Megger Testing Method Statement
Megger Testing Method Statement
(http://www.planningengineer.net/)
Planning Engineer (http://www.planningengineer.net)
/ Free Categories (http://www.planningengineer.net/category/free-categories/)
/ Project Management (http://www.planningengineer.net/category/free-categories/project-management/)
/ method statement megger testing
17
method statement megger testing
Jan By admin (http://www.planningengineer.net)
cable (/tag/cable/), megger testing (/tag/megger-testing/), method statement (/tag/method-statement/),
method statement megger testing (/tag/method-statement-megger-testing/), test (/tag/test/)
1 Comment on method statement megger testing (http://www.planningengineer.net/method-statement-
megger-testing/#comments)
http://www.planningengineer.net/method-statement-megger-testing/ 23-Jul-15
method statement megger testing | Planning Engineer Page 2 of 7
1. The leads used for connecting megger testing with the circuit
should be fault free and the two connecting leads should have
electrical continuity. It is checked by touching the free ends of the
leads together while the megger button is pressed ON to check
for zero resistance.
2. Check for PVC adopters are provided for cables and male
(/?p=950)
adapter for all PVC conduits terminating in the panel board.
method statement megger
3. Check the dressing is complete for all the wires in the panel testing
boards
1. Connect the free megger test probes to any two conductors required to be tested.
2. With all the appliance connected or the two ends of the conductors shorted and all Switches
switched ON the reading shown on the megger should be zero. If the reading shows infinity then
there is an open circuit. The fault should be traced and rectified.
3. For cables, the extreme ends of any two phase is shorted and when the test is conducted the
reading should be zero if the meter reads infinity or some value of mega ohms then there is a fault in
the cable and it should be rectified. Same procedure shall be repeated for other 3 conductors of the
cable.
FOR WIRES;
With the other ends of the circuit conductor open the value should be infinity for all the test. If the
value is zero there is short circuit or the insulation of the wire is damaged and the wire is changed
accordingly.
FOR CABLES:-
For Cables the Megger range should be 1000V, and both the ends of the cable shall be kept open and
test shall be conducted between phases and neutrals as follows:
http://www.planningengineer.net/method-statement-megger-testing/ 23-Jul-15
method statement megger testing | Planning Engineer Page 3 of 7
neutrals as follows:
i.RtoY
ii.RtoB
iii.YtoB
iv.RtoN
V.YtoN
vi.BtoN
all these reading should be infinity, if otherwise the cable ^ores/phases are faulty and should be
rectified.
The test results shall be recorded in a format for Engineers reference and record. The format shall be
submitted to Consultant for approval in advance prior to perform the megger test operation.
Optical Powermeters
Range of Fiber Handheld Testers For All Networks & Connector Types
(http://www.planningengineer.net/method-
(http://www.planningengineer.net/mep-
(http://www.planningengineer.net/free-
statements-for- commissioning-check- online-100-question-
planning-engineers/) lists/) simulated-pmp-exam-
Method statements for MEP Commissioning Check
practice-test/)
Free online 100 Question
planning engineers Lists
Simulated PMP Exam
(http://www.planningengineer.net/method-
(http://www.planningengineer.net/mep-
Practice Test
statements-for-planning- commissioning-check-lists/)
(http://www.planningengineer.net/free-
engineers/)
online-100-question-
(http://www.planningengineer.net/full-
(http://www.planningengineer.net/bored-
(http://www.planningengineer.net/full-
simulated-pmp-exam-
online-simulated-pmp- piling-method- online-simulated-pmp-
exam-4-practice-test- statement-2/) practice-test/)
exam-5-practice-test-
200-questions-time- BORED PILING METHOD
200-questions-4-hrs/)
restrictions/) Full online Simulated PMP
STATEMENT
Full online Simulated PMP
Exam No. 5 Practice Test-
(http://www.planningengineer.net/bored-
Exam No. 4 Practice Test-
200 Questions - in 4 HRS
piling-method-
200 Questions - No Time
(http://www.planningengineer.net/full-
statement-2/)
Restrictions
(http://www.planningengineer.net/week-
(http://www.planningengineer.net/%
(http://www.planningengineer.net/full-
3-primavera- d8%a7%d9%85%d8%
http://www.planningengineer.net/method-statement-megger-testing/ 23-Jul-15
method statement megger testing | Planning Engineer Page 4 of 7
discussion-oil-storage-
online-simulated-pmp- aa%d8%ad%d8%a7% online-simulated-pmp-
Share and tell your friends!
