Development Project (Estimated Timesheet) : # Tasks Time Assignments Notes 1 Conceptualization 1 2 Week

1. The development project involves conceptualizing and building a blockchain-based application for engineering projects over 5 months. 2. It involves brainstorming concepts for roles like engineers, borrowers, auditors, administrative agents, and lenders during the 1-2 week conceptualization phase. 3. The 2 month development phase focuses on designing and implementing backend chaincode for roles and functionality, and integrating sub-modules while the 2 month frontend phase simultaneously works on the Node.js framework, dashboard design, and testing connectivity between frontend and chaincode.

Uploaded by

Abhinav Garg
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
67 views

Development Project (Estimated Timesheet) : # Tasks Time Assignments Notes 1 Conceptualization 1 2 Week

1. The development project involves conceptualizing and building a blockchain-based application for engineering projects over 5 months. 2. It involves brainstorming concepts for roles like engineers, borrowers, auditors, administrative agents, and lenders during the 1-2 week conceptualization phase. 3. The 2 month development phase focuses on designing and implementing backend chaincode for roles and functionality, and integrating sub-modules while the 2 month frontend phase simultaneously works on the Node.js framework, dashboard design, and testing connectivity between frontend and chaincode.

Uploaded by

Abhinav Garg
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

Development Project(Estimated Timesheet)

# Tasks Time Assignments Notes


1 Conceptualization 1-2 week
Brainstorming Working & functionality
of
Engineer,Borrower,Audit
or, Administrative Agent,
Lender
Concepts
2 Development
Phase
Designing 2 Months
Beckend Chain code Chaincode for respective PBFT
implementatio all roles,functionality. workout,No
n Structure workout. ops,
of( borrrower, Digital Signature Trigger
engineer, Event
auditor, admin Handling.
agent &
lender)
Test Prototype Sub-Modules Integration PDF
uploads
functionalit
y,
Sureity
consensus.

3 Frontend 2 Months
Simultaneousl Node.js framework Roles and
y working on structure to be designed permission
integration and integration with s to be
with all dashboard. designed
provided Roles Design of Dashboard . for each
and functions. individual
Roles.
Testing To check the Notification
connectivity with nodejs s.
w.r.t chaincode

4. Middleware 1 Month Integration of API’s.


API’s

Total Estimation: 5 months