Work Measurement
Work Measurement
qualified worker to carry out a specified job at a defined level of performance. It refers to the
estimation of standard time. The fundamental purpose of work measurement is to set time
standards for a job.
Standard time is the time allowed for completing one piece of job using the given method. This
is the time taken by an average experienced worker for the job with provisions for delays
beyond the workers control.
1 To schedule work and allocate capacity - All scheduling approaches require some
estimate of how much time it takes to do the work being scheduled.
3 To bid for new contracts and to evaluate performance on existing ones - Questions
such as Can we do it? and How are we doing? presume the existence of
standards.
1) Select
2) Record
3) Examine
4) Measure
5) Compile
6) Define
Techniques of Work Measurement
There are several techniques used for estimation of standard time in industry. These
include :
1) Time study
2) Work sampling
3) Predetermined time standards(PTS)
4) Standard data
1) Time Study
Is a work measurement technique for recording the time and rates of working for the
elements of a specified job under specific conditions and for analyzing the data so as to
obtaining the time necessary for carrying out the job at a defined level of performance. A time
study is generally made with a stopwatch, either on the spot or by analyzing a videotape for the
job. The job or task to be studied is separated into measurable parts or elements, and each
element is timed individually.
Time Study is the most versatile and the most widely used.
Some general rules for breaking down the elements are :
1 Define each work element to be short in duration but long enough so that it can be
timed with a stopwatch and the time can be written down.
2 If the operator works with equipment that runs separately (meaning the operator
performs a task and the equipment runs independently), separate the actions of the
operator and of the equipment into different elements.
3 Define any delays by the operator or equipment into separate elements.
Timing device
Time study observation sheet
Time study observation board
Other equipment
Timing Device
The stop watch and the electronic timer are the most widely used timing devices used
for time study. The two perform the same function with the difference that electronics timer can
measure time to the second or third decimal of a second and can keep a large volume of time
data in memory.
Other Equipment
This includes pencil, eraser and device like calculator, etc.
Step 1: Define objective of the study. This involves statement of the use of the result, the
precision desired, and the required level of confidence in the estimated time standards.
Step 2: Analyse the operation to determine whether standard method and conditions exist and
whether the operator is properly trained. If need is felt for method study or further training of
operator, the same may be completed before starting the time study.
Step 3: Select Operator to be studied if there is more than one operator doing the same task.
Step 4: Record information about the standard method, operation, operator, product,
equipment, quality and conditions.
Step 6: Time the operator for each of the elements. Record the data for a few number of cycles.
Use the data to estimate the total numbers of observations to be taken.
Step 7: Collect and record the data of required number of cycles by timing and rating the
operator.
Step 8: For each element calculate the representative watch time. Multiply it by the rating
factory to get normal time.
Normal time = Observed time * Rating factor
Add the normal time of various elements to obtain the normal time for the whole operation.
Step 9: Determine allowances for various delays from the company's policy book or by
conducting an independent study.
Step 10: Determine standard time by adding allowances to the normal time of operation.
Standard time = Normal time + allowances