rapid and frequent operations, and
excellence in marketing and customer service (Wright and Hook, 2007). It is the element of a
separate right-of-way that distinguishes high-end BRT from lower quality services, which
some have called BRT Lite. Table 1 distinguishes high-end, full-service BRT from low-end to

1

moderate-quality services in terms of key design and operating features. High-end services,
such as in Bogot, Colombia and Guangzhou, China, offer a metro-quality service, featuring: an
integrated network of routes and corridors; enclosed, high-quality stations; pre-board fare
collection/verification; frequent and rapid services; modern, clean vehicles; branding and
marketing; and superior customer service. BRT Lite offers some form of priority but not full-
segregated busways and instead of stations usually has simpler bus shelters. Thus what mainly
distinguishes high-end from low-end services is the presence of exclusive or dedicated rights-of-
way for operating buses and more substantial station platforms and boarding areas. Bus
stations are particularly important since they accommodate fare payment before boarding the
bus, allowing for faster, more orderly, multi-door boarding and alighting, similar to urban rail
systems. This reduces dwell time at stops and allows for more predictable scheduling and thus
more reliable services. Advanced technologies are also part and parcel of high-end BRT: AVL
(automated vehicle location) for real-time management and dispatching, preferential signal
treatment of buses at signalized intersections, and real-time dynamic passenger information
systems (next bus at stations; next station on buses). Other features of BRT are common
regardless whether high-end or not. These include: branding (e.g., logos and color schemes
that distinguish BRT from conventional bus services); wider spacing between stops/stations
than traditional bus services; raised platforms and same-level boarding and alighting
(eliminating the need for passengers to climb steps to get on the bus and thus reducing vehicle
dwell times); vehicles that are quiet, have high capacities, and run on clean fuels; and
intersection treatments to expedite vehicle flows, such as far-side bus stops and queue-jumper
lanes.

Table 1. Differences between High-End BRT and BRT Lite

High-End BRT/ Low-End BRT/ BRT Lite/


Full-Service Moderate-Service
Running Ways Exclusive Transit-ways; Mixed Traffic
Dedicated Bus Lanes; Some
grade separation
Stations/Stops Enhance Shelters to large Stops, sometimes with
temperature-controlled shelter, seating, lighting, and
transit centers passenger information
Service Design Frequent services; integrated More traditional service
local and express services; designs
timed transfers
Fare Collection Off-vehicle collection; smart More traditional fare media
cards; multi-door loading
Technology Automated Vehicle Location More limited technological
(AVL); passenger information applications
systems; traffic signal
preferences; vehicle
docking/guidance systems

2

For BRT to truly represent a mode that is time-competitive with urban rail systems and private
automobiles, exclusive, dedicated right-of-way is an essential feature. A new terminology has
been introduced in recent years, adopting the Olympic medals of Gold, Silver, and Bronze, to
rate BRT in terms of service quality. In The BRT Standard 2013, a collection of pro-BRT
organizations led by ITDP, five essential elements needed to keep the R in Bus Rapid Transit
and thus achieve a Gold Standard are:

Busway alignment: median-location of a busway or bus-only corridor that minimizes
conflicts with turning vehicles, delivery vehicles, and other potential obstructions
(Figure 1);
Dedicated right-of-way: physical segregation and full enforcement;
Off-board fare collection: barrier-controlled turnstiles that verify off-board ticket
payment;
Intersection treatments: turn prohibitions across busway and sign priorities; and
Platform-level boarding: elimination of steps and shrinkage of gaps between vehicles
and platforms through bus guidance, raised platforms, and boarding bridges.

Lower-quality BRT exists where elements deviate from this (according these services Silver or
Bronze standards), such as the use of delineators or colorized pavement in lieu of physical
separators along the dedicated right-of-way or barrier-free, proof-of-payment schemes instead
of turnstile controls with verified ticketing for passenger entry.

The three BRT systems that have been awarded the Gold Standard Bogot, Guangzhou, and
Lima, Peru to date have also added elements that safeguard or improve the speed, reliability,
and comfort of services. These include full-service control centers that GPS-monitor bus
locations (to respond to incidents, avoid bunching, and recording demand patterns for future
service adjustments) and passing lanes at stations.


2. Global Trends

To date, more than 150 cities have implemented some form of BRT system worldwide, carrying
around estimated 28 million passengers each weekeday. At present, BRT systems worldwide
comprised 280 corridors, 4,300km of routes, 6,700 stations, and 30,000 buses (BRTDATA.ORG).

BRT systems are currently being added at a geometric rate, gaining particular favor in the
developing world, following on the heels of widely publicized BRT successes in Curitiba, Bogot,
Mexico City, Istanbul, Ahmedabad, and Guangzhou. These developing cities show that high-
performance BRT systems that yield appreciable mobility and environmental benefits can be
built at an affordable price. Metrorail systems, studies show, can cost 10 times as much a BRT
system of similar length (Suzuki et al., 2013). Light Rail Transit (LRT) can be more than four
times as expensive. Besides cost-savings, highly congested mega-cities of the world, like

3


Figure 1. Desirable Busway Alignments. Designs that minimize obstructions and maintain high
travel speeds, receiving 7 points in The BRT Standard 2013. Source: ITDP et al. (2013).


Jakarta, Delhi, Sao Paulo, and Lagos have been drawn to BRT because high-capacity transit can
be built and expanded quickly during periods of rapid motorization and ever-worsening traffic
congestion. The ability to open segments before an entire system is in place is particularly
attractive to politicians and taxpayers who want quick results. Politicians are also drawn to the
economic development potential of BRT. In its Liveanomics series, the Economist Intelligence
Unit survey of September 2010 found that 61 percent of mayors reported that improving
public transport/roads was the most important thing that could done to make their city more
competitive for business on the global stage (Economist, 2011). This was nearly twice the share
that felt investing in schooling and education was the key to being economically competitive.

The rationales for BRT investments have broadened with time. Early BRT adopters, such as
Ottawa and Curitiba, built busways mainly because they were more affordable than Light Rail
Transit (LRT) (Cervero, 1998). In recent times, cities like Seoul, Mexico City, and Bangkok have
invested in BRT as a robust complement to pre-existing urban rail systems. To some developing
cities that have historically lacked a viable public transit system, instead relying on a
constellation of mostly uncoordinated private bus and informal paratransit services, BRT is part
of a major transformation, serving as the backbone of a new public system. This characterizes
cities like Lagos, Jakarta, and Ahmedabad.

2.1 BRT Systems by Countries and Regions

Figure 2 rank-orders countries or regions based on the number of cities with BRT systems as of
mid-2013. The vast majority of these systems have been built in the last 15 years. Brazil has

4

emerged as the global leader in building BRT systems, extending the success of Curitibas
pioneering system to 30 other cities. When Curitiba launched its Surface Metro in 1976, it
sought to mimic many features of nearby So Paulos metrorail system dedicated right-of-
way, attractive stations, off-board fare collection, and frequent, fast services. Bi-articulated
buses and well-designed boarding tubes significantly expanded carrying-capacity. Curitiba is
today best known for using BRT to channel urban growth along compact, mixed-use corridors
that attract transit riders (Cervero, 1998).

Other Latin American countries, notably Colombia and Mexico but also Chile, Peru, and
Ecuador, have since followed Brazils lead. Latin America is today the epicenter of the global
BRT movement. A third of BRT route kilometers and nearly two thirds (63%) of ridership are in
Latin America (BRTDATA.ORG, 2013). Bogots 110km TransMilenio is recognized as the Gold
Standard of BRT. Delegations of officials and dignitaries from around the world visit Bogot to
marvel at the system. Operating on a two-lane dedicated carriageway, TransMilenio carries
upwards of 40,000 passengers per hour per direction, which matches the passenger-
throughputs of most metros. The system also boasts enhanced stations (accessible by
networks of skyways), smart card-based fare collection, advanced control systems, distinctive
images, and affordable fares. TransMilenios patronage is growing at a healthy pace of around
10 per cent annually, from 800,000 daily riders when it opened in 2001 to around 1.7 million
today, accounting for 74 percent of public transit trips in the city. Finance policy has played a
role in TransMilenios success. In 2000, a 20 per cent surcharge was tacked onto all gasoline

35
31
30

25
No. of BRT CiUes

20 17
14
15 13
11
10
9
10 8
6 6 6 6 6
5
5 3 3 3


Figure 2. Number of Cities with BRT Systems, by National and Regional Settings, 2013. Source:
BRTDATA.ORG.

5

sales in Bogot, with half the revenues earmarked for TransMilenio infrastructure. As a cross-
subsidy from the 19 per cent of Bogots population that owned cars to transit-dependents, the
policy promoted social as well as environmental sustainability.

China has followed Latin Americas footsteps in aggressively building BRT, with more than ten
cities, including Beijing, Hangzhou, Xiamen, Jinan, and Guangzhou, having opened dedicated-
lane BRT services since 2005. Over the past eight years, China has added BRT lane-kms at a
faster pace than any part of the world (Figure 3). All have been high-end investments.

600
Km of BRT Lines: Busways & Mixed

500

400
Trac

300

200

100

0
2004 2005 2006 2007 2008 2009 2010 2011 2012


Figure 3. Growth in Chinas BRT Network Lengths (in Kilometers, Two Directions): 2004 to
2012. Source: CHINABRT.ORG.

Figure 2 reveals that after Brazil and China, three developed countries the US, France, and the
UK rank next in terms of numbers of cities with BRT systems. With the exception of exclusive
busways like the Orange line in Los Angeles and Eugene, Oregons EmX, most US systems fall in
the category of BRT lite. The purveyors of BRT in Europe were Runcon UK, which installed a
Figure-8 busway as part of a master-planned new town and Essen, Germany, the first city to
build a track-guided busway. Today , European BRT systems, particularly those in France, have
a more rail-like appearance than elsewhere, such as in Caen, Paris, and Rouen (Deng and
Nelson, 2011). BRT systems in these places operate on dedicated rights-of-way, supported by
various guidance technologies, and feature vehicles that to many are visually indistinguishable
from modern tramways. Rouen, France has three guided BRT lines, called TEOR (Transport Est-
Ouest Rouennais). Optical guidance allow TEOR vehicles to run along tightly restricted
corridors, offering riders reliable, comfortable and accessible services (Rambaud et al., 2008).

Like France, the UK today boasts several high-end guided BRT services in Cambridgeshire,
Ipswich, Crawley, Leeds, and Luton-Dunstable, modeled after the O-Bahn track-guided busways
built two decades earlier in Adelaide and Essen. At 19 km in length, Cambridgeshire busway is

6

reputedly the worlds longest point-to-point system (Foster, 2011). Purpose-built busways
without guidance have also been built in the UK, such as in Swansea and Kent. Kent
conventional Thameside Fastrak system has won praise from customers 95 percent have
rated overall Fastrack experience as excellent or good (Deng and Nelson, 2011).

Africas three BRT systems -- Lagos, Johannesburg, and Capetown fall on the BRT Lite end of
the spectrum. Lagoss system, which opened in 2008, cost just US$1.7 million per kilometer to
build, one of the cheapest anywhere (ITP and IBIS, 2009). Still, it carries almost 200,000
passengers a day or a quarter of public transport trips along its corridor even though BRT
vehicles make up just 4 percent of vehicles on the route (Pirie, 2011).

Notwithstanding the furious pace of BRT investments of the past decade, there remains plenty
of room for growth. In 2011, the nearly 28 million passenger trips served by BRT systems
worldwide were but 2.2 percent of all public transport trips and a mere 0.3 percent of all
motorized person trips made that year (Pourbaix, 2011).


2.2 Regional Comparisons of BRT Ridership and Performance

BRT yields environmental and mobility benefits only if it attracts riders specifically former
motorists as opposed to those who previously used a conventional bus or commuted by train.
One study in the US estimated that 24 percent to 33 percent of riders served by new BRT
systems are new transit users, most having switched from private car (Peak et al., 2005). In
Adelaide, 40 percent of those riding track-guided buses were former motorists (Cervero, 1998).

