Group 1, Sec 3 Editted
Group 1, Sec 3 Editted
A. substructure
1.Earth work & excavation
48.39 1.1.site clearance & removing
19.53 of top soil 30cm thick
945.0567 m2
46.89 1.2. bulk excavation in ordinary
18.23 soil to a depth of 1.05m
1.05
897.54494 m3
2.9 1.3. pit excavation to a depth of
11 2.9 1500mm in ordinary soil for F1
1.5
138.765 m3
3.3 ditto but f2
19 3.3
1.5
310.365 m3
3.4 ditto but f3
4 3.4
1.5
69.36 m3
3.6 ditto but f4
4 3.6
1.5
77.76 m3
596.25 m3
1.4 Trunch excavation around the building
for massonery construction between axis
1.71 2&3 between axis 4&5 between axis 6&7
8 0.8 between axis 8&9 on axis A between axis 1&
1 2 bteween axis8&9 on axis D between axis1&2
between axis 9&10 on axis B
10.944 M3
ditto but between axis 3&4 between axis 7&8
on axis A, between axis 2&3, between axis
1.51 3&4 between axis 4&5 between axis 5&6 bet
8 0.8 ween axis7&8 between axis 6&7 on axis D
1
9.664 M3
1 1.91 ditto but between axis 9&10 on
0.8 axis D
1
1.528 m3
3.01
2 0.8 ditto but between axis C&D
1 on axis 1&10
4.816 M3
2 1.31 ditto but between axis B&C on aaxis 1&10
0.8
1
2.096 m3
1.21 ditto but between axis 1&2 on axis 2&9
2 0.8
1
1.936
30.984
4.51 1.5 well compacted selected material
5 4.01 fill under hard core Gfs 1
0.7
63.29785 m
ditto but Gfs2
4.51
8 3.91
0.7
98.75096 m3
ditto but Gfs3
4.51
8 5.61
0.7
141.68616 m3
ditto but Gfs4
4.51
1 4.01
0.7
12.65957 m3
316.39454
1.6 cartaway
1541.3067 m3 TEV=TE+PE+BE
1.7 250mm thick hard core fill
4.51
5 4.01
90.4255 m2
ditto but Gfs2
4.51
8 3.91
141.0728 m2
ditto but Gfs3
4.51
8 5.61
202.4088 m2
ditto but Gfs4
4.51
1 4.01
18.0851 m2
451.9922 m2
2. concrete work
2.1 lean concret work under footing pad F1
2.4
11 2.4
63.36 M2
ditto but F2
2.8
19 2.8
148.96 m2
ditto but F3
2.9
4 2.9
33.64 m2
ditto butF4
3.1
4 3.1
38.44 m2
ditto but Gfs1 andGfs4
4.51
7 4.01
126.5957 m2
ditto but gfs 2
4.51
8 3.91
141.0728 m2
ditto but gfs3
4.51
8 5.61
202.4088 m2
lean concrete for ground floor beam gfb1
43.59
3 0.3
39.231 m3
ditto but gfb2
14.73
2 0.3
8.838 m3
ditto but gfb 3
11.14
2 0.3
6.684 m3
ditto but gfb 4
14.73
4 0.3
17.676
ditto but gfb 5&gfb6
15.4
4 0.3
18.48
845.3863
2.2. rain forced concrete work for footing pad f1
2.4
11 2.4
0.65
41.184 m3
ditto but f2
2.8
19 2.8
0.8
119.168 m3
ditto but f3
2.9
4 2.9
0.8
26.912 m3
ditto but f4
3.1
4 3.1
0.85
32.674 m3
for footing column c1 f1
0.4
10 0.3
1.85
2.22 m3
ditto but c2f2 and c7 f2 and c3f2 and c5 f3 and c6f2
0.4
21 0.3
1.7
4.284 m3
ditto c3 f1
0.4
1 0.3
1.85
0.222 m3
ditto but c5f4 and c4f3
0.4
6 0.3
1.65
1.188 m3
43.59 rain forced concrete for ground floor beam gfb1
3 0.3
0.5
19.6155 m3
14.73 ditto but gfb2
2 0.3
0.5
4.419 m3
11.14 ditto but gfb 3
