CLIENT : DESIGN BY :
JOB NO. : DATE : REVIEW BY :
Wind Analysis for Open Structure (Solar Panels) Based on ASCE 7-2010
INPUT DATA
Exposure category (B, C or D) = C
Importance factor, 1.0 only, (Table 1.5-2) Iw = 1.00
Basic wind speed (ASCE 7-10 26.5.1) V = 136 mph
Topographic factor (26.8 & Table 26.8-1) Kzt = 1 Flat
Height of mean roof h = 10.5 ft
Roof slope 0 : 12
Roof length L = 16 ft
Roof horizontal projected width B = 11.33 ft
Effective area of component / cladding A = 10 ft2
DESIGN SUMMARY
1. Main Wind-Force Resisting System
Max horizontal force / base shear from roof = 0.00 kips
+ 0.00 kips (eave & columns increasing)
S 0.00 kips
ANALYSIS
Velocity pressure
qh = 0.00256 Kh Kzt Kd V2 = 34.21 psf
where: qh = velocity pressure at mean roof height, h. (Eq. 28.3-1 page 298 & Eq. 30.3-1 page 316)
Kh = velocity pressure exposure coefficient evaluated at height, h, (Tab. 28.3-1, pg 299) = 0.85
Kd = wind directionality factor. (Tab. 26.6-1, for building, page 250) = 0.85
h = height of mean roof = 10.50 ft
INPUT DATA
Exposure category (B, C or D) = C
Importance factor, pg 73, (0.87, 1.0 or 1.15) I = 1.00 Category II
Basic wind speed (3 sec. gust wind) V = 85 mph
Topographic factor (Sec.6.5.7.2, pg 26 & 45) Kzt = 1 Flat
Height of mean roof h = 10.5 ft
Roof slope 0 : 12
Roof length L = 16 ft
Roof horizontal projected width B = 11.33 ft
Effective area of component / cladding A = 10 ft2
DESIGN SUMMARY
1. Main Wind-Force Resisting System
Max horizontal force / base shear from roof = 0.00 kips
+ 0.00 kips (eave & columns increasing)
S 0.00 kips
ANALYSIS
Velocity pressure
qh = 0.00256 Kh Kzt Kd V2 I = 13.36 psf
where: qh = velocity pressure at mean roof height, h. (Eq. 6-15, page 27)
Kh = velocity pressure exposure coefficient evaluated at height, h, (Tab. 6-3, Case 1,pg 79) = 0.85
Kd = wind directionality factor. (Tab. 6-4, for building, page 80) = 0.85
h = height of mean roof = 10.50 ft
INPUT DATA
Exposure category (B, C or D) = C
Importance factor, pg 73, (0.87, 1.0 or 1.15) I = 1.00 Category II
Basic wind speed (3 sec. gust wind) V = 90 mph
Topographic factor (Sec.6.5.7.2, pg 30 & 47) Kzt = 1 Flat
Height of centroid of roof area h = 35 ft
Roof slope 1 : 12
Roof length L = 100 ft
Roof horizontal projected width B = 60 ft
DESIGN SUMMARY
Max horizontal force / base shear = 26.02 kips
Max vertical uplift / download force = 73.15 kips
Max bending moment at centroid of base = 910.64 ft-kips
ANALYSIS
Velocity pressure
qz = 0.00256 Kz Kzt Kd V2 I = 17.80 psf
where: qz = velocity pressure at mean roof height, h. (Eq. 6-15, page 31)
Kz = velocity pressure exposure coefficient evaluated at height, z, (Tab. 6-3, Case 1,pg 75) = 1.01
Kd = wind directionality factor. (Tab. 6-4, for building, page 76) = 0.85
z = height of centroid of roof area = 35.00 ft
INPUT DATA
Exposure type (B, C or D) = C
Importance factor, (CBC Tab.16-K) Iw = 1.00
Basic wind speed (fastest mile wind) V = 75 mph
Height of centroid of roof area h = 35 ft
Roof slope 1 : 12
Roof length L = 100 ft
Roof horizontal projected width B = 60 ft
DESIGN SUMMARY
Max horizontal force / base shear from roof = 39.14 kips
Max vertical download force = 0.00 kips
Max vertical uplift force = 78.56 kips
Max bending moment at centroid of base from roof = 1370.00 ft-kips
ANALYSIS
Design pressures for wind force acting normal to the roof
F = C e C q q s Iw A f = ( 0.00 psf ) Af = 0.00 kips, (inward)
= ( 13.09 psf ) Af = 78.83 kips, (outward)
where: F = design wind load on open structural roof. (Sec. 1620).
q = roof angle = 4.76 degree
h = max top height for Ce calculation = 37.49 ft
Ce = exposure and gust factor. (Tab. 16-G) = 1.29
Cq = pressure coefficient. (Tab. 16-H, Item 1) = 0.00 inward
= 0.70 outward
qs = wind stagnation pressure. (Tab. 16-F) = 14.50 psf
Af = roof actual area. = 6020.8 ft2