Wpci Progress Billing 1

This document is an accomplishment report from WinWinWin Plumbing Company Inc. for a proposed 5-storey condotel and commercial center project located in Boracay Island, Aklan, Philippines. It details the plumbing materials installed, including PVC pipes and fittings for sanitary stacks, ventilation, and potable water lines. No quantities are reported, as the project is still in progress.

Uploaded by

Riche B. Agocoy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
81 views45 pages

Wpci Progress Billing 1

This document is an accomplishment report from WinWinWin Plumbing Company Inc. for a proposed 5-storey condotel and commercial center project located in Boracay Island, Aklan, Philippines. It details the plumbing materials installed, including PVC pipes and fittings for sanitary stacks, ventilation, and potable water lines. No quantities are reported, as the project is still in progress.

Uploaded by

Riche B. Agocoy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 45

OWNER : Canyon de Boracay, Inc.

PROJECT : Proposed 5 - Storey Condotel & Commercial Center


LOCATION : Brgy. Balabag, Malay, Boracay Island, Aklan
CONTRACTOR : WinWinWin Plumbing Company Inc.

ACCOMPLISHMENT REPORT
TOTAL
DESCRIPTION UNIT
QTY

1 Sanitary Stack & Collection ( P V C - Series 1000 )


1.01 PIPE (P V C - Series 1000 ) 1.00
100 mm X 1m 30.00 Lm
75 mm X 1m 36.00 Lm
50 mm X 1m 30.00 Lm
1.02 WYE STANDARD (P V C) - "ATLANTA" 0.00
100 mm 4.00 pc
75 mm 4.00 pc
50 mm 8.00 pc
1.03 WYE REDUCER (P V C) - "ATLANTA"
100 mm X 75 mm 4.00 pc
100 mm X 50 mm 4.00 pc
WINWINWIN PLUMBING COMPANY, INC. PAGE 1 OF 45
OWNER : Canyon de Boracay, Inc.
PROJECT : Proposed 5 - Storey Condotel & Commercial Center
LOCATION : Brgy. Balabag, Malay, Boracay Island, Aklan
CONTRACTOR : WinWinWin Plumbing Company Inc.

ACCOMPLISHMENT REPORT
TOTAL
DESCRIPTION UNIT
QTY

75 mm X 50 mm 4.00 pc
1.04 ELBOW 90 (P V C) - "ATLANTA"
100 mm 8.00 pc
75 mm 8.00 pc
50 mm 16.00 pc
1.05 ELBOW 45 (P V C) - "ATLANTA"
100 mm 4.00 pc
75 mm 8.00 pc
50 mm 12.00 pc
1.06 TEE STANDARD (P V C) - "ATLANTA"
100 mm 0.00 pc
75 mm 0.00 pc
WINWINWIN PLUMBING COMPANY, INC. PAGE 2 OF 45
OWNER : Canyon de Boracay, Inc.
PROJECT : Proposed 5 - Storey Condotel & Commercial Center
LOCATION : Brgy. Balabag, Malay, Boracay Island, Aklan
CONTRACTOR : WinWinWin Plumbing Company Inc.

ACCOMPLISHMENT REPORT
TOTAL
DESCRIPTION UNIT
QTY

50 mm 0.00 pc
1.07 TEE REDUCER (P V C) - "ATLANTA" 1.00
100 mm X 75 mm 12.00 pc
100 mm X 50 mm 12.00 pc
75 mm X 50 mm 12.00 pc
1.09 CLEAN OUT (P V C) - "ATLANTA"
100 mm 4.00 pc
75 mm 4.00 pc
1.11 P - TRAP (P V C) - "ATLANTA"
50 mm 24.00 pc
1.12 SOLVENT - "ATLANTA"
400 cc - "ATLANTA" 9.00 can
WINWINWIN PLUMBING COMPANY, INC. PAGE 3 OF 45
OWNER : Canyon de Boracay, Inc.
PROJECT : Proposed 5 - Storey Condotel & Commercial Center
LOCATION : Brgy. Balabag, Malay, Boracay Island, Aklan
CONTRACTOR : WinWinWin Plumbing Company Inc.

ACCOMPLISHMENT REPORT
TOTAL
DESCRIPTION UNIT
QTY

1 Ventilation ( P V C - Series 600 )


1.13 PIPE ( P V C - Series 600 ) - "ATLANTA" 1.00
75 mm X 1m 72.00 Lm
50 mm X 1m 72.00 Lm
1.14 WYE STANDARD (P V C) 0.00
75 mm 0.00 pc
50 mm 0.00 pc
1.15 WYE REDUCER (P V C) 0.00
75 mm X 50 mm 0.00 pc
1.14 ELBOW 90 (P V C) - "ATLANTA" 1.00
75 mm 0.00 pc
50 mm 0.00 pc
WINWINWIN PLUMBING COMPANY, INC. PAGE 4 OF 45
OWNER : Canyon de Boracay, Inc.
PROJECT : Proposed 5 - Storey Condotel & Commercial Center
LOCATION : Brgy. Balabag, Malay, Boracay Island, Aklan
CONTRACTOR : WinWinWin Plumbing Company Inc.