2 0.3
0.5
3.342 m3
14.73 ditto but gfb4
4 0.3
0.5
8.838
15.4 ditto but gfb5 &gfb6
4 0.3
0.5
9.24
4.51 ditto but gfs1 andGfs4
6 4.01
0.15
16.27659 m3
4.51 ditto butgfs2
8 3.91
0.15
21.16092 m3
4.51 ditto but gfs3
8 5.61
0.15
30.36132 m3
341.10533
9.7 2.3.form work 25mm thik timber for footing pad
11 0.65 f1
69.355 m2
11.3
19 0.8 ditto but f2
171.76 m2
11.7 ditto but f3
4 0.8
37.44 m2
12.5 ditto but f4
4 0.85
42.5 m2
10 1.5 ditto but c1f1
1.85
27.75 m2
21 1.5 ditto but c2f2 & c7f2 & c3f3 &
1.7 c5f3 & c6f2
53.55 m2
1.5 ditto but c3f1
1 1.85
2.775 m2
6 1.5 ditto but c5f4 & c4f3
1.65
14.85 m2
ditto but GFB1
3 87.78
0.5
131.67 m2
ditto but GFB2
30.06
2 0.5
30.06 m2
2 22.88 ditto but GFB3
0.5
22.88 m2
4 30.06 ditto but gfb4
0.5
60.12
31.4 ditto but gfb5&gfb6
4 0.5
62.8
727.51 m2
3. masonry construction
3.1 below ground level
massonery construction between axis
4.51 2&3 between axis 4&5 between axis 6&7
8 0.3 between axis 8&9 on axis A between axis 1&
1 2 bteween axis8&9 on axis D between axis1&2
between axis 9&10 on axis B
10.824 M3
ditto but between axis 3&4 between axis 7&8
on axis A, between axis 2&3, between axis
4.51 3&4 between axis 4&5 between axis 5&6 bet
8 0.3 ween axis7&8 between axis 6&7 on axis D
1
10.824 M3
1 4.51 ditto but between axis 9&10 on
0.3 axis D
1
1.353 m3
5.51
2 0.3 ditto but between axis C&D
1 on axis 1&10
3.306 M3
2 3.81 ditto but between axis B&C on aaxis 1&10
0.3
1
2.286 m3
3.91 ditto but between axis 1&2 on axis 2&9
2 0.3
1
2.346
30.939
ITEM DIM QTY DESCRIPTION
LOCATION DIAMETER LENGTH (M)
Footing pad f1 12 3.4
Footing pad f2 14 4.1
Footing pad f3 14 4.2
Footing pad f4 16 4.5
Footing column C1 20 4.2
Footing column C2 20 4.2
Footing column C3 20 4.2
Footing column C4 20
Footing column C5 20 4.2
Footing column C6 20 4.2
Footing column C7 20 4.2
stirrup for footing column ST1 8 1.2
stirrup for footing column ST1
GFS1 8 4.35
GSF 2 8 3.75
GSF 3 8 5.45
GSF 4 8 1.1
GFB1 14 93.2
GFB2 14 32
GFB3 14 23.7
GFB4 14 31.9
GFB5 14 33.4
GFB6 14 33.4
stirrup for GFB1 8 1.4
stirrup for GFB2 8 1.4
stirrup for GFB3 8 1.4
stirrup for GFB4 8 1.4
stirrup for GFB5&GFB6 8 1.4
total length(m)
weight(kg/m)
total weight(kgs)
NO OF barsR NO Of members Total no of bars 6 8 10
46 10 460 1564
52 20 1040
54 4 216
48 4 192
6 10 60
8 5 40
8 3 24
2 0
8 6 48
6 10 60
6 2 12
14 38 532 638.4
s
453 5 2265 9852.75
162 8 1296 4860
162 8 1296 7063.2
18 1 18 19.8
3 3 9
3 2 6
3 2 6
3 4 12
3 2 6
3 2 6
219 3 657 919.8
75 2 150 210
57 2 114 159.6
75 4 300 420
78 4 312 436.8
638.4 23941.95 1564
0.222 0.395 0.617
141.7248 9457.0703 964.988
12 14 16 20 24
4264
907.2
864
252
168
100.8
201.6
252
50.4
638.4
838.8
192
142.2
382.8
200.4
200.4