BRT systems in Latin America have attracted, by far, the most riders, as shown in Figure 4.
Among 38 Latin American BRT cities with reliable data, average weekday ridership was more 10
times greater than averages for BRT cities of the U.S. and Europe. With 1.65 million passengers
per weekday, Bogots TransMilenio is the worlds most heavily patronized BRT system.
Counting passengers on feeder lines that funnel into BRT stations, Curitiba averages 2.26
million weekday riders (Duarte and Rojas, 2012). Curitiba also holds the record for the most
passengers moved on an entire BRT system in a day 2.3 million. Figure 4 shows that Asian
BRT cities, dominated by China and India, averaged more than a quarter million daily riders.
The relationship between BRT ridership and factors like household income and vehicle
ownership, it is safe to say, is generally an inverse one.

Latin America and Asian BRT similarly dominate on the supply side in terms of kilometers of BRT
lines. The relationship between BRT supply and demand, moreover, is fairly robust. Figure 5
shows a simple scatterplot for 115 BRT systems with reliable data. The correlation between
BRT kilometers and ridership is 0.56 though as the plot reveals, ridership levels vary
considerably as systems become larger.

7


Figure 4. Average Weekday Ridership Among BRT Cities, by Continent-Region. Numbers in
bards denote number of BRT cities in region that are included in the analysis. Source: BRTDATA.ORG.


Figure 5. Scatterplot of Average Weekday Ridership and BRT Length Among 115 BRT Cities.
Source: BRTDATA.ORG.

8

Combining ridership with supply-side data yields a basic indicator of BRT performance: average
weekday riders per kilometer of BRT busway or dedicated lane. Figure 6 shows that Latin
American systems are by far the most productive, averaging more than 2 times as many
weekday riders per BRT kilometer as Asian systems, more than 3 times as many as Oceana and
African systems, more than 5 times as many as North American systems, and nearly 6 times as
many as European systems.


Figure 6. Average Weekday Riders per BRT Kilometer Among BRT Cities, by Continent-Region.
Numbers in bars denote number of BRT cities in region that are included in the analysis. Source:
BRTDATA.ORG.

On a riders per bus basis, BRT systems in Guayaquil, Guadajalara, and Istanbul are the most
intensively used (Hildalgo and Carrigan, 2010; Yazici et al., 2013). Istanbuls Metrobus, for
example, averages 2,255 boardings per bus per day, more than twice as much as TransMilenios
1,077 (Yazici et al., 2013).


2.3 Urban Densities and BRT Usage

In addition to factors like income and car ownership rates, urban densities also have a strong
influence on transit ridership, whether for bus-based or rail systems (Pushkarev and Zupan,
1977; Ewing and Cervero, 2010). As the saying goes, mass transit needs mass, or density.
Figure 7 presents average population densities among BRT cities, stratified by region.
Comparing Figure 7 with similarly stratified ridership data in Figure 4 suggests a strong
association between urban densities and BRT ridership. Latin American BRT cities, however,

9

average considerably lower densities than their Asian counterparts yet they tend to attract
considerably more customers, overall and on a per kilometer basis. Clearly, in Latin America
factors other than density, such as BRT service quality and affordability, have played a role in
attracting riders and boosting productivity.



Figure 7. Average Population Densities Among BRT Cities, by Continent-Region. Numbers in
bars denote number of BRT cities in region that are included in the analysis. Year of density data varies
by city, ranging from 1999 to 2011. Source: UN Habitat (2012).


Disaggregating data to the city level provides a better gauge of the relationship between BRT
ridership productivity (riders per BRT km) and urban densities. For 105 BRT cities for which
reliable data could be obtained, Figure 8 suggests a moderately positive relationship. The
presence of outliers weakens the simple correlation (.225) and as the scatterplot reveals, the
number of riders per BRT kilometer tends to vary more as urban densities increase.
Regardless, the positive association between urban densities and ridership productivity argues
in favor of BRTOD Bus Rapid Transit-Oriented Development.

Figure 8 is dominated by BRT cities from developing countries. In developed cities of Europe
and North America that have experienced auto-fueled suburbanization and sprawl in recent
decades, BRTs market niche is considered to be smaller to medium-size cities and the suburbs
of bigger cities. As a flexible, versatile technology, BRT is able to better serve the spread-out
development patterns than urban rail and the private car better (Cervero, 1998; Levinson et al.,

10

2003). Despite compact-city and smart-growth initiatives, population continues to disperse in
most advanced economies. From 1990 to 2000, average urban densities fell from 3545 to 2825
people in developed countries, declining in all 32 developed cities surveyed by the World Bank
(Angel, 2011). Because of the inherent flexibility advantages of rubber-tire buses e.g., unlike
rail systems, the same vehicle that functions as a line-haul carrier can also morph into a
neighborhood feeder -- BRT is especially suited for many lower density, non-CBD settings. In
The Transit Metropolis, BRT is defined as a form of adaptive transit best able to serve largely
market-driven, spread-out development patterns (Cervero, 1998).



Figure 8. Scatterplot of Riders per BRT Kilometer and Population Density Among 105 BRT
Cities. Sources: BRTDATA.ORG and UN Habitat (2012).


4. Characterizing BRT: The Supply Side

This section discusses BRT systems in terms of supply-wide attributes: infrastructure and
running ways; stations; and rolling stock. This is followed by discussions on BRT operations:
network design; operations and routing; and fare collection.


11

4.1 Infrastructure and Running-ways

The speed and time-competitive of BRT (vis--vis private car or metrorail) depends significantly
on the rights-of-way provided. As noted earlier, high-end BRTs have mostly protected,
exclusive rights-of-way whereas low-end systems do not.

BRT services operate across four different lane configurations: (1) running in mixed traffic
(sometimes with signal priority at intersections); (2) operating in dedicated shoulder or curb
lanes; (3) running in dedicated median lanes; and (4) using exclusive bus lanes, also called
busways (Levinson et al., 2003; Wright, 2011). Mixed-traffic systems are the slowest. Those
using dedicated shoulders or curb lanes typically rely on markers and physical barriers to
separate regular traffic from BRT buses.

For BRT systems with dedicate median lanes or exclusive bus lanes, buses operate in four ways :

Along railroad alignments (e.g., Ottawa, Miami, Los Angeles, Amsterdam)
In arterial medians or freeways (e.g., Cleveland, Vancouver, Bogot, Nantes, Seoul,
Beijing)
In tunnels (e.g., Seattle, Boston)
On elevated structures (e.g., Nagoya, Adelaide, Xiamen)

The overwhelming majority of busways operate in the center of an arterial street or freeway.
Systems with their own dedicated roadway, whether on a former railroad alignment or
alongside motorways (e.g., Brisbane), are far more the exception than the rule.

If at-surface BRT lines are to become time-competitive with metrorail systems, some degree of
grade-separation is necessary at busy intersections. Only 14 exclusive-lane BRT systems offer
some degree of grade separation; most rely on signal prioritization schemes (BRTDATA.ORG).
Xiamens 49km busway, the worlds sixth longest, features several tunnels and a very long
bridge to avoid disruptions at key junctures.

Jakarta today boasts the largest network of dedicated BRT lanes. With 134 km of protected,
dedicated buslanes, TransJakarta was designed to mimic TransMilenio. ITDP opened a branch
office in Jakarta and staffed it with professionals from Colombia to design TransJakarta
according to TransMilenio specifications. With 105 kms of busway, Bogot has the second
longest system, followed by Mexico City (81.5 km) and Curitiba (70 km). Among 36 global BRT
systems with dedicated busways, the median length system is 28km.

Several cities have experimented with track-guided buses (e.g., Nagoya, Leeds, Adelaide,
Mannhaim, Nantes). Track systems are typically built in areas with restricted rights-of-way,
such as along narrow freeway medians. Nestled between tracks and steered by guide wheels
and horizatonal stabilizers, riders enjoy a smooth and often scenic ride however these systems
tend to be considerably more expensive than other BRT running environments.

12

4.2 Stations

BRT systems pride themselves on providing more than a sign marking where to catch a bus.
High-end BRT systems feature full-service stations with reliable passenger information both
real-time dynamic (next bus at station) and static (e.g., schedules, maps, brochures) as well
as fare machines, comfortable seating and waiting areas, and occasionally temperature control.
Fully enclosed stations on Ottawas Transitway, for example, are air-conditioned in the summer
and heated in the winter (necessary given Ottawa is the worlds second coldest capital city).
More common are large awnings and shelters at station platforms that provide full protection
from rain and sunrays, found at more than 30 BRT systems worldwide (CHINABRT.ORG). Most
high-end BRT stations also feature plexi-glass sliding doors that regulate passenger flows,
reduce the risk of accidents, and prevent people from entering unauthorized station locations
or falling onto bus-lanes. In China (e.g., in Gaungzhou, Lanzhou, and Lianyungang), CCTV
surveillance has been installed at all stations for BRT systems.

Just as most busways lie in the median of roadways, so do most BRT stations. Center stations
facilitate transfers between buses however often at the expense of disruptions to customer
access. Crossing busy parallel streets at pedestrian-crossings can be dangerous and negotiating
skywalks and flyovers can be taxing, particularly for the elderly and disabled and especially in
warm-climate settings. Bogots network of metal skyways that feed into center bus stations
can be so deafening during rush hours when nearby traffic shakes the structures that they have
been likened to being inside a steel drum (Suzuki et al., 2013).

The BRT Standard 2013 sets the ideal station spacing at 1.5km, or around a mile, apart: beyond
this, customers spend to much time walking whereas less than this, bus speeds are
compromised (ITDP et al, 2013). In built-up urban areas, most BRT stations are 500 to 600
meters apart. Australian and US systems average considerably longer spacings of 1.5 km,
reflecting their lower average population densities (Hensher and Golob, 2008). Amsterdam
averages the longest spacing, 1750m between stations, followed by Los Angeles, Bangkok, and
Zoahuang, China whose BRT stations are around 1.5km apart (CHINABRT.ORG). At 470m,
Nantes averages the closest spacing among BRT systems with dedicated running ways.

Lastly, park-and-ride lots are found at only a few BRT stations, typically at terminuses, such as
Los Angeless Orange Line. More common is bicycle parking , found at BRT stations in Beijing,
Guangzhou, Changde, and Lianyungang, China as well as Amsterdam, Utrecht, Bogot, and
Bangkok. Guangzhou, Hangzhou, Nantes, and Mexico City, moreover, offer bikesharing in the
vicinity of BRT stations. Besides BRT systems in North American, Europe, and Australia,
wheelchair accessible stations are today found in a handful of stations in the developing world,
notably Bangkok, Cali, Leon, Capetown, Johannesburg, and Lima.

4.3 BRT Vehicles

Modern BRT fleets feature low-floor, clean-fuel buses with more and wider doors than
traditional buses, along with a unique image or brand. Ballooning ridership and the need to

13

accommodate swift, large-volume loading has meant articulated and bi-articulated buses with
multiple doors are common (Levinson et al., 2003; Hildalgo and Gutirrez, 2013). ITDP et al.
(2013) calls for a minimum of three doors for articulated buses and two for regular buses.
Along busy corridors, double- and triple-section articulated vehicles can carry more than 150
passengers. Curitibas 24m bi-articulated buses have a crunch load capacity of 270 passengers.
Istanbuls 4-door Mercedes CapaCity buses can carry upwards of 200 passengers. During peak
periods, far more people stand than sit. Wide aisles provide space to move around.

Numerous manufacturers are today producing BRT buses. Large systems such as Bogot and
Mexico City operate BRT buses from multiple manufacturers, in their cases Volvo, Mercedes,
and Scania. Curitibas special bi-articulated buses and left-side boarding Ligeirinho, or Speedy,
buses are made by Volvo, whose South American bus manufacturing plant is located in Curitiba.
Chinas BRT buses are often made by Chinese manufactures or joint ventures (e.g., MAN and
Huanghai makes buses for Dalian) and in India, Tata has mostly cornered the BRT market.
Chinese manufacturers such as Xiamen-based Kinglong are branching out, designing and
building buses not only for Xiamens high-end BRT system but also for Guangzhou, Lianyungang,
Zaozhuang, and Lima, Peru.

