0% found this document useful (0 votes)
46 views

SN. Released Items & Description Attached Lists or Documents No. Released For

The document is an electrical release report from Orascom Construction Industries for the New Assiut Combined Cycle Add-On Power Plant 500 MW Project. It lists two released items for civil construction: a demineralized water transfer pump and associated piping. The report certifies that the listed items have been completed according to drawings, specifications, international standards and the contract and are ready for civil works.

Uploaded by

Elec Eng
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
46 views

SN. Released Items & Description Attached Lists or Documents No. Released For

The document is an electrical release report from Orascom Construction Industries for the New Assiut Combined Cycle Add-On Power Plant 500 MW Project. It lists two released items for civil construction: a demineralized water transfer pump and associated piping. The report certifies that the listed items have been completed according to drawings, specifications, international standards and the contract and are ready for civil works.

Uploaded by

Elec Eng
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

ORASCOM CONSTRUCTION INDUSTRIES Report No.

138
New Assiut Combined Cycle Add-On Power Plant 500 MW Project.
Contract No.: Cairo/N/BB/GE&OC/2015/93 Page No. 1 OF 3

Electrical RELEASE REPORT Date 5/13/2017

SN. Released Items & Description Attached Lists or Documents No. Released for

1- 9-DB-7601-00002
1- DEMIN WATER TRANSFER PUMP
2- 24911-A Civil

Activities to be Done After Release :


* Orascom Hereby Certifies That.

* The Above Mentioned Piping Has Been Completed in Accordance With Drawings,Specfications,International Standards and Contrat.

* The Above Mentioned Piping Has Been Accepted by QC Team and /or Subcontractor for Civil.

* The Referenced Piping is Ready For Civil Construction Work.

COMPANY Site Mechanical EngineerOC QC Mechanical Engineer Site Civil Engineer OC QC Civil Engineer UEEPC

NAME

SIGNATURE

DATE

Form Ref. AS-OC-QA-FRM-017 Rev.00