AWS D1.1 Visual Inspection Acceptance Criteria
Visual Inspection Acceptance Criteria
Uploaded by
briang-2
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download now
Download
Save AWS D1.1 Visual Inspection Acceptance Criteria For Later
Download
Save
Save AWS D1.1 Visual Inspection Acceptance Criteria For Later
88%
88% found this document useful, undefined
13%
, undefined
Embed
Share
Print
Report
88%
(8)
88% found this document useful (8 votes)
14K views
AWS D1.1 Visual Inspection Acceptance Criteria
Visual Inspection Acceptance Criteria
Uploaded by
briang-2
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download now
Download
Save AWS D1.1 Visual Inspection Acceptance Criteria For Later
Carousel Previous
Carousel Next
Download
Save
Save AWS D1.1 Visual Inspection Acceptance Criteria For Later
88%
88% found this document useful, undefined
13%
, undefined
Embed
Share
Print
Report
Download now
Download
You are on page 1
/ 1
Search
Fullscreen
CLAUSE 6. INSPECTION AWS D111D1-M2015 Table 6.1 Visual Inspection Acceptance Criteria (see 6.9) Discontinaity Category and Inspection Criteria, ‘Staically Loaded Nontubalar Connections (Cyelicaliy Loaded Nonubalar Connections iO Crack Prohibition Ay crack shal be unaccepable, regardless of size or location, x x (@) WelaBase Metal Fusion ‘Complete fusion shall exit between adjacent layers of weld metal and becweon weld metal sand base metal x x (8) Crater Cross Section ‘All raters sll be fillod to provide the specified wel size, excupt forthe ends of ‘normitne lle welds outside of their elective langth. @ Weld Profiles ‘Weld profiles shall be in conformance with 5.23. © Time of Inspection ‘Visual inspetion of welds in all sees may begin immediately after the completed welds have cooled to ambient temperate, Acceptance erteria for ASTM A514, ASIT. and ‘A709 Grade HPS 100W [HPS 6900 stels shall be based on visual inspection performed| not less than 48 hours after completion ofthe wel. (6) Undersized Welds ‘The size oil weld in any connuows weld ay be ls than the specified nominal sire (L) tht comection the fling smaens() L v specified nominal weld sie rm] allowabe decrease om Lin 3/16 (5) $116 (2) V4 (6) $9782 [2.5] 25/16 (8) $18 )3) Inall exes the undesizeporion ofthe weld hal ot exceed 102% cf the wader On web-to-ange wel on irs, underran shal be prohibited athe en oar cqpalo ce te wih of he ange. ] Underewe (A) For material les than 1 in [25 eum] thick, undercut shall not exceed 1/32 in [1 mn, ‘wit the following excepson: ndereat shall not exceed 1/16 in [2 em] for any accumu- lated length up to 2 in [50mm] in any 12 in 200 mm]. For material equal oor greater than im [25 mm] thick, undercut shall nat exceed 1/18 in [2 mm) for any length of weld {B In primary members, undorout shall bene more than 0.01 in [0.25 mm) deep when ‘the wel is transverse to tensile stress under any design loading condition. Undereut shall ‘be no more than 1/32 in [1 mal deep forall other cases. @ Porosigy (A) CIP groove welds in bu Jott wansverse tothe diesion of computed tens sress Shall ive no visible piping pros. For al ake raove welds ad for let wel the Sum of the vse piping porosity 121 ma or gestern diameter shall ot exceed [YS in (10 mm] in any linear ine f weld an shal ot excnd 3/4 in (20 malin any 12 in (300m length of wel 1) The frequency of piping porosity i ile welds shall not exceed one in each in [100 mm| of weld length and the maximum dizmeter shall not excoed 3/32 in [2.5 mm, Exception: for fillet welds connecting stiTeners co web, the sur of th diameters of piping porosity shall not exceed 38 in [10 mm] in ay lnoar inch of weld and shall not exceed 3/4 in [20 mm] in any 12 in [300 am length of weld (© GP groove weds in but joins transverse to the direction of computed tensile stress shall have no piping poeosty. Fr al other groove wold, the froquency of piping porosity Shall not exceed one in 4 in [100 mm] of leg and the maxcmar diameter sall not exceed 3/32 in 2.5 mm. ‘Not: Aa "lds epplienliy forthe connocion yp 8 shaded ara idan nar pb. 208
You might also like
Inspection Checklist
PDF
60% (10)
Inspection Checklist
2 pages
WPS, PQR & WPQ - Duplex 2205
PDF
33% (6)
WPS, PQR & WPQ - Duplex 2205
20 pages
Blank Sample WPS Form (GMAW & FCAW) Welding Procedure Specification (WPS)
PDF
100% (1)
Blank Sample WPS Form (GMAW & FCAW) Welding Procedure Specification (WPS)
1 page
AWS D1.1 - Acceptance Criteria For RT
PDF
80% (5)
AWS D1.1 - Acceptance Criteria For RT
11 pages
Aws Table 8.1 MT PT
PDF
No ratings yet
Aws Table 8.1 MT PT
1 page
AWS D1.1 Acceptance Standards
PDF
92% (13)
AWS D1.1 Acceptance Standards
2 pages
Welder Continuity Log
PDF
100% (1)
Welder Continuity Log
3 pages
ASME B31.3 Acceptance Criteria - Tab 341.3.2A
PDF
90% (21)
ASME B31.3 Acceptance Criteria - Tab 341.3.2A
2 pages
Tabla 8.1 para No Tubulares AWS D1.1 2020 PDF
PDF
100% (1)
Tabla 8.1 para No Tubulares AWS D1.1 2020 PDF
1 page
AWS D1.1-D1.1M-2015 (WeldingWorld) 250
PDF
100% (1)
AWS D1.1-D1.1M-2015 (WeldingWorld) 250
1 page
LPT Report
PDF
100% (2)
LPT Report
2 pages
Weld Inspection Report
PDF
100% (5)
Weld Inspection Report
5 pages
Guideline For Weld Reject Rate Reduction: Table of Contents
PDF
100% (1)
Guideline For Weld Reject Rate Reduction: Table of Contents
14 pages
PQR-3G SMAW Sample
PDF
0% (1)
PQR-3G SMAW Sample
16 pages
WPS-200-24 Shear Stud PDF
PDF
100% (1)
WPS-200-24 Shear Stud PDF
22 pages
Penetrant Test Procedure AWS D1.1
PDF
100% (4)
Penetrant Test Procedure AWS D1.1
13 pages
Table 6.1 AWS D1.1 D1.1M-2010
PDF
75% (8)
Table 6.1 AWS D1.1 D1.1M-2010
1 page
RT Report Format
PDF
No ratings yet
RT Report Format
1 page
Smaw Fillet Aws d1.1
PDF
100% (2)
Smaw Fillet Aws d1.1
1 page
WPS - 024
PDF
No ratings yet
WPS - 024
4 pages
Electrode Baking Procedure
PDF
90% (10)
Electrode Baking Procedure
3 pages
Welding Defect - MACRO PDF
PDF
No ratings yet
Welding Defect - MACRO PDF
5 pages
Welder Qualification Template
PDF
No ratings yet
Welder Qualification Template
1 page
Acceptance Level TWI Sample
PDF
100% (1)
Acceptance Level TWI Sample
1 page
AWS D1.1 Guides
PDF
100% (7)
AWS D1.1 Guides
6 pages
ASME P Material Numbers
PDF
100% (2)
ASME P Material Numbers
1 page
2 Marginal Analysis
PDF
No ratings yet
2 Marginal Analysis
25 pages
P5 Course Slides
PDF
100% (1)
P5 Course Slides
200 pages
Tolerance As Per AWS D1.1
PDF
No ratings yet
Tolerance As Per AWS D1.1
3 pages
Weld Inspection Report - Sample
PDF
