Gas Emission Flow Sheet

This document summarizes the equipment and processes at a waste gas treatment plant. It includes a diagram labeling the major equipment pieces including dust collection bags, fans, a water tank, pump, and electrostatic precipitator. Tables provide data on gas temperature, flow rates, dust and emissions collection efficiency at different points in the system. Specifications are given for the water tank, spray pump, main fans, and a removed cooling fan.

Uploaded by

Wendra Haka
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
51 views

Gas Emission Flow Sheet

This document summarizes the equipment and processes at a waste gas treatment plant. It includes a diagram labeling the major equipment pieces including dust collection bags, fans, a water tank, pump, and electrostatic precipitator. Tables provide data on gas temperature, flow rates, dust and emissions collection efficiency at different points in the system. Specifications are given for the water tank, spray pump, main fans, and a removed cooling fan.

Uploaded by

Wendra Haka
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 6

GAS EMISSION TREATMENT PLANT

H-120
J-1 Glass Furnace

G-122 C-130

E-110
F-121

ST BY PASS
G-123

H-140

New EP
F-112

F-111
10 H-140 New EP
9 C-130 Chimney
L-113 8 G-123 Main Fan #2
7 G-122 Main Fan #1
6 F-121 EP Dust Bag
5 H-120 Electrostatic Precipitator
4 F-112 Stabilizer Dust Bag
3 L-113 Spray Water pump
2 F-111 Water Tank
1 E-110 Stabilizer
no CodeF- Equipment
180
GAS EMISSION TREATMENT
PLANT
Item Temp. Flowing Flow Water O2 Dust * Lead * SOX * NOX *
Velocity Rate Content (Pb)
Position oC m/s Nm3/Hr % % 350 mg/m3 12 mg/m3 800 mg/m3 1000 mg/m3

Point 1 430
Point 2 245
Point 3 220
Point 4 226 33.4 24561.52 13.33 19.5 92.07 55.77 4.24 753.16
Point 5 - 7.29 28118.97 - - 27.55 16.78 1.26 226.14
Source : 2004 Average Data of waste gas Analysis
Ave BC Ratio : 80 / 20 <2004>
* Kep-13/MENLH/3/1995
Ave Pull : 201,6 T/D <2004>
Equipement Specification of Waste Gas Treatment Plant

1. Water Tank <F-111>


Capacity : 1 m3

2. Spray Water Pump <L-113>


Pump capacity
Small : 1 m3/hr, 55 mH, 2900 rpm, 2.2 kW
Big : 15 m3/hr, 40.5 mH, 37kW x 1
Water Flow : 2.0 ~ 2.3 m3/hr

3. Main Fan <G-122, G-123>


Specification : 1630 rpm, 90 KW
Flow Rate : 1100 m3/min
q'ty : 2 pcs

4. Axial Cooling Fan <G-131>..<already remove on end of Feb 2005>


Specification : 3000 rpm, 0.75 kW, 3,7 A
Flow Rate : 321 l/sec
H-120
J-1 Glass Furnace

G-122
C-130

E-110
F-121

G-123
H-140 G-131

New EP
Under Construction

F-112

F-111 L-113

10 H-140 New EP
9 C-130 Chimney
8 G-123 Main Fan #2
7 G-122 Main Fan #1
6 F-121 EP Dust Bag
5 H-120 Electrostatic Precipitator
4 F-112 Stabilizer Dust Bag
3 L-113 Spray Water pump
2 F-111 Water Tank
1 E-110 Stabilizer
no CodeF Equipment
-180
WASTE GAS TREATMENT
PLANT
Rev.0 ; 14 March 2005
500
441.62

350
360 102.9 102.9