Worldwide, most BRT buses today run on clean diesel fuels that meet Euro-III and Euro-IV
emission standards. Due its natural resource base, all BRT buses in Australian cities run on
CNG. Because natural gas burns more cleanly than liquid fossil fuels, does not emit diesel
particulates, and generates much lower levels of nitrogen oxides and sulfur oxides, the
combination of fast moving vehicles on busways (as in Brisbane, Adelaide, and Sydney) running
on clean fuels has meant Australian BRT services are the worlds eco-friendliest.

Outside of Australia, Jakarta, Lima, Nantes, Los Angeles, and several Chinese cities also run CNG
buses. LNG is used by Beijings and Guangzhous fleets. Some of Curitibas buses are propelled
by biofuels. In Istanbul, Hefei, Zheng, and Seattle, diesel-hybrid buses are operated. Istanbuls
ATC Phileas buses, 26 meters in length that accommodate up to 230 passengers, run on clean
diesel along high-speed busway and electric batteries in idling and slow-speed mode. Electric
traction allows lighter vehicles, faster acceleration, and the ability to feed energy back into
batteries or the power grid through regenerative brakes. In tunnels, Seattle uses diesel-electric
hybrid buses, which operate similar to hybrid cars outside the tunnel and in a low-noise, low-
emissions hush mode (in which the diesel engine does not exceed idle speed) when
underground.

Branding is another distinguishing feature of BRT buses. Logos, color schemes, and other visual
element are used to convey BRTs unique identify, distinguishing them from regular buses. Las
Vegass BRT buses and stations, for example, feature old casino signs that reflect the citys
iconic identify and history.

BRT Lite buses often have a low-floor or kneeling configuration, allowing same-level boarding
and alighting at simple curbside stations. Higher-end buses that stop at raised platforms or full-
service stations, such in Quito and Bogot, deploy ramps to expedite passenger flows. Some

14

systems, such as in Beijing and Hangzhou, combine low-floor buses with slightly raised station
platforms (Kantor et al., 2006).

In Europe and particularly France, the distinction between BRT and rail is becoming increasingly
blurred. Sensitive to the need to project a modern, rail-like image, French cities like Caen,
Clermont-Ferrand, Lyon, Nancy, and Rouen have purchased Civis by Irisbus and TVR (Transport
sur Voie Reserve) by Bombardier that feature rounded bodies and covered wheels. Rouens
Civis feature hybrid diesel-electric articulated vehicles with train-like appearance, including four
doors, optical guidance, and wide aisle. Tram-like Van Hool vehicles are used in Metz. Rubber-
tired TVR vehicles in Caen and Nancy operate both on and off a dedicated runway. Caens
Twisto system is the hardest to label, running on rubber tires as well as a central rail that keeps
it on course. Twisto vehicles are propelled by overhead electrical wires in town but can run on
diesel in the suburbs.

Steering further distinguishes some European BRT systems. Civis buses in Rouen and Clermont-
Ferrand have been using optical guidance since 2001. Eindhovens Phileas vehicles have
electromagnetic-guided steering. These system are far more advanced than the first-
generation mechanical guidance introduced with the original OBahn systems of Adelaide and
Essen (i.e., guide-wheels nestled along horizontal tracks/stabilizers). In the UK, improved
versions of mechanical curb-guided buses have been introduced in Ipswich, Leeds, Bradford,
Sussex, Edinburgh, Luton, and Cambridge-St. Ives.


4.4 Network Designs

BRT networks often follow urban form. They also reflect service philosophies. Early Latin
America BRT cities like Curitiba and Bogot have distinct radial city forms and accordingly radial
BRT systems. Most trips are distributed along high-density corridors. In contrast, Chinese cities
tend to have high, fairly uniformly distributed urban densities (Yang et al., 2012). Their spread-
out, planar urban form calls for more flexible, multi-directional systems, such as in Guangzhou.
Rather than radial or hub-and-spoke systems with transfer points, Chinese cities tend to have
branching networks and flexible route designs that minimize transfers.

Ideally, a BRT network mimics the spatial coverage and connectivity of other regional
transportation facilities, notably regional freeway and motorway networks. If bus-based transit
systems are to be time-competitive with the private automobile, it is imperative that they
deliver the same degree of regional access. TransJakartas proposed network at build out aims
to do just that, stretching in all direction across the city of 14-million inhabitants sprawling
landscape (Figure 9).

BRT network designs also reflect cities public transport histories and broader policy agendas.
In Seoul, BRT was introduced as part of a radical service reform. There, BRT functions as high-
capacity trunklines and most other routes have been reconfigured to serve as feeders, to cater
to non-BRT markets, or provide nice-market services like downtown circulators or cross-town

15

express lines (Cervero and Kang, 2011). In low-income settings, such as southeast Asia, BRT has
been introduced partly to help rationalize and formalize transit services, with informal or quasi-
legal micro- and mini-buses either eliminated or upgraded/redesigned to play a complementary
role, such as BRT-feeders. Long-standing private operators and other incumbents have
sometimes been removed as a necessary way to achieve economies of scale and financial
sustainability, with varying degrees of success (Cervero and Golob, 2011). Highly atomize quasi-
informal paratransit feeder services continue to characterize BRT station areas in cities like
Jakarta, Bangkok, Delhi, and Lagos.


Figure 9. Planned Regional Coverage of the TransJakarta BRT Network at Build-Out
Source: ITDP et al. (2013)

Network integration is essential to successful BRT. BRT services materially improve when they
are linked to existing rail, regular bus, and minibus services -- physically as well as through
scheduling and tariffs/fare media. Several of Guangzhous BRT stations are connected to the
citys metrorail system via air-conditioned tunnels. Integration of BRT routes is equally
important. Mexico Citys Metrobus added 20,000 daily passengers by eliminating the transfer
penalty following the direct route connections of separate BRT corridors (ITDP et al., 2013). In
Los Angeles, intermodal BRT-rail connections as well as park-and-ride provisions have been
statistically associated with gains in daily ridership (Cervero et al., 2010). In Seoul, a single fare
card can be used for all transit modes. GPS and smart cards allow the charging of BRT
customers an interim fare when exiting the bus and a final fare upon completing the trip by rail.
Moreover, distance-based fares can be adjusted by the value of service: if the connecting
16

metrorail training is late, fares can be lowered to compensate for the diminished quality of
service.

4.5 BRT Operations, Routing, and Scheduling

The three main types of BRT operations and vehicle routing are: (1) trunk-only, also called
closed systems; (2) trunk-feeder; and (3) direct-service, also called open systems. Among
exclusive-lane systems, around a dozen operate as trunk-only systems, with BRT buses
operating only along dedicated running-ways. Among the largest BRT exclusive-lane systems,
trunk-only, closed systems are found in Jakarta, Ahmedabad, Beijing, Xiamen, and Istanbul. Of
course, all of these systems have regular buses and sometimes minibuses that feed into
stations however they are not part of the BRT system, operated instead by different (mostly
private) operators.

In Latin America, trunk-feeder systems are common, featuring BRT buses that operate mainly
on the trunk line but occasionally will leave the busway and function as a neighborhood
distributor at one end of the route. More commonly, however, smaller buses featuring a
different color scheme and operated by the BRT company offer feeder services. Trunk-feeder
BRT operations are today found in Bogot, Curitiba, Mexico City, Leon, Lima, and Quito.
Bogots green-color midi-buses, for example, provide free connections between mostly
informal housing settlements and TransMilenios terminal stations.

Direct-service open operations characterize BRT services in many Chinese cities, including
Guangzhou, Dalian, Hangzhou, Hefei, Lianyungang, Yangcheng, Yinchuan, and Zhengzhou. With
open systems, buses enter and leave the running ways, usually at both ends of a route. This
allows the integration of line-haul and feeder (i.e., collection/distribution) services.
Guangzhous open system involves multiple bus routes that converge on a single dedicated BRT
corridor, each serving different origin-destination patterns (Figure 10). Outside of China, Cali,
Utrecht, and Johannesburg operate similarly. Some BRT systems, like Mexico City, run a mix of
trunk-only and direct-line services. Even Guangzhou operates a mix of closed (trunk-only) and
open (BRT and regular bus) services. Some of Guangzhous bus routes run only up and down
the BRT corridor. Most, however, use just part of the BRT corridor, morphing into feeder buses
on regular streets. Most BRT lines stop at every station; some express (skip-stop) services also
operate. In Guangzhou and elsewhere, an overlay of express (or limited stop) as well as all-stop
(or local) service is becoming the norm (Levinson et al., 2003; Wright, 2011).

17


Figure 10. Guangzhou Chinas Direct-Line, Open BRT System, with 31 different bus routes
sharing a 23 KM BRT corridor. Source: CHINABRT.ORG.

Direct-line services with mixes of regular and express services are gaining popularity because
they exploit the inherent flexibility and versatility advantages of BRT. Because BRT vehicles can
operate practically anywhere, routes can be designed so that passengers enjoy a no-transfer,
one-seat ride. As urban densities decline worldwide and travel patterns become more diffuse
and complex, bus-based systems offer tremendous advantages. BRT is better positioned than
rail or even traditional fixed-route/fixed-schedule buses to serve the new geography of
suburban travel i.e., increasingly many origins to many destinations. A suburban-urban
route, for example, may use neighborhood streets to collect riders and then a busway for
express service to a major destination such as downtown. Unlike urban rail systems, a BRT
system can also have off-line stations located some distance from the running way. A vehicle
might exit a busway, travel a short distance to a major destination, and then return to the
busway. Vehicles, not passengers, transfer from line to line.

Besides grade separation, a service feature that dramatically increases the throughput
capacities of BRT systems is auxiliary passing lanes at stations. The provision of dual
carriageways was a major advancement of Bogots TransMilenio (Figure 11), raising its peak
throughput capacity, theoretically at least, to some 45,000 passengers per hour per direction
(similar to that of many metrorail systems, although the systems highest recorded throughput
volume is 37,700) (Hildalgo and Graftieaux, 2008). This compares with Curitibas directional,
hourly throughput of some 11,000 passengers, despite its use of larger (bi-articulated) buses
than in Bogot. Only a handful of other exclusive-lane BRT systems Guangzhou, Lanzshou,
Cali, Lima, Los Angeles, Capetown, and Johannesburg have auxiliary passing lanes at stations.

18


Figure 11. Bogots Dual Carriageway BRT System, with passing lanes at stations. Upper
image: cross-section of center-lane BRT station on a major 5-lane arterial. Bottom image: Plan view of
passing lanes at stations.


Along Guangzhous Zhongshan Boulevard 23-kmcorridor, median BRT lanes with auxiliary
passing lanes at stations were built in each direction. Three additional measures were
introduced to further expedite bus flows: strict right-of-way control that limits lanes to BRT
buses (and emergency vehicles); separate pedestrian crossings (26-grade separated and 10 at-
grade signalized ones); and comprehensive traffic management improvements, including
dynamic signalization that optimizes speeds for buses. Collectively, these treatments have
increased Guangzhous throughput capacity to over 27,000 passengers per hour per direction,
nearly three times higher than that of any other Asian BRT system.

Lastly, almost all busways operate in a with-flow direction. Two notable exceptions are the
contra-flow operations BRT services in Istanbul and San Juan. In addition, most BRT systems
operate on headway-based schedules. During peak hours, dedicated-lane BRT services typically
operate buses every 5 minutes or less. Theoretically, buses can operate on headways of 10
seconds or less. In Curitiba and Bogot, 90 minute headways are the norm during peak periods.
At some busy intersections, TransMienio buses average 13 second headways, the shortest
headway of any BRT system, followed by Istanbuls average of 14 seconds.


