The document is a log of material submittals for an MEP project. It includes 9 initial submittals for items like air terminals, flexible ducts, refrigerant pipes, and drainage pipes. These were submitted on June 18, 2017 for a proposed 1+3 villa project by M/s Adnan Saffarini for M/s AL Fazeela Technical services. The log tracks review status and dates for the initial and possible resubmissions of each submittal.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
479 views
Mep Material Submittals Log
The document is a log of material submittals for an MEP project. It includes 9 initial submittals for items like air terminals, flexible ducts, refrigerant pipes, and drainage pipes. These were submitted on June 18, 2017 for a proposed 1+3 villa project by M/s Adnan Saffarini for M/s AL Fazeela Technical services. The log tracks review status and dates for the initial and possible resubmissions of each submittal.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1
EMPLOYER: M/s AL Fazeela Technical services APP APPROVED
ENGINEER: M/s Adnan Saffarini AAN APPROVED AS NOTED
PROJECT: Proposed B+G+1 villa UCR UNDER CONSULTANT REVIEW Date: 18.6.2017 AANR APPROVED AS NOTED RESUBMIT NAR NOT APPROVED, RESUBMIT MATERIAL SUBMITTALS - MEP LOG 1ST SUBMISSION 2nd SUBMISSION DATE APPROVAL DATE APPROVAL APPROVAL SL No: REF. DESCRIPTION REV. DATE REPLIED DATE REPLIED DATE REPLIED DATE REPLIED SUBMITTED STATUS SUBMITTED STATUS STATUS