67% found this document useful (3 votes)
2K views

Jha For Replacement of Lightning Arrestor

1. The document outlines the steps and hazards involved in maintenance work replacing a lightning arrestor at a training school. It identifies potential hazards at each step such as slips/trips, falling objects, adverse weather. 2. Controls are specified to mitigate each hazard, such as using harnesses and maintaining 3 points of contact when working at height. Proper use of tools and PPE like gloves and masks are also required. 3. Responsibilities are delegated for implementing controls and responding to incidents with first aid or medical evacuation. The site supervisor and CSR oversee work while the HSE officer ensures safety protocols are followed.

Uploaded by

martins73
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
67% found this document useful (3 votes)
2K views

Jha For Replacement of Lightning Arrestor

1. The document outlines the steps and hazards involved in maintenance work replacing a lightning arrestor at a training school. It identifies potential hazards at each step such as slips/trips, falling objects, adverse weather. 2. Controls are specified to mitigate each hazard, such as using harnesses and maintaining 3 points of contact when working at height. Proper use of tools and PPE like gloves and masks are also required. 3. Responsibilities are delegated for implementing controls and responding to incidents with first aid or medical evacuation. The site supervisor and CSR oversee work while the HSE officer ensures safety protocols are followed.

Uploaded by

martins73
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

WHITEHAVEN MULTINATIONAL SERVICES

JOB/ACTIVITY: EARTHING AND LIGHTNING PROTECTION SYSTEM MAINTENANCE DATE: 10/02/2017


TASK: REPLACEMENT/INSTALLATION OF LIGHNTNING ARRESTOR AT TRAINING SCHOOL Team Composition: Chuks Ekweburu(CSR), Angela Okpele(HSE Officer), Alex Usanga,
Louis Ogbuebunu(Supervisor), Ebere Anyawu (Nurse)
TASK STEPS HAZARD/HAZARD THREAT TOP EVENT CONSEQUENCES WHO OR INHERENT BARRIER/CONTROL RECOVERY ACTION/RESPONSIBLE
SOURCE WHAT MAY RISK PARTY
BE HARMED
1. Visual 1. Slips, trips and 1.1Slippery Fall Injury Personnel P2C C1.1.1 Be careful of your steps R1.1 First Aid Louis: C1.1.1-C1.1.2
inspection of falls. uneven grounds Loss of C1.1.2 Avoid slippery uneven RI.2 Medivac Angela: R1 & R2
work area balance grounds
and tools 2.Use of hand 2.1 Hazardous Body contact Cut Personnel P2C C2.1.1 Use of correct hand tools R1.1 First Aid Louis: C2.1.1-C2.2.1
tools hand tools with sharp Injury Asset A1C C2.2.1 Wear hand glove, R1.2 Angela: R1 & R2
2.2 sharp object/edges coverall and safety shoe. Medivac
object/edges

2. Climb 1. Height 1.1 working at Fall Injury Personnel P3C C1.1.1Proper use of harness. R1.1 First Aid Daniel: C1.1.1-C1.1.2
scaffold and height Fatality C1.1.2Maitain 3 point contact R1.2 Angela: R1 & R2
send on ladder. Medivac
materials 2. scaffold 2.1 Unsecure Buckling of Injury Personnel P3C C2.1.1 Ensure proper erection R1.1 First Aid Louis: C1.1.1-C1.1.2
and tools scaffold parts scaffold, Fall Fatality of scaffold. R1.2 Angela: R1 & R2
using marine Medivac
rope 3. Dropped 3.1 unsecure Falling Injury Personnel P3C C3.1.1 Secure tools properly R1.1 First Aid Daniel: C3.1.1
object tools/materials Object R1.2 Angela: R1 & R2
Medivac
3. Remove 1.use of hand 1.1 Improper use Strain Injury Personnel P2C C1.1.1 Use right tools for the R1.1 First Aid Daniel: C1.1.1 Chuks:
displaced tools of tools job R1.2 C1.2.1
lighting 1.2 C1.2.1Use competent personnel Medivac Angela: R1 & R2
arrestor Incompetence
2. Height 2.1 Working at Fall Injury Personnel P3C C2.1.1 Proper use of harness R1.1 First Aid Daniel: C2.1.1-C2.1.3
height Fatality C2.1.2 Maintain 3 point contact R1.2 Angela: R1 & R2
on the ladder. Medivac
C2.1.3 Use the guy wire
3. Weather 3.1 Adverse Exposure to Illness Personnel P2C C3.1.1 Do not work under rain R1.1 First Aid Louis:C3.1.1-C3.1.2
condition weather/heavy adverse Cold C3.1.2 Evacuate to safe place R1.2 Angela:R1 & R2
storms/lightning weather Medivac
condition
4. Fix the 1. cement 1.1Cement dust Inhalation of Breathing Personnel P2C C1.1.1 Use of dust mask R1.1 First Aid Daniel:C1.1.1 Louis:
galvanised dust particles difficulty C1.1.2 Use SHOC card R1.2 C1.1.2
pipe on top Medivac ANGELA: R1 & R2
of the roof 2.Use of hand 2.1 Improper use Strain Injury Personnel P2C C2.1.1 Use right tools for the R1.1 First Aid Daniel: C2.1.1 Chuks:
tools of tools job R1.2 C2.2.1
and use
2.2 C2.2.1Use competent personnel Medivac Angela: R1 & R2
mortar to Incompetence
hold it to 3. Height 3.1 Working at Fall Injury Personnel P3C C3.1.1 Proper use of harness R1.1 First Aid Daniel: C3.1.1-C3.1.3
position height Fatality C3.1.2 Maintain 3 point contact R1.2 Angela: R1 & R2
on the ladder. Medivac
C3.1.3 Use the guy wire
5.Fix the air 1.use of hand 1.1 Improper use Strain Injury Personnel P2C C1.1.1 Use right tools for the R1.1 First Aid Daniel: C1.1.1 Chuks:
------------------------------------- -----------------------------------
Louis Ogbuebunu Chuks Ekweburu
(Site Supervisor) (CSR)

You might also like