4.6 Fare Collection and Enforcement

Most BRT systems charge a flat fare. A survey of 31 high-end BRT systems worldwide showed
only 3 had distance-based or zonal fares; the rest had flat ones (CHINABRT.ORG). BRT fares are

19

often more affordable than what informal or quasi-private operators charge (Cervero and
Golob, 2011). Bogots fare of around one US dollar is good for an entire day. Despite fairly
affordable fares, Latin American BRT systems are least dependent on operating subsidies
(Hensher and Golob, 2008). Their higher ridership productivity levels, discussed earlier, likely
accounts combination of affordable fares and low subsidies.

Pre-board fare collection and fare verification is most widely found among BRT systems in Latin
America, Asia, and France. US and European BRT systems rely predominantly on pre-paid
ticketing with barrier-free, proof-of-purchase inspection.

Due to the large clientele of low-income, transit-dependent users, fare evasion remains a
problem with many BRT systems in developing cities. Santiagos BRT system, Transantiago,
averages a fare evasion rate of 27.7 percent (Torres-Montoya, 2013). The switch from a highly
atomized privately operated system of mostly run-down minibuses and converted lorries to a
formal public system organized designed as a hybrid of mixed-traffic and dedicated-lane BRT in
2007, was followed by a steady deterioration of services. In fear of contractors abandoning
services, Chiles government opted to pay operators on the basis of expected, rather than
actual, demand. With revenues guaranteed, operators shrank their fleets and sometimes even
ignored waiting passengers. By mid-2007, the system was running a deficit of over 35 percent
even though it was suppose to incur none. Services cuts led to even more service declines.
Many Santiaguinos associate bad BRT service with the right to avoid fare payment. Rampant
fare evasion has been a main contributor to the systems growing deficit (Torres-Montoya,
2013).


5. BRT System Performance

In this section, global experiences with BRT systems are reviewed with regard to several key
performance measures: operating speed, levels of comfort, safety, environmental impacts, and
social equity.

5.1 Operating Speeds

As a rule, the higher the quality of BRT services, the faster the average operating speed, and
correspondingly the more time-competitive BRT becomes to the private car and metrorail
services. Hildalgo and Graftieaux (2008) reviewed BRT systems in 11 cities in Latin America and
Asia, finding that average speeds increased by between 15 kph and 26 kph following the
conversion from regular to BRT services, depending on the quality of the busway. The fastest
systems have not only separate rights-of-way but also grade-separation e.g., track-guided
buses of Adelaide (80 kph) and high-end busways of Brisbane (58 kph), Miami (45 kph), and
Pittsburgh (East Busway, at 41 kph). Buses on Adelaides Northeast corridor can reach speeds
as high as 100 kph (Currie, 2006). Guide-roller attached to the front axle of buses function as
horizontal stabilizers, allowing speeds akin to rail on a guideway. Continuous and precisely

20

fitted prefabricated concrete surfaces with tolerances of 2mm on crossbeams allows for
smooth flows at rail-like speeds.

The absence of tunnels, overpasses, and other forms of grade separation as well as mixed-
traffic operations slows speeds considerably. Among surface BRTs with at-grade crossings, the
average operating speed is 20kph (Hensher and Golob, 2008). In central cities, speeds decline
even more, even where dedicated lanes are provided. A typical average central-city speed for
high-end BRT systems is 16 to 18kph. At 35kph, Istanbul averages the highest central-city peak
hour speed of any BRT system (CHINABRT.ORG). A recent survey of Istanbul Metrobus
passengers revealed that fast travel speeds and a lower risk of being stuck in traffic congestion
were the overwhelming reason customers opted for the mode (Yazici et al., 2013).

While exclusive lanes and grade separation are critical to fast services, other elements of high-
end BRT also help shave door-to-door travel times. Fast boarding techniques, enabled by off-
board electronic payment, multi-door boarding, and level boarding expedites passenger flows,
thus reducing vehicle dwell times at stops. Improvements in service reliability and on-time
performance is an important side-benefit of expediting bus flows with dedicated lanes and
passenger flows with same-level boarding. Services become less stochastic and expected
arrival times more predictable because buses are less vulnerable to the disruptive effects of
non-recurring incidences in typical traffic streams, such as vehicle accidents or breakdowns or
delays in accommodating wheelchair patrons.

Experiences show that BRT improvements increase speeds of not only buses but also motorists.
Buses, however, benefit the most. In mid-2004, Seoul introduced median-lane bus services
and by 2008 74km had been built along 8 corridors (Figure 12). The combination of exclusive-
lane services, bus-priority traffic signals, real-time passenger information systems, and
attractively designed bus stops materially improved service quality. Separating buses from cars
sped up regular traffic. However average bus speeds increased far more, making transit more
time-competitive with the car (Cervero and Kang, 2011). Table 1, which compares bus versus
car speeds along three road segments of the BRT network, shows bus users enjoyed substantial
travel time savings relative to motorists. Schedule adherence also improved. As a
consequence, previous declines in bus ridership citywide were reversed, with bus patronage
jumping 10 percent between the end of 2003 (prior to median-lane services) and the end of
2004 (after median-lane services).

Not all of the travel time savings that have followed BRT improvements can be attributed to
technology itself. Some gains have been due to the replacement of unplanned and unreliable
private services with more organized and formalized public ones. Following Istanbuls 2007
opening of Metrobus, 1,300 private minibuses were removed from the streets. Among those
who switched from minibus or BRT, an average daily time savings of 52 minutes was recorded
(Yazici et al., 2013). Where older private buses are allowed to share dedicated lanes with BRT
buses, however BRT speed advantages have eroded. This has been the case in Delhi where
older buses are not only slower but also more likely to malfunction or break down, thus
disrupting BRT flows.

21

2004

2005
2004

2006 2003
1996
2006

2005

2004 2008

2006


Figure 12. Evolution of Seouls Median-Lane-BRT: GIS Plot of Bus Stops. Source: Cervero and
Kang, 2011.


Table 2. Comparison of Changes in Operating Speeds (Km/Hr) of Cars and Buses along Three
Road Segments with Exclusive Median Bus Lanes, Before and After BRT
Before After Percentage
Description
(June 2004) (August 2004) Change
Bus (exclusive lane) 11 20.3 85.0%
Road A
Car (other lane) 18.5 19.9 7.6%
Bus (exclusive lane) 13.1 22.5 72.0%
Road B
Car (other lane) 20.3 21 3.4%
Bus (exclusive lane) 13 17.2 32.0%
Road C
Car (other lane) 18 19.1 6.1%
Source: Seoul Development Institute, 2005.

5.2 Comfort

BRT earns high marks for passenger comfort. In Istanbul, 58 percent of surveyed residents
were either satisfied or very satisfied with the BRT service (Yazici et al., 2013). BRT scores high,
even when compared to rail. Surveys from Adelaide show customers rated BRT more highly
than on-street bus or rail services (Currie, 2006). In Los Angeles, riders on the full-service
Orange Line rated BRT comparable to the brand-new Gold Line (LRT) in terms of comfort and
convenience (Cain et al., 2009).

The BRT experience is judged not only by time spent in a bus but also at stations waiting or
transferring. The BRT Standard 2013 has defined what makes for a comfortable BRT station
environment: platforms with internal width of at least 3 meters; protection from inclement
weather; well-lit, transparent setting that allows natural surveillance; and in-person guards and
cameras that instill a sense of security.

22

5.3 Safety

Studies show center-lane configurations, left-turn prohibitions, and signalized mid-block
pedestrian crossings with refuge islands significantly improve safety on corridors where BRT
operates (Duduta et al., 2013). Safety precautions have a modest effect on reducing BRT bus
speeds thus the safety benefits are viewed as more than offsetting slight declines in service
quality. Road safety improvements implemented in concert with BRT deployment in Bogot
have been credited with an 88 percent reduction in traffic fatalities on TransMilenio corridors
(Hidalgo and Yepes, 2005; Hidalgo et al., 2012; Echeverry et al., 2005). Most of the decline was
in pedestrian deaths. In Istanbul, the removal of minibuses and regular bus routes and the
deployment of new buses in dedicated lanes was followed by a 64 percent reduction in bus
accidents in one year (Yazici et al., 2013).

5.4 Environmental Impacts

Urban buses emit relatively high levels of particulate matter (PM) and nitrogen oxides (NOx), a
precursor to photochemical smog. As noted earlier, the widespread use of clean-diesel and
other low-emission fuels have moderated the air-quality impacts of BRT. Accounting for
indirect impacts, the net air quality impacts of BRT are likely positive. By removing cars from
city streets and replacing slow-moving buses in mixed traffic and stop-and-go conditions with
smoother-flowing, dedicated-lane services, BRT improves air quality relative to the status quo.
Where BRT formalizes transit services, such in Latin American where BRT systems have replaced
older, poorly maintained, high-emission minibuses and microbuses, air quality has improved.
One study found that commuters exposure to air pollutants in Mexico City fell after the
implementation of the Metro-bus BRT systems (Whrnshimmel et al., 2008). Hildalgo et al.
(2013) estimated heath-cost savings from reduced emissions following TransMilenios first two
phases totaled US$114 million over a 20-year period. Because old buses displaced by
TransMilenio moved to the urban edge and smaller surrounding townships, Echeverry et al.
(2005) caution that these benefits could be mostly redistributive, marked by emission increases
in non-BRT-served areas.

With regard to global pollution, i.e., greenhouse gas (GHG) emissions, BRT likely again confers
net benefits. BRT generally emits less carbon dioxide than LRT vehicles due to the use of
cleaner fuels as well as its lower cost which allows more services to be deployed for a given
budget (Vincent and Jerram, 2006). Attracting former motorists to BRT can significantly reduce
VKT (vehicle kilometers traveled) and thus GHG emissions (Cervero and Murakami, 2010). It is
for this reason that the International Energy Agency (2013) has called for a mass deployment of
BRT services worldwide, as much as 25,000km of new exclusive-lane services in total, to help
limit the global temperature rise to no more than 2 degrees.

In terms of noise impacts, well-patronized buses that come by every few minutes are certainly
quieter than steady streams of single-occupant cars carrying similar numbers of people. They
are also generally quieter than steel-wheels-on-steel rail. BRT corridors could emit more noise
around stations due to the concentration of accelerating buses however this is likely offset by

23

quieter operations along smoother flowing corridors. Soundwalls can mitigate noise impacts at
busy stations, though at the expense of station-area aesthetics.

5.5 Social Equity

BRT investments are pro-poor. Bogots decision to investment in BRT vis-a-visa metrorail was
driven in part by a desire to deliver a lower cost, more affordable mobility option that serves
outlying informal settlements as much as downtown financial districts and other commercial
clusters typically served by rail (Penalosa, 2002). Hildalgo and Yepes (2005) estimated that the
first phase of TransMilenio produced more travel times savings for the poor (18 minutes per
trip) than for the middle-class (10 minutes). Savings accrued from faster in-vehicle travel times;
adding times for access to stations, waiting, and transferring, however, translated into an
increase in door-to-door trip durations for poor and non-poor alike (Lleras, 2003).

More substantial have been savings in average bus fares, which have been recorded in Jakarta
(Wright and Hook, 2007), Bogot (Hildalgo and Yepes, 2005; Cervero, 2005), and Lagos (ITP and
IBIS, 2009). The replacement of loosely regulated private buses with government-sponsored
BRT has usually translated into lower shares of daily earnings devoted to travel for the very
poor (Cervero, 2011). Studies of Bogot (Cervero, 2005) and Cali (Jaramillo et al., 2012) also
show that BRT can substantially improve access of the poor to low-skill job opportunities.
Another analysis revealed that Mexico Citys Metrobus Line 3 BRT yielded the most benefits to
the lowest three income quintiles (Delgado and Uniman, 2011). In contrast, Johannesburgs 26-
km BRT line (Rea Vaya) has failed to improve the livelihoods of the poor due to its pricing
scheme and focus on middle-income markets (Venter et al., 2013).


