SK Project
SK Project
PREM COMPUTER
SUBMITTED TO THE
Submitted by
Shrikant mishra
Anuj dahayat
This is to certify that the Live Project Synopsis Report on perm computer
which is being submitted by Shrikant Mishra (B1692R14300035) and Anuj
(B1692R14300025) for the award of degree of Master of Computer Application
of AKS University, Satna (M.P) has been approved under our supervision
and it has not been submitted elsewhere for any other degree.
the computer shop management system has been developed to override the
problems prevailing in the practicing manual system. This software is supported to
eliminate and in some cases reduce the hardships faced by this existing system.
Moreover this system is designed for the particular need of the company to carry
out
Operations in a smooth and effective manner.
The application is reduced as much as possible to avoid errors while entering the
data.
It also provides error message while entering invalid data. No formal knowledge is
needed for the user to use this system. Thus by this all it proves it is user friendly.
Computer shop management system, as describe above, can reed to error free ,
secure ,reliable and fast
Management system. It can assist the user to concentrate on their other activity
rather to concentrate on the record keeping. Thus it will help organization in better
utilization of resources.
Every organization, wether big or small, has challenge to overcome and managing
the information of customer, computer,dept,seller,company. Every computer shop
management system has different computer needs. Therefore we designed
exciusive employee management systems that are adapted to your managerial
requirements. This is designed to assist in strategic planning and well help you
ensure that your organization is equipped with the right level of information and
details for your future goals. Also, for those busy executive who are always on the
go, our systems come with remote access features, which will allow you to manage
your workforce anytime, at all times. These system will ultimately allow to your
better manage resources.
Abstract of the project computer shop management system:
it may help collecting perfect management in details. in a very short time , the
collection will be obvious, simple and sensible. it will help a person to know the
management of passed year perfectly and vivdly. it also help in current all works
relative to computer shop management system. it will be also reduced the cost of
collecting the management and collection procedure will go on smoothly
our project aims at business process automation , i.e. we have tried to
computerize various processes of computer shop management system .
in computer system the person has to fill the various forms and numbers of
copies of the forms can be easily generated at a time.
in computer system , it is not necessary to create the mainfest but we can
directly print it, which saves our time.
the system generates types of information that can be used for various
purposes.
it satisfy the user requirement
be easy to understand by the user and operator
be easy to operate
have a good user interface
be expandable
delivered on schedule with in the budget.
reports of computer shop management system:
it generates the report on computer , customer, seller
provide filter reports on employee , department, company
you can easily export pdf for the computer , seller, department
application also provides excel export for customer, employee, seller
you can also export the report into csv format for computer,
customer, company
in this phase, a logical system is built which fulfils the given requirement . design
phase of software developments deals with transforming the clients requirements
in to a logically working system. normally design is performed in the following in
the following two steps:
1. primary design phase:
in this phases, the system is designed at block level. the blocks are created on the
basic of analysis done in the problem identification phase. different blocks are
created for different function emphasis is put on minimising the information flow
between blocks .
2. secondary design phases:
our project is only a humble venture to satisfy the needs to manage their project
work. several user friendly coding have also adopted. this package shall prove to
be a powerful l package in satisfying all the requirements of the college .the
objective of software planning is to provides a frame work that enables the
manger to make reasonble estimates made within a limited time frame at
the beginning of the software project and should be updated regularly as
the project progresses.
references and bibliography:
Google for problem solving