Open navigation menu
Close suggestions
Search
Search
en
Change Language
Upload
Sign in
Sign in
Download free for days
0 ratings
0% found this document useful (0 votes)
158 views
Shop Inspection and Test Procedure For PS-3
Shop Inspection and Test Procedure
Uploaded by
hmid007
AI-enhanced title
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download now
Download
Save Shop Inspection and Test Procedure for PS-3 (1) For Later
Download
Save
Save Shop Inspection and Test Procedure for PS-3 (1) For Later
0%
0% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
0 ratings
0% found this document useful (0 votes)
158 views
Shop Inspection and Test Procedure For PS-3
Shop Inspection and Test Procedure
Uploaded by
hmid007
AI-enhanced title
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download now
Download
Save Shop Inspection and Test Procedure for PS-3 (1) For Later
Carousel Previous
Carousel Next
Save
Save Shop Inspection and Test Procedure for PS-3 (1) For Later
0%
0% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
Download now
Download
You are on page 1
/ 10
Search
Fullscreen
Kybota eB S MANUFACTURING NO, TA-T019 [WORK NO.] — a GOVERNMENT OF UZBEKISTAN CUSTOMER MINISTRY OF AGRICULTURE AND WATER RESOURCES. Ise THE RECONSTRUCTION OF IRRIGATION AND PROJECT DRAINAGE NETWORKS IN DJIZZAKH AND SYRDARYA REGIONS aoe SHOP INSPECTION AND TEST PROCEDURE TITLE EQUIPMENT 01A) PS-3 MAIN PUMP (DV-L 1200 x 1000) CW 3 sets 02A) PS-3 MAIN PUMP (DV-L 1200x1000) CCW 3 sets 0 BROW FBRS| Bt ER ie * fe mle BLK rev.no. | MARK | DATE NOTES OF REVISION Drawn _by| Checked by] Approved by jee th Fe ee y DISTRIBUTION Drawn _by 2G le = Ly Checked by |X. Ae foo a BB [Approved _by A. Hae Fl ff Dato of Issued $oia/2/22 Si re RAM A oc. No. [sheet No. usted OM RU FRM BEEEEE cp raroi9-0102 KUBOTA Corporation HIRAKATA PLANT 1/10 PUMP QA DEPARTMENTIX) hota —SHOP INSPECTION AND TEST PROCEDURE _ 4. Scope This inspection/test procedure shall define the method of shop inspection and test of pump for ‘THE RECONSTRUCTION OF IRRIGATION AND DRAINAGE NETWORKS IN DJIZZAKH AND SYRDARYA REGIONS 2. Applied standards Following standards form a part of this inspection procedure. i) _Japanese Industrial Standards (JIS). ii) KUBOTA Standards. iv) 3. Major Specification Type Capacity _m*/hr_| Total Head Speed_min PS-S MAIN PUMP] ov-. 1200 1000) 12,960 W977 375 PS-3 MAIN PUMP| 12,960 11.77 375 ov-L 1200% 1000) 4. Inspection and test items Manufacturer's Witnessed by [Subject Inspection Employer eer eresae IF [Material test 08 no — yes Hydrostatic test yes no yes Dynamic balance test_ es no es. [Visual inspection yes yes no [External dimension check os no es Performance test yes yes(1) INPSH test se jest) [Mechanical running test yes yes(t) [Painting inspection yes. __yes inspection for delivery yes ina) Review of measuring instrument lis no Note : *1 Pump Performance test will be carried out for all pumps with one representative job motor and the test report will be submitted . One representative pump will be subject to witness test reat No, 2/10 KUBOTA Corporation DOC.No,Ixy hota _SHOP INSPECTION AND TEST PROCEDURE 5. Test procedure and Criterion WORK NO 7A-7019 ITEM DESCRIPTION CRITERION. eT Material test ‘Testing method and judging criteria is in accordance with Standard: respective JIS standards or other standards. a) FOD450-10 JIG G 5502 1). Inspection by the test specimens method; b) Scs6 a) Casing (Lower half and Upper half) JIS G 5121 b) Impeller ©) scmago 2) Review of material certificate; JIS G 4053 ©) Shaft @) scs24 4) Casing ring, Impeller ring JIS G 5121 e) Sleeve ) SUS403 JIS G 4303 5. 