6. BRT Versus Urban Rail: Cost and Service Comparisons

Apple-to-apple comparisons of BRT versus urban rail systems are difficult because of their
contrasting designs, carrying capacities, impacts on urban development, and the like (Table 3).
By most accounts, however, BRT is a cost-effective alternative to light or heavy rail (i.e.,
metrorail) systems. The more economical use of rights-of-way and roadway operations lowers
the cost of BRT relative to rail systems, though at the expense of generally lower passenger
carrying capacities and slower speeds. Comparisons of passenger capacities are made difficult
by wide variations among BRT systems as high as 45,000 passengers per direction per hour
(ppdph) in the case of Bogot however one tenth this amount for other busway systems (and
even lower peak hourly throughputs of 1000 passengers in Capetown, Amsterdam, and
Changde). These are theoretical numbers. In practice, BRTs carrying capacities are lower.
Hensher and Golob (2008) found the crunch-load ridership of many BRT systems to range from
2000 to 8000 ppdph. Thus the line capacities of BRT relative to urban rail, and thus its relative
cost-effectiveness, in Table 3 could be exaggerated. Any cost-effectiveness edge of BRT is also
curbed to the degree that large-scale rail networks provide greater connectivity and
accessibility at faster travel speeds in addition to having stronger city-shaping impacts than

24

more limited range BRT systems.


Table 3. Comparisons of BRT and Urban Rail Transit Systems


Urban Rail Transit


BRT Light Rail Metrorail
Mixed: shared (at- Exclusive (elevated or Exclusive, grade-
grade); dedicated and barriers) or shared (at- separated
Rights-of-Way exclusive lanes grade)
Running Ways Pavement; roadways Steel Track Steel Track
Internal Combustion Electric (overhead Electric (high-voltage
Vehicle Propulsion Engine wires) third rail)
Automated/Sign Automated/Sign
Vehicle Control Operator/Visual Control Control
Construction Time 1-2 Years 2-3 Years 4-10 Years
Maximum Capacity
(passengers/vehicle unit) 160-270 170-280 240-320
Maximum Capacity
(passengers/coupled unit) 160-270 500-900 1000-2400
Minimum headway
(seconds) 12-30 75-150 120-150
Line Capacity
(passengers/direction/hour) 5000 - 45000 12000 27000 40000 - 72000
Maximum Speed (kph) 60-70 60-80 70-100
Average Capital Costs1 8.4 21.5 104.5
(2000 US$/km)
Average Operating Cost1 2.94 7.58 5.30
(2000 US$ per vehicle
revenue km)
Notes
1. Costs figures are for US case studies. Costs adjusted to $2000, calculated using Consumer Price Index
average.
Sources: Levinson et al., (2003); Vuchic (2005); Hensher and Golob (2008); Zhang (2009); Deng and
Nelson (2011)





25

6.1 Cost Comparisons

There is no disputing the fact that BRT systems cost considerably less to build than their urban
rail counterparts. This makes BRT the preferred choice for budget-constrained cities. Wright
and Hook (2007) estimated that constructing a BRT system typically costs 4 to 20 times less
than an LRT system and 10 to 100 times less than a metrorail system. According to Menckhoff
(2005), BRT costs, on average, one-tenth as much as other rail systems per kilometer of running
way/guideway. There are exceptions, however. Adelaides track-guided bus cost over US$26
million per kilometer (2008 dollars) and Nagoyas exceeded US$45 million per km, considerably
more than most LRT systems. At the other end of the spectrum is TransJakarta busway (mostly
nestled in the median of motorways), which cost just US$1.35 per kilometer (Hildalgo et al.,
2013). To date, most BRT investments have come in well below US$10 million per kilometer
(Hensher and Golob, 2008).1

BRTs capital costs-savings have been found across a variety of settings, whether in an affluent
advanced western economy or a rapidly developing one. In the US, a typical busway was
estimated to cost around 60 percent less to build per mile than a typical light rail system even
though average operating speeds between the two were similar (Figure 13). Savings accrued
from BRT not necessarily requiring a fully dedicated right-of-way for the entire length of a bus
corridor nor sophisticated single-purpose signalizing, power supply systems, or extra bus
maintenance facilities. Los Angeles Rapid Bus on Wilshire Boulevard cost $120,000 per km
versus $38 million per kilometer for the Gold Line LRT. BRT can be even cheaper than rail
modernization projects. Pittsburghs dedicated west busway cost $16 million per kilometer
versus $23.3 million for the reconstruction and upgrading of a traditional tramway to an LRT
standard. Parts of the Boston Silver Line Phase 1, on the other hand, registered high capital
costs due to expensive downtown tunneling. Sections of Bostons Silver BRT line cost more
than US$52 million per kilometer (Guerra and Cervero, 2011). Miamis busway cost over US$20
million per kilometer, similar to the cost of high-end BRT systems in Australia, notably Brisbane
and Sydney (Hensher and Golob, 2008). In Europe, the per kilometer cost of building heavy rail
systems has been placed in the $100-$150 million range (in 2002 dollars) compared to $25-$35
million for light rail and $10-$15 million for BRT (Flyvberg et al., 2008).

For developing countries, Wright (2011) recently found the capital costs of seven high-quality
BRT systems across seven countries to range from US$4 million to US$7 million per kilometer
versus US$15 million to US$40 million for six at-grade LRT systems in three countries. Elevated
skytrains in southeast Asia ranged from US$40 million to US$100 million per kilometer and
underground metrorails cost US$45 million to US$350 million. By one account, Bangkoks BRT
system cost one thirty-fourth that of the citys skytrain per kilometer of running way/guideway

1
In a study of BRT investments across 37 global cities, Hensher and Golob (2008) could not identify factors that
overwhelming explained variations in capital costs. Costs per km did rise with the number of terminals,
intersections with signal priorities, and levels of grade separation but only marginally. Localized and idiosyncratic
factors (e.g., amount of disruption and relocation impacts; number of contract bidders; soil conditions) that were
not directly controlled for in the study were thought to partly explain cost differences.

26

(Hossain, 2006). Such cost savings means that for the same budget, far more BRT services can
be provide than rail, delivered in a much shorter period e.g., 84 km of BRT built in Bogot
from 1999 to 2006 and 45 km in Guayaquil, Ecuador from 2003 to 2006. Quito, Ecuador was
able to build nearly 20 times as much kilometers BRT than would have been possible if funds
instead went to building a metro rail system (Figure 14).

Light Rail 34.79

Busways 13.49

Bus on HOV
8.97
Lanes

0 10 20 30 40
Dollars in millions (2000)

Figure 13. Comparison of Capital Costs of LRT, Busways, and Bus on HOV Lanes in the United
States. Costs in 2000 US dollars. Source. U.S. General Accounting Office, 2001.


Figure 14. BRT Cost-Savings Advantage Over Metrorail In Quito, Ecuador. 37 Kilometers BRT
Investment in Quito, Ecuador provided 20 times as much high-capacity services as a Metrorail
for equivalent capital investment expenditures. Source: Institute of Transportation Development
Policy.

27

With respect to BRT operating cost, experiences vary due to widely differing labor cost
structures. One US study found average operating costs of BRT to be less than that of LRT and
metrorail on both a revenue-kilometer and revenue-hour basis despite bus services being more
labor-intensive (Zhang, 2009). Moreover, many BRT systems in the developing world (e.g.,
Bogot, Kunming, Lanzhou, Guayaquil, Curitiba) operate without a public operating subsidy,
something that few urban rail systems can lay claim to. For Porto Alegre, one study found that
every passenger trip was subsidy-free whereas the citys urban rail system required a 70
percent subsidy for each passenger carried (Wright and Hook, 2007).

6.2 Urban Densities and Cost-Effective Investments

To justify the high price of high-capacity transit investments, high urban densities are needed.
Tens of millions of dollars often go to tunneling, rerouting utilities, acquiring land, relocating
displaced households, and constructing running ways, thus large concentrations of residents
and jobs are needed around stations to produce enough trips and farebox revenues to justify
these outlays. A recent US study examined the combined job and population densities that are
needed to produce capital costs-per-rider that fell in the top performance quartile of recent
LRT, HR, and BRT investments (Guerra and Cervero, 2011). Figure 15, from the study, shows
that a BRT system that costs US$50 million per mile (or per 1.61 km) would need around 18 jobs
and residents per acre (or 45 per hectare) within a half of mile (or .8 km) of its station to be in
top 75 percent of cost-effective investments. An LRT investment at the same per-mile cost
would need nearly 50 jobs and residents per acre (or 125 per hectare) and a heavy-rail
investment would need nearly 60 per acre (or 150 per hectare) to fall in the top quartile.

350

300
Capital Cost per Guideway Mile ($2009)

LRT
250
HR

BRT
200

150

100

50

0
5 10 25 50 75 100
Job + Population Densities (per acre)

Figure 15. Minimum Urban Densities needed for top-performance investments across a
range of fixed-guideway capital costs in the U.S. Graph reveals densities it would take for a
project to be in the top 25 percent of past U.S. fixed-guideway investments in terms of cost-
effectiveness under typical conditions. Source: Guerra and Cervero (2011).

28

6.3 The Limits of BRT Relative to Urban Rail

While BRT generally wins out over urban rail systems in terms of investment and operating
costs per passenger carried, it must be remembered that it does not always match up well in
terms of service quality (e.g., average speeds) and regional coverage. BRT particularly suffers
in dense, built-up areas where buses operate on surface streets. As discussed in the next
section, BRTs ability to shape urban growth and leverage TOD is also questioned by some.

In some instances, BRT systems have been a victim of their own success, suffering the effects of
being too popular relative to their capacities. Veritable elephant trains of overcrowded buses
are a sure-fire way of chasing away choice travelers who own a car, which has been the case in
both Bogot and Curitiba. From 2005 to 2010, TransMilenios fleet grew just 2.2 percent
whereas daily demand rose from 1.2 to 1.7 million (30 percent). Sardine-like conditions and
problems of groping and pickpocketing have resulted, chasing away middle-class riders in
droves (Gilbert, 2008; Suzuki et al., 2013). During peak hours, TransMilenio average 6.5
passengers per square meter of bus (EMBARQ, 2009). The inability of buses to load more
passengers and thus leave customers stranded at stations during peak periods has sparked riots
and blemished TransMilenios reputation.

Curitiba has also begun to experience the limits of rubber-tire technologies. With buses
operating on 30 second intervals on main routes during the peak hour, bunching problems have
disrupted and slowed services. Successions of closely spaced buses have increased operating
costs and precluded the kinds of economies of scale enjoyed by trains operated by a single
driver. Extreme overcrowding has prompted many former bus rides to buy cars and switch to
driving. In the words of one urban planner: Many Curitibanos view (BRT) as noisy, crowded
and unsafe. Undermining the thinking behind the master plan, even those who live alongside
the high-density rapid-bus corridors are buying cars (Lubow, 2007, p. M8). A long-discussed
light rail line, to replace overcrowded buses, has yet to gain momentum due to cost concerns
and political inertia (Duarte and Ultramari, 2012).

Many earlier BRT systems were designed (in terms of overhead clearances, station platforms,
track geometries) to allow conversion to electric rail services if and when market demand
justified the change-over. This was so for Ottawa and Curitiba. Institutional and political
impediments, however, have stood in the way of bus-to-rail conversions. Once bus-based
organizations and institutions are in place, a status-quo mindset takes hold, obstructing
technological conversions.

6.4 Net Welfare Impacts

To pass judgments on the economic merits of BRT versus urban rail, the approach long used by
economists is to conduct a benefit-cost analysis (BCA). Few credible BCAs studies of BRT versus
rail have been conducted to date. A recent study by Hildalgo et al. (2013) tried to assign a net
rate of return for Bogots TransMilenio investment. The authors estimated that
TransMilenios first two phases yielded sizable net economic benefits in terms of travel-time

29

times savings, reduced vehicle operating costs, fewer accidents, and health benefits from
cleaner air. A benefit-cost ratio of 2.5 and a social internal rate of return of 24.2 percent were
estimated. Accounting for redistributive effects (e.g., displacing old, loosely regulated buses to
the urban periphery), Echeverry et al. (2005) estimated the net economic benefits of
TransMilenios first two phases to be considerably less.

