Amorato Stadium, Don Alejandro Roces Avenue, Quezon City (100m)
Amorato Stadium, Don Alejandro Roces Avenue, Quezon City (100m)
Initial Date Amorato Stadium, Don Alejandro Roces Avenue, Quezon City Proj.no 11
Raised by 3 Scale
(100m )
Designed MJRI 7/20/2017 Description: Rev. No 0
Checked VVCJr 7/20/2017 MANILA WATER EMERGENCY RESERVOIR PROJECT Dwg/Calc No.
Approved
Calculation Procedure
SOIL SPRING
Parameters
s = 18.00 kN/m3 unit weight of fill
H = 3.50 m depth to pipe centerline
D = 3.00 m pipe outside diameter
= 32 internal angle of friction of soil
FS = 3.0 factore of safety
Lateral Soil Spring
The maximum lateral soil force per unit length of pipe that can be transmitted to the pipe is
= 7.1236
Nqh = horizontal bearing capacity factor ( for = 0 )
=
= 2.4217
Factor x a b c d e
Nch 0 1.1667 6.752 0.065 -11.0630 7.119000 0
Nqh 20 1.1667 2.399 0.439 -0.0300 0.001059 -1.75E-05
Nqh 30 1.1667 4.565 1.234 -0.0890 0.004275 -9.16E-05
Nqh 32 1.1667 5.4654 1.548 -0.1118 0.002871 -0.000122
Nqh 35 1.1667 6.816 2.019 -0.1460 0.000765 -0.000168
where:
Nch = vertical uplift factor for clay (0 for c = 0)
Nch = vertical uplift factor for sand ( for = 0 )
Qallow = Pu/FS + ySH
1,415.3 kPa
k = 40 FS Pallow
= 169,834 kPa