GOB DPP Format
GOB DPP Format
PART-A
Project Summary
Total
Econo Economic Economic Unit Quantity Total GOB Project Aid Own Others % of Total
mic Sub-Code Sub-code Cost* (FE) RPA DPA Fund (FE) Project Cost
Code wise Item Through Special Through Throug
Description GOB Account PD h DP
**
1 2 3 4 5 6 7 8 9 10 11 12 13 14
(a) Revenue:
13.0 After completion, whether the output of the project needs to be transferred to the
revenue budget
13.1 If yes, briefly narrate the institutional arrangement and technical & financial requirement
for operation and maintenance.
(To continue the benefits of the projects required yearly costs and personnel should be
mentioned)
13.2 If not briefly narrate the institutional arrangement and financial requirement for
operation and maintenance.
(To continue the benefits of the projects required yearly costs and personnel should be
mentioned)
Project Details
25.0 Whether environmental clearance under the ECA 1995 (revised 2010) has been obtained?
If yes, attach the certificate. if not mention the cause(s)
26.0 Specific Linkage with Perspective Plan/Five Years Plan/SDGs/Ministry/Sector Priority
(mention the pages with clauses of respective document/attach the relevant pages of
those document)
27.1 How does this project contribute in achieving the Vision, Mission of the Ministry/Division
and Implementing agency?
27.2 How does this project relate with the Allocation of Business of the Sponsoring
Ministry/Division.
28.0 Whether private sector/local government or NGO's participation is considered? If yes,
describe how will they be involved?
29.0 Mention the major conditionality (ies) for foreign aid.
30.0 Does the project involve compensation, rehabilitation/ resettlement? If so, indicate the
magnitude and cost
31.0 Risk Analysis and Mitigation measures (Identify risks during implementation & operation)
---------------------------------------------------------------
Signature of the Head of the Executing Agency
with seal and date.
------------------------------------------
Signature of the Secretary
of the sponsoring Ministry/Division with seal and date
Annexure - I
Location wise cost breakdown
1 2 3 4 5 6 7
Agency Total
Procuring Entity Name & Code GoB
Project / Programme Name & Code PA
Own Fund
Contract
Description of Procure Estd.
Approvi Source
Packag Procurement Quanti ment Cost
Unit ng of Indicative Dates
e No. Package as per ty Method (Taka in
Authorit Funds
DPP / TPP & (Type) lac)
y
Invitation for
Invitation Signing Comple
Prequalificatio
for of tion of
WORKS n (if
Tender Contract Contract
applicable)
1 2 3 4 5 6 7 8 9 10 11 12
Total Value of Works
Procurement
Economi Economi Economic Total Physical & Financial Target Year-1 Year- 2
c code c Sub Sub code
code descriptio Uni Unit Quantity Total Weig Financial Physical Financial Physical
n t cost cost ht amount % of % of amount % of % of
( in detail ) Item project Item proj
ect
1 2 3 4 5 6 7 8 9 10 11 12 13 14
(a) Revenue
(b) Capital
Annexure-V
Sub-total
(b) Capital
Sub total
Total (a) + (b)
Sub-total
(b) Capital
Sub total
Total (a) + (b)
Annex-VI
Amortization Schedule
Name of Project :
Total Investment :
Loan Portion :
Loan period :
Rate of Investment :
(Taka in lac)
Year Beginning Principal Yearly fixed Amount to be paid Yearly Interest to be paid Total Payment (Principal Ending Principal
Amount (Principal) + Interest) Balance
1 2 3 4 5=(3+4) 6=(2-3)
1
2
3
4
5
7
8
Total:
-
/ ()
( )
. :
. / :
. () :
. :
. () :
( /
. :
) :
) :
. ( )
:
. ():
(: )
. :
.
( )
( ) () ( )
(
)
. :
(
)
() () ()
. :
/
/
( )
. (-):
. - ( ):
*
- - =
(
(++)
) (
(items) )
(%)
() :
()
() :
()
()
()
( + + + )
(Log Frame):
(NS)*
(OVI)**
(MOV)***
(IA)****
(Goal)
(Purpose/Outcome)
(Output)
(Input)
.
:
(- II)
(Implementation Arrangement)
.
(- III (), III (), & III ())
. (Target Plan)
( - IV) :
.
:
. ,
( )
. ,
( )
( )
*NS - Narrative Summary
**OVI - Objectively Verifiable Indicators
***MOV - Means of Verification
****IA - Important Assumptions
-
. :
. :
. / :
.
. :
. (Objectivees)
. (Outcome)
. (Output)
.
. (
)
. (Population Coverage)
. -/ /- ?
( ):
.
( )
. (NPV):
(i)
(ii)
. (BCR):
(i)
(ii)
. (IRR) :
(i)
(ii)
. /:
.
.
. :
. :
. (- ):
. / ():
.
(- ):
. / / :
. /
. - , , , -, (
EIA )
. / - ?
. (Rehabilitation/Resettlement) ?
. :
[ ( ) ]
. :
:
.
. (PSC)
. (PIC)
. ( )
---------------------
( )
-----------------------------------------------
/
( )
( )
/
/ /
() ( )
-
1) :
2) :
3) :
- /
(/ /
/
)
- ()
:,
/ ( )
/
( )
(
}
)
- III ()
:,
/ ( )
/
(
)
( )
-III()
:,
/
/ ( )
/
/
( )
(
)
:
//
- -
- - (-- ) (-- )
() (Weight
)
( ) (
)
()
- ()
()
- ()
()
()
( + + +)
= ----------------------------
/
= --------------------------------------------------------- x
/
- -
- - (---- ) (---- )
() ( (
) ( ) (
) )
()
- ()
()
- ()
() + ()
()
()
( + + +)
-
(Beginning Principal Amount) (Interest) (+)
(Principal)
=(+)