80% found this document useful (5 votes)
3K views

Inspection Checklist: Fill, Backfill and Compaction Inspection QCL-A-004 Civil-Umm Wu'Al Phosphate Project SEG

This inspection checklist is used to inspect fill, backfill, and compaction work at the UMM WU'AL Phosphate Project. It contains acceptance criteria for items like lift thickness, compaction levels, slope requirements, and material properties. The inspector found the work to meet the criteria specified, including placing fill in lifts no more than 200mm thick, compacting to at least 90% density below structures, and maintaining proper surface drainage.

Uploaded by

Alby
Copyright
© © All Rights Reserved
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
80% found this document useful (5 votes)
3K views

Inspection Checklist: Fill, Backfill and Compaction Inspection QCL-A-004 Civil-Umm Wu'Al Phosphate Project SEG

This inspection checklist is used to inspect fill, backfill, and compaction work at the UMM WU'AL Phosphate Project. It contains acceptance criteria for items like lift thickness, compaction levels, slope requirements, and material properties. The inspector found the work to meet the criteria specified, including placing fill in lifts no more than 200mm thick, compacting to at least 90% density below structures, and maintaining proper surface drainage.

Uploaded by

Alby
Copyright
© © All Rights Reserved
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 2

CHECKLIST NUMBER DATE RFI NUMBER

INSPECTION CHECKLIST
Fill, Backfill and Compaction Inspection QCL-A-004 CIVIL-
PROJECT TITLE CONTRACTOR / SUBCONTRACTOR

UMM WU'AL PHOSPHATE PROJECT SEG


ITP NUMBER ACTIVITY NUMBER WORK PERMIT REQUIRED?
CV-ITP-0001 N/A
JACOBS INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL YES
W H

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

A Fill and backfill Inspection

MD-101-SMEM-
A1 Fill material shall be placed in lifts not exceeding 200mm in loose depth. EG-CV-SPC-
0001

MD-101-SMEM-
Fill material shall be placed in lifts not exceeding 100mm in loose depth
A2 EG-CV-SPC-
for hand-operated compaction.
0001

MD-101-SMEM-
Granular fill material shall be compacted in 300mm in loose depth using
A3 EG-CV-SPC-
vibratory compactor
0001

MD-101-SMEM-
Fill material shall be placed in lifts not exceeding 230mm in loose depth
A4 EG-CV-SPC-
for hand-operated compaction.
0001

Fill and backfill adjacent to any type of structure shall not be compacted MD-101-SMEM-
A5 with heavy equipment; Hand operated equipment shall be used within EG-CV-SPC-
1.2 meters of any structures. 0001

MD-101-SMEM-
Area to be filled or backfilled shall be free from vegetarian, debris, loam.
A6 EG-CV-SPC-
snow, ice,standing water or frozen ground.
0001

Place backfill simultaneousely on both sides of installed work to equalize MD-101-SMEM-


A7 loading.difference in fill height shall not exceed 300mm for structural EG-CV-SPC-
components or 150mm for pipes. 0001

MD-101-SMEM-
Excavation, fill, backfill and finished grading shall be to the lines,grades
A8 EG-CV-SPC-
shown on the drawing.
0001

MD-101-SMEM-
Grading shall be done in such way that surface drainage is maintained
A9 EG-CV-SPC-
in all areas.
0001

B Compaction Inspection

Compaction shall begin only after the fill or backfill has been properly MD-101-SMEM-
B1 placed and the material to be compacted is at the proper moisture EG-CV-SPC-
content within +/-2% of the optimum moisture content. 0001

Fill or backfill placed below area paving, levees,site area fill shall be
compacted to 90% of the maximum Modified Proctor density as MD-101-SMEM-
B2 determined by ASTM D1557.for cohesionless free draining EG-CV-SPC-
soil,compaction shall be 70% of the relative density as determined by 0001
ASTM D 4253 and ASTM D 4254.

Fill under foundation shall be 95% of the modified proctor density as


MD-101-SMEM-
determined by ASTM D 1557.for cohesionless soil,fill shall be compacted
B3 EG-CV-SPC-
to 80% relative density as determined by ASTM D 4253 and ASTM D
0001
4254.

Page 1 of 2
MD-101-SMEM-
In no case compaction is allowed on slope steeper than 1(V) to 5(H)
B4 EG-CV-SPC-
(20%).
0001

Compaction by water jetting or flooding not permitted for most fill MD-101-SMEM-
B5 material.however,flooding may be used if the fill material is cohesionless EG-CV-SPC-
freely draining sand. 0001

Construction of new slopes shall be accomplished by compacting MD-101-SMEM-


B6 horizontal fill layers at least 1 roller width beyond the design edge of the EG-CV-SPC-
slope and then trimming back to achieve the final slope dimensions 0001

REMARKS:

REFERENCE DOCUMENTS:

Contractor Jacobs
Construction Department
Work is Complete and Ready for Inspection:
Name, Initials and Date:

QC Inspector Jacobs Representative


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor
Quality Record Approved:
Name, Sign and Date:

*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED

Page 2 of 2