B.3.4 Final Report
B.3.4 Final Report
Sample
Attention:
Project Name/Address:
In accordance with Chapter 17 of the International Building Code, special inspection has
been provided for the following items:
I certify that I performed special inspection on the following portions of the work at the
above address that required continuous inspections, and for which I was employed.
* Building official may require the signature / stamp of agency engineer responsible
for special inspection.