This document is a budget information form for construction programs. It includes a table to list total project costs, non-allowable costs, and total allowable costs across 16 line items. There is also a section to calculate the requested Federal assistance share based on eligible project costs and the Federal percentage share.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
231 views

SF424C 2 0-V2.0 PDF

This document is a budget information form for construction programs. It includes a table to list total project costs, non-allowable costs, and total allowable costs across 16 line items. There is also a section to calculate the requested Federal assistance share based on eligible project costs and the Federal percentage share.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

OMB Number: 4040-0008

Expiration Date: 01/31/2019

BUDGET INFORMATION - Construction Programs


NOTE: Certain Federal assistance programs require additional computations to arrive at the Federal share of project costs eligible for participation. If such is the case, you will be notified.
a. Total Cost b. Costs Not Allowable c. Total Allowable Costs
COST CLASSIFICATION (Columns a-b)
for Participation
1. Administrative and legal expenses $ $ $

2. Land, structures, rights-of-way, appraisals, etc. $ $ $

3. Relocation expenses and payments $ $ $

4. Architectural and engineering fees $ $ $

5. Other architectural and engineering fees $ $ $

6. Project inspection fees $ $ $

7. Site work $ $ $

8. Demolition and removal $ $ $

9. Construction $ $ $

10. Equipment $ $ $

11. Miscellaneous $ $ $

12. SUBTOTAL (sum of lines 1-11) $ $ $

13. Contingencies $ $ $

14. SUBTOTAL $ $ $

15. Project (program) income $ $ $

16. TOTAL PROJECT COSTS (subtract #15 from #14) $ $ $

FEDERAL FUNDING
17. Federal assistance requested, calculate as follows:
(Consult Federal agency for Federal percentage share.) Enter eligible costs from line 16c Multiply X % $
Enter the resulting Federal share.

You might also like