ACCOMPLISHMENT REPORT
TOTAL
DESCRIPTION UNIT
QTY

1.35 ELBOW 45 (P V C) - "ATLANTA" 0.00


75 mm 0.00 pc
50 mm 0.00 pc
1.15 TEE STANDARD (P V C) - "ATLANTA" 1.00
75 mm 0.00 pc
50 mm 0.00 pc
1.16 TEE REDUCER (P V C) 1.00
75 mm X 50 mm 0.00 pc
1.18 SOLVENT - "ATLANTA"
400 cc - "ATLANTA" 0.00 can
2 Waterline - Potable Water Line PN20
2.01 PIPE ( P P R ) - "ATLANTA" 1.00
WINWINWIN PLUMBING COMPANY, INC. PAGE 5 OF 45
OWNER : Canyon de Boracay, Inc.
PROJECT : Proposed 5 - Storey Condotel & Commercial Center
LOCATION : Brgy. Balabag, Malay, Boracay Island, Aklan
CONTRACTOR : WinWinWin Plumbing Company Inc.

ACCOMPLISHMENT REPORT
TOTAL
DESCRIPTION UNIT
QTY

32 mm X 1m 0.00 Lm
25 mm X 1m 0.00 Lm
20 mm X 1m 0.00 Lm
2.02 TEE STANDARD ( P P R )
32 mm 0.00 pc
25 mm 0.00 pc
2.03 TEE REDUCER ( P P R )
32 mm X 25 mm 0.00 pc
25 mm X 20 mm 0.00 pc
2.04 ELBOW 90 ( P P R )
32 mm 0.00 pc
25 mm 0.00 pc
WINWINWIN PLUMBING COMPANY, INC. PAGE 6 OF 45
OWNER : Canyon de Boracay, Inc.
PROJECT : Proposed 5 - Storey Condotel & Commercial Center
LOCATION : Brgy. Balabag, Malay, Boracay Island, Aklan
CONTRACTOR : WinWinWin Plumbing Company Inc.

ACCOMPLISHMENT REPORT
TOTAL
DESCRIPTION UNIT
QTY

20 mm 0.00 pc
2.05 TEE ADAPTER ( P P R )
20 mm 0.00 pc
2.06 CAP ( P P R )
32 mm 0.00 pc
20 mm 0.00 pc
2.07 ELBOW ADAPTER ( P P R )
32 mm 0.00 pc
20 mm 0.00 pc
2.08 GATE VALVE
32 mm (GI) - EKOVAL BRAND 0.00 pc
25 mm (BRASS - US BRAND EKOVAL) 0.00 pc
WINWINWIN PLUMBING COMPANY, INC. PAGE 7 OF 45
OWNER : Canyon de Boracay, Inc.
PROJECT : Proposed 5 - Storey Condotel & Commercial Center
LOCATION : Brgy. Balabag, Malay, Boracay Island, Aklan
CONTRACTOR : WinWinWin Plumbing Company Inc.

ACCOMPLISHMENT REPORT
TOTAL
DESCRIPTION UNIT
QTY

20 mm (BRASS - US BRAND EKOVAL) 0.00 pc


2.09 COUPLING ( P P R )
32 mm 0.00 pc
25 mm 0.00 pc
20 mm 0.00 pc
2.10 COUPLING REDUCER ( P P R )
32 mm X 25 mm 0.00 pc
32 mm X 20 mm 0.00 pc
25 mm X 20 mm 0.00 pc
2.11 ADAPTER W/ BRASS MALE THREAD ( P P R )
32 mm 0.00 pc
25 mm 0.00 pc
WINWINWIN PLUMBING COMPANY, INC. PAGE 8 OF 45
OWNER : Canyon de Boracay, Inc.
PROJECT : Proposed 5 - Storey Condotel & Commercial Center
LOCATION : Brgy. Balabag, Malay, Boracay Island, Aklan
CONTRACTOR : WinWinWin Plumbing Company Inc.

ACCOMPLISHMENT REPORT
TOTAL
DESCRIPTION UNIT
QTY

20 mm 0.00 pc
2.12 ADAPTER W/ BRASS FEMALE THREAD ( P P R )
32 mm 0.00 pc
25 mm 0.00 pc
20 mm 0.00 pc
5 Drainage
5.01 PIPE ( P V C - SERIES 1000 ) - "ATLANTA" 1.00
75 mm X 1m 0.00 Lm
50 mm X 1m 0.00 Lm
5.02 WYE STANDARD ( P V C ) - "ATLANTA"
75 mm 0.00 pc
50 mm 0.00 pc
WINWINWIN PLUMBING COMPANY, INC. PAGE 9 OF 45
OWNER : Canyon de Boracay, Inc.
PROJECT : Proposed 5 - Storey Condotel & Commercial Center
LOCATION : Brgy. Balabag, Malay, Boracay Island, Aklan
CONTRACTOR : WinWinWin Plumbing Company Inc.

