13.3/8" Casing Cementing Job: Total Volume of Slurry, Bbls

This document provides details for cementing 13.3/8" casing, including: - Dimensions of the previous and current casing shoes and hole size - Volume calculations for cement slurry, displacement mud, and required thickening time - Pumping rates and times to displace the cement with mud - Contingency volumes accounting for pump efficiency and potential issues - The total job price and key drawbacks like not being able to set the ACP if the plug does not bump.

Uploaded by

umairahmedbaig
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
69 views

13.3/8" Casing Cementing Job: Total Volume of Slurry, Bbls

This document provides details for cementing 13.3/8" casing, including: - Dimensions of the previous and current casing shoes and hole size - Volume calculations for cement slurry, displacement mud, and required thickening time - Pumping rates and times to displace the cement with mud - Contingency volumes accounting for pump efficiency and potential issues - The total job price and key drawbacks like not being able to set the ACP if the plug does not bump.

Uploaded by

umairahmedbaig
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

13.

3/8" Casing Cementing Job


Shoe of previous casing
Current Shoe
OH, m
OH, f
Casing OD
Hole Size
Cap, bbl/f
Tail, Lead
Tail, Lead w/ Excess 30%, 50%
Total Volume of Slurry, bbls

Pumping at 5bpm, time, mins


Pumping at 5bpm, time, hrs
Displacement with mud Rate (bbl/hr)
Displacement with mud Time, hr
Total required thickening time[ 1 hrs Contingency], hrs

Casing capacity, bbl/f


Shoe track, 2jts, 3jts, bbls

Displacement volume, bbls


Surface lines volume- Will be considered during disp
Displacement, bbl
Error of 1.5%, bbl [ Pump Efficency]- Current Eff 95 %
Half Shoe Track
Diff in Plug Bumping - If pump Eff Issue (bbls)
Drawbacks
13.3/8" Casing Cementing Job
1287.5
1950
662.5 400
2173.6625 1312.4
13.375
17
0.1069646153
232.504973126 140.3803611327
302.3 196.5
498.8 336.9

99.8 67.4
1.7 1.1
4 5
3.9 3.1
6.6 5.2

0.148
11.662 17.492
Job Price, USD

935.84 929.73
5 5
940.84 934.73
14.11 14.02
5.83 8.75
-8.282 -5.275
If plug does not bump, won't be able to set ACP More time to drill floats & Cements
132k