67% found this document useful (9 votes)
8K views

Condensate Drain Calculation - Lab AHU

This document provides information for estimating the condensate drain amount, line size, and trap for the HVAC system of a laboratory at the Golar Hilli FLNG Project location. It details the specifications of the constant air volume air handling unit, including fan pressure and air flow rates. It then calculates the expected condensate drain amount of 41.6 kg/hr based on the dehumidifying capacity and manufacturer specifications. The document specifies a 25mm diameter condensate drain pipe with a required trap height of 105mm to accommodate the estimated 0.15m/s flow velocity of the condensate water.

Uploaded by

kokocdf
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
67% found this document useful (9 votes)
8K views

Condensate Drain Calculation - Lab AHU

This document provides information for estimating the condensate drain amount, line size, and trap for the HVAC system of a laboratory at the Golar Hilli FLNG Project location. It details the specifications of the constant air volume air handling unit, including fan pressure and air flow rates. It then calculates the expected condensate drain amount of 41.6 kg/hr based on the dehumidifying capacity and manufacturer specifications. The document specifies a 25mm diameter condensate drain pipe with a required trap height of 105mm to accommodate the estimated 0.15m/s flow velocity of the condensate water.

Uploaded by

kokocdf
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Project : Golar Hilli FLNG Project

Location : HVAC System for Laboratory


Title : Condensate Drain Amount, Line Size & Trap Estimation
Date : 24 / 07 / 2017
Condensate Drain Amount, Line Size & Trap Estimation

1. Type of AHU : Constant Air Volume with Draw Through Type


Blower Fan
2. Fan Total Pressure : 1,460 Pa 5.84 in - W.C
3. External Static Pressure : 450 Pa 1.80 in - W.C
4. Fan Inlet Pressure : 750 Pa 3.00 in - W.C
5. Fan Outlet Pressure : 520 Pa 2.08 in - W.C

Cooling Coil
6. Volumetric Air Flow through Coil : 1,440 m3 / hr
7. Air Velocity through Coil : 1.00 m/s < 2.0 m/s ( w/o Mist Eliminator )
o
8. Inlet Air Properties : 40.00 C 33.43 g / ( kg-dry air )
o
9. Outlet Air Properties : 14.00 C 9.67 g / ( kg-dry air )
10. Condensate Drain Amount : 41.60 kg / hr ( Dehumidifying Capacity )
11. Condensate Drain Amount : 42.00 kg / hr ( From Coil Manufacturer )
3
12. Density of Water : 1,000 kg / m

Fig. 1 - Trap for Draw Through Unit Fig. 2 - Trap for Blow Through Unit
( During Fan Off Cycle ) ( During Fan Off Cycle )

Condensate Drain Line & Trap 1 ( Draw Through Arrangement ) ( Fig. 1 )


13. Velocity of Condensate Water : 0.15 m/s
14. Diameter of Condensate Pipe : 25 mm
15. Required Height ( H ) : 105.00 mm = 4.00 in

16. Drain Pipe & Trap Material : TBA


17. Insulation Material : Armaflex
18. Jaketting Material : TBA