ACCOMPLISHMENT REPORT
TOTAL
DESCRIPTION UNIT
QTY

5.03 WYE REDUCER ( P V C ) - "ATLANTA"


75 mm X 50 mm 0.00 pc
5.04 ELBOW 90 ( P V C ) - "ATLANTA"
75 mm 0.00 pc
50 mm 0.00 pc
5.05 ELBOW 45 ( P V C ) - "ATLANTA"
75 mm 0.00 pc
50 mm 0.00 pc
5.09 SOLVENT - "ATLANTA"
400 cc - "ATLANTA" 0.00 can
5.11 DECK DRAIN
75 mm - JAMAN 0.00 pc
WINWINWIN PLUMBING COMPANY, INC. PAGE 10 OF 45
OWNER : Canyon de Boracay, Inc.
PROJECT : Proposed 5 - Storey Condotel & Commercial Center
LOCATION : Brgy. Balabag, Malay, Boracay Island, Aklan
CONTRACTOR : WinWinWin Plumbing Company Inc.

ACCOMPLISHMENT REPORT
TOTAL
DESCRIPTION UNIT
QTY

11 Plumbing Fixtures (OSM) 1.00


11.01 WATER CLOSET 0.00 set
11.02 WATER CLOSET FLV 0.00 set
11.04 LAVATORY FAUCET 0.00 set
11.05 FLOOR DRAIN 50 mm JAMAN 0.00 set
11.06 SHOWER 0.00 set
12 Pipe Sleeving 1.00 lot
13 Hangers & Support 1.00 lot
14 Miscellaneous & Consumables 1.00 lot
15 Testing & Commisioning 1.00 lot
16 Mobilization/Demobilization 1.00 lot
17 Site Management & Contingencies 1.00 lot
WINWINWIN PLUMBING COMPANY, INC. PAGE 11 OF 45
OWNER : Canyon de Boracay, Inc.
PROJECT : Proposed 5 - Storey Condotel & Commercial Center
LOCATION : Brgy. Balabag, Malay, Boracay Island, Aklan
CONTRACTOR : WinWinWin Plumbing Company Inc.

ACCOMPLISHMENT REPORT
TOTAL
DESCRIPTION UNIT
QTY

18 Gravity Test 1.00 lot

GRAND T

Prepared by:

Engr. Riche B. Agocoy


Project Manager- WPCI
Canyon de Boracay Premier

WINWINWIN PLUMBING COMPANY, INC. PAGE 12 OF 45


er

PORT
UNIT LABOR TOTAL TOTAL
COST COST AMOUNT Labor Cost

238.00 95.20 9,996.00 2,856.00


178.67 71.47 9,004.97 2,572.85
83.33 33.33 3,499.86 999.96

131.00 52.40 733.60 209.60


84.30 33.72 472.08 134.88
35.40 14.16 396.48 113.28

173.00 69.20 968.80 276.80


109.00 43.60 610.40 174.40
WINWINWIN PLUMBING COMPANY, INC. PAGE 13 OF 45
er

PORT
UNIT LABOR TOTAL TOTAL
COST COST AMOUNT Labor Cost

105.00 42.00 588.00 168.00

0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00
WINWINWIN PLUMBING COMPANY, INC. PAGE 14 OF 45
er

PORT
UNIT LABOR TOTAL TOTAL
COST COST AMOUNT Labor Cost

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00


WINWINWIN PLUMBING COMPANY, INC. PAGE 15 OF 45
er

PORT
UNIT LABOR TOTAL TOTAL
COST COST AMOUNT Labor Cost

0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00
WINWINWIN PLUMBING COMPANY, INC. PAGE 16 OF 45
er

PORT
UNIT LABOR TOTAL TOTAL
COST COST AMOUNT Labor Cost

0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

WINWINWIN PLUMBING COMPANY, INC. PAGE 17 OF 45


er

PORT
UNIT LABOR TOTAL TOTAL
COST COST AMOUNT Labor Cost

0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00
WINWINWIN PLUMBING COMPANY, INC. PAGE 18 OF 45
er

PORT
UNIT LABOR TOTAL TOTAL
COST COST AMOUNT Labor Cost

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00
WINWINWIN PLUMBING COMPANY, INC. PAGE 19 OF 45
er

PORT
UNIT LABOR TOTAL TOTAL
COST COST AMOUNT Labor Cost

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00
WINWINWIN PLUMBING COMPANY, INC. PAGE 20 OF 45
er

PORT
UNIT LABOR TOTAL TOTAL
COST COST AMOUNT Labor Cost

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00

0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00
WINWINWIN PLUMBING COMPANY, INC. PAGE 21 OF 45
er

PORT
UNIT LABOR TOTAL TOTAL
COST COST AMOUNT Labor Cost

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00


WINWINWIN PLUMBING COMPANY, INC. PAGE 22 OF 45
er

PORT
UNIT LABOR TOTAL TOTAL
COST COST AMOUNT Labor Cost

OSM 500.00 0.00 0.00


OSM 500.00 0.00 0.00
OSM 500.00 0.00 0.00
500.00 112.50 0.00 0.00
OSM 250.00 0.00 0.00
10,000.00 10,000.00 10,000.00
3,500.00 5,000.00 5,000.00
3,000.00 3,000.00 3,000.00
5,000.00 5,000.00 5,000.00
3,000.00 3,000.00 3,000.00
10,000.00 10,000.00 10,000.00
WINWINWIN PLUMBING COMPANY, INC. PAGE 23 OF 45
er