2 Hydrostatic test [Using fluid: Normal temperature clean water No leakage from Holding time: 10 min lparts surfaces, Test pressure : 0.50 MPa lany joints and seals. Test parts: Casing (Lower half and Upper half) 5. 3 Dynamic balance test [After machining , Dynamic balance test is applied to the impeller with test shaft. Balance quality: G63 of JIS B 0905 (Equivalent 180) iB. 4 Visual inspection 1) Casing surfaces will be subjected to visual inspection. 2) It will be inspected whether the structures and the constructions are conformed to the drawings. No injurious defects lon casting surfaces. [Based on the approved drawings.the external dimension will be Ichecked to be within the tolerances. Measureing instruments; Tape measure , scale [Standard: Kubota Standard KUBOTA Corporation DOC.No. QCP-7A7019-01,02 Shoot No. 3/10Ith —suorinsercron ano test eroceoure. _NoRK No 7A-7019 5. Test procedure and Criterion DESCRIPTION. CRITERION, Test fluid; [Standard Normal temperature clean water. (Dencity:1000kg/m*) JIS B 8301 (2000) (Rotodynamic pumps Test method & apparatus; “Hydraulic perfor According to JIS B 8301 & 8302 “mance acceptance ltests-Grades!and2) Test driver; ‘One of working (actual) motors is used for performance test of all motors. jJIS B 8302 (2002) (Measurement, Measurement instruments; methods of pump a) Capacity: Weir or Electro~magnetic folw meter discharge) b) Head: Bourdon type pressure gauge or Pressure transducer c) Speed: Electric tacho-meter ) Input power into motor: Watt-meter, Ampere-meter, Voltage-meter or Transducer (Three phase type) Performance test is carried out by a Computer Aided Pump Testing and Evaluation System (CAPTES). (Capacity, Head, Speed, Input & etc. are automatically measured and the average value is calculated by computer), 5) Measurig point; Six(6) or more including followings a) Shut-off b) Around the rated capacity (12,960m°/h) ¢) Runout point (= intersection of measured head ) curve and minimum resistance curve. The results are converted to the rated speed.(375min ') (Minimum resistance curve is shown in fig .2) ® Total head ~ Capacity Capacity corresponding to the specified total head shall be equal to or larger than the specified capacity. ® Overall efficiency of pump and motor (Functional guarantee) Not to be less than the guarantee efficiency of pump and motor at rated capacity.(12,960m"/h) (npX 1m = 79.98%, equivalent to not more than 0.920 in kW/WHP value) kW(power absorbed) = 0.736 x @ x HX 10000/(75X mp x Tm) WHP(water horse power) = QXH/75 Grated capacity(L/s), H:Total head at rated capacity(m), T ppump efficiency(%), 7 m:motor efficiency(%) Ta6t No. KUBOTA Corporation DOC.No. 4/10It Jha QF suornsercnoy ano rest proceoure WORK NO 7A~7019 5. Test procedure and Criterion ITEM DESCRIPTION. CRITERION, 5.7 INPSH(req) test NPSH(req) test shall bo carried out at the flowrate of the 2 Points by throttling suction valve gradually. NPSH(req) is calculated at 3% drop in total head against ample suction condition. Table Criterion of NPSHra Rated capacity] xem oat goin — ‘a2a60n'/n)_|*Runout point NPSHreq) TJ 909< | asfolloning [CRITERION] Intersection of total head curve and minimum resistance curve NPSH(req) value at measuring point should be less than calculated NPSH (av) Ex. If the capacity of the runout point is 4.2m'/s, NPSH(av) at runout point is 8.94m and this value is criterion of NPSH(rq) (by using fig.2 & fig ‘The NPSH(rq) should be less than 8.94m 3) 5. 