No ratings yet
Weld Inspection Report - Sample
6 pages
Val Caraig WPQT
PDF
No ratings yet
Val Caraig WPQT
1 page
WPS Sample
PDF
100% (1)
WPS Sample
2 pages
Bs Tech: Electrodes Issue and Return Register
PDF
No ratings yet
Bs Tech: Electrodes Issue and Return Register
1 page
Pwps Asme Gtaw & Smaw
PDF
100% (2)
Pwps Asme Gtaw & Smaw
2 pages
Tolerances As Per Aws D1.1: Structural Welding Code
PDF
100% (3)
Tolerances As Per Aws D1.1: Structural Welding Code
34 pages
Welding Procedure Specification For GTAW
PDF
No ratings yet
Welding Procedure Specification For GTAW
9 pages
QW-352 QW-353 QW-354 (Note (2) ) QW-355 QW-356 QW-357 (Note (1) )
PDF
No ratings yet
QW-352 QW-353 QW-354 (Note (2) ) QW-355 QW-356 QW-357 (Note (1) )
1 page
Pqr-152 - Run Sheet
PDF
No ratings yet
Pqr-152 - Run Sheet
38 pages
Ultrasonic Inspection NDT Sample Test Report Format
PDF
0% (1)
Ultrasonic Inspection NDT Sample Test Report Format
3 pages
Visual Inspection Report
PDF
No ratings yet
Visual Inspection Report
2 pages
WPS Sample
PDF
No ratings yet
WPS Sample
6 pages
Acceptance Criteria-Asme Section 5
PDF
75% (4)
Acceptance Criteria-Asme Section 5
18 pages
Weld Log PDF
PDF
100% (2)
Weld Log PDF
1 page
PQR (GMAW) - Notes
PDF
No ratings yet
PQR (GMAW) - Notes
3 pages
Aws d1.1 Tubular Vs Non Tubular
PDF
100% (1)
Aws d1.1 Tubular Vs Non Tubular
1 page
PQR A106 HAL-1
PDF
No ratings yet
PQR A106 HAL-1
1 page
WQT
PDF
100% (1)
WQT
1 page
Quick Review On Essential Variables: AWS D1.1 (Structural Welding Code-Steel)
PDF
100% (2)
Quick Review On Essential Variables: AWS D1.1 (Structural Welding Code-Steel)
10 pages
Hardness Test Report Blank
PDF
No ratings yet
Hardness Test Report Blank
2 pages
Before, During and After Welding.
PDF
No ratings yet
Before, During and After Welding.
2 pages
Welder Qualification Radiography Acceptance Criteria
PDF
No ratings yet
Welder Qualification Radiography Acceptance Criteria
2 pages
Acceptance Criteria - ASME B31.3 2022
PDF
100% (1)
Acceptance Criteria - ASME B31.3 2022
7 pages
RT Acceptance Criteria For Welder Test According To ASME Sec IX (QW 191 1.2)
PDF
100% (1)
RT Acceptance Criteria For Welder Test According To ASME Sec IX (QW 191 1.2)
20 pages
Welder I.D Card
PDF
100% (1)
Welder I.D Card
2 pages
Bs Tech: Electrodes Baking and Holding Register
PDF
No ratings yet
Bs Tech: Electrodes Baking and Holding Register
1 page
RT - Accepted Standards For Plates
PDF
100% (1)
RT - Accepted Standards For Plates
3 pages
VISUAL Acceptance Criteria
PDF
No ratings yet
VISUAL Acceptance Criteria
1 page
Cuadro de Inspeccion Visual
PDF
No ratings yet
Cuadro de Inspeccion Visual
1 page
Visual Inspection Acceptance Criteria (See: Prohibition
PDF
0% (1)
Visual Inspection Acceptance Criteria (See: Prohibition
1 page
Visual Acceptance AWS D1.1 Structural
PDF
100% (1)
Visual Acceptance AWS D1.1 Structural
1 page
AWS D1 1-D1 1M-2015 Criterios de Inspeccion Visual
PDF
No ratings yet
AWS D1 1-D1 1M-2015 Criterios de Inspeccion Visual
1 page
Table 6 1 AWS D1 1 D1 1M 2010 PDF
PDF
No ratings yet
Table 6 1 AWS D1 1 D1 1M 2010 PDF
1 page
AWS D1.1 2015 Table 4.1 PDF
PDF
No ratings yet
AWS D1.1 2015 Table 4.1 PDF
1 page
Prequalified WPS Requirement ASTM D1.1
PDF
No ratings yet
Prequalified WPS Requirement ASTM D1.1