Welfare economics aside, one unassailable advantage of BRT systems is that they can be
introduced incrementally as different segments of a project are finished. This is because buses
have the options of using regular streets until gaps in the system are completed. Fast
implementation builds political support and public goodwill since elected officials and taxpayers
alike quickly see benefits on the ground.


7. BRT and Urban Development

One only has to look at the skylines of cities with world-class rail systems like New York City and
Hong Kong to appreciate the powerful city-shaping influences of rail investments.
Agglomerations of 200,000 or more workers in central business districts (CBDs) are impossible
without rail systems for the simple reason that roadways are incapable of funneling this many
people to jobs in concentrated areas during rush hours (Pushkarev and Zupan, 1977; Cervero,
1998).

Some question the city-shaping potential of BRT, in part due to a belief it delivers fewer
regional accessibility benefits than rail but also the social stigma some assign to bus-based
forms of mass mobility. Doubt remains in the minds of some as to whether BRT can induce less
car-dependent, more sustainable patterns of urban growth in rapidly motorizing and
suburbanizing cities. While BRT is often conceived as being better suited to lower density,
more outlying settings, under the right conditions, experiences show that BRT can also be every
bit as influential as metrorail systems in inducing urban redevelopment and shaping urban
growth in more sustainable formats.

Bus-based systems are thought to have weaker city-shaping effects partly because they confer
fewer regional accessibility benefits relative to faster, more geographically extensive rail
operations (Vuchic, 2007). The absence of a fixed guideway or high-profile infrastructure is also
thought to dilute bus-transits development potential in minds of real-estate developers, who
never can be sure of the service features of future bus operations. Factors like the spewing of
diesel emissions and the social stigma attached to transit-dependent (and thus often lower
income) users also detract from bus-transits image. High-end BRT systems with exclusive lanes
and clean-fuel buses, however, begins to mimic the service features of metrorail systems and
correspondingly hold the potential to exert comparable impacts on urban form.

Whether BRT can promote transit oriented development (TOD) compact, mixed-use,
pedestrian-friendly development organized around a transit station on a significant scale, at

30

least comparable to what is found around some metrorail stations, remains an open question.
TOD is widely viewed as an inherently efficient and sustainable urban form (Curtis et al., 2009).
Experiences show that well-designed TOD not only increases ridership but also serves as a hub
for organizing community development and revitalizing long-distressed urban districts (Bernick
and Cervero 1997; Cervero 1998). Transit-oriented growth lies on a spectrum of built forms,
with BRT well-positioned to occupy low-to-moderate density market niche of TOD (Dittmar and
Poticha, 2003; Chen, 2010).

Empirical evidence on BRTs city-shaping impacts is limited. Levinson et al. (2002) reported
significant development activities around BRT stops in Pittsburgh, Ottawa, and Adelaide,
however the absence of control or comparison sites confounded the ability to associate this
growth to the presence of improved transit services. Land-price capitalization benefits of BRT
investments have also be reported in Brisbane (Levinson et al., 2002), Los Angeles (Cervero,
2006), Pittsburgh (Perk and Catala, 2009), Boston (Kittelson & Associates and Levinson, 2007),
Bogot (Rodriquez and Targa, 2004; Rodriquez and Mojica, 2008; Munoz-Raskin, 2010), and
Seoul (Cervero and Kang, 2011). In Los Angeles, land value impacts were very small and
accrued only for commercial parcels (Cervero, 2006). A recent study in Beijing similarly found
no appreciable capitalization benefits conferred on residential properties by the citys BRT
system; properties near the citys metrorail system, on the other hand, averaged a price
premium of 5 percent (Ma et al., 2013). In contrast, studies of the more substantial BRT system
in Bogot, Colombia have found appreciable land-value benefits (Rodriquez and Targa, 2004;
Rodriquez and Mojica, 2008; Munoz-Raskin, 2010). There, multi-family housing units close to
Bogots TransMilenio BRT rented for more per square meter than units located farther away
(Rodriguez and Targa, 2004). There is also some evidence that creating pedestrian-friendly
environments near BRT bus stops can further increase land-value benefits (Estupinan and
Rodriguez, 2008). Adding new BRT lines, moreover, benefitted properties on older corridors by
improving regional access by BRT (Rodriquez and Mojica, 2008).

Ottawa and Curitiba are perhaps the best two global examples of BRT TOD. As BRT pioneers,
city leaders carved visions early on in the planning of both systems to use BRT to channel
growth along well-defined linear corridors (Cervero, 1998). In both instances, BRT was
envisaged as not only a mobility investment but also an opportunity to shape urban growth in a
more sustainable, transit-oriented format (Suzuki et al., 2013). Local governments proactively
leveraged TOD through zoning reforms, pro-development tax policies, assistance with land
assemblage, and supportive infrastructure investments (Cervero, 1998). In Curitiba, local
government mandated that all medium- and large-scale urban development be sited along a
BRT corridor. Orchestrating regional growth has been the Institute for Research and Urban
Planning (IPPUC), an independent entity charged with ensuring integration of all elements of
urban growth.

A design element used to enhance transit accessibility in Curitiba was the trinary (Figure 15)
three parallel roadways with compatible land uses and building heights that taper with
distance from the BRT corridor. The first two floors of the busway, which do not count against
permissible plot ratios (building height/land area), are slated for retail uses. Above the second

31

floor, buildings must be set back at least five meters from the property line, to allow sun to cast
on the busway. The inclusion of upper-level housing entitles property owners to density
bonuses, which has led to vertical mixing of uses within buildings. An important benefit of
mixed land uses and transit service levels along these corridors, in addition to extraordinarily
high ridership rates, has been balanced bidirectional flows, ensuring efficient use of bus
capacity.


Figure 15. Curitibas Trinary Road System. Source: Lindau et al., 2010

The higher densities supported by the trinary design have translated directly into higher
ridership. Concentrated commercial development has also channeled trips from residences
beyond BRT terminuses to the trinary corridors. In 2009, for example, 78.4 percent of trips
boarding at the terminus of Curitibas north-south trinary corridor were destined to a bus stop
on the same corridor (Duarte and Ultramari 2012). Figure 16 shows daily ridership at stops
along Curitibas north-south BRT line superimposed on the corridors skyline. Where densities
rise, so generally does ridership.

Dividends from the past two decades of leveraging TOD through BRT improvements have been
remarkable. Curitiba today averages considerably more transit trips per capita than Rio de
Janeiro and So Paulo, which are much bigger cities. Its share of motorized trips by transit (45
percent) is the highest in Latin America (Santos, 2011). High transit use has appreciably shrunk
the citys environmental footprint. Curitibas annual congestion cost per capita of $0.67 (in
US$2008) is a fraction of So Paulos (Suzuki et al., 2011). The city also boasts the cleanest air
of any Brazilian city with more than 1 million inhabitants, despite having a sizable industrial
sector. The strong, workable nexus that exists between Curitibas bus-based transit system and
its mixed-use linear settlement pattern deserves most of the credit.

32


Figure 16. Correspondence Between Daily Transit Boardings (vertical axis) and Skyline Profile
Along Curitibas North-South Trinary Axis. Source: Duarte and Ultramari, 2012

Sustained political commitment has been pivotal to Curitibas success. The harmonization of
transit and land use took place over 40 years of political continuity, marked by a progression of
forward-looking, like-minded mayors who built on the work of their predecessors. A cogent
long-term vision and the presence of a politically insulated regional planning organization, the
IPUCC, to implement the vision have been crucial in allowing the city to chart a sustainable
urban pathway.

The Green Line is Curitibas first new BRT corridor in years, an 18- kilometer corridor that was
converted from a federal highway. As in Bogot, the Green Line has passing lanes, which greatly
increase capacity by supporting express services. As important is an evolved view of BRT
corridors as rights-of-way that also accommodate linear parks and bike paths. A recent law
promotes the preservation of green space along BRT corridors by giving developers increased
building rights in exchange for purchasing or preserving land along the corridor as parks.
Formerly a national highway dotted with truck stops and lumberyards, this hodgepodge of
industrial uses is slated to become a pedestrian-friendly mixed-use corridor that can
accommodate up to half a million new residents.

Cities like Curitiba and Ottawa are more the exception than the rule. In Transforming Cities
with Transit, Suzuki et al. (2013) argue that cities with extensive and well-regarded BRT
systems, like Bogot and Ahmedabad, have squandered opportunities to shape urban growth
with BRT. This was mainly due to BRT being envisaged principally as mobility rather than city-
shaping investments. Engineering principles won out over urban-planning ones. In the drive to
economize on investment costs, there has been a tendency to follow the path of least
resistance. This has often meant siting BRT lines and stations in the medians of busy roadways,
often with poor pedestrian access, because of relatively cheap available rights-of-way and the
avoidance of building demolitions and relocation costs. Thus near-term cost-minimization

33

principles ended up suppressing longer term land-development opportunities.

A number of Chinese cities, notably Guangzhou, have designed high-quality connections to BRT
stops. Guangzhous BRT features seamless pedestrian connections through gently sloped
footbridges and same-level integration with the second floors of adjoining commercial buildings
(Figure 17). A network of green connectors ensures high-quality perpendicular connections for
pedestrians and cyclists reaching stations from two or more blocks away (Figure 18). Owing to
the combination of high-quality BRT services and pedestrian connections to stations, high-rise
commercial development is gravitating to Guangzhous BRT corridor, increasing real estate
prices by 30 percent during the first two years of BRT operations (Suzuki et al., 2013).


Figure 17. Planned View of Pedestrian Integration with Guangzhous BRT stops. Source: ITDP
China, 2012.


Figure 18. Green Perpendicular Connectors to Guangzhous BRT stations. Source: ITDP China,
2012.

34

In the US and Europe, BRT has been credited with rejuvenating once decaying urban districts.
Clevelands Euclid Avenue BRT cost US$200 million to build and proponents contend attracted
US$4.3 billion in new commercial and institutional development to a formerly distressed
neighborhood. In the UK, Kent Thamesides BRT system, Fastrack, was consciously designed to
leverage brownfield redevelopment by delivering high-quality BRT services prior to private real-
estate projects. A strong public commitment to upgrading transportation services, it was felt,
was critical in attracting private capital to the district, which has since occurred.


8. BRT Management and Institutional Challenges

Most BRT systems introduced to date have embraced the managed competition model
(Hook, 2005; Wright, 2011). Under this approach, a public authority retains control over
planning, policies, designing routes and schedules, fare setting and collection, services
standards, and marketing. The delivery of BRT services is then competitively tendered to the
lowest bidders that meet quality-control standards while earning fair returns on investments.
Functionally, then, there is a separation of sponsorship (public sector) and operations (private
sectors).

With managed competition, competition is for, not within the market (Gwilliam, 2002).
Firms aggressively compete within the bidding process however once winning firms have been
selected, there is no competition on the street to wrestle passengers away from other
companies. Exceptions to the managed competition model are mostly found in the developed
world, where BRT services are often both managed and delivered by public authorities e.g., in
greater Paris (Ile de France), RATP (Rgie Autonome des Transports), a state-owned transit
authority, oversees and operates BRT as well as metrorail, trams, regular bus, and regional rail
services, subject to policies set by the regional planning authority, STIF.

In a recent review of BRT institutions, Wright (2011) defined the typical BRT business model as:

An institutional regulatory environment in which privately concessioned firms operate
the system with strong public oversight;
An operating bidding process that encourages competition for the market but limits
competition within the market;
Operator compensation based upon vehicle-kilometers traveled rather than number of
passengers; and
An independently concessioned fare collection system that distributes revenues in a
wholly transparent manner.

8.1 Managed Competition in Bogot

Bogots TransMilenio largely follows the business model laid out by Wright. TransMilenio is
administered by a public authority that manages concession contracts to the private sector and

35

oversees service quality. A series of concessions and standard contracts establish the
relationship with each private-sector party, which includes construction firms, an independent
fare collection company, and bus operators. Institutionally, then, facility construction, fare
administration, and operations are functionally separated.

