Dissertation Gantt Chart

The document outlines a research project timeline spanning June to April. It is divided into two sections - the first focuses on lab experiments involving assembling a device using electrodes and substrates, measuring velocity and forces, developing circuitry, and testing. The second section involves developing research questions, conducting a literature review, designing research, interviewing subjects, analyzing data, and writing the final report. Key deliverables are submitting for feedback and final submission after binding.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
58 views

Dissertation Gantt Chart

The document outlines a research project timeline spanning June to April. It is divided into two sections - the first focuses on lab experiments involving assembling a device using electrodes and substrates, measuring velocity and forces, developing circuitry, and testing. The second section involves developing research questions, conducting a literature review, designing research, interviewing subjects, analyzing data, and writing the final report. Key deliverables are submitting for feedback and final submission after binding.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

Task Name Duration Jun July August Sep

Week Number 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
Read Literature & Notes
Starting Lab Experiment
Assemble the device using two electrodes, ITO
& a-Si on a glass substrate
velocity measurement and estimation of the
forces by OET
Development the methodology of previous
project
Form complex circuit using OET experiment
Placing the Surface Mount Technology
Depositing the positive and negative electrodes
using Lithography process
Testing and measuring the device
Printing the Circiut in 3D
Writing Final Report
Submit to tutor and await feedback
Act on feedback
Print & Bind
Submit
Activity Oct Nov Dec Jan Feb March April
Week Number 1 1 1 1 1 ### 1 ###

Holiday
Read Literature
Develop Research Questions
Draft Literature Review
Develop Research Design

Draft Interviews
Trial & Revise Interviews
Conduct Interviews

Transcribe and Analyse Data


Draft findings
Complete remaining Chapters

Submit to tutor and await feedback


Act on feedback
Print & Bind
Submit
April
3