1 page
SA 387 Grade 91 Class 2
PDF
No ratings yet
SA 387 Grade 91 Class 2
4 pages
ENiCrFe 2
PDF
No ratings yet
ENiCrFe 2
1 page
American Welding Society 8669 NW 36 Street, #130 Miami, FL 33166-6672
PDF
No ratings yet
American Welding Society 8669 NW 36 Street, #130 Miami, FL 33166-6672
1 page
Certified Material Test Report: Melanie Speyrer
PDF
No ratings yet
Certified Material Test Report: Melanie Speyrer
1 page
Celebrity Endorsement in Advertising PDF
PDF
No ratings yet
Celebrity Endorsement in Advertising PDF
38 pages
Q2: What Conflicts or Barriers Internal To Barilla Does
PDF
No ratings yet
Q2: What Conflicts or Barriers Internal To Barilla Does
7 pages
Lean Six Sigma
PDF
No ratings yet
Lean Six Sigma
33 pages
Final Presentation
PDF
No ratings yet
Final Presentation
34 pages
Aman
PDF
No ratings yet
Aman
2 pages
Customization To Set Up BP & Customer Integration: 1. Activate Creation of Post Processing Orders
PDF
No ratings yet
Customization To Set Up BP & Customer Integration: 1. Activate Creation of Post Processing Orders
10 pages
Nisa Girls College, Sialkot Class:BBA-hons Mid-Term Exams Subject: Principles of Marketing Marks:50 Time: 1:45 Objective Part
PDF
No ratings yet
Nisa Girls College, Sialkot Class:BBA-hons Mid-Term Exams Subject: Principles of Marketing Marks:50 Time: 1:45 Objective Part
3 pages
Warehouse Manager (190002va) : Mission
PDF
No ratings yet
Warehouse Manager (190002va) : Mission
4 pages
The Strategy of International Business
PDF
No ratings yet
The Strategy of International Business
1 page
CV Farhani Wiem
PDF
No ratings yet
CV Farhani Wiem
1 page
Chapter 1 - Introduction to Operations and SCM
PDF
No ratings yet
Chapter 1 - Introduction to Operations and SCM
40 pages
SCM PPT Starbucks
PDF
No ratings yet
SCM PPT Starbucks
11 pages
Solder Nozzle Cleaning Data Sheet - English
PDF
No ratings yet
Solder Nozzle Cleaning Data Sheet - English
2 pages
MUDA
PDF
No ratings yet
MUDA
20 pages
New PDD 4
PDF
No ratings yet
New PDD 4
27 pages
Shapping Brand Value Over Its Lifecycle
PDF
No ratings yet
Shapping Brand Value Over Its Lifecycle
2 pages
Fb37 1rev0 Checkliste WPK Metallkonstruktionen Englisch
PDF
No ratings yet
Fb37 1rev0 Checkliste WPK Metallkonstruktionen Englisch
13 pages
Eom 3
PDF
No ratings yet
Eom 3
37 pages
Chapter 11
PDF
No ratings yet
Chapter 11
65 pages
Activity Unit 1
PDF
No ratings yet
Activity Unit 1
2 pages
Incoterms 2020: EXW FCA CPT CIP DAP DPU DDP FAS
PDF
100% (2)
Incoterms 2020: EXW FCA CPT CIP DAP DPU DDP FAS
1 page
Armamastic TDS
PDF
No ratings yet
Armamastic TDS
3 pages
New Business Models and Strategies For Internet Economy
PDF
No ratings yet
New Business Models and Strategies For Internet Economy
20 pages
Girish Awachat
PDF
No ratings yet
Girish Awachat
4 pages
Demand of Local and Organic Products: Kishor
PDF
No ratings yet
Demand of Local and Organic Products: Kishor
16 pages
Deliverables Tracker 11-Jul-19 O&M O2C Round 2 Final Updates
PDF
No ratings yet
Deliverables Tracker 11-Jul-19 O&M O2C Round 2 Final Updates
121 pages
Business Canvas Model KRBL - Ayush Srivastava
PDF
No ratings yet
Business Canvas Model KRBL - Ayush Srivastava
1 page
ISO9001 Audit Plan
PDF
100% (3)
ISO9001 Audit Plan
2 pages