PORT
UNIT LABOR TOTAL TOTAL
COST COST AMOUNT Labor Cost

5,000.00 5,000.00 5,000.00

GRAND TOTAL 67,270.19 48,505.77

WINWINWIN PLUMBING COMPANY, INC. PAGE 24 OF 45


er

PORT
UNIT LABOR TOTAL TOTAL
COST COST AMOUNT Labor Cost

WINWINWIN PLUMBING COMPANY, INC. PAGE 25 OF 45


Project : Proposed Chun Hua - Mandaue (Cancer Center)
Subject : Cost Estimate - Sanitary/Plumbing System
Location : Mantawi International Drive, Subangdaku Mandaue City

UNIT COST
DESCRIPTION UNIT QTY
MAT'L LABOR

I. SANITARY/PLUMBING 1.00
SEWER AND WASTE PIPES AND FITTINGS (PVC) 1.00
1.10 PVC Pipes 1.00
315 mm lm Err:509 Err:509 Err:509
250 mm lm Err:509 Err:509 Err:509
200 mm lm Err:509 Err:509 Err:509
150 mm lm Err:509 Err:509 Err:509
100 mm lm 30.00 238.00 95.20
75 mm lm 36.00 178.67 71.47
50 mm lm 30.00 83.33 33.33
1.20 PVC Wye Standard 1.00
315 mm pcs Err:509 Err:509 Err:509
250 mm pcs Err:509 Err:509 Err:509
200 mm pcs Err:509 Err:509 Err:509
150 mm pcs Err:509 Err:509 Err:509
100 mm pcs 4.00 131.00 52.40
50 mm pcs 8.00 35.40 14.16
1.30 PVC Wye Reducer 1.00
Err:509 pcs Err:509 Err:509 Err:509
Err:509 pcs Err:509 Err:509 Err:509
Err:509 pcs Err:509 Err:509 Err:509
Err:509 pcs Err:509 Err:509 Err:509
Err:509 pcs Err:509 Err:509 Err:509
Err:509 pcs Err:509 Err:509 Err:509
Err:509 pcs Err:509 Err:509 Err:509
Err:509 pcs Err:509 Err:509 Err:509
100 mm X 75 mm pcs 4.00 173.00 69.20
100 mm X 50 mm pcs 4.00 109.00 43.60
75 mm X 50 mm pcs 4.00 105.00 42.00
1.40 PVC Elbow 90 1.00
Err:509 pcs Err:509 Err:509 Err:509
Err:509 pcs Err:509 Err:509 Err:509
Err:509 pcs Err:509 Err:509 Err:509
Err:509 pcs Err:509 Err:509 Err:509
100 mm pcs 8.00 - -
75 mm pcs 8.00 - -
50 mm pcs 16.00 - -
1.50 PVC Elbow 45 1.00
Err:509 pcs Err:509 Err:509 Err:509
Err:509 pcs Err:509 Err:509 Err:509
Err:509 pcs Err:509 Err:509 Err:509
Err:509 pcs Err:509 Err:509 Err:509
100 mm pcs 4.00 - -
75 mm pcs 8.00 - -

Page 26 of 45
Project : Proposed Chun Hua - Mandaue (Cancer Center)
Subject : Cost Estimate - Sanitary/Plumbing System
Location : Mantawi International Drive, Subangdaku Mandaue City

UNIT COST
DESCRIPTION UNIT QTY
MAT'L LABOR
50 mm pcs 12.00 - -
1.60 PVC Tee Standard 1.00
50 mm pcs - - -
1.70 PVC Tee Reducer 1.00
100 mm X 50 mm pcs 12.00 - -
1.80 PVC Coupling 1.00
1.90 PVC Coupling Reducer 1.00
Err:509 pcs Err:509 Err:509 Err:509
Err:509 pcs Err:509 Err:509 Err:509
1.10 PVC Clean Out 1.00
Err:509 pcs Err:509 Err:509 Err:509
Err:509 pcs Err:509 Err:509 Err:509
Err:509 pcs Err:509 Err:509 Err:509
Err:509 pcs Err:509 Err:509 Err:509
100 mm pcs 4.00 - -
75 mm pcs 4.00 - -
Err:509 pcs Err:509 Err:509 Err:509
1.11 PVC Tap Tee 1.00
Err:509 pcs Err:509 Err:509 Err:509
Err:509 pcs Err:509 Err:509 Err:509
1.12 PVC P-Trap 1.00
50 mm pcs 24.00 - -
1.13 PVC Solvent Cement 1.00
400 cc - "ATLANTA" cans 9.00 - -
TOTAL FOR SEWER AND WASTE PIPES AND FITTINGS 1.00
2.0 STORM DRAINAGE PIPES AND FITTINGS 1.00
2.1 PVC Perforated Pipe 1.00
Err:509 lm Err:509 Err:509 Err:509
Err:509 lm Err:509 Err:509 Err:509
2.2 PVC Perforated Wye Standard 1.00
Err:509 pc Err:509 Err:509 Err:509
2.3 PVC Perforated Wye Reducer 1.00
Err:509 pc Err:509 Err:509 Err:509
2.4 PVC Perforated Elbow 90 1.00
Err:509 pcs Err:509 Err:509 Err:509
2.5 PVC Perforated Elbow 45 1.00
Err:509 pcs Err:509 Err:509 Err:509
Err:509 pcs Err:509 Err:509 Err:509
2.6 PVC Clean Out 1.00
Err:509 pcs Err:509 Err:509 Err:509
Err:509 pcs Err:509 Err:509 Err:509
2.8 PVC Pipes 1.00
Err:509 lm Err:509 Err:509 Err:509
Err:509 lm Err:509 Err:509 Err:509

