1. Objective
The objective of this document is to inform the Owner the organization plan and the
executive method of APAVE Vietnam and South East Asias project management. This is to
obtain/ satisfy the requirements of project and of customers.
2. Scope of application
This document is applied in APAVE Vietnam and South East Asias and the parties which
are related to the projects managed by APAVE Vietnam and South East Asia.
3. Reference
Quality Manual of APAVE Vietnam and South East Asia
The current edition of ISO 9001
Decree 12/2009/NCP issued on 12/02/2009 about the Construction Management
for Construction works and the current documents
Decree 209/2004/NCP issued on 16/12/2004 about the Quality Management for
Construction works
4. Content
If any page(s) of this document is found dirty, deficient, torn or unreadable, please inform to be re-supplied.
The contractors
Scale of construction project
Structure of construction project
Architecture of construction work
Technical systems
4.3.2 Requirements of the Owner
Quality of construction work
Completion time of construction work
Execution manners
Other requirements
4.3.3 Scope of work
Scope of project management is based on the memorial minutes which is established
between the Owner and APAVE Vietnam and South East Asia
Scope of work usually consists of:
Support the Owner in project execution, from the investment preparation to the
investment execution
Support the Owner in project execution in the investment completion
Technical design/ construction drawing design verification and estimate of
expenditure
Tender planning, tender organization, tender evaluation and tendering result
submission to the Owner
Negotiation organization, submission to the Owner
Management and operation of construction project, consisting of:
- Quality management
- Quantity management
- Schedule management
- Cost management
- Human resources management
- Risk management
- Communication management
- Procurement management
- Labor safety & Environmental hygiene management
Legality verification of the related works in construction phase.
Verification of acceptance documents, as-built quality/ quantity documents
Supporting the Owner in documents/ records establishment and storage
- Legal documents
If any page(s) of this document is found dirty, deficient, torn or unreadable, please inform to be re-supplied.
- Quality documents
- Material documents
- Labor safety documents
4.3.4 Appointment of Project Director and Project Manager
Project Director
Project Director shall be APAVE Deputy General Director, Branch Managers or
Division Managers depending on the project scale
Project Director shall bear the principle responsibility for executing the requirements
in the contract between APAVE Vietnam and South East Asia and the Owner in
project execution
Project Director shall bear responsibilities to the General Director of APAVE Vietnam
and South East Asia in consequences of management, of Project Management
Board operation and in ensuring the project quality to the contract requirements
Project Manager
Project Manager shall be appointed with rights and responsibilities in order to ensure
that he can bring into play the competence of Project Management Board to satisfy
the Owners requirements
4.3.5 Project management for construction works
Basing on the scope of work assigned by the Owner, the construction projects managed by
APAVE Vietnam and South East Asia are divided into the following phases:
4.3.5.1 Design phase
The Big Projects Management Board and APAVE branch offices near the sites shall support
in this phase. It consists of the following affairs :
Planning the organization of a designer selection and an evaluation board (if
needed). The invited designers must have appropriate design experiences.
Organizing a designer selection
Negotiating contract with the design consultant
Deploying preliminary design, technical design and construction drawing design
steps
Supervising and controlling the design process
Supporting the Owner in selecting design solutions
Verifying designs and estimating of expenditure
Reviewing verification results and amending
Submitting drawing designs to the Owner
Submitting cost estimate documents to the Owner
If any page(s) of this document is found dirty, deficient, torn or unreadable, please inform to be re-supplied.
References:
Procedure for verifying the structural design of civil and industrial construction works,
AVN-CTC-P01
Procedure for verifying the cost estimate document, APS-CTC-P03
Instruction for checking the calculation and design of foundation of construction
works, AVN-CTC-P01-I01
Instruction for checking the design calculation of reinforced concrete structure,, AVN-
CTC-P01-I02
4.3.5.2 Tender phase
The Big Projects Management Board and APAVE branch offices near the sites shall support
in this phase. It consists of the following affairs :
Planning the organization of a tendering, ensuring that attending contractors must
know and have much experiences in the same construction works.
Supporting the Owner in approving tender plans.
Supporting the Owner in organizing a Tender Evaluation Board, verifying
consultants tender evaluation results, selecting the winner.
Supporting the Owner in establishing Tender selection documents and notifying
tendering results
Supporting the Owner in negotiating contract with selected parties
Submitting contracts to the Owner for approval.
References:
Procedure for consultation of tender arrangement for erection & purchasing of material &
equipment, AVN-CTC-P03
4.3.5.3 Construction phase
If any page(s) of this document is found dirty, deficient, torn or unreadable, please inform to be re-supplied.
OWNER STATE
DEPARTMENTS
PROJECT MANAGEMENT
CONSULTANT
APAVE VN & SEA
QUALITY
DESIGN SUPERVISING CONSTRUCTOR CONSTRUCTION
CONSULTANT CONSULTANT CONTROL
If any page(s) of this document is found dirty, deficient, torn or unreadable, please inform to be re-supplied.
