Weekly Construction Progress Report - #01: Period Covered: W6 - July 06, 2017 To July 12, 2017

The weekly construction progress report covers July 6-12, 2017 and provides information on the C5 South Link Expressway project. It details the project contract amount of 1.087 billion PHP and client as Cavitex Infrastructure Corporation. Safety statistics for the period and project to date are presented, along with the status of safety, health, and environment compliance and activities for the week. Photos may be attached.

Uploaded by

khraieric16
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
26 views

Weekly Construction Progress Report - #01: Period Covered: W6 - July 06, 2017 To July 12, 2017

The weekly construction progress report covers July 6-12, 2017 and provides information on the C5 South Link Expressway project. It details the project contract amount of 1.087 billion PHP and client as Cavitex Infrastructure Corporation. Safety statistics for the period and project to date are presented, along with the status of safety, health, and environment compliance and activities for the week. Photos may be attached.

Uploaded by

khraieric16
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

WEEKLY CONSTRUCTION PROGRESS REPORT_#01

Period Covered: W6 - July 06, 2017 to July 12, 2017

I. PROJECT INFORMATION

Project Title: Construction of C5 South Link Expressway Project Project ID: 16C5

Project Location: City of Paraaque, Taguig & Pasay Days 35/730


Elapsed: Calendar Day(s)
Contract Start: June 02, 2017 Contract June 02, 2019 Revised
Completion Contract
Date: Completion:
Project Contract P1,087,000,000.00 Variation Revised
Amount: Order: Contract
Amount:
Project Client: Cavitex Infrastructure Corporation Aguinaldo Blvd.

II. SAFETY REPORT

A. Man-Hour Summary
LAST WEEK THIS WEEK TO DATE

B. Site Safety Statistics

INCIDENT EXPERIENCE SUMMARY LAST WEEK THIS WEEK INCEPTION-TO-DATE

1) First Aid Treatment


2) Property Damage
3) Fire Incident
4) Near Miss
5) Environmental Incident
6) Others

Note: Provide brief description of accidents/ Incidents:

C. Status of Safety, Health & Environment Compliance

Note: List down of all applicable laws including local ordinances and resolutions with relevance
to Safety, Health & Environment encountered within the project period (e.g. Project Safety &
Health Program was approved by DOLE last January 01, 1999)
D. Safety, Health & Environment Activities, Issues and Concern

Note: Provide highlights & lowlights activities for the week. Attach also some photos.

III.QUALITY REPORT