C (No of Corn Bushels) Profit (30W + 50C) - (6W/5 + 10C/4) 10

The document outlines a linear programming problem to maximize profit from deciding how many bushels of wheat (W) and corn (C) to grow given constraints on available acres and labor hours. It lists the decision variables, objective function to maximize total profit, and constraints on available resources and maximum sales. The optimal solution is presented that allocates land and labor to grow 125 bushels of wheat and 80 bushels of corn for a maximum profit of $4,250.

Uploaded by

Utkarsh Sinha
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
57 views

C (No of Corn Bushels) Profit (30W + 50C) - (6W/5 + 10C/4) 10

The document outlines a linear programming problem to maximize profit from deciding how many bushels of wheat (W) and corn (C) to grow given constraints on available acres and labor hours. It lists the decision variables, objective function to maximize total profit, and constraints on available resources and maximum sales. The optimal solution is presented that allocates land and labor to grow 125 bushels of wheat and 80 bushels of corn for a maximum profit of $4,250.

Uploaded by

Utkarsh Sinha
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 5

Decision variables W (no of wheat bushels)

C (no of corn bushels)

Profit (30W + 50C) - (6W/5 + 10C/4)*10


18W + 25C Objective function

Constraints
Acres available W/5 + C/4 <= 45
Labor hours avail 6W/5 + 10C/4 <= 350
Sale cap W W <= 140
Sale cap C C <= 120
Minimun W W >= 0
Minimum C C >= 0
Microsoft Excel 16.0 Sensitivity Report
Worksheet: [Answer_1.xlsx]Part 2
Report Created: 4/29/2017 7:02:59 PM

Variable Cells
Final Reduced Objective Allowable Allowable
Cell Name Value Cost Coefficient Increase Decrease
$B$3 W 125 0 18 2 6
$C$3 C 80 0 25 12.5 2.5

Constraints
Final Shadow Constraint Allowable Allowable
Cell Name Value Price R.H. Side Increase Decrease
$D$10 Minimum W 125 0 0 125 1E+030
$D$11 Minimum C 80 0 0 80 1E+030
$D$6 Acre 45 75 45 1.2 6.666666667
$D$7 labor hours 350 2.5 350 40 12
$D$8 Selling cap W 125 0 140 1E+030 15
$D$9 Selling cap C 80 0 120 1E+030 40
W C
125 80
Profit 18 25 4250
S.t.
Acre 0.2 0.25 45 <= 45
labor hours 1.2 2.5 350 <= 350
Selling cap W 1 0 125 <= 140
Selling cap C 0 1 80 <= 120
Minimum W 1 0 125 >= 0
Minimum C 0 1 80 >= 0

Land allocated 25 20
Labor purchase 150 200
Maximum profit 4250
Labor cost 1500 2000
Probability
0.1 0.2 0.4 0.6 0.8 1

S.t.
Students 900
no of panels #DIV/0! >= 15
Students 0 <= 60

Cost #DIV/0!
power output no of panels required

cost (no of panels + no of panels * prob)*10000