The document describes the inbound process with LOSC, involving two warehouse tasks - the first to move goods from the inbound area IB02 to an interim storage bin, and the second to then move them from the interim bin to their final destination location LOSC. Upon unloading and goods receipt, the system creates these two sequential tasks to transport the materials through the warehouse from the inbound area to the target storage location.

Uploaded by

mj
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
135 views

02.inbound Process With LOSC

The document describes the inbound process with LOSC, involving two warehouse tasks - the first to move goods from the inbound area IB02 to an interim storage bin, and the second to then move them from the interim bin to their final destination location LOSC. Upon unloading and goods receipt, the system creates these two sequential tasks to transport the materials through the warehouse from the inbound area to the target storage location.

Uploaded by

mj
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 7

Inbound process with LOSC:

1. Complete Goods receipt and Unloading for inbound delivery.

Warehouse task 101- For Unloading

Now HUwill available in IB02 and Work Centre DEKO


/SCWM/DCONS - Deconsolidation in Goods Receipt

Complete HU step in Work center

And execute (F8).

Please find below next warehosue task , Before IB03 WT created to LOSC from IB02.

Now one more warehouse Task was created. IB02 to Inter-Bin and another WT will create from
Inter-bin to LOSC.

See the Warehosue task creation Log.


Now HU available in IB02 and Detestation storage location will be LOSC.

System created Two warehouse Tasks (IB02 Inter bin - LOSC)