In reality, some competition within the BRT marketplace exists even in Bogot. TransMilenio
has as many as four different operators providing services on the same BRT route. From the
customers perspective, all vehicles and services look the same. A control center monitors
vehicles to ensure suitable headways and frequencies. Fare transaction information is relayed
to computers at both public companies and private operators, creating fully transparent sharing
of revenue information.

The bidding process is a critical part of successful managed competition. Bogot uses a point
system that incentivizes firms to be cost-effective, invest prudently, and operate clean vehicles.
This has helped modernize the citys bus fleet. In phase II of TransMilenio, firms scrapped 9
older vehicles for every new articulated bus introduced (Wright 2011). TransMilenio has also
managed to assuage private operators who were reticent to join their ranks. Including existing
small operators in a bid, for example, gains firms additional points. This avoids alienating and
creating ill-will among incumbent operators, and ensures their experience with operating in the
streets of Bogot is not wasted.

Tying income to service deployed rather than numbers of passenger carried has also curbed the
kind of aggressive competition that plagues informal transit services throughout the developing
world (Cervero and Golob, 2011). Paying operators based on kilometers of service deployed in
conjunction with performance-based incentives (e.g., on-time services) shifts the focus to
service quality. There are also strictly enforced sanctions. In Bogot, operators are fined as
much as 10 percent of their monthly income for failing to meet service standards. This is done
by reducing future kilometers of services for operators guilty of infractions. For example,
picking up passengers at stops other than stations or alteration of the GPS communications
system costs TransMilenio operators 250 kilometers. As a double incentive, the best-
performing companies are awarded the vehicle-kilometers surrendered by the penalized firms.
This service-based penalty-reward system has allowed TransMilenio to be one of the most cost-
effective BRT operators worldwide (Hildalgo et al., 2013). Other BRT cities that similarly pay
private firms by bus kilometers rather than passengers include Curitiba, Jakarta, Johannesburg,
Guangzhou, and Leon.

8.2 Other BRT Institutional Experiences

Other large-scale BRT systems that have adopted Bogots institutional approach i.e., a BRT
authority responsible for planning and control of the system and competitively tendered
operations and concessions -- include Ahmedabad, Guangzhou, Jakarta, Mexico City, and Cali.
Ahmedabad launched its Janmarg (Peoples Way) system in 2009 according to both design and
organization specifications of TransMilenio, with a few twists. The Ahmedabad Municipal
Corporation (AMC) developed the initial proposal for BRT and remains the chief authority for

36

the system, responsible for setting policies, rules, and regulations, and correspondingly
ensuring the systems financial solvency. System design and implementation is led by an
independent entity -- CEPT University in Ahmedabad whose charge was to build a safe,
efficient, and cost-effective system. State and national departments served on a steering
committee to oversee the project development and provide financial support. The Ahmedabad
Janmarg Limited (AJL) was created by local and state as a special-purpose and independent
agency with operating authority, responsible for overseeing operations, achieving performance
standards, and maintaining financial sustainability. Other functions have been strategically
outsourced to maximize efficiency. Bus operations and fare collection are competitively bid on
a gross-cost per kilometer basis over a seven-year contract period. Incentives and penalties
have been set and are enforced regarding fleet maintenance, vehicle fitness, and cleanliness
(Rizvi, 2011; Tiwari and Jain, 2010).

One notable institutional failure is the Transantiago BRT project in the Chilean capital. Prior to
Transantiagos opening in 2007, transit was controlled by a cartel of small private operators
that worked in a mostly unregulated market (Boncompte and Galilea, 2013). To incentivize
incumbent operators to join the BRT system, public authorizes minimized risks, guaranteeing up
to 90 percent of operators income. In one day, Transantiago changed from a helter-skelter
mix of private minibus operators to a publicly sponsored trunk-feeder system with completely
new services, routes, and often buses, with virtually no risk to former private operators.
Because of guaranteed subsidies, however, the market discipline to deliver high-quality services
disappeared. A series of problems immediately surfaced: insufficient supply of buses, poor
route definition, unfinished infrastructure, breach of contracts, and failure of vehicle-control
and payment systems. Service quality rapidly deteriorated long waits, excessive numbers of
transfers, severe overcrowding, and inability to get to desired destinations. Regulators
eventually reduced income guarantees and began imposing fines and sanctions. A give-and-
take series of intense negotiations has over time allowed a reasonably workable mix of risk-
sharing and accountability among private and public interests to take form. Transantiago
service quality and reliability has since improved. According to Jiron (2011), problems as in
Santiago can be traced to such institutional shortcomings as a weak transportation authority,
poor management and accountability, and insufficient fiscal resources to mount and sustain
services.

Another case where the jury is still out about managed competition is Quito, Ecuador. Quitos
BRT system was given over to a consortium of private operators that run buses and handle
fares. BRT buses share corridors with incumbent private operators, creating in-market
competition and redundancies. Local government provides loans to the private consortium to
acquire new buses, contingent on repayment once the system achieves financial stability and
profitability (Boncompte and Galilea, 2013). With the consortium handling all fare transactions,
authorities are unable to assess the systems financial status. Operators claim they have yet to
achieve profits thus so far, government loans have not been repaid.

In close, managed competition of BRT has for the most part allowed cost-effective services to
be delivered. Bogot as well as a handful of other BRT cities (Curitiba, Guayaquil, Lanzhou)

37

require no government operating subsidies partly as a result. A side-benefit of a wholesale
switch to BRT services is that it allows for an institutional shake-up. While traditional bus
services are difficult to reform because of incumbent operators resist efforts to increase
competition, inauguration of a wholly new type of transit, BRT, provides the political
opportunity to introduce meaningful institutional reforms (Wright, 2011).


9. Conclusion

The future for BRT is bright. Rapid motorization and ever-worsening traffic conditions in many
rapidly emerging economies and fast-growing cities make investments in high-capacity, high-
performance transit systems more imperative than ever. Mounting concerns over the long-
term environmental and fiscal impacts of car-dependent sprawl combined with global initiatives
to dramatically curb carbon emissions further favor a world of expanded transit services. The
bulk of future population growth throughout the 21st century will be in settings conducive to
BRT. According to UN Habitat (2011), most of the 2 billion new urban dwellers between now
and 2030 will be in cities with populations of 100,000 to 500,000. In these places, less-
expensive BRT networks are likely to be more cost-effective than metros or LRT systems. Even
in more mature, advanced economies, budget constraints along with continuing growth on the
urban fringes favors BRT over urban rail.

For large metropolitan areas, the choice between BRT and urban rail is fortunately not either-
or. In cities as diverse as Beijing, Los Angeles, Teheran, Delhi, Seoul, and Mexico City, BRT and
metrorail systems nicely co-exist. BRT can be both a complement to and a substitute for rail.
As cities, households structures, neighborhood designs, societal values, and lifestyle choices
continue to diversify, a more plural transportation landscape one that provides a rich set of
mobility options at a range of price points is needed. BRT stands poised to add to the mix of
mobility choices over a wide range of urban contexts throughout the 21st century.

Rail versus bus is increasingly a false dichotomy. Less important than the physical apparatus
whether rubber-tires on pavement or steel-wheel-on-steel-rail is the quality of service
delivered. In this regard, BRT gets high marks. Its versatility at linking feeder and line-haul
services in the same vehicle, and thus eliminating transfers, makes it particularly well suited for
lower-density settings. As existing BRT systems expand, moreover, mobility and environmental
benefits can be expected to accelerate due to network effects. Each new BRT line benefits not
only those living, working, and traveling to the newly served corridor but also to residents and
workers on existing corridors that can now reach new destinations.

As an industry, BRT is hardly static. As the BRT matures, new trends are emerging. These
include: service and tariff integration of BRT with citywide transit services, better ways of
eliciting private participation in operations, increased funding support from national
governments, BRT-oriented land development, and the growth of bus manufacturers and
technology-providers from Brazil, India, Indonesia, and China (Suzuki et al., 2013; Hidago and
Gutirrez, 2013).
38


One thing that successful BRT cities like Bogot, Curitiba, and Seoul share in common is a legacy
of strong and visionary political leadership. Cities that have failed to deliver the high-quality
BRT services originally envisaged, such as Jakarta, Lagos, and Santiago, fell short mainly because
of political pressures to retain the status quo. In Jakartas first phase, the lack of integration
between trunk and feeder vehicles and unwillingness to prevent incumbent operators to run
alongside BRT buses, undermined service quality (Wright, 2011). Ultimately, the obstacles to
BRT development are more likely to be political than financial or technical. However, for the
few political leaders who take the chance to redefine their cities with full BRT, the rewards are
clear (Wright, 2011, p. 454).


References

Angel, S. 2011. Making room for a planet of cities. Cambridge, Massachusetts: Lincoln Institute
of Land Policy.

Bernick, M. and Cervero, R. 1997. Transit villages for the 21st century. New York: Mc-Graw Hill.

Boncompte, J. and Galilea, P. 2013. Identification of key factors in the design and
implementation of BRT systems in developing countries. Paper presented at the13th World
Conference on Transportation Research, Rio de Janeiro, Brazil, July.

BRTDATA.ORG. Accessed July 24-25, 2013.

Cain, A., Flynn, J., McCourt, M., and Reyes, T. 2009. Quantifying the importance of image and
perception to Bus Rapid Transit. Washington, DC: Federal Transit Administration, US
Department of Transportation, Demonstration and Innovations.

Cervero, R. 1998. The transit metropolis: a global inquiry. Washington, D.C.: Island Press.

Cervero, R. 2005. Progressive transport and the poor: Bogot's bold steps forward. Access, No.
27, pp. 24-30.

Cervero, R. 2006. The property value case for transit. Developing Around Transit: Strategies and
Solutions That Work, R. Dunphy et al., eds. Washington, DC: Urban Land Institute.

Cervero, R. 2011. State roles in providing affordable mass transport services for Low-Income
Residents. Paris: Organization for Economic Development/International Transport Forum,
Discussion Paper 2011-17.

Cervero, R. and Murakami, J. 2010. Effects of built Environments on vehicle miles traveled:
evidence from 370 U.S. metropolitan areas, Environment and Planning A, Vol. 42, pp. 400-418.

39

Cervero, R., Murakami, J., and Miller, M. 2010. Direct ridership model of bus rapid transit in Los
Angeles county, Transportation Research Record, Vol. 2145, pp. 1-7.

Cervero, R. and Golob, A. 2011. Informal public transport: a global perspective. In: Urban
Transport in the Developing World: A Handbook of Policy and Practice, H. Dimitriou and R.
Gakenheimer, eds. Cheltenham UK: Edward Elgar, pp. 488-518.

Cervero, R. and Kang, C. 2011. Bus rapid transit impacts on land uses and land values in Seoul,
Korea. Transport Policy, Vol. 18, pp. 102-116.

Chen, X. 2010. Prospect of the transit-oriented development in China, Management Research
and Practice, Vol. 2, No. 1, pp. 83-983.

CHINABRT.ORG. ITDP China, Institute for Transportation & Development Policy, Guangzhou,
China. Accessed data July 24-25, 2013.

Currie, G. 2006. Bus transit oriented development: strengths and weaknesses relative to rail.
Journal of Public Tranpsortation, Vol. 9, No. 4, pp. 1-21.

Curtis, C., Renne, J., and Bertolini, L. 2009. Transit oriented development: making it happen.
Surrey, UK: Ashgat.

Delgado, H. and Uniman, D. 2011. Analysis de distribucion de impacts: costs y beneficios
application Metrobus Line 3, Centro de Transporte Sustentable de Mesico. Presented at the
VII Sustainable Transport Congress, Mexico City.

Deng, T. and Nelson, J. 2011. Recent developments in bus rapid yransit: a review of the
literature. Transport Reviews, Vol. 31, No. 1, pp. 69-96.

Dittmar, H. and Ohland, G. 2003. The new transit town: best practices in transit-oriented
development. Washington, DC: Island Press.