8 Mechanical running test 1) Bearing temperature rise check ‘The temperature is measured until it has been stabilized at the rated capacity operation. Measuring position : surface of bearing housing Instrument : thermistor of thermo-couple |Allowable limit: pump bearing 175°C or ambient temp. plus 40°C lwhichever is less. 2) Vibration check Vibration peak to peak amplitude shall be measured in x, y and z direction at the rated capacity condition only. The result shall be for reference, because the testing equipment shall be installed temporary. for reference 3) Noise check Noise level shall be measured at a distance of 1.0m from the machine at the rated capacity condition only. ‘The measurement value may be corrected to remove the influence of back ground noise. for reference Shop test target value 90 dB(A) 5.9 Painting inspection The following will be checked after final painting works. 1) Total film thickness of paint. 2) Final condition of painting surface. IThe result aro free lfrom abnormal condition. iS. 10 Inspection for deliver|The followings shall be checked during and after packing. 1) Visually check for all equipments. 2) Quantity check for main equipments and accessories eto. The results are confirmed according |to approved drawings, |specification. saa Review of measuring instrument list Review of measuring instrument list for performance test, Item: pump speed, capacity, discharge head, input power to motor (Voltage/Current/Watt) vibration, noise level, bearing temperature rise. KUBOTA Corporation DOC.No. QCP-7A7019-01 raat No, 5/10Hizb Fy stor insorction ano test proceoure WORK No 7A-7018 5. Test procedure and Criterion 1. Calculation of pump performance 1-1. Total head; Ht (m)=hd hs + hz + hy Where, hd Discharge Head (m) hs ‘Suction Head (m) hz :Gauge Height (m) hy Velocity Head (m) Vd" / 2g ~ Vs" / 2g g — :Acceleration of gravity (9.80 m/s") 1 -2. Water power : = 1-2, Water p Lav (kW) sox Tor PB GH Density (kg/m") Where, p Q — :Capacity (m*/min) H g Total head (m) ‘Acceleration of gravity (9.80 m/s") 1-8. Motor output ( = Shaft power):Lm (=Lt) (kW) = WX mm Where, W_—: Motor Input. Tm :Motor Efficiency 1-4, Pump efficiency : mp (%) =Lw/ Lt x 100 Where, Lw_ : Water Power Lt :Shaft Power KUBOTA Corporation DOC.No.Ki b 9 ka SHOP INSPECTION AND TEST PROCEDURE WORK No 7A-7019 5. Test procedure and Criterion 3. Calculation of NPSH (rq) Test Results 3-1, NPSH(rq) = Pa HhstZs)- Pv + hvs Where, Pa :Atomosperic Pressure (m) hs :Suction head (m) Zs :Gauge height (m) (See table.1) Py :Saturated vapor Pressure (m) (See table.2) hvs_: Velocity Head of Suction (m) Table.1 Gauge height Zs = above atmospheric + below atmospheric» * + (plus) (minus) WAM tepeliee zane eae ia ems Table.2 Saturated vapor pressure UNIT: ml ko 0 1 2 3 4 5 6 u 8 9 0 | 0062 | 0.067 | 0072 | 0.077 | 0.083 | 0089 | 0095 | 0.102 | 0.109 | 0.117 10 | 0.125 | 0134 | 0.143 | 0.153 | 0.163 | 0.174 | 0185 0224 T 20 | 0.238 | 0254 | 0.270 | 0286 | 0904 | 0323 | 0343 0.408 30 | 0432 | 0458 | 0485 | 0513 | 0542 | 0573 | 0608 ona 40 | 0.752 1 mmHg = 13.5951mm, 760 mmHg = 10.3323 m reat No. KUBOTA Corporation DOC.No. QCP-7A7019-01,02 1/10‘ung uot yang pauedy aren a co WA, Ny NI |a18h 1993009 OLS soyay aa}4 91 ,0ut0-0139913 eaeTE _— el eREO did YO4 SALWaYdd¥ 1S31 dOHS 40 3NI7LNO rag || ee Bee“ Le(sew) mois 009 00's oor ove 00% 000 a £-Sd 10} ening soueisisoy wnuNU wey oh (uu) PeoH Ie, %ov (S/ew) Moly vo cb bv 8 YE VE ce géy duind urew ¢-Sq 40} SIGEIEAPHSN PereinojeD 88 S88 68 G68 Z U coe = koe sé & 26 G76 6
