The document provides instructions for testing the operating speed of the boom cylinders, stick cylinder, and bucket cylinder of a 324D excavator. It describes the test procedures and provides specifications for the cylinder operating speeds.

Uploaded by

victor
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
54 views4 pages

Tiempo de Ciclos Excavadora

The document provides instructions for testing the operating speed of the boom cylinders, stick cylinder, and bucket cylinder of a 324D excavator. It describes the test procedures and provides specifications for the cylinder operating speeds.

Uploaded by

victor
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

324D L Excavator T2D00001-UP (MACHINE) POWERED BY C-7 Engine(SEBP45...

Page 1 of 4

Cerrar SIS

Pantalla anterior

Producto: EXCAVATOR
Modelo: 324D EXCAVATOR T2D00327
Configuracin: 324D L Excavator T2D00001-UP (MACHINE) POWERED BY C-7 Engine

Pruebas y Ajustes
324D Excavator Hydraulic System
Nmero de medio -RENR9905-08 Fecha de publicacin -01/05/2014 Fecha de actualizacin -08/05/2014

i02634055

Cylinder Speed - Check


SMCS - 5456-535-VF; 5458-535-VF

Note: The engine speed and/or the machine configuration that is used during this test can affect
the results of this test. Refer to Testing and Adjusting, "Engine Performance - Test (Engine
Speed)" for the engine speed that was used for this test. Refer to Testing and Adjusting,
"Operational Checks" for the machine configurations that were used for this test.

Note: The relief valve pressure settings must be set to the relief valve pressure specification before
performing this operational check. Refer to Testing and Adjusting, "Specifications".

1. Perform the following steps in order to test the operating speed of the boom cylinders.

Illustration 1 g00298498

(A) Extension test

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw... 7/08/2017
324D L Excavator T2D00001-UP (MACHINE) POWERED BY C-7 Engine(SEBP45... Page 2 of 4

(B) Retraction test

a. Place the machine on level ground.

b. The bucket should be empty.

c. Fully retract the bucket cylinder and the stick cylinder.

d. Position the bucket on the ground. With a stopwatch, measure the time that is required
to fully extend the boom cylinders.

e. Position the boom cylinders at full extension. With a stopwatch, measure the time that
is required for the bucket to come in contact with the ground.

f. Refer to the specifications in Table 2 for the operating speed of the boom cylinders.

2. Perform the following steps in order to test the operating speed of the stick cylinder.

Illustration 2 g00298558

(A) Extension test

(B) Retraction test

a. Place the machine on level ground.

b. The bucket should be empty.

c. Position the upper surface of the boom parallel to the ground.

d. Fully extend the bucket cylinder.

e. Retract the stick cylinder. With a stopwatch, measure the time that is required to fully
extend the stick cylinder.

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw... 7/08/2017
324D L Excavator T2D00001-UP (MACHINE) POWERED BY C-7 Engine(SEBP45... Page 3 of 4

f. Extend the stick cylinder. With a stopwatch, measure the time that is required to fully
retract the stick cylinder.

g. Refer to the specifications in Table 2 for the operating speed of the stick cylinder.

3. Perform the following steps in order to test the operating speed of the bucket cylinder.

Illustration 3 g00298598

(A) Extension test

(B) Retraction test

a. Place the machine on level ground.

b. The bucket should be empty.

c. Position the upper surface of the boom parallel to the ground.

d. Position the stick so that the stick is perpendicular to the ground.

e. Fully retract the bucket cylinder.

f. With a stopwatch, measure the time that is required to fully extend the bucket
cylinder.

g. Position the bucket cylinder at full extension. With a stopwatch, measure the time that
is required to fully retract the bucket cylinder.

h. Refer to the specifications in Table 2 for the operating speed of the bucket cylinder.

Table 1
Cylinder Operating Speed (seconds)

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw... 7/08/2017
324D L Excavator T2D00001-UP (MACHINE) POWERED BY C-7 Engine(SEBP45... Page 4 of 4

Item New Rebuild Service Limit


Extension 3.1 0.5 4.1 (1) 4.7 (1)
Boom
Retraction 2.4 0.5 3.2 (1) 3.6 (1)
Extension 3.1 0.5 4.1 (1) 4.7 (1)
Stick
Retraction 2.7 0.5 3.6 (1) 4.1 (1)
Extension 3.9 0.5 5.2 (1) 5.9 (1)
Bucket
Retraction 2.1 0.5 2.9 (1) 3.3 (1)
(1)
Maximum

Copyright 1993 - 2017 Caterpillar Inc. Mon Aug 7 08:42:42 EST 2017
Todos los derechos reservados.
Red privada para licenciados del SIS.

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw... 7/08/2017

You might also like