Page 27 of 45
Project : Proposed Chun Hua - Mandaue (Cancer Center)
Subject : Cost Estimate - Sanitary/Plumbing System
Location : Mantawi International Drive, Subangdaku Mandaue City

UNIT COST
DESCRIPTION UNIT QTY
MAT'L LABOR
Err:509 lm Err:509 Err:509 Err:509
Err:509 lm Err:509 Err:509 Err:509
Err:509 lm Err:509 Err:509 Err:509
75 mm X 1m lm - - -
50 mm X 1m lm - - -
2.9 PVC Wye Standard 1.00
Err:509 pcs Err:509 Err:509 Err:509
Err:509 pcs Err:509 Err:509 Err:509
Err:509 pcs Err:509 Err:509 Err:509
Err:509 pcs Err:509 Err:509 Err:509
Err:509 pcs Err:509 Err:509 Err:509
75 mm pcs - - -
2.10 PVC Wye Reducer 1.00
Err:509 pcs Err:509 Err:509 Err:509
Err:509 pcs Err:509 Err:509 Err:509
Err:509 pcs Err:509 Err:509 Err:509
Err:509 pcs Err:509 Err:509 Err:509
Err:509 pcs Err:509 Err:509 Err:509
Err:509 pcs Err:509 Err:509 Err:509
Err:509 pcs Err:509 Err:509 Err:509
2.11 PVC Elbow 90 1.00
Err:509 pcs Err:509 Err:509 Err:509
Err:509 pcs Err:509 Err:509 Err:509
Err:509 pcs Err:509 Err:509 Err:509
Err:509 pcs Err:509 Err:509 Err:509
Err:509 pcs Err:509 Err:509 Err:509
75 mm pcs - - -
2.12 PVC Elbow 45 1.00
Err:509 pcs Err:509 Err:509 Err:509
Err:509 pcs Err:509 Err:509 Err:509
Err:509 pcs Err:509 Err:509 Err:509
Err:509 pcs Err:509 Err:509 Err:509
Err:509 pcs Err:509 Err:509 Err:509
75 mm pcs - - -
2.13 PVC Tee Standard 1.00
Err:509 pcs Err:509 Err:509 Err:509
2.14 PVC Clean Out 1.00
Err:509 pcs Err:509 Err:509 Err:509
Err:509 pcs Err:509 Err:509 Err:509
Err:509 pcs Err:509 Err:509 Err:509
Err:509 pcs Err:509 Err:509 Err:509
Err:509 pcs Err:509 Err:509 Err:509
Err:509 pcs Err:509 Err:509 Err:509
2.15 PVC Solvent Cement 1.00

Page 28 of 45
Project : Proposed Chun Hua - Mandaue (Cancer Center)
Subject : Cost Estimate - Sanitary/Plumbing System
Location : Mantawi International Drive, Subangdaku Mandaue City

UNIT COST
DESCRIPTION UNIT QTY
MAT'L LABOR
400 cc - "ATLANTA" cans Err:509 - -
2.16 RC Pipe 1.00
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
2.17 CI Pipe 1.00
Err:509 Err:509 Err:509 Err:509 Err:509
2.18 CI Wye 1.00
Err:509 Err:509 Err:509 Err:509 Err:509
2.19 CI Elbow 90 1.00
Err:509 pc Err:509 Err:509 Err:509
2.20 CI Elbow 45 1.00
Err:509 pc Err:509 Err:509 Err:509
2.21 CI Clean Out 1.00
Err:509 pc Err:509 Err:509 Err:509
TOTAL FOR STORM DRAINAGE PIPES AND FITTINGS
3.0 VENT PIPES AND FITTINGS 1.00
3.1 PVC Pipes 1.00
Err:509 ### Err:509 Err:509 Err:509
75 mm X 1m ### 72.00 - -
50 mm X 1m ### 72.00 - -
3.2 PVC Elbow 90 1.00
Err:509 ### Err:509 Err:509 Err:509
50 mm ### - - -
3.3 PVC Tee Standard 1.00
Err:509 ### Err:509 Err:509 Err:509
75 mm ### - - -
50 mm ### - - -
3.4 PVC Tee Reducer 1.00
Err:509 ### Err:509 Err:509 Err:509
Err:509 ### Err:509 Err:509 Err:509
75 mm X 50 mm ### - - -
3.5 PVC Solvent Cement 1.00
400 cc - "ATLANTA" cans - - -
TOTAL FOR VENT PIPES AND FITTINGS 1.00
7.0 POTABLE WATER PIPES AND FITTINGS 1.00
7.1 PPR Pipes, PN20 1.00
Err:509 Err:509 Err:509 Err:509 Err:509