You might also like
01 SK130HDL-8B TRG Text - Complete-1 PDF
PDF
100% (7)
01 SK130HDL-8B TRG Text - Complete-1 PDF
211 pages
Factory Acceptance Test (FAT)
PDF
100% (2)
Factory Acceptance Test (FAT)
9 pages
Komatsu (PPM D155ax-6 Testing HPV160)
PDF
100% (1)
Komatsu (PPM D155ax-6 Testing HPV160)
28 pages
PPM Rebuilt Unit Manual: Testing Method
PDF
100% (3)
PPM Rebuilt Unit Manual: Testing Method
35 pages
LPV63 Test 708-1U-00140 Steering Pump
PDF
100% (1)
LPV63 Test 708-1U-00140 Steering Pump
22 pages
Engineer'S Sticker Contractor'S Sticker: 22SWCG00061
PDF
No ratings yet
Engineer'S Sticker Contractor'S Sticker: 22SWCG00061
15 pages
Een00057-00 Wa380-6 LMF28 Test 50186
PDF
100% (1)
Een00057-00 Wa380-6 LMF28 Test 50186
15 pages
Centrifugal Pump Performance Test
PDF
No ratings yet
Centrifugal Pump Performance Test
7 pages
PC200-6 MAIN PUMP TEST (94999 Up) SEBH537361 - 10678
PDF
100% (7)
PC200-6 MAIN PUMP TEST (94999 Up) SEBH537361 - 10678
14 pages
Vendor Fabrica Tion Shop Site Construction: QA/QC Inspections: Inspection Test Plan
PDF
No ratings yet
Vendor Fabrica Tion Shop Site Construction: QA/QC Inspections: Inspection Test Plan
3 pages
Fan Motor D155ax-6 Lmf75 Test 50495
PDF
100% (1)
Fan Motor D155ax-6 Lmf75 Test 50495
12 pages
PPM Rebuild Unit Manual: Testing Method
PDF
100% (2)
PPM Rebuild Unit Manual: Testing Method
15 pages
pc200 7 Main Pump Test Method
PDF
100% (1)
pc200 7 Main Pump Test Method
26 pages
Pc200-8 Main Pump Test Method
PDF
93% (15)
Pc200-8 Main Pump Test Method
36 pages
BHM60 Testwriteup Barh
PDF
No ratings yet
BHM60 Testwriteup Barh
5 pages
Pump (P-400-101201 AB) - Copy
PDF
No ratings yet
Pump (P-400-101201 AB) - Copy
4 pages
EEN00008-00 HPV160+160 (190+190cc) PC450-7 Pump Test
PDF
100% (3)
EEN00008-00 HPV160+160 (190+190cc) PC450-7 Pump Test
27 pages
Data Sheet Template - Eil
PDF
No ratings yet
Data Sheet Template - Eil
2 pages
Pump Specification Data Sheet
PDF
100% (1)
Pump Specification Data Sheet
3 pages
Visual Flow Test Procedure
PDF
No ratings yet
Visual Flow Test Procedure
11 pages
Centrifugal Pump Performance Test Procedure: Step 1. The Flow Vs Head (Q/H) Test
PDF
100% (1)
Centrifugal Pump Performance Test Procedure: Step 1. The Flow Vs Head (Q/H) Test
8 pages
PC200,220 (LC) - 8 Motor Kmf125abe-5 Een00042-00 - 47678
PDF
100% (1)
PC200,220 (LC) - 8 Motor Kmf125abe-5 Een00042-00 - 47678
17 pages
Vertical Turbine Pump
PDF
No ratings yet
Vertical Turbine Pump
4 pages
Centrifugal Pump Performance Test Setup
PDF
No ratings yet
Centrifugal Pump Performance Test Setup
5 pages
Centrifugal Pump Performance Test Procedure
PDF
100% (2)
Centrifugal Pump Performance Test Procedure
7 pages
Shop Test Procedure For Turbine
PDF
No ratings yet
Shop Test Procedure For Turbine
9 pages
ANSI HI 2 6 2000 Vertical Pump Tests
PDF
No ratings yet
ANSI HI 2 6 2000 Vertical Pump Tests
50 pages
Centrifugal Pumps CL-100D
PDF
No ratings yet
Centrifugal Pumps CL-100D
2 pages
Section 7 Test and Inspection
PDF
No ratings yet