Duarte, F. and Ultramari, C. 2012. Making public transport and housing match:
accomplishments and failures of Curitiba's BRT, Journal of Urban Planning and Development,
Vol. 138, No. 2, pp. 183-194.

Duarte, F. and Rojas, F. 2012. Intermodal connectivity to BRT: a comparative analysis of Bogot
and Curitiba. Journal of Public Transportation, vol. 15, no. 2, pp. 1-18.

Duduta, N., Adriazola-Steli, C., Hildalgo, D., Lindau, L; and Santos, P. 2013. The relationship
between safety, capacity, and operating speed on bus rapid transit. Paper presented at the13th
World Conference on Transportation Research, Rio de Janeiro, Brazil, July.

40

Echeverry, J., Ibex, A., Myoa, A. and Hilln, J. 2005. The economics of TransMilenio: a mass
transit system for Bogot. Economia, Spring.

EMBARQ. 2009. Evaluacin ex-post sistema de transport masivo de Bogot: Fases I y I.
Washington, D.C.

Estupinan, N. and Rodriquez, D. 2008. The relationship between urban form and station
boardings for Bogotas BRT, Transportation Research A, Vol. 42, pp. 296-306.

Ewing, R. and Cervero, R. 2010. Travel and the built environment: a meta-analysis, Journal of
the American Planning Association, Vol. 76, No. 3, pp. 265-294.

Foster, A. 2011. Waiting is finally over for the longest busway in the world. Bus Rapid Transit
Has Arrived: A Review of Key Developments 2011/2012, Landor Links, BRTuk, pp. 23-24.

Flyvbjerg, B., N. Bruzelius, and B. van Wee (2008) Comparison of capital costs per route-
kilometre in urban rail. European Journal of Transportation and Infrastructure Research, vol. 8,
no. 1, pp.17-30.

Gilbert, A. 2008. Bus rapid transit: Is Transmilenio a miracle cure? Transport Reviews, Vol. 28,
No. 4, pp. 439-467.

Guerra, E. and R. Cervero. 201. Cost of a ride: the effects of densities on fixed-guideway transit
ridership and costs, Journal of the American Planning Association vol. 77, no. 3, pp. 27-290.

Gwilliam, K. 2002. Cities on the move. Washington, D.C.: The International Bank for
Reconstruction and Development/The World Bank, A World Bank Transport Strategy Review.

Hensher, D. and Golob, T. 2008. Bus rapid transit systems: a comparative assessment.
Transportation Vol. 35, No. 4, pp. 501-518.

Hildalgo, D. and Yepes, T. 2005. Are bus rapid transit systems effective in poverty reduction?
Economist Intelligent Unit. 2010. Liveanomics: urban liveability and economic growth.
http://www.managementthinking.eiu.com/liveanomics.html. Accessed June 25, 2013.

Hildalgo, D. and Graftieaux, P. 2008. Bus rapid transit systems in Latin America and Asia: results
and difficulties in 11 cities. Transportation Research Record, Vol. 2072, pp. 77-88.

Hildalgo, F. and Carrigan, A. 2010. BRT in Latin America: high capacity and performance, rapid
iImplementation and low cost. Built Environment, Vol. 36, No. 3, pp. 283-297.

Hidago, D. and Gutirrez, L. 2013. BRT and BHLS around the world: explosive growth, large
positive impacts and many issues outstanding. Research in Transportation Economics, Vol. 39,
N0. 1, pp. 8-13.

41

Hildalgo, D., Pereira, L., Estupin, N., and Jimnez, P. 2013. TransMilenio BRT system in
Bogot: high-performance and positive impacts; main results of an ex-post evaluation.
Research in Transportation Economics, Vol. 39, No. 1, pp. 133-138.

Hook, W. 2005. Institutional and regulatory options for BRT in developing countries: lessons
from international experiences. Transportation Research Record 1939, pp. 184-191.

Hossain, M. 2006. The issues and realities of BRT planning initiatives in developing Asian cities.
Journal of Public Transportation, Vol 9, No. 4, pp. 69-87.

IEA (International Energy Agency). 2013. Global land transport infrastructure requirement:
estimating road and railway infrastructure capacity and costs to 2050. Paris: OECD/IEA.

ITDB (Institute for Transportation & Development Policy), ClimateWorks Foundation, Deutsche
Gesellschaft fr Internationale Zusammenarbeit (GIZ), International Council on Clean
Transportation, and Rockefeller Foundation. 2013. The BRT standard 2013. New York.

ITP (Integrated Transport Planning Ltd) and IBIS Transport Consultants Ltd. 2009. Lagos BRT-
Lite: Africas first Bus Rapid Transit scheme: scheme evaluation and summary report.

Jaramillo, C., Lizrraga, C., and Grindlay, A. 2012. Spatial disparity in transport social needs and
public transport provision in Santiago de Cali, Colombia. Journal of Transport Geography, Vol. 2,
pp. 340-357.

Jiron, P. 2011. Sustainable urban mobility in Latin America and the Caribbean. Nairobi: UN
Habitat, Nairobi. http://www.unhabitat.org/grhs/2013.

Kantor, D., Moscoe, G. , and Henke, C. 2006. Issues and technologies in level boarding strategies
for BRT. Journal of Public Transportation, Vol. 9, No. 3, pp. 89-101.

Kittelson & Associations, Inc. and Levinson, H. 2007. Bus Rapid Transit Practitioners Guide.
Washington, DC: Transportation Research Board, TCRP Report 118.

Levinson, H., Zimmerman, S., Clinger, J., and Gast, J. 2003. Bus Rapid Transit: Synthesis of case
studies. Transportation Research Record 1841, pp. 1-11.

Lleras, G. Bus Rapid Transit: Impacts on travel behavior in Bogot. Cambridge, Massachusetts:
Massachusetts Institute of Technology, Department of Urban Studies and Planning, masters
thesis.

Lindau, L., Hildalgo, D. and Facchin, D. 2010. Bus Rapid Transit in Curitiba, Brazil: a look at the
outcome after 35 Years of bus-oriented development. Transportation Research Record, Vol.
2193, pp. 17-27.

42

Lubow, A. 2007. The road to Curitiba. New York Times Magazine, May 20, pp. 4-6.

Ma, L , Ye, R., Titheridge, H. 2013. Capitalization effects of rail transit and BRT on residential
property values in a booming economy: evidence from Beijing. Paper presented at the13th
World Conference on Transportation Research, Rio de Janeiro, Brazil, July.

Menckhoff, G. 2005. Latin American experience with bus rapid transit. Melbourne: paper
presented at World Bank Annual Meeting, Institute of Transportation Engineers. Available at:
http://www.gobrt.org/Latin_American_Experience_with_Bus_Rapid_Transit.pdf.

Munoz-Raskin, R. 2010. Walking accessibility to Bus Rapid Transit: does it affect property
values? Transport Policy, Vol. 17, pp. 72-84.

Peak, M., Henke, C., and Wnuk, L. 2005. Bus rapid transit ridership analysis. Washington, D.C.:
U.S. Department of Transportation, Federal Transit Administration, Report FTA-CA-26-7068-
2004.1.

Penalosa, E. 2002. Urban transport and urban development: a different model. Berkeley: The
Center for Latin American Studies, University of California, Berkeley.

Perk, V. and Catala, M. 2009. Land use impacts of bus rapid transit: effects of BRT station
proximity on property values along the Pittsburgh Martin Luther King, Jr. East Busway.
Washington, DC: Federal Transit Administration, US Department of Transportation.

Pirie, G. 2011. Sustainable urban mobility in Anglophone Sub-Saharan Africa. Nairobi: UN
Habitat, Nairobi. http://www.unhabitat.org/grhs/2013.

Pourbaix, J. 2011. Towards a smart future for cities: urban transport scenarios for 2025 Public
Transport International, Vol., 3, pp. 8-10.

Pushkarev, B. and Zupan, J. 1977. Public transportation and land use policy. Bloomington:
Indiana University Press.

Rambaud, F., Rabuel, S., and Crest, T. 2008. BHLS: The French BRT approach. Paris: Centre on
Transport and Urbanism (Centru).

Rizvi, A. 2011. Alternative approaches to economically sustainable mobility in India: comparing
Ahmedabad Bus Rapid Transit and Dehli Metro Systems. Nairobi: UN-Habitat, case study
prepared for sustainable urban mobility: global report on human settlements 2013; available
from: www.unhabitat.org/grhs/2013.

Rodriquez, D. and Targa, F. 2004. Value of accessibility to Bogotas Bus Rapid Transit system,
Transport Reviews, Vol. 24, No. 5, pp. 587-610.

43


Rodriquez, D. and Mojica, C. 2009. Capitalization of BRT network expansion effects into prices
of non-expansion areas. Transportation Research A Vol. 43, pp. 560-571.

Santos, E. 2011. Pioneer in BRT and urban pPlanning. Saarbrcken, Germany: Lambert
Academic Press.

Seoul Development Institute. 2005a. Toward better public transport. Seoul, Korea: Seoul
Development Institute, Seoul Metropolitan Government.

Suzuki, H., Dastur, A., Moffatt, S., Yabjuk, N. and Maryyama, H. 2010. Eco2 cities: ecological cities
as economic cities. Washington, D.C.: The World Bank.

Suzuki, H., Cervero, R. and Iuchi, K. 2013. Transforming cities with transit: transit and land-use
integration for sustainable urban development. Washington, DC: World Bank.

Tiwari, G. and Jain, D. 2010. Bus rapid transit projects in India cities: a status report. Built
Environment, vol. 36, no. 3, pp. 353-362.

Torres-Montoya, M. 2013. Tackling fare evasion in Transantiago: an integrated approach. Paper
prepared for presentation at the 93rd annual meeting of the Transportation Research Board,
Washington, DC, scheduled for January 2014.

UN Habitat. 2011. Global report on human settlements 2011: Cities and Climate Change.
Nairobi: UN Habitat.

UN Habitat. 2012. Database on urban densities among global cities. Nairobi: UN Habitat.
Proprietary data provided to the author.

United States General Accounting Office. 2001 Bus Rapid Transit shows promise. Washington,
DC: U.S. Congress, General Accounting Office, Report GAO-01-984.

Venter, C., Hildalgo, D., Pineda, A. 2013. Assessing the equity impacts of bus rapid transit:
emerging frameworks and evidence. Paper presented at the13th World Conference on
Transportation Research, Rio de Janeiro, Brazil, July.

Vincent, W. and Jerram, L. 2006. The potential for Bus Rapid Transit to reduce transportation-
related CO2 emissions. Journal of Public Transportation, Vol. 9, No. 3, pp. 219-237.

Vuchic, V. 2007. Urban transit systems and technology. New York: John Wiley.

Whrnschimmel, J., Zuk, M, Martinez-Villa, G., Cern, Crdenas, B., and Rojas-Brancho. 2008.
The impact of a bus rapid transit system on commuters exposure to benzene, CO, PM2.5, and

44

PM10 in Mexico City. Atmospheric Environment, Vol. 42, pp. 8194-8203.

Wright, L. 2011. Bus rapid transit: a review of recent advances. Urban transport in the
developing world: a handbook of policy and practice, H. Dimitriou and R. Gakenheimer, eds.
Cheltenham, U.K.: Edgar Elgard, pp. 421-455.

Wright, L. and Hook, W. 2007. Bus rapid transit planning guide. New York: Institute of
Transportation & Development.

Yang, J., Shen, A., Shen, J., and He, C. Transport impacts of clustered development in Beijing:
Compact development versus overconcentration, Urban Studies, Vol. 49, No. 6, pp. 1315-1331.

Yazici, M., Levinson, H., Ilicali, M., Camkesen, N., Kamga, C. 2013. A bus rapid transit line case
study: Istanbuls Metrobus system. Journal of Public Transportation, Vol. 16, No. 1, pp. 153-177.

Zhang, M. 2009. Bus versus rail: meta-analysis of cost characteristics, carrying capacities, and
land use impacts. Transportation Research Record, Vol. 2110, pp. 87-95.

45

You might also like