Page 29 of 45
Project : Proposed Chun Hua - Mandaue (Cancer Center)
Subject : Cost Estimate - Sanitary/Plumbing System
Location : Mantawi International Drive, Subangdaku Mandaue City

UNIT COST
DESCRIPTION UNIT QTY
MAT'L LABOR
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
32 mm X 1m Lm - - -
25 mm X 1m Lm - - -
20 mm X 1m Lm - - -
Err:509 Err:509 Err:509 Err:509 Err:509
7.2 PPR Tee Standard 1.00
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
32 mm pc - - -
Err:509 Err:509 Err:509 Err:509 Err:509
7.3 PPR Tee Reducer 1.00
Err:509 ### Err:509 Err:509 Err:509
Err:509 ### Err:509 Err:509 Err:509
Err:509 ### Err:509 Err:509 Err:509
Err:509 ### Err:509 Err:509 Err:509
Err:509 ### Err:509 Err:509 Err:509
Err:509 ### Err:509 Err:509 Err:509
Err:509 ### Err:509 Err:509 Err:509
Err:509 ### Err:509 Err:509 Err:509
Err:509 ### Err:509 Err:509 Err:509
Err:509 ### Err:509 Err:509 Err:509
Err:509 ### Err:509 Err:509 Err:509
Err:509 ### Err:509 Err:509 Err:509
Err:509 ### Err:509 Err:509 Err:509
32 mm X 25 mm ### - - -
25 mm X 20 mm ### - - -
Err:509 ### Err:509 Err:509 Err:509
Err:509 ### Err:509 Err:509 Err:509
7.4 PPR Elbow 90 1.00
Err:509 ### Err:509 Err:509 Err:509
Err:509 ### Err:509 Err:509 Err:509
Err:509 ### Err:509 Err:509 Err:509
32 mm ### - - -
25 mm ### - - -
20 mm ### - - -
Err:509 ### Err:509 Err:509 Err:509
Err:509 ### Err:509 Err:509 Err:509
7.5 PPR Tee Adapter 1.00
Err:509 ### Err:509 Err:509 Err:509
20 mm ### - - -
Err:509 ### Err:509 Err:509 Err:509

Page 30 of 45
Project : Proposed Chun Hua - Mandaue (Cancer Center)
Subject : Cost Estimate - Sanitary/Plumbing System
Location : Mantawi International Drive, Subangdaku Mandaue City

UNIT COST
DESCRIPTION UNIT QTY
MAT'L LABOR
7.6 PPR End Cap 1.00
Err:509 ### Err:509 Err:509 Err:509
20 mm ### - - -
Err:509 ### Err:509 Err:509 Err:509
7.7 PPR Elbow Adapter 1.00
Err:509 ### Err:509 Err:509 Err:509
7.10 PPR Coupling 1.00
Err:509 ### Err:509 Err:509 Err:509
Err:509 ### Err:509 Err:509 Err:509
Err:509 ### Err:509 Err:509 Err:509
Err:509 ### Err:509 Err:509 Err:509
32 mm ### - - -
25 mm ### - - -
20 mm ### - - -
Err:509 ### Err:509 Err:509 Err:509
7.11 PPR Coupling Reducer 1.00
Err:509 ### Err:509 Err:509 Err:509
Err:509 ### Err:509 Err:509 Err:509
Err:509 ### Err:509 Err:509 Err:509
Err:509 ### Err:509 Err:509 Err:509
Err:509 ### Err:509 Err:509 Err:509
32 mm X 25 mm ### - - -
25 mm X 20 mm ### - - -
7.12 PPR Adapter w/ Brass Male Thread 1.00
Err:509 ### Err:509 Err:509 Err:509
Err:509 ### Err:509 Err:509 Err:509
Err:509 ### Err:509 Err:509 Err:509
Err:509 ### Err:509 Err:509 Err:509
32 mm ### - - -
25 mm ### - - -
Err:509 ### Err:509 Err:509 Err:509
1.00
TOTAL FOR POTABLE WATER PIPES AND FITTINGS 1.00
1.00
9.0 DRAINS AND ACCESSORIES 1.00
9.1 Floor Drain 1.00
100 mm pcs Err:509 Err:509 Err:509
9.2 Trench Drain 1.00
100 mm pcs Err:509 Err:509 Err:509
9.3 Parking Drain 1.00
Err:509 pcs Err:509 Err:509 Err:509
9.4 Roof Drain 1.00
Err:509 pcs Err:509 Err:509 Err:509
9.5 Deck Drain 1.00

Page 31 of 45
Project : Proposed Chun Hua - Mandaue (Cancer Center)
Subject : Cost Estimate - Sanitary/Plumbing System
Location : Mantawi International Drive, Subangdaku Mandaue City

