0% found this document useful (0 votes)
54 views

Weekly Program

This document provides details of cutting work done from May 13 to May 18, 2017. It lists one job with no cutting of asphalt or tiles, laying 750 meters of an unspecified material near a 132kV substation, with no details on the type of crossing and no remarks other than describing the work as excavation and cable laying. The document provides client and contact information but no other context about the work.
Copyright
© © All Rights Reserved
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
54 views

Weekly Program

This document provides details of cutting work done from May 13 to May 18, 2017. It lists one job with no cutting of asphalt or tiles, laying 750 meters of an unspecified material near a 132kV substation, with no details on the type of crossing and no remarks other than describing the work as excavation and cable laying. The document provides client and contact information but no other context about the work.
Copyright
© © All Rights Reserved
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

From 13/05 /2017 to 18 / 05 /2017

Client :

Type of
S. R/N Location & Road Type of Cutting Start Comp.
NOC Crossing Remarks
No. * No. Date Date
Asp Tiles U.M Other DR O/Cutt
EXCAVATION NEAR 132KV
01 PVT NIL NIL 750M NIL NIL NIL CMC SYBSTATION &
CABLE LAYING