Section 7 Test and Inspection
12 pages
Mechrun Test Procedure
PDF
No ratings yet
Mechrun Test Procedure
5 pages
Inspection & Test Plan (For Reference)
PDF
No ratings yet
Inspection & Test Plan (For Reference)
11 pages
Appendix H. Factory Test Procedure: H1.0 Scope and Purpose
PDF
No ratings yet
Appendix H. Factory Test Procedure: H1.0 Scope and Purpose
14 pages
Eni - Iraq Zubair Oil Field Development Project
PDF
No ratings yet
Eni - Iraq Zubair Oil Field Development Project
4 pages
Torishima Pump Hand Book
PDF
100% (2)
Torishima Pump Hand Book
266 pages
Torishima Pump Hand Book
PDF
100% (4)
Torishima Pump Hand Book
266 pages
1-Check List CF Pump
PDF
No ratings yet
1-Check List CF Pump
2 pages
ANSI HI 1 6 2000 M104 HI 1-6 Pre
PDF
No ratings yet
ANSI HI 1 6 2000 M104 HI 1-6 Pre
9 pages
320 CV CU
PDF
No ratings yet
320 CV CU
11 pages
F555-01(2011) Standard Test Method for Motor Life Eval
PDF
No ratings yet
F555-01(2011) Standard Test Method for Motor Life Eval
5 pages
Group 3 Tests and Adjustments Group 3 Tests and Adjustments
PDF
No ratings yet
Group 3 Tests and Adjustments Group 3 Tests and Adjustments
15 pages
Hand Pump HPA-300118 Service Instruction
PDF
No ratings yet
Hand Pump HPA-300118 Service Instruction
4 pages
HL740 6-3
PDF
No ratings yet
HL740 6-3
16 pages
Pump Testing Presentation
PDF
No ratings yet
Pump Testing Presentation
26 pages
Centrifugal Pump Lab New UTT Script
PDF
No ratings yet
Centrifugal Pump Lab New UTT Script
6 pages
6-3.presiones de Trabajo.
PDF
No ratings yet
6-3.presiones de Trabajo.
16 pages
Energy Cost of Pump Motor
PDF
No ratings yet
Energy Cost of Pump Motor
16 pages
Centrifugal Pump Test Rig (With A.C Motor, 3 Speed With Step Cone Pulley)
PDF
No ratings yet
Centrifugal Pump Test Rig (With A.C Motor, 3 Speed With Step Cone Pulley)
9 pages
MH - 8 Test Report of Oil Purifier
PDF
No ratings yet
MH - 8 Test Report of Oil Purifier
12 pages
Typical Centrifugal Pump Datasheet
PDF
No ratings yet
Typical Centrifugal Pump Datasheet
7 pages
Drain Pump, Data Sheet and Performance Curve: Genral Arrangement of
PDF
100% (1)
Drain Pump, Data Sheet and Performance Curve: Genral Arrangement of
11 pages
Tuesb Inspection Checklist Form Wip A Doc 0008 Rev 0001
PDF
No ratings yet
Tuesb Inspection Checklist Form Wip A Doc 0008 Rev 0001
1 page
V-2158-103-A-851 - 4 ITP For Pump
PDF
100% (1)
V-2158-103-A-851 - 4 ITP For Pump
4 pages
Bangladesh University of Engineering and Technology: ME-422 Fluid Machinery Sessional
PDF
No ratings yet
Bangladesh University of Engineering and Technology: ME-422 Fluid Machinery Sessional
28 pages
Lab 4 Centrifugal Pump2021
PDF
No ratings yet
Lab 4 Centrifugal Pump2021
31 pages
Gatpu Experiment2
PDF
No ratings yet
Gatpu Experiment2
21 pages
Group 3: Group 3 Engine Speed & Stall RPM Engine Speed & Stall RPM
PDF
No ratings yet
Group 3: Group 3 Engine Speed & Stall RPM Engine Speed & Stall RPM
1 page
Pumps Basics
PDF
No ratings yet
Pumps Basics
3 pages
IEC 62271-200 - S - Presentation - 031023
PDF
No ratings yet
IEC 62271-200 - S - Presentation - 031023
19 pages
ResourcesFrictionLossData PDF
PDF
No ratings yet
ResourcesFrictionLossData PDF
4 pages
2MKAB Instrumentation Cables Catalogue
PDF
No ratings yet
2MKAB Instrumentation Cables Catalogue
46 pages
04 - Sewage Pumping Stations
PDF
No ratings yet
04 - Sewage Pumping Stations
14 pages
04 - Sewage Pumping Stations
PDF
No ratings yet
04 - Sewage Pumping Stations
14 pages