0% found this document useful (0 votes)
26 views

Regode Bridge Revised Programme

1. The document outlines a revised programme of work for improvements to minor bridges on two roads in Medak District. 2. The original milestone schedule and quantities of earthwork, VCC/VRCC construction, and other tasks are shown for two periods. 3. A revised schedule and milestones are then presented, adjusting the timelines and quantities for certain tasks to be completed in the improvement project. 4. The total contract value (TCV) remains the same at Rs. 1,53,36,752 for the revised programme of work.

Uploaded by

Nithin Khandesh
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
26 views

Regode Bridge Revised Programme

1. The document outlines a revised programme of work for improvements to minor bridges on two roads in Medak District. 2. The original milestone schedule and quantities of earthwork, VCC/VRCC construction, and other tasks are shown for two periods. 3. A revised schedule and milestones are then presented, adjusting the timelines and quantities for certain tasks to be completed in the improvement project. 4. The total contract value (TCV) remains the same at Rs. 1,53,36,752 for the revised programme of work.

Uploaded by

Nithin Khandesh
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

REVISED PROGRAMME OF WORK

Improvemets to Minor Bridges on Shankarampet to narayankhed (via) Regode in Km 8/8 to 9/2, Km 12/2 to 12/8 in medak District

As per agreement As per revised milestone


Earthwork Earthwork
VCC/VRCC VCC/VRCC
Mile Earthwork VCC/VRCC for Earthwork VCC/VRCC for
for for
S.No. Stone/peri for for formation for for formation
foundatio GSb in WMM in DBM & BC foundatio WMM in DBM & BC
od Foundatio Superstru of Financial Foundatio Superstru of GSb in Cums Financial
ns & sub- Cums Cums in Cum ns & sub- Cums in Cum
ns in ctures in embankm ns in ctures in embankm
structures structures
Cums Cums ent in Cums Cums ent in
in Cums in Cums
Cums Cums

1st
Milestone
1 3 months 2680 cum 377 cums - 16026 cum- - - Rs.80,00,000
(0 to 90
days)
0 0 0 0 0 0 0 0
2nd Mile
stone 6
months
2 - - 592 cum - 570 cums 913 cums 107 cums Rs.73,36,752
(91 days
to 180
days )

3 Revised 2680 cums 377 cums - 16026 cum - - - Rs.80,00,000


1stM/s 0
to 90 days
Revised
4 2stM/s 90 - 532 cums - 570 cums 913 cums 107 cums Rs.73,36,752
to 185
days
5 2680 377 592 16026 570 913 107 Rs.1,53,36,752 2680 377 592 16026 570 913 107 Rs.1,53,36,752
6
7 Total TCV= Rs.1,53,36,752 Total TCV = Rs.1,53,36,752

Contractor Assistant Executive Engineer (R&B) Dy. Executive Engineer (R&B), Executive Engineer (R&B),
Section shankarampet A Subdivision Medak Division Medak