Check List For Mivan Shuttreing Works

This document provides a checklist for mivan shuttering works for a construction project. The checklist includes 10 items to inspect, such as levels and alignments of columns, walls, beams and slabs before pouring concrete. Spaces are provided to note the location, drawing number, date, inspection results and remarks. The document also includes sections for signatures of surveyors and foremen to approve the works.

Uploaded by

mangeshshinde124
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
100% found this document useful (2 votes)
21K views

Check List For Mivan Shuttreing Works

This document provides a checklist for mivan shuttering works for a construction project. The checklist includes 10 items to inspect, such as levels and alignments of columns, walls, beams and slabs before pouring concrete. Spaces are provided to note the location, drawing number, date, inspection results and remarks. The document also includes sections for signatures of surveyors and foremen to approve the works.

Uploaded by

mangeshshinde124
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 1

PRATIBHA INDUSTRIES LIMITED

CHECK LIST FOR MIVAN SHUTTERING WORKS

Location : ___________________________________________________________

Unit :

Drg. No. : Date :

Sr. No. Description of Check Yes No Remarks

1 Levels ( for Column and Slab) before center line, line out

2 Centre line, line out and Checking position of Kicker

3 Cleaning of Mivan Shuttering (Column, walls ,Beam and Slab)

4 Appling of shuttering oil for (Column, walls ,Beam and Slab)

5 Alignments and level, line and Plumb for (Column, walls ,Beam and Slab)

6 Line, Level, Plumb for (Column, walls ,Beam and Slab)

7 Tighten wall Ties and Pin Wedges properly.

8 Checking of PL props (Beam and Slab)

9 Shuttering work followed as per approved method statement.

10 Area cleared for reinforcement tying.

Note :

LABOUR HEAD FORAMEN FOR THE UNIT

SURVEYOR PIL

FORAMEN PIL

PIL V A (WADHWA) CONST P LT