If any page(s) of this document is found dirty, deficient, torn or unreadable, please inform to be re-supplied.
B) Planning
Planning process for project mangement shall be prepared after the contract between
APAVE Vietnam & South East Asia and the Owner is signed.
Construction management plan shall be made prior to the construction phase and shall
be summited to the Owner for approval before use.
Construction management plan shall includes:
Intergrated mangement plan
- Definition, preparation, integration and cooperation small plans to monitor and
control overall project.
- Establishing procedures for project construction cooperation
- Establishing the plan to monitor and control the general situation of the project.
Reference: Procedure for executive cooperation, AVN-PIM-P01
If any page(s) of this document is found dirty, deficient, torn or unreadable, please inform to be re-supplied.
Establishing plans to collect wastes, garbages, keep the construction site dry and
clean.
Reference: Instruction for labor safety and environmental hygiene, AVN-PIM-I03
C) Executing
Control, coordinate the activities of project based on approved plan.
Apply the systems procedures to ensure the quality of project.
Make the periodical payment report and balance report to the Owner.
Attend with the Owner to explain the balance report.
Human resource management including the human appointment, ability
improvement and member interface ensures that the project is well done;.
Exchange and supply information in time to right object.
Guide the contractor to implement the labour safety and site sanitary mission.
D) Monitoring, supervising and controlling
The construction project monitoring, supervising and controlling processes ensure that
all the execution works are carried out as requirements, all risk problems are identified in
time so that the reparation action will be performed; and the regular monitoring and
measurement can identify all the changes compared with plan.
Project performance situation supervising and controlling:
- The informations about project performance situation shall be collected and
measured. To make the project performance reports, supply the information
about workload, progress, cost, manpower, quality and risk. All the evaluation of
works process and tendency will be performed to ameliorate the process
effectively.
- Project management parts will make the project performance report to Project
Manager.
- Monitor all the design changements (if any).
- Verify, reckon up all the complaint of Contractor and report to the Owner.
- If there is any variation, it should be coordinated with design consultancy,
contractor to make the actuality confirming record , reason of the variation and
report to the Owner.
- Monitor, reckon up and synthetize all the contract breachs of Contractor record
including the loss and report to the Owner.
Reference:
Procedure for supervision work of civil and industrial construction, AVN-CTC-P02
Unified technical procedure for construction inspection, APS-CTC-P02.
Instruction for supervising of civil engineering construction, AVN-CTC-P02-I12
Supervising and quantity management:
If any page(s) of this document is found dirty, deficient, torn or unreadable, please inform to be re-supplied.
- Supervise, reckon up and update the works quantity in defined period (monthly).
Works quantity shall be supervised by items: structure and infrastructure, M&E
and architecture.
- The verification and comparation compare between the actuality and as-built
drawing of each item is used to confirm the finishing quatity and is basis for the
payment to Contractor from the Owner.
- Base on the work structure in planning stage, to identify the variation of quantity
in project performance process.
- Indentify the reason of variations for the approval of the Owner.
- Confirm the variation quantities.
- Make the periodical report about finishing work to the Owner.
The schedule supervising and controlling:
- Supervise and evaluate the execution progress of Contractor and report to the
Owner for approval.
- Supervise, reckon up and update the actual work on site: starting time and
finishing time of each task. Verify and compare the actual progress with the
approved.
- Propose to the Owner, Contractor the specific and in time method to keep the
schedule.
- Modify the schedule if needed.
- Control all the changes of projects schedule.
- Identify the reason and period of time of the execution delay.
Cost Supervising and controlling:
- Reckon up all payment situation following time progress.
- Control the change of cost, unit cost.
- Consider the influence of the elements to the changes of project budget and
control these changes.
Project quality upervising and controlling:
- Monitor the quality of these items: structure, M&E, and architect.
- Indentify the way to eliminate the reasons which influence to quality.
Reference:
Instruction for checking the construction of reinforced concrete structure at site,
AVN-CTC-P02-I01
Instruction for steel structure construction checking, AVN-CTC-P02-I02
Instruction for external drainage construction checking, AVN-CTC-P02-I03
Instruction for bored pile and wall in trench construction checking, AVN-CTC-
P02-I04
Instruction for testing piles by P.I.T method, AVN-CTC-P02-I05
If any page(s) of this document is found dirty, deficient, torn or unreadable, please inform to be re-supplied.
o Materials records.
o Labour safety documents.
o Projects general logs.
o As-built drawings.
Hand over the documents to the Owner, these documents include both type:
hard copy (paper) and soft copy (on CD). In addition, documents should be
kept in accordance with APAVEs procedures.
b) Project closing
Finish all activities concerning to project.
Update all the operation procedures to make its more conformable and
perfect.
Finish the contract with the Owner.
5. Annex
Reference list of procedures and instructions
If any page(s) of this document is found dirty, deficient, torn or unreadable, please inform to be re-supplied.
If any page(s) of this document is found dirty, deficient, torn or unreadable, please inform to be re-supplied.