UNIT COST
DESCRIPTION UNIT QTY
MAT'L LABOR
Err:509 pcs Err:509 Err:509 Err:509
Err:509 pcs Err:509 Err:509 Err:509
9.6 Trench Grill 1.00
Cover lm Err:509 Err:509 Err:509
9.8 Balcony Drain 1.00
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
9.9 Catch Basin 1.00
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
9.10 Poly Cloth 1.00
Poly Cloth lm Err:509 Err:509 Err:509
9.11 BI Flange 1.00
Err:509 pc Err:509 Err:509 Err:509
Err:509 pc Err:509 Err:509 Err:509
9.12 Check Valve 1.00
Err:509 pc Err:509 Err:509 Err:509
Err:509 pc Err:509 Err:509 Err:509
9.13 Gate Valve 1.00
Err:509 pc Err:509 Err:509 Err:509
Err:509 pc Err:509 Err:509 Err:509
9.14 Valve Box 1.00
set Err:509 Err:509 Err:509
TOTAL FOR DRAINS AND ACCESSORIES 1.00
10.0 VALVES AND ACCESSORIES 1.00
10.1 PPR Gate Valve 1.00
Err:509 ### Err:509 Err:509 Err:509
Err:509 ### Err:509 Err:509 Err:509
Err:509 ### Err:509 Err:509 Err:509
32 mm (GI) - EKOVAL BRAND ### - - -
25 mm (BRASS - US BRAND EKOVAL) ### - - -
Err:509 ### Err:509 Err:509 Err:509
10.2 GI Gate Valve 1.00
100 mm ### Err:509 Err:509 Err:509
75 mm ### Err:509 Err:509 Err:509
10.3 Check Valve 1.00
Err:509 ### Err:509 Err:509 Err:509

Page 32 of 45
Project : Proposed Chun Hua - Mandaue (Cancer Center)
Subject : Cost Estimate - Sanitary/Plumbing System
Location : Mantawi International Drive, Subangdaku Mandaue City

UNIT COST
DESCRIPTION UNIT QTY
MAT'L LABOR
10.4 Flexible Connector 1.00
Err:509 ### Err:509 Err:509 Err:509
10.5 Foot Valve 1.00
Err:509 ### Err:509 Err:509 Err:509
10.6 Float Valve 1.00
Err:509 ### Err:509 Err:509 Err:509
10.7 Sub Water Meter 1.00
Err:509 ### Err:509 Err:509 Err:509
TOTAL FOR VALVES AND ACCESSORIES 1.00
1.00
11.0 INSTALLATION OF PLUMBING FIXTURES 1.00
WATER CLOSET set - OSM 500.00
WATER CLOSET FLV set - OSM 500.00
Err:509 Err:509 Err:509 Err:509 Err:509
LAVATORY FAUCET set - OSM 500.00
FLOOR DRAIN 50 mm JAMAN set - 500.00 112.50
SHOWER set - OSM 250.00
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
TOTAL FOR PLUMBING FIXTURES AND ACCESSORIES 1.00
12.0 SUPPLY AND INSTALLATION OF PUMPS
Err:509 sets Err:509 Err:509 Err:509
1.00
Err:509 sets Err:509 Err:509 Err:509
1.00
Err:509 sets Err:509 Err:509 Err:509
1.00
Err:509 sets Err:509 Err:509 Err:509
1.00
Err:509 sets Err:509 Err:509 Err:509
1.00
Err:509 sets Err:509 Err:509 Err:509
1.00
Err:509 sets Err:509 Err:509 Err:509
1.00
TOTAL FOR PUMPS
-
13.0 SUPPLY AND INSTALLATION OF TANKS 1.00
13.10 Hydroneumatic Pressure Tank and Accessories sets Err:509 Err:509 Err:509
1.00

Page 33 of 45
Project : Proposed Chun Hua - Mandaue (Cancer Center)
Subject : Cost Estimate - Sanitary/Plumbing System
Location : Mantawi International Drive, Subangdaku Mandaue City

UNIT COST
DESCRIPTION UNIT QTY
MAT'L LABOR
13.20 Stainless Steel Elevated Water Tank sets Err:509 Err:509 Err:509
1.00
TOTAL FOR TANKS 1.00

14.0 ELECTRICAL lot 1.00 - Err:509

TOTAL FOR ELECTRICAL 1.00

15.0 FIRE SEALANTS lot 1.00

TOTAL FOR FIRE SEALANTS 1.00

16.0 HANGERS AND SUPPORTS lot 1.00 3,500.00 -

TOTAL FOR HANGERS AND SUPPORTS 1.00

17.0 MISCELLANEOUS AND CONSUMABLES lot 1.00 3,000.00 -

TOTAL FOR MISCELLANEOUS AND CONSUMABLES 1.00

18.0 TESTING AND COMMISSIONING lot 1.00 5,000.00 -

TOTAL FOR TESTING AND COMMISSIONING 1.00

II. PRELIMINARIES 1.00


1.1 Mobilization/Demobilization lot 1.00 3,000.00 -
1.2 Permits & Licences lot 1.00 - -
1.2.1 Plumbing Permit 1.00
Sanitary Permit 1.00