facility-project/) d9%86-%d8%a8%d9%
exam-4-practice-test-200- exam-5-practice-test-200-
4 1
Week 3 Primavera 1 89-%d8%a7%d9%85-%
questions-time- d8%a8%d9%89-%d8% questions-4-hrs/)
Discussion -oil storage a7%d9%88%d9%86%
restrictions/)
facility project d9%84%d8%a7%d9%
8a%d9%86-%d9%85%
(http://www.planningengineer.net/week-
d8%ac%d8%a7%d9%
Author
3-primavera-discussion-oil- 86%d8%a7-pmp/)
storage-facility-project/)
admin
PMP
Hany Ismael BSc, MSc is a Civil Engineering post graduate student from the
(http://www.planningengineer.net/%
Liverpool University, a Project Management Professional with Certified PMP,
d8%a7%d9%85%d8%aa%
involved in various multi level construction projects since 11 years, and currently
d8%ad%d8%a7%d9%86-%
working as Planning Manager. Hany beleives sharing knowledge helps grow and
teach ourselves. Hany is rapid in updating himself of latest project management tools and techniques in
d8%a8%d9%89-%d8%a7%
d8%a7%d9%88%d9%86%
d9%84%d8%a7%d9%8a%
d9%86-%d9%85%d8%ac%
Comment (1)d8%a7%d9%86%d8%a7-
pmp/)
Schmuelsons Reid
Reply (/method-statement-megger-testing/?replytocom=1494#respond)
Somebody with hands on experience please help me on this one. Considering the
high voltage involved I need to clarify and propose and calculate the risk, probability
and the severity of the works impact.
Jun 10, 2013 at 7:28 am
Leave a comment
Website
http://
Comment
http://www.planningengineer.net/method-statement-megger-testing/ 23-Jul-15
method statement megger testing | Planning Engineer Page 5 of 7
Post Comment
Our Products
(http://www.planningengineer.net/progress-
measurement-system-downloadable-
course)
Progress Measurement
System- Downloadable
Course
(http://www.planningengineer.net/progress-
measurement-system-
Price: $149.00
Search..
(http://www.planningengineer.net/progress-
measurement-system-downloadable-
course)
Member Login
USERNAME
PASSWORD
Remember me
Login
http://www.planningengineer.net/method-statement-megger-testing/ 23-Jul-15
method statement megger testing | Planning Engineer Page 6 of 7
Forgot Password?
Join Us (http://www.planningengineer.net/join-us/)
Categories
Select Category
Filter by Tag
Activities (/tag/activities/) activity (/tag/activity/) Cash Flow (/tag/cash-flow/) cmamad id (/tag/cmamad-id/) cost (/tag/cost/)
excel
Engineering (/tag/engineering/) engineering careers (/tag/engineering-careers/) exam (/tag/exam/)
(/tag/excel/) excel template (/tag/excel-template/) ingenieur (/tag/ingenieur/) job (/tag/job/) make (/tag/make/)
management (/tag/management/) method of statement (/tag/method-of-statement/)
method statement (/tag/method-statement/) microsoft excel (/tag/microsoft-excel/) mobid
(/tag/mobid/) mobid ad (/tag/mobid-ad/) p6 (/tag/p6/) plan (/tag/plan/) planning (/tag/planning/)
planning engineer (/tag/planning-engineer/) planning engineers (/tag/planning-engineers/)
Planning Engineer salary (/tag/planning-engineer-salary/) PMI (/tag/pmi/) PMP (/tag/pmp/) pmp exam
(/tag/pmp-exam/) Primavera (/tag/primavera/) primavera p6
(/tag/primavera-p6/) Project (/tag/project/) project management
(/tag/project-management-2/) project management plan (/tag/project-management-plan/)
project manager (/tag/project-manager/) Qatar (/tag/qatar/) report (/tag/report/) salaire (/tag/salaire/)
salary (/tag/salary/) Salary 2015 (/tag/salary-2015/) schedule (/tag/schedule/) time (/tag/time/) time schedule
(/tag/time-schedule/) WBS (/tag/wbs/) work (/tag/work/) ( /tag/%d8%a8%d8%b1%d9%86%d8%a7%d9%85%d8%ac/)
About Us
Planning Engineer is a specialized website in Project Management. We love to help individuals to enhance their project
management, planning, and scheduling skills by creating Free and Premium courses and articles. Furthermore, we are
ready to provide full support to organizations by simply provide system that works. Our jobs section provide attractive jobs
to Planning Engineers, and introduce Planning Engineers resumes to companies who are looking for qualified candidates.
PREMIUM CATEGORIES
FREE CATEGORIES
http://www.planningengineer.net/method-statement-megger-testing/ 23-Jul-15
method statement megger testing | Planning Engineer Page 7 of 7
USEFUL LINKS
Join Us (http://www.planningengineer.net/join-us/)
Contact Us (http://www.planningengineer.net/contact-us/)
CONTACT US...
FOLLOW US...
WE ACCEPT
(http://www.planningengineer.net/store/products)
http://www.planningengineer.net/method-statement-megger-testing/ 23-Jul-15