CP7301-Software Process and Project Management PDF
CP7301-Software Process and Project Management PDF
DEPARTMENT OF
COMPUTER SCIENCE AND ENGINEERING
QUESTION BANK
Prepared by
PART-A (2 MARK)
1 Differentiate TSP and PSP Analyse BTL4
5 Give the information about the agile development process Understand BTL2
7 How would you classify different levels in PSP structure? Analyse BTL4
8 Summarize the ways for choosing the right product Evaluate BTL5
17 Can you Classify five frame work activities of PSP? Apply BTL3
1. Prepare a report summarizing your experiences with the Personal Create BTL6
Software Process, the general idea of structuring software
development activities, and insights and statistics from the
assignments you did in the term.
2. Develop a program to calculate the mean and standard Create BTL6
deviation of a sample of n real numbers based on PSP.
4. Write a case study to build safety critical system using Team Evaluate BTL5
Software Process and explain in detail.
Tutorial: Conduct QAW, elicit, analyze, prioritize, and document requirements using ACDM
PART-A (2 MARK)
1 List some of the reasons why is requirements elicitation
Remember BTL1
difficult.
2 Discuss non-function requirements. Provide example. Understand BTL2
3 Pointout the functional requirements. Analyse BTL4
4 Explain absolute software requirement. Give example. Evaluate BTL5
5 Create the Hierarchy structure for Traceability.
Create BTL6
6 Explain Brainstorming. Evaluate BTL5
7 Show the goals for ACDM. Apply BTL3
8 Show what ACDM is. Apply BTL3
9 Give a simple explanation about Joint Application Design Understand BTL2
(JAD).
1. 20the
Give Give the list of 6 Ps. Understand BTL2
PART-B(13 MARK )
1
1. Demate (i) Demonstrate in detail about functional requirements.(7) Apply BTL3
PART-A (2 MARK)
1 Name some project efforts. Remember BTL1
4 Compare and contrast use case point and function point. Understand BTL2
5 Define Risk. Remember BTL1
PART-A(2 MARK)
1 What is debugging? Identify their properties. Remember BTL1
2 Show the benefits of acceptance testing. Apply BTL3
3 List some defects and define it. Remember BTL1
19 Can you make the comparison for entry criteria in design phase and BTL5
testing phase in ETVX? Evalulate
20 Develop design phase for Entry Task Validation Exit. Create BTL6
PART-B(13 MARK )
1 (i) Describe the design and architecture for process(7).
Remember BTL1
(ii) List and discuss process elements.(6)
2 (i)Analysis about process modeling.(7)
Analyse BTL4
(ii) Explain the relationship between elements and process
modeling.(6)
3 (i)Narrate and formulate about process definition techniques. (7) Create BTL6
(ii)Develop and explain process definition.(6)
4 (i)Describe about architecture and process component ETVX. (7) Understand BTL2
(ii)Describe about specification and approaches in ETVX.(6)
5 (i)Evaluate about process baselining.(7) Evaluate BTL5
(ii)Explain in detail about bench marking .(6)
6 (i)Describe briefly on features of six sigma.(6) Remember BTL1
(ii)List and explain about the key elements of six sigma.(7)
7 (i)Summarize on CMM.(7) Understand BTL2
(ii)Describe briefly the features of CMMI model.(6)
8 (i)Demonstrate on process assessment.(7) Apply BTL3
(ii)Classify the process improvement.(6)
9 (i)Describe the procedure involved in ETVX model.(6)
Remember BTL1
(ii)Illustrate ETVX with an example.(7)
10 (i)Illustrate on process baselining.(5) Apply BTL3
(ii)Illustrate on
(a)CMM.(3)
(b)Boots trap.(3)
(c)SPICE.(2)
11 (i)Listout the goals of process model.(7) Remember BTL1
(ii)Describe briefly on software process models-spiral and RAD.(6)
12 (i)Discuss the two key methodologies in Six sigma.(7) Understand BTL2
(ii)Explain six sigma with an example.(6)
13 (i)Explain in detail about CMMI framework model.(7) Analyse BTL4
(ii)Pointout the maturity levels of CMMI model.(6)
14 (i)Compare and contrast process assessment and improvement.(13) Analyse BTL4
PART-C(15 MARK)
1 Illustrate and explain a process architecture that can be used to Evaluate BTL5
develop an organizational process for measurement based on
ETVX.
2 Develop a document to provide a method for defining the Create BTL6
activities of any Process Architecture. The method described
in this document should be ETVX .
3 Analyse how customer satisfaction is achieved through process Analyse BTL4
improvement in six sigma.
4 Prepare a document for CMMI with an example. Create BTL6