1.3 Bonds and Insurances 1.00


1.3.1 Surety Bond (for Downpayment) lot 1.00 #REF! -
1.3.2 Performance bond lot 1.00 #REF! -
1.3.3 CARI lot 1.00 #REF! -
1.3.4 Guarantee Bond lot 1.00 #REF! -
1.3.5 Contractor's Employees Accident Insurance and CGL lot 1.00 #REF! -
1.4 Temporary Facilities 1.00
1.4.1 Temporary Facilities (Site Office, Warehouse, Staging A lot 1.00 Err:509 -
a Site Office 1.00
b Warehouse 1.00
c Staging Area 1.00
1.5 Submittals, Shopdrawings and As Built Plans lot 1.00 Err:509 -
1.6 Safety and Housekeeping lot 1.00 Err:509 Err:509
1.7 Pipe Sleeving lot 1.00 10,000.00 -

Page 34 of 45
Project : Proposed Chun Hua - Mandaue (Cancer Center)
Subject : Cost Estimate - Sanitary/Plumbing System
Location : Mantawi International Drive, Subangdaku Mandaue City

UNIT COST
DESCRIPTION UNIT QTY
MAT'L LABOR
1.8 Site Management & Contengencies lot 1.00 10,000.00 -
TOTAL FOR PRELIMINARIES
GRAND TOTAL

Page 35 of 45
TOTAL AMOUNT
TOTAL

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
333.20 9,996.00
250.14 9,004.97
116.66 3,499.86

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
183.40 733.60
49.56 396.48

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
242.20 968.80
152.60 610.40
147.00 588.00
- -
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
- -
- -
- -

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
- -
- -

Page 36 of 45
TOTAL AMOUNT
TOTAL
- -

- -

- -

Err:509 Err:509
Err:509 Err:509

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
- -
- -
Err:509 Err:509

Err:509 Err:509
Err:509 Err:509

- -

- -
Err:509

Err:509 Err:509
Err:509 Err:509

Err:509 Err:509

Err:509 Err:509

Err:509 Err:509

Err:509 Err:509
Err:509 Err:509

Err:509 Err:509
Err:509 Err:509

Err:509 Err:509
Err:509 Err:509

Page 37 of 45
TOTAL AMOUNT
TOTAL
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
- -
- -

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
- -

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
- -

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
- -

Err:509 Err:509

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509

Page 38 of 45
TOTAL AMOUNT
TOTAL
- Err:509

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509

Err:509 Err:509

Err:509 Err:509

Err:509 Err:509

Err:509 Err:509

Err:509 Err:509
Err:509

Err:509 Err:509
- -
- -

Err:509 Err:509
- -

Err:509 Err:509
- -
- -

Err:509 Err:509
Err:509 Err:509
- -

- -
Err:509

Err:509 Err:509

Page 39 of 45
TOTAL AMOUNT
TOTAL
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
- -
- -
- -
Err:509 Err:509

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
- -
Err:509 Err:509

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
- -
- -
Err:509 Err:509
Err:509 Err:509

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
- -
- -
- -
Err:509 Err:509
Err:509 Err:509

Err:509 Err:509
- -
Err:509 Err:509

Page 40 of 45
TOTAL AMOUNT
TOTAL

Err:509 Err:509
- -
Err:509 Err:509

Err:509 Err:509

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
- -
- -
- -
Err:509 Err:509

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
- -
- -

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
- -
- -
Err:509 Err:509

Err:509

Err:509 Err:509

Err:509 Err:509

Err:509 Err:509

Err:509 Err:509

Page 41 of 45
TOTAL AMOUNT
TOTAL
Err:509 Err:509
Err:509 Err:509

Err:509 Err:509

Err:509 Err:509
Err:509 Err:509

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509

Err:509 Err:509

Err:509 Err:509
Err:509 Err:509

Err:509 Err:509
Err:509 Err:509

Err:509 Err:509
Err:509 Err:509

Err:509 Err:509
Err:509

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
- -
- -
Err:509 Err:509

Err:509 Err:509
Err:509 Err:509

Err:509 Err:509

Page 42 of 45
TOTAL AMOUNT
TOTAL

Err:509 Err:509

Err:509 Err:509

Err:509 Err:509

Err:509 Err:509
Err:509

#VALUE! #VALUE!
#VALUE! #VALUE!
Err:509 Err:509
#VALUE! #VALUE!
612.50 -
#VALUE! #VALUE!
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
#VALUE!

Err:509 Err:509

Err:509 Err:509

Err:509 Err:509

Err:509 Err:509

Err:509 Err:509

Err:509 Err:509

Err:509 Err:509

Err:509

Err:509 Err:509

Page 43 of 45
TOTAL AMOUNT
TOTAL
Err:509 Err:509

Err:509

Err:509 Err:509

Err:509

3,500.00 3,500.00

3,500.00

3,000.00 3,000.00

3,000.00

5,000.00 5,000.00

5,000.00

3,000.00 3,000.00
- -

#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!

Err:509 Err:509

Err:509 Err:509
Err:509 Err:509
10,000.00 10,000.00

Page 44 of 45
TOTAL AMOUNT
TOTAL
10,000.00 10,000.00
Err:509
Err:509

Page 45 of 45